ML20084F911
| ML20084F911 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/30/1974 |
| From: | Amish K ROCHESTER GAS & ELECTRIC CORP. |
| To: | Goller K US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084F681 | List: |
| References | |
| NUDOCS 8304210316 | |
| Download: ML20084F911 (1) | |
Text
-
O Q
p l
l j'(y j,i l t
l ROCHESTER, GAS AND ELECTRIC CORPORATION e 69 EAST AVENUE. ROCHESTER, N.Y.14649 l
sr E 4 T r4 V.
A ad : bH Y t Lt 'as oas t
- 7 "2;M J.P.."" l.'T July 30, -1974 Mr. Karl Goller Assistant Director for Operating Reactors Directorate of Licensing U. S. Atomic Energy Commission Washington, D.C. 20545
Subject:
Inspection of Hydraulic Shock Ai sorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973 concerning periodic inspection of hydraulic shock absorbers (snubbers), an inspection of all snubbers, both inside and outside of containment, was conducted en Jul/19 an:119,1974 b; ctation maintenance ;: rconnel.
All snubbers were considered operable at this inspection. A small quantity of fluid was added to two of the Bergen-Paterson snubber accumulators out-side the containment. Fluid additions had not been made to these particular units since the end of the refueling shutdown. There was no indication of any leakage in the area. The units are among those that do not have ethylene-propolene seals and will be inspected on a monthly basis until their seals have been replaced.
Very tru y yours,
/ /[