MONTHYEAR05000186/LER-2024-003, University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.212024-10-25025 October 2024 University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.21 ML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 05000186/LER-2023-003, University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b2023-06-0606 June 2023 University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 the Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel ML21098A1992021-06-10010 June 2021 the Curators of the University of Missouri Issuance of Amendment No. 40 to Renewed Facility Operating License No. R 103 to Amend Technical Specifications 6.2 and 6.4 for the University of Missouri Columbia Research Reactor 2024-08-27
[Table view] Category:Operating Report
MONTHYEARML0603805372006-01-20020 January 2006 MURR Operations Monthly Summary for December 2005 ML0508404462005-03-15015 March 2005 February 2005 Monthly Operating Report for University of Missouri-Columbia Research Reactor ML0233105762002-11-19019 November 2002 MURR Monthly Operating Report for October, 2002 ML0228302142002-09-26026 September 2002 August 2002 Monthly Operations Summary for University of Missouri-Columbia, Research Reactor 2006-01-20
[Table view] Category:Monthly
MONTHYEARML0508404462005-03-15015 March 2005 February 2005 Monthly Operating Report for University of Missouri-Columbia Research Reactor ML0233105762002-11-19019 November 2002 MURR Monthly Operating Report for October, 2002 ML0228302142002-09-26026 September 2002 August 2002 Monthly Operations Summary for University of Missouri-Columbia, Research Reactor 2005-03-15
[Table view] |
Text
Research Park Research Reactor Center Columbia, MO 65211 University of Missouri-Columbia PiiONE (573) 882-4211 FAX (573) 882-6360 September 26, 2002 Mr. Alexander Adams, Jr.
U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001
SUBJECT:
Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for August, 2002. If you have any questions, please contact me at (573) 882-5264.
Sincerely, Paul S. Hobbs, PE Reactor Manager PSH/lmcg cc. Craig Bassett Enclosure N_ý AN EQUAL oPPoRrrYN/ADA INSTrrUTION
UNVVERSITY OF MISSOURI RESEARCHREACTOR opEp.qg7oxs,,mo-w7-H'.fy su-,m,,m-/qRy
-AUýýUST'2002 Preyaredby:
Oyerations Staff
INTRODUCTION The reactor operated continuously in August with the following exceptions: four shutdowns for scheduled maintenance and refueling; two unscheduled shutdowns.
MAINTENANCE ACTIVITIES, 8/4/02 Refueled - removed core 02-38, loaded core 02-39.
8/5/02 Refueled - removed core 02-39, loaded core 02-40.
Transferred eight spent fuel elements to the BMI cask in preparation for shipment to the Westinghouse Savannah River Site.
8/12/02 Refueled - removed core 02-40, loaded core 02-41.
8/19/02 Refueled - removed core 02-41, loaded core 02-42.
8/20/02 Refueled - removed core 02-42, loaded core 02-43.
8/26/02 Refueled - removed core 02-43, loaded core 02-44.
UNSCHEDULED SHUTDOWVNS Date No. Type Cause 8/4/02 1144 RRI Blade 'D' not in contact with magnet On August 4, a Rod Not In Contact With Magnet Rod Run-In was automatically initiated when Blade 'D' anvil separated from its magnet during a sample handling evolution. The Blade 'D' Full In Light was lit so the control room operator initiated a manual scram and the reactor was shutdown. It was determined that during sample handling an operator trainee had allowed a 3" silicon holder to bump Control Blade 'D' Offset Mechanism. This bump was sufficient to cause the anvil to separate from the magnet. The reactor was subsequently refueled and returned to power.
Date No. Typ. Cause 8/20/02 1145 RRI Blade 'A' not in contact with magnet On August 20, a Rod Not In Contact With Magnet Rod Run-In was automatically initiated when Blade 'A' anvil separated from its magnet during a sample handling evolution. The Blade 'A' Full In Light was lit so the control room operator initiated a manual scram and the reactor was shutdown. It was determined that during sample handling an operator trainee had allowed a 4" silicon holder to bump Control Blade 'A' Offset Mechanism. This bump was sufficient to cause the anvil to separate from the magnet. The reactor was subsequently refueled and returned to power.
Both of these unscheduled shutdowns were the result of relatively new operators handling samples in close proximity to the reactor control blades. Operations personnel were reminded of the necessity of flawless attention to detail and to use care in sample handling.
OPERATION
SUMMARY
FOR MONTH OF Aug-02 University of Missour Research Reactor Center (MURR)
I 670 56 HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR 244,793.48 HOURS OPERATED AT FULL POWER, THIS PERIOD I 667.63 TOTAL HOURS AT FULL POWER, REACTOR 241,53863 INTEGRATED POWER THIS PERIOD I27830 IIMWD TOTAL INTEGRATED POWER, REACTOR I9483853 MWD Submitted by.
MWD Custodian/Reactor Physicist Date, f