G20020183/LTR-02-0230 - Christine Patronik-Holder, Et Al. Ltr Re Requests That Firstenergy Corporation Be Required to Provide a Whole Plant X-ray Examination Followed by a Full System Walk-Down of the Davis-Besse Nuclear Plant in Oak HarborML020920808 |
Person / Time |
---|
Site: |
Davis Besse, Cook, Yankee Rowe |
---|
Issue date: |
03/21/2002 |
---|
From: |
Greenberg S, Hughes D, Patronik-Holder C, Simpson A, Trepal C, Waltzer K, Wasserman H, Weir S Citizen Power, Citizens Protecting Ohio, Earth Day Coalition, Environmental Health Watch, Ohio Citizen Action, Ohio Environmental Council, Ohio Public Interest Research Group, Safe Energy Communication Council |
---|
To: |
Meserve R NRC/Chairman |
---|
References |
---|
-RFPFR, G20020183, LTR-02-0230 |
Download: ML020920808 (5) |
|
|
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring 2024-09-09
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 04/22/02 EDO CONTROL: G20020183 DOC DT: 03/21/02 FINAL REPLY:
Christine Patronik-Holder Safe Energy Communication Council Chris Trepal, Earth Day Coalition Amy Simpson, OH Public Interest Res. Group Stuart Greenberg, Environmental Health Watch Shari Weir, Ohio Citizen Action David Hughes, Citizens Power Harvey Wasserman, Citizens Protecting Ohio Kurt Waltzer, Ohio Environmental Council Chairman Meserve FOR SIGNATURE OF : ** GRN ** CRC NO: 02-0230 Collins, NRR DESC: ROUTING:
Request FirstEnergy Corporation be required to Travers Provide a "Whole Plant" X-Ray Examination Followed Paperiello by a Full System Walk-Down of the Davis-Besse Kane Nuclear Plant Norry Craig Burns/Cyr DATE: 04/01/02 Dyer, RIII ASSIGNED TO: CONTACT:
NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
-1,mp'LoQIQ- Se-C-V--C 17 e:- V_ (b&
.seoy-e)
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed.Mar 29, 2002 16:28 PAPER NUMBER: LTR-02-0230 LOGGING DATE: 03/29/2002 ACTION OFFICE: EDO AUTHOR: Christine Patronik-Holder (OH)
AFFILIATION: OH ADDRESSEE: CHRM Richard Meserve
SUBJECT:
Requests that FirstEnergy Corporation be required to provide a "whole plant" X-ray examination followed by a full system walk-down of the Davis-Besse nuclear plant in Oak Harbor ACTION: Direct Reply DISTRIBUTION: Chrm, Comrs.
LETTER DATE: 03/21/2002 ACKNOWLEDGED No SPECIAL HANDLING:
NOTES: SECY to Ack FILE LOCATION: ADAMS DATE DUE: 04/22/2002 DATE SIGNED:
EDO -- G20020183
Safe Energy Communication Council Earth Day Coalition Ohio Citizen Action Ohio EnvironmentalCouncil Citizen Power Citizens ProtectingOhio Ohio Public InterestResearch Group EnvironmentalHealth Watch March 21, 2002 Dr. Richard A. Meserve Chairman U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
Dear Chairman Meserve:
Ohio groups today, Thursday, March 21, 2002 call upon you to protect the public health and safety of all Ohioans by requiring FirstEnergy Corporation to provide a "whole plant" X-ray examination followed by a full system walk-down of the Davis-Besse nuclear power plant in Oak Harbor, and to require that the plant remain closed until a new reactor head is installed.
The NRC approved a full X-ray for the Yankee Rowe nuclear plant in Massachusetts, which subsequently closed. A full system walk-down conducted at Michigan's Cook Nuclear Reactor after start-up had been authorized resulted in the discovery of numerous safety violations.
FirstEnergy reported in mid-February that cracks in the reactor's stainless steel nozzles allowed acid to eat through a six-inch-thick carbon steel head, leaving a mere 3/8 of an inch protection. The company proposes to mend the half-foot thick hole in the reactor with a "patch." On March 19, an additional area of corrosion was discovered.
The U.S. Nuclear Regulatory Commission could not explain the leakage and described the degradation as the most extensive corrosion ever found on the vessel head of any American nuclear reactor saying: "It's certainly very unusual.... Certainly, it's a deterioration of a very important safety feature."
Sixty-nine of the nation's 103 commercial nuclear power plants are constructed with a pressurized water reactor design similar to Davis-Besse. However, the NRC has notified all of the nation's nuclear power plants to be on the alert for this unusual problem.
Davis-Besse's checkered history of safety and shut-downs was carefully documented in a report titled "Stainless Steel Clad: The Dutchboy's Finger in the Davis-Besse Dike" released yesterday by the Union of Concemed Scientists. It is clear that after 25 years of operation, the plant is already aging poorly showing signs of stress due to extensive heat
Davis-Besse concerns page 1 of 2 and radiation, in addition to the extraordinary steel cap deterioration. Yet, FirstEnergy says itwants to extend plant's operating license until 2027.
The company's failure to follow safety regulations has led to this unprecedented occurrence, which demands unprecedented action. As advocates for consumers and the environment, we urge the NRC and the State of Ohio to require the most stringent inspection ever developed, including X-ray examinations for even the smallest cracks and leaks followed by a walk-down of the entire system before the plant is allowed to resume operations.
The people of Ohio deserve more than filling the holes of what is becoming a nuclear sieve with an assortment of makeshift plugs.
Sincerely, Safe Energy Communication Council Ohio Citizen Action Christine Patronik-Holder Shari Weir 660 Crackel Road 614 Superior NW Aurora, Ohio 44202 Cleveland, Ohio 44113 440-708-1755 216-861-5200 Earth Day Coalition Citizen Power Chris Trepal David Hughes 3606 Bridge Avenue 2424 Dock Road Cleveland, OH 44113-3314 Madison, Ohio 44057 216-281-6468 x227 412-421-6072 Ohio Public Interest Research Group Citizens Protecting Ohio Amy Simpson Harvey Wasserman 2460 Fairmount Blvd 735 Euclaire Avenue Cleveland Heights, Ohio 44106 Bexley, Ohio 43209 216-791-1116 614-231-0507 Environmental Health Watch Ohio Environmental Council Stuart Greenberg Kurt Waltzer 4115 Bridge Ave. #104 1207 Grandview Suite 201 Cleveland, OH 44113 Columbus, Ohio 43212 216/961-4646 614-487-7506 cc: Jan Strasma, Office of Public Affairs, Region III
660 Crackel Road Aurora, Ohio 44202 Dr. Richard A. Meserve Chairman U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 I