MONTHYEARML20195H0421998-11-17017 November 1998
[Table View]Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position Project stage: Other ML20198A0441998-12-0909 December 1998 Forwards RAI Re Licensee 980722 Submittal of Proposal to Amend Plant,Units 1 & 2 TSs to Permit Use of Westinghouse Fuel.Response Due on or Before 990131 Project stage: RAI ML20198Q7551999-01-0505 January 1999 Forwards RAI Re 980722 Request for Amend to Plant,Units 1 & 2 TSs to Permit Use of Westinghouse Fuel.Response Requested on or Before 990131 Project stage: RAI ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call Project stage: Draft Approval ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 Project stage: Other ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended Project stage: Other ML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel Project stage: Other ML0208006742002-02-28028 February 2002 Stations, Topical Report DPC-NE-2009 (TAC Nos. MA2359, MA2361, MA2411, MA2412), Revision 2 - Updates to Chapters 2, 4 & 5 Project stage: Other 1999-10-25 |
ML020800674 | |
Person / Time | |
---|---|
Site: | Catawba, McGuire, Mcguire |
Issue date: | 02/28/2002 |
From: | Tuckman M Duke Energy Corp |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
TAC MA2359, TAC MA2361, TAC MA2411, TAC MB2412 DPC-NE-2009, Rev. 2 | |
Download: ML020800674 (49) | |
Category:Letter
MONTHYEARIR 05000414/20240922024-11-20020 November 2024
[Table view]NRC Inspection Report 05000414/2024092 ML24313A0102024-11-13013 November 2024 – NRC Examination Results Summary - Examination Report 05000413/2024301 and 05000414/2024301 ML24311A1882024-11-0808 November 2024 Request to Remove Document from Public Availability and Withhold Proprietary Information from Public Disclosure, Mcguire Nuclear Station, Unit No. 1 ML24304A9602024-11-0505 November 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information ML24257A1492024-09-16016 September 2024 Operator Licensing Examination Approval 05000413/2024301 and 05000414/2024301 IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting 2024-09-05 Category:Topical Report MONTHYEARRA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023
[Table view]Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A2020-10-15015 October 2020 Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A RA-19-0115, Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 442019-02-18018 February 2019 Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44 RA-18-0004, Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 432018-08-13013 August 2018 Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43 ML17356A1782017-12-13013 December 2017 Attachment 1: WCAP-18265-NP, Rev. 0, Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 & 2 Reactor Vessel Internals. RA-17-0025, Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 422017-05-22022 May 2017 Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 42 RA-15-0050, Implementation of a Duke Energy Common Quality Assurance Topical Report2016-01-19019 January 2016 Implementation of a Duke Energy Common Quality Assurance Topical Report CNS-15-078, WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations2015-11-30030 November 2015 WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations CNS-15-024, WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations.2015-04-23023 April 2015 WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations. RA-14-0021, Change to Quality Assurance Topical Report, Amendment 402014-10-23023 October 2014 Change to Quality Assurance Topical Report, Amendment 40 ML11304A1352011-10-26026 October 2011 Independent Spent Fuel Storage Installation, Quality Assurance Program Topical Report Amendment 39 ML1021102942010-07-28028 July 2010 ISFSI, McGuire Units 1 & 2, Catawba Units 1 & 2, Quality Assurance Program Topical Report Alternate Amendment 37 ML1006103812010-02-18018 February 2010 Duke Energy Carolinas, Topical Report Quality Assurance Program, Revision 37 ML0830900492008-10-23023 October 2008 Duke Energy Carolinas Topical Report, Quality Assurance Program, Revision 36 ML0725407962007-08-30030 August 2007 Duke Energy Carolinas Topical Report Quality Assurance Program ML0613603572006-05-0404 May 2006 Duke Power Company, Transmittal of QA Topical Report, Revision 34 ML0506803092004-09-30030 September 2004 DPC-NE-3000-A, Rev 3, Thermal-Hydraulic Transient Analysis Methodology. ML0510103212004-08-31031 August 2004 Non-proprietary Nuclear Design Methodology Using CASMO-4 / SIMULATE-3 MOX, DPC-NE-1005-NP-A, Revision 0 ML0423902142004-08-20020 August 2004 Westinghouse Owners Group Request to Withdraw WCAP-16168-NP, Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval, (PA-MSC-0120) ML0422302072004-08-0202 August 2004 Duke Energy Corp Topical Report, Quality Assurance Program, Revision 33 - Catawba, McGuire & Oconee Nuclear Station ML0421903532004-07-30030 July 2004 Summary of 07/27/2004 Meeting with Duke Energy Corp. Re. Modification to Quality Assurance Program for Catawba, McGuire, and Oconee Nuclear Station, Attachment 2 - Meeting Handouts ML0417407192004-06-10010 June 2004 Duke Power Company, Quality Assurance Program Topical Report, Revision 32 ML0416103902004-06-0303 June 2004 Units, 1, 2 and 3, McGuire, Units 1 and 2 and Catawba, Units 1 and 2, Alternative Submittal of Duke Energy Topical Report, Duke-1-A, Amendment 32 ML0332302252003-11-12012 November 2003 Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. ML0331100912003-10-23023 October 2003 Submittal of Revision 3 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0319206472003-06-19019 June 2003 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0323405632003-05-29029 May 2003 Draft Revision 2 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0305705352003-02-19019 February 2003 Issuance of Approved Version of Topical Report DPC-NE-2009A, Revision 2, Duke Power Westinghouse Fuel Transition Report, Section E, Table of Contents - References ML0305705032003-02-19019 February 2003 Issuance of Approved Version of Topical Report DPC-NE-2009A, Revision 2, Duke Power Westinghouse Fuel Transition Report, Table of Contents - Attachment B, Chapter 6 ML0305901742003-02-13013 February 2003 Submittal of Published Versions of Approved Topical Reports, Table of Contents - Section 11 ML0305902452003-02-13013 February 2003 Submittal of Published Versions of Approved Topical Reports, Section 12 - Safety Evaluation Report ML0305902512003-02-13013 February 2003 Submittal of Published Versions of Approved Topical Reports, Table of Contents - Safety Evaluation ML0305903242003-02-13013 February 2003 Submittal of Published Versions of Approved Topical Reports, Table of Contents - Safety Evaluation ML0301600572002-12-31031 December 2002 Amendment 31 to Duke Energy Topical Report Quality Assurance Program ML0236004972002-12-16016 December 2002 Amendment 31 to the Duke Energy Corp., Topical Report, Duke-1-A, Quality Assurance Program ML0230902522002-09-16016 September 2002 Non-Proprietary Approved Version of Topical Report DPC-NE-2005A, Revision 3, Duke Power Company Thermal-Hydraulic Statistical Core Design Methodology, Appendix a, Revision 0 - Appendix E, Attachment 2 ML0230902992002-09-16016 September 2002 Non-Proprietary Approved Version of Topical Report DPC-NE-2005A, Revision 3, Duke Power Company Thermal Hydraulic Statistical Core Design Methodology - Table A-4 ML0222701742002-08-0202 August 2002 Duke Power Company Topical Report Quality Assurance Program ML0220702482002-07-26026 July 2002 Request for Additional Information - Review of Duke Topical Report DPC-NE-2009, Revision 2 ML0208705322002-03-19019 March 2002 Reactor Cavity Neutron Measurement Program ML0208006742002-02-28028 February 2002 Stations, Topical Report DPC-NE-2009 (TAC Nos. MA2359, MA2361, MA2411, MA2412), Revision 2 - Updates to Chapters 2, 4 & 5 2023-11-15 |