SEN E i RMAT FOR OFF ICJ DAVIS-BESSE RESTART STATUS This information is current as of dfj3Q6 (EST) on February 12, 2004.

The plant is in Mode 3 maintaining Normal Operating Pressure/Normal Operating Temperature.

(NOPNOT - 532 0F/21155 psg), TxR t1i ai'eh s 6 until ,e~rt.

The r ting titl~cin,se td di p,anc readiness - 'sirt ,is he1a~it's b~Ipg fheld thiseyernng, b0,1 u 2ieartt ~ite Carn LICENSEE ACTIVITIES PRIOR TO RESTART The licensee is currently tracking outstanding activities that need to be completed prior to restart [Mode 2/1]. There are approximately 52 restart items.

  • Corrective Actions: 1.6
  • Condition Reports: 7
  • Field Work: 13
  • Post Maintenance Tests: 4
  • Surveillance Tests: 2 NRC ACTIVITIES PRIOR TO RESTART The public exits for both the followup Management and Human Performance Inspection and the followup Restart Readiness Assessment Team Inspection are scheduled for 2:00 pm, February 12, near the site at Camp Perry.

Region IlI Division of Reactor Safety continues with the baseline Emergency Preparedness Inspection onsite this week, February 91hf-13m,focusing on a review of site-specific Emergency Action Levels. A debrief with the licensee Is scheduled for the morning of February 13'.

Below Is a simplified time line that describes the significant NRC and licensee activities and milestones that are necessary for NRC to authorize restart.

These tentative dates are predicated upon the licensee successfully completing NRC pre-restart activities and demonstrating acceptable operating performance.

Key Agency decision points are annotated with asterisks (**) In the timeline below.

The outcome of each decision point could materially alter the timing and substance of the rest of the schedule.

The details of these activities are described in three internal NRC documents: the Davis-Besse Oversight Panel Process Plan, the Davis-Besse Restart Communications Plan and the Davis-Besse Restart Punch List.

-Februar

_Ebrr EP Inspection onsite RRATI and M&HP-Phase 3 follow-up Inspections public exits Public Restart Meeting with the Licensee

'- Describe 0350 NRC Oversight Process

- Licensee presents basis for restart

- Deon making process

' I9\ ';';.1sSE ITOVtE INFORMATION - FFICIAL US E /y/\

SEN91XV NFR ON - FOR OFFICIAL USE ONLY TV!" rC Panel deliberationssonon r Panel briefing for Jim Caldwell, Jim Dyer, anam Collins on restart deliberations Panel Issues restart recommendation to Jim Caldwell Panel briefing for Commissioners' TAs S

Jim Caldwell issues draft Order to licensee (for affirmation/hearing declination)

Licensee affirms conditions of Order and declines hearing Finalize restart authorization letter and Order (letter to be signed by Jim Caldwell; will authorize restart and transmit the Order - Order to be signed by Jim Dyer)

Implement Restart Communications Plan (1-day Enforcement Notification)

Issue restart authorization letter and Order Implement restart inspection plan HALLENGA THAT THE LICENSEE IS CURRENTLY ADDRESSING The NRC Is reviewing the licensee's 50.59 evaluation which qualifies the backfeed method through the main and station auxiliary transformers as a qualified power circuit to supply their 1E AC electrical busses. Repairs to the startup transformer are expected to be completed by February 140'.

LICENSEE ACTIVITIES FOLLOWING RESTART AUTHORIZATION The following sequence of events were taken from a licensee Level 1 schedule.

NRC approval for restart Enter operational Mode 2 (reactor startup)

Reactor critical - Zero power physics testing Enter Mode 1 (greater than 5%power)

Readiness and effectiveness review prior to synch to the grid Synch to the grid Readiness and effectiveness review prior to exceeding 50% power Reactor at 100% power S STV NOMToN-SY

- __ - - __N..