ML030790394

From kanterella
Revision as of 23:40, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NMC Open Issues Table
ML030790394
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/30/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094
Download: ML030790394 (1)


Text

OPEN ISSUES WHO WHEN COMMENTS Incident Investigation S. Thomas 11/21/20021 I I I I On-Line Work Risk Manaaement J. Anderson Ongoina NP 10.3.7, Unplanned Yellow Actions R. Wood Ongoing Ref CA27023 and CAP30052/Mod required for green Interim Corrective Actions CA026908/Charter Tracking Item D. Schoon 11/27/2002 Training Needs Analysis and Related Actions P. Smith 2/2/2003 Ref CAP029999/CA026986- Trng Needs Analysis is completed Condition Evaluation/further enhancements M. Schug 12/6/2002 Ref CAP029999/CE10848 Independent Evaluation of Procedure changes D. Schoon 11/27/2002 Ref CA026909 - review complete/complete CA Independent Evaluation of briefings & training D. Schoon 11/27/2002 Ref CA026910 - review complete/complete CA Engineering Resolution Team and RCE Conduct Root Cause Evaluation - Draft Report R. Flessner 11/18/2002 Ref RCE0000191 - first draft issued Conduct Root Cause Evaluation - Final Report R. Flessner 11/26/2002 PRAIrisk significance evaluation J. Masterlark 1/29/2003 Ref CA026900/Also requires PHI inputs Hydraulic system repsponse T. Kendall 12/15/2002 CA02691 1- PII final report expected 12/20/02 Develop a test plan T. Kendall TBD CA026912 - PII/PSA/Engr - remains under consideration Analyze corrosion products B. Zipp 1/20/2003 CA026913- PII final report expected 12/20/02 AFW sources and quantity of corrosion products B. Zipp 1/20/2003 CA026914 - PH1 final report expected 12/20/02 Modifications to orifice design J. McNamara 12/13/2002 Ref CA026918 Fabrication J. McNamara 12/17/2002 5 weeks from 11/12 is December 17 Testing J. McNamara TBD Coordination Installation J. McNamara TBD Planning for Coordination of work schedule with station J. McNamara TBD 13 week schedule process - Input OPR000031 Part Il/Schedule for correction due J. McNamara 11/27/2002 Complete Part II of OD 31 NEW - Electrical design modifications M. Rosseau TBD Scope, schedule, etc (Clint Drescher as designer)