Minutes of Internal Meeting of the Davis-Besse Nuclear Power Station IMC 0350 Panel
ML022050392
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/18/2002
From: Grobe J
Division of Reactor Safety III
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0261
Download: ML022050392 (5)


Text

July 18, 2002 MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Director, DRS /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE NUCLEAR POWER STATION IMC 0350 PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held June 7.

Attached for your information are the minutes from the internal meeting of the IMC 0350 panel.

Attachment:

As stated cc w/att: S. Rosenburg, OEDO W. Dean, NRR A. Mendiola, NRR D. Pickett, NRR S. Bloom, NRR J. Dyer, RIII J. Caldwell, RIII G. Grant, RIII S. Reynolds, RIII C. Lipa, RIII L. Collins, RIII D. Simpkins, RIII J. Jacobson, RIII S. Burgess, RIII R. Lickus, RIII S. Thomas, RIII DOCUMENT NAME: G:\Davis-Besse 0350\internalmtgminutes0607.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII NAME LCollins: CLipa JGrobe DATE 07/11/02 07/18/02 07/18/02 OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Restart Panel Meeting Davis-Besse Nuclear Power Station DATE: June 7, 2002 TIME: 2 p.m. (Eastern)

ATTENDEES:

A. Mendiola C. Lipa W. Dean W. Bateman J. Grobe D. Pickett M. Holmberg S. Thomas J. Jacobson M. Mitchell S. Burgess Agenda Items:

1. Reports from Staff Site Activities (RIO)

The panel discussed the need for NRR support (Bateman) to review and document the licensees determination that the N stamp is restored on the Midland Head.

(ACTION: Mr. Bateman to followup with licensee to determine what process they are planning to use. Panel to discuss at future meeting)

The licensee has established a restart oversight panel (ROP) and the first panel meeting is June 10, 2002. The panel discussed plans to attend a future meeting of the licensees ROP.

Risk Analysis (DSSA/SRA)

Licensee answers to the RAI are expected in June.

Licensing Issues/Actions (DLPM)

The licensee may withdraw relief requests and plans to use 50.59 for replacement of the head. NRR is discussing the proper post modification testing for the cut in the containment to install the new Midland head and remove old head.

(ACTION: Jacobson to determine what other Region III sites have done for post-modification testing following steam generator replacement.)

Public Communications The panel determined that, based on the nature of the two meetings on June 12, only the afternoon meeting with the licensee would be transcribed.

2. IMC 0350 Panel Business Inspection Schedule The panel discussed the AIT followup inspection and other priorities for the originally assigned inspector. This will be reassigned. The panel chairman also discussed that a lead inspector needs to be assigned for each of the building block inspections that the panel determines to be necessary.

Process Plan This item was not discussed.

Restart Checklist Updates This item was not discussed.

Licensee Return to Service Plan The panel discussed preparations for the next public meeting. Each panel member should read the plan and the root cause report and be prepared to discuss with the licensee at the June 12 meeting.

2. NRC/Licensee weekly calls This item was not discussed.
3. Utilization of the Web Page This item was not discussed.
4. Future Activities/Plans/Meetings The panel discussed other upcoming meetings. The panel Chairman plans to meet with the county officials on June 11 or 12. He also plans to attend the Lessons Learned Task Force entrance with the licensee on June 12.
5. Discuss how to handle public or staff comments, questions, allegations, and concerns received by phone, fax, letter, email, or at public meetings.

This item was not discussed.

IMC 0350 Panel Action Items Item Action Item (Date Assigned to Comments Number generated) 1 Review the need for a full core S. Thomas Complete. Email to DB0350 5/23 offload (May 21) 2 Develop slides for 0350 portion C. Lipa Complete of ACRS meeting (May 21) 3 Invite Casto/Bateman to panel to B. Dean Complete 5/23 - See internal meeting discuss review of root cause minutes (May 21) 4 Develop operational history C. Lipa Due 6/18 package for Davis-Besse T. Mendiola (May 21) 5 Followup with State of Ohio after R. Lickus Complete 5/23 - See internal meeting May 23 meeting w/licensee minutes (May 21) 6 Review AIT procedure to see if it C. Lipa Complete 5/23 should be used for AIT followup (May 21) 7 Communicate with the licensee M. Johnson, Complete 5/23 - See internal meeting regarding the need for updated T. Mendiola, minutes risk assessment (May 21) D. Pickett 8 Setup location for June 12 0350 S. Thomas Complete 5/23 See internal meeting meeting (May 21) minutes 9 Provide draft restart checklist to C. Lipa Will bring back draft checklist for June 18 the panel (May 16) meeting.

10 Send second RAI to licensee T. Mendiola NRR to have call by 6/18. Draft responses (May 16) already received.

11 Decide if umbrella charter J. Grobe Complete 5/23 should go on the web page (May 16) 12 Prepare information request for T. Mendiola Complete LLTF (May 23) C. Lipa 13 Send licensee building block S. Thomas Complete plans (3) to Lipa, Pickett (May 23) 14 Issue Meeting Notice for 6/12 C. Lipa Complete - on website meeting (May 23) 15 Discuss expectations for 6/12 C. Lipa Complete. J. Grobe to discuss again meeting with licensee J. Jacobson w/licensee 6/11 (May 23) J. Grobe 16 Read licensee return to service Panel Complete plan in preparation for 6/12 meeting

Item Action Item (Date Assigned to Comments Number generated) 17 Develop 6 week look ahead C. Lipa Complete.

schedule 18 Slide on Checklist to discuss J. Grobe Closed not completed.

with licensee 19 Send 3 plans to HQ C. Lipa Complete - all 6 plans sent to RIII and NRR 20 Obtain history of Byron, J. Jacobson Complete. All performed ILRT Braidwood, Palisades, and Pt.

Beach containment mods and leak test requirements 21 Set up next meeting/bridge line L. Collins Complete for 6/12 22 Confirm that transcriber will be C. Lipa Complete ready at 3:00 PM 23 Request licensee to provide S. Thomas Complete speaker phone for internal meeting 6/12 24 Discuss making information Panel Discuss by June 30, after safety related to HQ/licensee calls and significance assessment complete.

the Congressional request publicly available 25 Determine containment testing T. Mendiola required (PSB) 26 Provide licensee with inspection Panel schedule