ML031110140

From kanterella
Jump to navigation Jump to search

DC Cook, Unit 2, Safety Evaluation, Review of Draft Safety Evaluation for Measurement Uncertainty Recapture Power Uprate
ML031110140
Person / Time
Site: Cook 
Issue date: 04/18/2003
From: Stang J
NRC/NRR/DLPM/LPD3
To: Bakken A
Indiana Michigan Power Co
Stang J
References
TAC MB6751
Download: ML031110140 (4)


Text

April 18, 2003 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

SUBJECT:

DONALD C. COOK NUCLEAR PLANT, UNIT 2 - REVIEW OF DRAFT SAFETY EVALUATION FOR MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. MB6751)

Dear Mr. Bakken:

By application dated November 15, 2002, as supplemented February 24, 2003, you requested a 1.66-percent measurement uncertainty recapture power uprate for the D. C. Cook Nuclear Plant, Unit 2. The Nuclear Regulatory Commission (NRC) staff has prepared the enclosed draft safety evaluation in response to your application. Consistent with NRC staff guidance in the Office of Nuclear Reactor Regulations Office Instruction COM-203, Informal Interfacing And Exchange of Information With Licensees and Applicants, I request that you review the enclosed draft safety evaluation to verify that factual information is accurate and complete.

As mutually agreed to by the NRC staff and your staff, I request your response by April 25, 2003. Your response is needed by April 25th in order for the NRC staff to complete its review of your application in time to meet your needs for the upcoming refueling outage.

Sincerely,

/RA/ by MShuaibi John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-316

Enclosure:

Draft Safety Evaluation cc w/encl: See next page

ML031110140 (Letter)

ADAMS Accession No. ML031110144 (Safety Evaluation)

ADAMS Accession No. ML031110148 (Package)

OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JStang

/RA/ MShuaibi THarris

/RA/ RBouling LRaghavan DATE 04/18/03 04/18/03 04/18/03

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Drinking Water and Radiological Project Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr. Blvd.

P. O. Box 30630, CPH Mailroom Lansing, MI 48909-8130 Scot A. Greenlee Director, Nuclear Technical Services Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 David A. Lochbaum Union of Concerned Scientists 1616 P Street NW, Suite 310 Washington, DC 20036-1495 Michael J. Finissi Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Joseph E. Pollock Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106