ML031530189

From kanterella
Revision as of 16:52, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mode Hold Resolution Form - CR 02-03668
ML031530189
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/2003
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0224 CR 02-03668
Download: ML031530189 (1)


Text

MODE HOLlD RESOLUTION FORM Condition Report No. CR 02-03668 Mode: 5 Assigned Grotup: PE Assigned Owner: St. Clair, T. _____,_

Justification for Removal of Mode lold - Include Discussion of Cause (Assigned Owner or Designee):

Chronic leakage problems at the casing-to-cover joints on RCP P36-1 and P36-2 (CA#2 and CA#3) are being resolved under CR 02-09674 CA#t1 and CA#2 per ECR 02-805-00.

CR 02-09674 also has a mode 5 restraint associated with it. Quantification of thc leakage (if any) at P36-3 and P364 is to be completed during the startup from 13RO per CA#4 and CA#5. Implementation of ECR 02-805-00 for pumps P36-3 and P36-4 will bc perfornmed under WO #02-007530-000 and WO 402-007529-000 respectively and are not heing perfornmed this outage. Since the mode 5 restraint issues are being tracked by CR 02-09674, the mode 5 restraint associated with CR 02-03668 may be lifted.

Reference Applicable Documentation:

W.O. 4#

Operability Justificatio ff EWR# ECR 02-805-00 Other CR 02-09674

_ _ _ 7- _ _ _ _ ~~/ _ /~

Assigned Owner ignature Da e

__ ____ ____ ___ ___ / 2 -/i 3 4i3 Operational Approval for Rcmoval Date (OPS Superintendenit / OPS SRO Designee)

/,rPe Ca (A4 t c I.-. ..- .-.I....--. . .....e,.,-.:t_

.-_wvt_fi  : . ._.._...

_ _ow^_..^..

....1 w