Submittal of Change Sheet 4 to Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate Request
ML030570523
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/24/2003
From: Joseph E Pollock
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:3902, TAC MB6751
Download: ML030570523 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER February 24, 2003 AEP:NRC:3902 10 CFR 50, Appendix K Docket Nos.: 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 2 SUBMITTAL OF CHANGE SHEET 4 TO POWER MEASUREMENT UNCERTAINTY CALCULATION IN SUPPORT OF LICENSE AMENDMENT REQUEST FOR APPENDIX K MEASUREMENT UNCERTAINTY RECAPTURE - POWER UPRATE REQUEST (TAC NO. MB6751)

References:

1. Letter from J. E. Pollock, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 2, Docket No. 50-316, License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate Request," AEP:NRC:2902, dated November 15, 2002
2. Letter from J. E. Pollock, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Submittal of Change Sheet 2 to Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate Request," AEP:NRC:2900-05, dated December 6, 2002 By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 2, proposed to amend Facility Operating License DPR-74, including Appendix A, Technical Specifications, to allow a 1.66-percent increase in the licensed core power. By reference 2, I&M provided the Nuclear Regulatory Commission (NRC) a copy of Calculation 1-2 01-03 CALC 2, Revision 1, Change Sheet (CS)-2, "Power Calorimetric Accuracy Using the Caldon Check Plus Feedwater Flow Measurement System and a Modified PPC CALM Program," dated December 5, 2002 (Proprietary).

U. S. Nuclear Regulatory Commission AEP:NRC:3902 Page 2 In Reference 2, I&M indicated that future changes to this calculation would occur as a result of Unit 2 Leading Edge Flow Meter (LEFM) testing. to this letter provides CS-4 to I&M's Calculation 1-2-01-03 CALC 2, Revision 1, "Power Calorimetric Accuracy Using the Caldon Check Plus Feedwater Flow Measurement System and a Modified PPC CALM Program," dated February 17, 2003 (Proprietary), which incorporates the changes due to testing for the Unit 2 LEFM spoolpiece. Attachment 2 provides the application and affidavit for withholding Attachment 1 from public disclosure in accordance with 10 CFR 2.790.

The thermal power uncertainty measurement calculation provided in Attachment 1 to this letter establishes the basis for the core thermal power measurement uncertainty for both Unit 1 and Unit 2. This calculation supercedes, in its entirety, previous versions of the calculation that were submitted in support of the CNP Unit 1 MUR Power Uprate license amendment.

However, these changes have no impact on the NRC-approved Unit 1 MUR power uprate license amendment. There are no new commitments made in this submittal.

Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.

Sincerely, J. E. Pollock Site Vice President MGW/rdw

U. S. Nuclear Regulatory Commission AEP:NRC:3902 Page 3

Enclosure:

1. Affirmation Attachments:
1. Donald C. Cook Nuclear Plant Calculation No. 1-2-01-03 CALC 2, Revision 1, Change Sheet 4, "Power Calorimetric Accuracy using the Caldon Check Plus Feedwater Flow Measurement System and a Modified PPC CALM Program"
2. Application and Affidavit for Withholding Proprietary Information from Public Disclosure in Accordance with 10 CFR 2.790 c: K. D. Curry - AEP Ft. Wayne, w/o enclosure/attachments J. E. Dyer - NRC Region III J. T. King - MPSC, w/o enclosure/attachments MDEQ - DW & RPD, w/o enclosure/attachments NRC Resident Inspector J. F. Stang, Jr. - NRC Washington DC

U. S. Nuclear Regulatory Commission AEP:NRC:3902 Page 4 bc: Without Enclosure/Attachments A. C. Bakken, III M. J. Finissi S. A. Greenlee R. J. Grumbir D. R. Hafer N. Haggerty G. J. Hill D. W. Jenkins J. A. Kobyra B. A. McIntyre J. E. Newmiller J. E. Pollock D. J. Poupard K. W. Riches M. K. Scarpello M. G. Williams T. K. Woods

AFFIRMATION Michigan I, Joseph E. Pollock, being duly sworn, state that I am Site Vice President of Indiana the Nuclear Power Company (I&M), that I am authorized to sign and file this request with matters set Regulatory Commission on behalf of I&M, and that the statements made and the forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company J. E. Pollock Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME TI #DAY OF (2003 Notary E.NEWMILLER Public, JULIE Berrien County, MI

/Notary/ublic My Commission Expires Aug 22, 2004 My Commission Expires Z'N.

ATTACHMENT 2 TO AEP:NRC:3902 INDIANA MICHIGAN POWER COMPANY APPLICATION AND AFFIDAVIT FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.790 Application for Withholding of Proprietary Information from Public Disclosure:

Indiana Michigan Power Company (I&M) requests that the proprietary information described below be withheld from public disclosure.

1 to The proprietary information for which withholding is requested is contained in Attachment "Cook this I&M submittal, AEP:NRC:3902, dated February 24, 2003. Attachment 1 is titled, Sheet 4 - Power Nuclear Plant Calculation No. 1-2-01-03 CALC 2, Revision 1, Change System and Calorimetric Accuracy Using the Caldon Check Plus Feedwater Flow Measurement a Modified PPC CALM Program."

The affidavit provided following this application sets forth the basis by which the information addresses may be withheld from public disclosure by the Nuclear Regulatory Commission and 2.790 of the with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section Commission's regulations.

Joseph E. Pollock Site Vice President

Page 2 to AEP:NRC:3902 Affidavit for Withholding of Proprietary Information from Public Disclosure:

Affidavit of Joseph E. Pollock

1. I am Site Vice President of Donald C. Cook Nuclear Plant (CNP), Indiana Michigan Power Company (I&M), and as such, have the responsibility of reviewing the proprietary information sought to be withheld from public disclosure in connection with I&M's submittal on AEP:NRC:3902, dated February 24, 2003, and am authorized to apply for its withholding behalf of I&M.

the

2. I am making this affidavit in conformance with the provisions of 10 CFR 2.790 of regulations of the Nuclear Regulatory Commission (NRC) and in conjunction with I&M's application for withholding, which accompanies this affidavit.

or

3. I have knowledge of the criteria used by I&M in designating information as proprietary confidential.

for

4. Pursuant to the provisions of 10 CFR 2.790(b)(4), the following is being furnished consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.

and (i) The information sought to be withheld from public disclosure is owned by I&M has been held in confidence by I&M.

I&M.

(ii) The information is of a type that would customarily be held in confidence by The information consists of analysis methodology details, analysis results, supporting data, and aspects of system design, relative to an analysis that provides a competitive advantage to I&M.

of (iii) The information is transmitted to the NRC in confidence, and under the provision 10 CFR 2.790, it is to be received in confidence by the NRC.

the best of (iv) The information sought to be protected is not available in public sources to my knowledge and belief.

1 to this (v) The proprietary information sought to be withheld is contained in Attachment 1 is titled, I&M submittal, AEP:NRC:3902, dated February 24, 2003. Attachment 2, Revision 1, Change Sheet 4 "Cook Nuclear Plant Calculation No. 1-2-01-03 CALC Flow Power Calorimetric Accuracy Using the Caldon Check Plus Feedwater Measurement System and a Modified PPC CALM Program."

This information enables I&M to:

(a) Justify a proposed license amendment with equipment and system performance, evaluation, and analysis information.

Attachment 2 to AEP:NRC:3902 Page 3 (b) Enhance cost-effective plant operation by justifying future operation at an uprated power level.

5. Public disclosure of this information is likely to cause harm to I&M because it would allow other companies in the nuclear industry to benefit from the results of a significant analysis program without requiring commensurate expense, or allowing I&M to recoup a portion of its expenditures, or benefit from the sale of the information as described below.

CNP, but rather is an The activity that is the subject of the calculation is not specific to activity that potentially affects the nuclear plants of other utilities.

The calculation and development of the calculation methodology was funded solely by I&M.

The cost to I&M of the calculation and development of the calculation methodology was substantial.

The methodology can easily be adapted to other nuclear plants evaluating Measurement Uncertainty Recapture power uprates.

The subject information could only be duplicated by other companies or groups of companies at a similar expense to that incurred by I&M.

I&M may elect to recover a portion of the costs of this methodology development by making the information available to other utilities on a cost-sharing basis. Public disclosure of the information at this time would prevent implementation of this strategy.

the I, Joseph E. Pollock, being duly sworn, state that I am the person who subscribed my name to foregoing statement, and that the matters and facts set forth in the statement are true to the best of my knowledge, information and belief.

SWORN TO AND SUBSCRIBED BEFORE ME DAY OF Joseph E. Pollock Not*f" Public Site Vice President--)

My commission expires: ,_'__ Z; _

-JULIE E. NEWMILLER Notary Public, Berrien CountY. MI Z- -

.. ..--. - My Commission Expires Aug 22. 2004

--