MONTHYEARML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) 2024-09-05
[Table view] |
Text
June 19, 2002 Mr. Paul M. Blanch 135 Hyde Rd.
West Hartford, CT 06117
Dear Mr. Blanch:
Thank you for your E-mail correspondence to the Nuclear Regulatory Commission (NRC) dated May 9, 2002. Your letter indicated that you had reviewed the recently issued NRC augmented inspection team (AIT) report and the Davis-Besse root cause analysis (RCA) report. From these documents and comments made during the public meeting of May 7, 2002, you detailed six questions in your e-mail message and requested these be considered as formal questions from the meeting. Your questions have been evaluated by the staff and the responses to your specific concerns as they relate to Davis-Besse, are discussed below:
Question 1:
According to the RCA and the AIT, the cracking on Nozzle #3 was only axial. If this is true, then why did this nozzle fall over. In order to do this, it had to have circumferential cracking? Am I missing something? I think one of the enclosed photos clearly shows the circumferential crack around the "J" weld.
Response 1:
The cracking in Nozzle #3 at Davis-Besse was only axially-oriented according to the non-destructive examinations performed by the licensee. The nozzle fell over during the repair process when the nozzle was machined to a location above the J-groove weld and the nozzle lost the support of the J-groove weld. None of the photographs available to the NRC staff support the presence of a circumferential crack in Nozzle #3.
Question 2:
If the control rod drive mechanism had not fallen over, was Davis-Besse planning to clean the head, or as in the past, restart with a significant boron remaining on the vessel head?
Response 2:
Although the licensee for Davis-Besse did not have a regulatory commitment to clean the reactor pressure vessel (RPV) head, the licensee had stated a plan to clean the head during the most recent refueling outage to facilitate visual examination of the head at the next refueling outage. The RPV head cleaning was a contingency in case the planned new replacement head was not available at the next refueling outage.
P. Blanch Question 3:
The AIT and the RCA are consistent in the discussions about circumferential cracking. That is, the circumferential crack initiates from the outside diameter (OD) to the inside diameter. If this is the case, then how is it that circumferential cracking is considered primary water stress-corrosion cracking (PWSSC)? Can I assume that the circumferential cracking is the result of axial cracking?
Response 3:
Circumferential cracking initiated from the OD of the nozzle has been identified at plants both above and below the J-groove weld. For cracks initiated below the J-groove weld, the environment for these cracks is strictly primary water, and hence PWSCC is the mechanism of interest. For OD cracking above the J-groove weld, the water that initially fills the annulus between the nozzle and the reactor pressure vessel head comes from through-wall axial cracking and it has a composition similar to that of the primary water. As additional leakage occurs, the composition of the water in the annulus should become more concentrated due to the evaporation of the water itself. The description of this mechanism as PWSCC is intended to highlight that the source is primary water as opposed to secondary or raw water.
Question 4:
During the meeting there were many discussions about axial crack growth rate, but I did not hear any discussions about circumferential crack growth rates. It is my assumption that the circumferential cracks present the greater risk from possible rod ejection accidents than the axial cracks.
Response 4:
In general, circumferential cracks do present the greater safety risk from possible rod ejection events. For the conditions identified at Davis-Besse, the safety implications of the RPV head wastage outweighed those of the circumferential cracking identified. Because the licensees root cause summary report attributes the RPV head degradation to boric acid leakage from axial through-wall cracking, the focus of the May 7, 2002, public meeting was the growth rate of the axially oriented cracking in Nozzle #3.
Question 5:
Is it possible that a through wall axial crack may occur and remain visually undetected due to a tight interference fit at the top of the head and then cause undetected circumferential cracking during an operating cycle?
P. Blanch Response 5:
The possibility of initiation of a circumferential crack from an undetected axial through-wall crack is a concern that the NRC has addressed in Bulletin 2001-01. Specifically, the Bulletin describes a qualified visual examination which includes a demonstration of a leak path from the annulus between the nozzle and the reactor pressure vessel head spanning from the J-groove weld to the outside surface of the reactor pressure vessel head. If a licensee cannot conclude that a leak path exists for any particular nozzle at a high susceptibility plant, then Bulletin 2001-01 would indicate the need to perform volumetric examination capable of detecting OD-initiated circumferential cracking. In addition, a circumferential crack that develops during an operating cycle would not be expected to have sufficient growth during that cycle to raise a safety concern.
Question 6:
The following statement is made on page #3 of the NRC AIT report: "The cracks in these five nozzles initiated from the outside diameter of the nozzle near the J-groove weld." Again, a crack initiating from the OD does not appear to be PWSCC unless the crack was below the J-groove weld.
Response 6:
The OD-initiated cracks in four of the five nozzles described on page 3 of the AIT report are located on the nozzle below the J-groove weld, and hence, in this case, the cracking is due to PWSCC. The OD circumferential crack in Nozzle #2 is above the weld, and as described in Response 3, the conditions for this crack are not true PWSCC, but primary water is the source of the environment.
In conclusion, I would like to thank you for your correspondence and sincerely hope this has answered your questions. The NRC is closely monitoring the Davis-Besse issue and that the rules and regulations that provide for safe operation of nuclear power plants are followed, and thus public health and safety is maintained.
Sincerely,
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
ML021560650 Incoming: ML021620458 Incoming (Photo) ML021620542 Package: ML021620438 OFFICE PM:LPD3-2 LA:LPD3-2 BC:EMCB SC:LPD3-2 NAME SSands THarris WBateman AMendiola DATE 6/17/02 6/14/02 6/17/02 6/19 /02 DISTRIBUTION FOR YELLOW TICKET NO. Y020020137 NRC AIT REPORT AND THE DB RCA Dated: June 19, 2002 PUBLIC PD3-2 r/f S. Collins/J. Johnson (RidsNrrOd)
J. Zwolinski/L. Marsh (RidsNrrDlpm)
B. Sheron/K. Johnson (RidsNrrAdpt)
S. Bajwa (RidsNrrDlpmLpdiii)
A. Mendiola (RidsNrrDlpmLpdiii2)
S. Sands (RidsNrrPMSSands)
D. Pickett (RidsNrrPMDPickett)
T. Harris (RidsNrrLATHarris)
G. Grant, RIII NRR Mailroom (Y020020137)(RidsNrrWpc)
L. Cox W. Borchardt