Site Specific Interim Compensatory Measures for Physical Security in the Current Threat Environment at the University of Michigan'S Ford Nuclear Reactor
ML040640541
Person / Time
Site: University of Michigan
Issue date: 10/08/2002
From: Wehe D
University of Michigan
To: Mendonca M
NRC/FSME
References
Download: ML040640541 (1)


Text

(*ur f r sr/

MICHIGAN MEMORIAL- PHOENIX PROJECT PHOENIX MEMORIAL LABORATORY FORD NUCLEAR REACTOR ANN ARBOR, MICHIGAN 48109-2100 08 October 2002 Marvin Mendosa, Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 012-D13 Rockville, Maryland 20852 Phone: (301) 415-1128 The University of Michigan, Ford Nuclear Reactor, Docket 50-2, License R-28.

Subject:

Site Specific Interim Compensatory Measures for Physical Security in the Current Threat Environment at the University of Michigan's Ford Nuclear Reactor Dear Mr. Mendosa; As requested on 21 June 2002, The University of Michigan's Ford Nuclear Reactor is formally submitting actions that the 've are taking or plan on taking to be used in the preparation of the Confirmatory Action Letter (Enclosure 1) and the site-specific basis and information justifying these actions, plans and alternatives which show how the actions meet the intent of the ICMs (Enclosure 2). The actions in Enclosure I are based upon the guidance provided by the U.S.

Nuclear Regulatory Commission on 21 June 2002 and the response and feedback provided during the visit of representatives of the U.S. Nuclear Regulatory Commission on 29-30 July 2002 and U.S. Nuclear Regulatory Commission review of drafts of these documents submitted on 6 September 2002. At this time, the Ford Nuclear Reactor has not identified any ICMs having an adverse consequence and thus is proposing no alternatives to satisfy the intent of the ICMs.

Please confirm receipt of this letter to my assistant, Ms. Zonda Ketola (734.764.6213 or zketola cumich.edu). If there are any questions regarding this inquiry, please feel free to contact Christopher W. Becker at (734) 764-6224 or pager (734) 670-7210.

Respectfully, H: HACK David K. Weehe, Ph.D., Director Michigan Memorial Phoenix Project 2301 Bonisteel Boulevard Ann Arbor, Michigan 48109-2100 Phone: (734) 764-6215 email: dkwvra umich.edui

Enclosures:

1) lCM Actions
2) lCM Basis Document File: Correspondence 02-016 Security - 1CM Actions C:\UofNl\Letter FiIe\02-0I6.%%pd Phone: (734) 764-6220 Fax: (734) 936-1571 Fva3v9.umich.edu/-mmpp/