MONTHYEARML15196A0292015-07-0606 July 2015 Termination of Quality Assurance Program Approval for Radioactive Material Packages No. 0348 ML15112A0832015-04-14014 April 2015 Amendment No. 12 to Indemnity Agreement No. E-24 University of Michigan Ford Nuclear Reactor ML14310A5882015-04-0202 April 2015 Ford License Termination Letter - Termination of Facility Operating License No. R-28 for the University of Michigan Ford Nuclear Reactor ML15030A3112015-01-22022 January 2015 Analytical Results for University of Michigan Soil ML15020A7252015-01-16016 January 2015 University of Michigan, Ford Nuclear Reactor, Storage Ports Soil Sample Results ML15029A5102015-01-14014 January 2015 University of Michigan, Ford Nuclear Reactor, Report on Reactor. Operations ML14099A1072014-03-28028 March 2014 Report on Reactor Operations University of Michigan Ford Nuclear Reactor ML14063A2072014-02-26026 February 2014 University of Michigan, Request for Termination of the Ford Nuclear Reactor ML13360A1802013-12-23023 December 2013 University of Michigan Ford Reactor Master Inspection Plan IR 05000002/20120022013-10-0404 October 2013 IR 05000002-12-002(DNMS), on 09/11/2013, University of Michigan Ford Reactor Inspection Report ML13235A0092013-08-19019 August 2013 University of Michigan, Ford Nuclear Reactor, Submittal of Final Status Survey - Background Count Rate Correction ML13205A1532013-07-11011 July 2013 University of Michigan - Ford Nuclear Reactor: Final Status Survey Report (Cover Letter) ML13051A0472013-02-14014 February 2013 University of Michigan - Ford Nuclear Reactor, Reportable Occurrence #24, Reactor Building Flood - Ruptured Fire Suppression Line, Technical Specification (Section 1.0 / Item 8) ML13029A5002013-01-24024 January 2013 University of Michigan, Submittal of 2012 Report on Reactor Operations ML12356A1352012-12-18018 December 2012 MIP- University of Michigan Ford Reactor Master Inspection Plan CY2013 ML13028A1012012-12-11011 December 2012 University of Michigan, Technical Specification Amendment Request Final Status Survey - Survey Design Package for Fnr Foundation Cavity ML12312A1302012-11-0202 November 2012 Ford Nuclear Reactor, Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.5.10.6 (Final Status Survey) ML12293A3022012-10-25025 October 2012 T. Alexander Ltr. Approval of Partial Final Site Survey Plan for University of Michigan Ford Nuclear Reactor IR 05000000/20120012012-10-10010 October 2012 IR 0500000-12-001, 9/11/2012, University of Michigan - Ford Nuclear Reactor ML12264A0642012-09-18018 September 2012 University of Michigan - Ford Nuclear Reactor Final Disposition of Fnr Storage Ports ML12264A5622012-09-17017 September 2012 University of Michigan - Ford Nuclear Reactor, Quality Assurance Plan for Final Status Survey Plan ML12199A0182012-07-13013 July 2012 University of Michigan, Request an Amendment to the Ford Nuclear Reactor Technical Specification Decommissioning Plan - Revised Section 4.0 (Final Status Survey ML12157A2662012-06-0101 June 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML12117A1182012-04-20020 April 2012 Occupational Safety & Environmental Health ML12124A3102012-04-20020 April 2012 University of Michigan, Report on Reactor Operations for January 1 to December 31, 2011 ML12095A3782012-02-14014 February 2012 University of Michigan Ltr Ford Nuclear Reactor- Decommissioning Plan- Additional Information for Section 4.0 (Final Status Survey Plan) Docket 50-2/ License R-28 ML12025A1252012-01-20020 January 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML1132606162011-11-21021 November 2011 IR 05000002-11-001; 08/09/2011, University of Michigan, Reply to a NRC Inspection Report Notice of Violation IR 05000002/20110012011-10-24024 October 2011 IR 05000002-11-001 and Notice of Violation, on 08/09-11/2011 - 10/12/2011, Univ of Mi Ford Nuclear Reactor ML11273A0262011-09-29029 September 2011 Fy 2012 University of Michigan Ford Nuclear Reactor Master Inspection Plan ML1124208522011-08-23023 August 2011 Orise Contract No. DE-AC05-06OR23100 Letter Report for Analytical Results for Three Soil Samples from the University of Michigan Ford Reactor, Ann Arbor, Michigan ML11199A0092011-07-12012 July 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) (Response to NRC Comments Dtd June 1, 2011 on Initial Fnr - Technical Specification Amendment Submitted A IR 05000002/19500112011-04-29029 April 2011 Notification of Licensed Operator Initial Examination 05000250-11-3002,05000251-11-302 ML11119A0042011-04-0808 April 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) IR 05000002/20090032011-03-24024 March 2011 IR 05000002-09-003, on 09/14-16/2010, In-office Review Through 03/14/2011, University of Michigan - Ford Nuclear Reactor ML1104101322011-02-14014 February 2011 Change in NRC Staff Project Management for the University of Michigan Ford Nuclear Reactor ML1032300972010-11-17017 November 2010 Oak Ridge Institute for Science and Education (Orise) Letter Report for Four Soil Samples from the University of Michigan Ford Reactor (IR 05000002/2009003) ML1027803212010-10-0101 October 2010 MIP- University of Michigan Ford Nuclear Reactor Fiscal Year 2011 IR 05000002/19600102010-02-0909 February 2010 Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 ML0935210582009-12-17017 December 2009 Mip - University of Michigan Ford Nuclear Reactor-FY 2010 IR 05000002/20200902009-12-0404 December 2009 IR 05000220-090-10 and 05000410-09-010; Nine Mile Point Nuclear Station, LLC; on 10/5-22/2009; Nine Mile Point Nuclear Station, Units 1 and 2; Biennial Baseline Inspection of Identification and Resolution of Problems Report ML0931305262009-11-20020 November 2009 October 23, 2009 Summary of Open Meeting with the University of Michigan to Discuss Decommissioning Status of Ford Nuclear Reactor IR 05000002/19640092009-07-0909 July 2009 IR 05000264-09 on 06/22/09 - 06/26/09 for Dow Chemical Co IR 05000002/20090022009-06-19019 June 2009 IR 05000002-09-002 on 03/24/09 and 06/01/09 - 06/02/09 for Univ of Michigan - Ford Nuclear Reactor ML0915505952009-06-0101 June 2009 Orise, Letter Report for Analytical Results for Two Soil Samples and One Concrete Sample from the Ford Reactor at the University of Michigan, Ann Arbor, Mi IR 05000002/19772782009-01-0606 January 2009 EA-08-298, Peach Bottom - Notice of Violation with Proposed Imposition of Civil Penalty - $65,000 (Peach Bottom Atomic Power Station - NRC Investigation Report No. 1-2008-001 and NRC Inspection Report Nos. 05000277-278/2007404; and 05000277 IR 05000002/20090012008-12-23023 December 2008 IR 05000002-09-01 on 12/10/08 - 12/11/2008 for Ford Nuclear Reactor; (DNMS) ML0829806362008-10-22022 October 2008 University of Michigan Ford Nuclear Reactor Master Inspection Plan - Fiscal Year 2009 IR 05000002/20080012008-09-25025 September 2008 IR 05000002-08-01 (DNMS) on 08/28/08 for Ford Nuclear Reactor, Univ. of Michigan IR 05000002/20070012007-12-0606 December 2007 IR 05000002-07-001, on 06/28/2007 & 11/13-14/2007, Univ. of Michigan - Ford Nuclear Reactor Inspection 2015-07-06
[Table view] |
Text
Z o-University of Michigan O Sn SCampus Occupational Safet\E e
Occupational Safety & Environmental Health Safety Services Building 1239 Kipke Drive, Ann Arbor, M1 48109-1010 Phone: 734 647-1143
- Fax: 734763-1185 Terrance G.Alexander, Director March 1, 2002 U.S. Nuclear Regulatory Commission Document Control 11555 Rockville Pike Washington, D.C. 20852 RE: Reported Occupational Dose in Excess of 10 CFR 20.1201(a)(2)(ii) Limits Document Control:
The University of Michigan (U-M) is submitting this report in accordance with 10 CFR 20.2203(a)(2) under NRC License Number R-28 (U-M Ford Nuclear Reactor). The NRC Operations Center was notified on February 4, 2002.
On February 1, 2002, the U-M Radiation Safety Officer identified that an individual had received an apparent extremity dose of 72,640 millirem during the dosimeter wear period of October 15, 2001 to November 14, 2001. In accordance with 10 CFR 20.1201(a)(2)(ii), the annual dose limits to the extremities is 50,000 millirem. The U-M ALARA Level II investigation limit for extremity exposures is 1250 millirem per month.
Both the individual and the U-M Radiation Safety Service (RSS) / OSEH health physics staff investigated the apparent extremity exposure during the month-long dosimeter wear period and have concluded that the reported extremity dose is likely a reporting error and not a true dose to the individual. The individual did not perform or participate in any activities that could have resulted in a right-hand extremity dose of 72,640 millirem.
The U-M RSS/OSEH staff consulted with Landauer technical personnel and concluded that, after evaluating the TLD glow curve, the apparent dose to the finger ring TLD chip did result from an ionizing radiation exposure.
However, it is inconclusive and highly unlikely, that the dose reported for that particular finger ring dosimeter was received at the U-M.
The individual's whole body dosimeter and left-hand finger ring for the same monitoring period (October 15 November 14, 2001) were 33 millirem and 140 millirem, respectively. The individual did not participate in any activities that would have resulted in such a large disparity between the reported 72, 640 millirem right-hand extremity dose and the whole body and left-hand finger ring dosimeters. In addition, the individual noted that his finger ring dosimeter had never been misplaced or accidentally laundered during that time frame.
The U-M will request Landauer to adjust the individual's right-hand extremity dose from 72,640 millirem to 280 millirem for the October - November 2001 monitoring period. The 280 millirem is twice the extremity dose recorded for the left-hand finger ring dosimeter (140 millirem) for the same period.
Thank you for your time and consideration in this matter. Please do not hesitate to contact the Ford Nuclear Reactor Health Physicist, Heath Downey [(734) 763-2904], or me at Radiation Safety Service / OSEH [(734) 6472251] should you have any questions or comments regarding this report.
Sincerely, Mark L. Driscoll Director/ Radiation Safety Officer Radiation Safety Service / OSEH ,c: 0 cc: Christopher W. Becker, Laboratory Manager, Ford Nuclear Reactor Heath T. Downey, Health Physicist, Radiation Safety Service / OSEH