E-mail from D. Croulet of Entergy to J. Noggle of USNRC, Regarding Wll Status Friday December 16, 2005-1530 Hours
ML061000602
Person / Time
Site: Indian Point, U.S. Geological Survey
Issue date: 12/21/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000602 (2)


Text

I-Ja-m'es--N--o-p-qle---FW:-[:'W: WLL-STATUS'FRIbAY DECEMBER 16,2005-1530 HOURS Page 1 1 IJame Nogle- W: W:WL STTU FIDA DCEBE -16,00-153-HORS-age From: "Croulet, Donald" <dcroule ©entergy.com>

To: "'James Noggle"' <JDNCnrc.gov>

Date: 12/21/05 6:22AM Subject;: FW: FW: WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS Jim, Don Mayer has provided below a status of curtain drain analysis plans. Let me know if you need additional information. I will be here for three days next week, (Tuesday, Wednesday, and Thursday).


Original Message-----

From: Mayer, Don Sent: Tuesday, December 20, 2005 5:53 PM To: Croulet, Donald Cc: English, Christopher; BALL, WILLIAM; Axelson, William L

Subject:

RE: FW: WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS Don Chris English has the lead to evaluate the analysis of the south curtain drain. He has been working wilh an engineering firm looking at drawings to see how best to approach this. We are also working with the hydrologist on a well location that is south of the curVaih'dAin'that can also provide intelligence in this area.

Chris is on vacation and will return after new year and make recommendations on how best to proceed. I will ask Chris to brief Jim Noggle.


Original Message-----

From: Croulet, Donald Sent: Monday, December 19, 2005 11:04 AM To: Leach, Don; Mayer, Don; McMullin, Kathy; Conroy, Pat; Axelson, William L; Hinrichs, Gary

Subject:

FW: FW: WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS Bill, do you have the list Jim is referring to and requesting?

What's ihe status of information regarding Jim's question on our plans to verify that the Unit 1 south curtain drain was unblocked and functioning and also the Unit 2 containment footer drain system and segregation of its outfall for sampling at manhole 5.

Please let me know so that this information can be provided to Jim as soon as possible.


Original Message-----

From: James Noggle nrc.gov

Sent: Monday, December 19, 2005 10:53 AM To: Croulet, Donald

Subject:

Re: FW: WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS

Dear Dcn,

Thanks For all your e-mailings. It makes a difference to keep the regional people updated on progress at the site. One request I made through TR Jones that I wanted to make sure was passed along to you.

Could I get a copy of the all possible sources of tritium list? I believe Bill Axelson developed this and was already passed along to Tim Rice. I also mentioned to TR Jones, that we were looking for feedback on Entergy's plans to verify that the Unit 1 south curtain drain was unblocked and functioning and also the Unit 2 containment footer drain system and segregation of its outfall for sampling at manhole 5. Just wanted 1o make sure these issues were still on the plate. Thanks, Don.

Regards,

l Ja~s Nogle - FW: FW: WLL STATUS FRIDAY DECEM-BER 16, 2005-1530 HOURS Page 2Iii Page 2 I Janes Noggle FW: FW: WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS Jim

>>> "Croulet, Donald" <dcroule~entergy.com> 12/19/05 6:24 AM >>>

From: AKelson, William L Sent: Fr day, December 16, 2005 4:17 PM To: Rutkoske, Michael; Jones, T. R.; Morin, Kenneth; Skonieczny, John; Drake, Richard; Nuta, Dragos A; Deeds; Paul; Bode, Paul M.; English, Christopher; Peters, James; Wilson, Daniel; Leach, Don; Kulaga, Joe; Crculet, Donald; McMullin, Kathy; Durfee, Michael; Santis, Hank; Lavera, Ron; Hinrichs, Gary; Thiery, Al; Even;, Bob; Colville, Howard J.; Colville, Richard; Quinn, Dennis; Gray, Dara Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald

Subject:

WLL STATUS FRIDAY DECEMBER 16,2005-1530 HOURS Progress December 16, 2005 MW-31 Drilled 55' MW-32 Awaiting more power fYVacquum.Truck to expose metal indication at 7' depth MW-33,34,35 Set protective cover plates on well heads and cemented flush to ground for finish grade Storm Drains Sampled storm drains in Transformer Yard, MOB Area, and Water Front for tritium Transformer Yard: Cleaned yard from house keeping perspective Performed oil measurements on MW-33, 34, 35 (residual oil in ground and wells)

Vacuum Truck: Radiologically released vacuum truck Communications: Updated NRC and State on most recent survey results CC: "Jones, T. R." <tjones2@entergy.com>