MONTHYEARML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23304A2682023-11-0707 November 2023 License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23293A0052023-10-20020 October 2023 Lessons Learned from the ITAAC Hearing Process for Vogtle 3 and 4 ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23072A1802023-03-13013 March 2023 2023 RIC Powerpoint Slide Presentation, Vogtle 3: Journey from Construction to Operations ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22335A5542022-12-0101 December 2022 Slides - SNC Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request - ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22126A0012022-05-0606 May 2022 SNC Slides - Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemptions ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22060A0062022-02-28028 February 2022 4Q 2021 Performance Summary U3 ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML22026A0582022-01-26026 January 2022 Dashboard Report 1-26-2022 ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21197A0032021-08-0606 August 2021 Slides - SNC Slides - Pre-Submittal Meeting on August 13, 2021 - Vogtle TS 3.3.1 and 3.3.2 LAR ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21188A3612021-07-0606 July 2021 1Q 2021 Performance Summary U4 ML21188A3592021-07-0606 July 2021 1Q 2021 Performance Summary U3 ML21188A3622021-07-0606 July 2021 Archives ML21193A0772021-06-24024 June 2021 Exemption from Operator Written Examination and Operating Test for Unit 4 Licenses, 6-24-21 Pre-submittal Meeting ML21124A2522021-05-31031 May 2021 Request for Alternative to ASME Section XI and Section III Requirements for Repair of Reactor Vessel Head Penetrations - NRC Pre-submittal Meeting May 10, 2021 (EPID L-2021-LRM-0047) (Slides) ML21085A4902021-05-19019 May 2021 Risk-informed Resolution of Generic Letter 2004-02 ML21113A2272021-04-23023 April 2021 Readiness Group Public Meeting Presentation Slides - April 28, 2021 2024-01-08
[Table view] |
Text
ITP Inspection Planning Meeting 1
Agenda
- NRC Region II and NRO: ITP IPs Status
- SNC: ITP Status & Licensing Update 2
Agenda
- Administrative Procedures
- Licensing Topics: Non-LAR Changes
- Test Procedure Development Strategy
Safety Brief 4
ITP Status Steve Waldrup l Lindsey Grissom ITP Manager l Licensing Engineer 5
Project Milestones 6
7 8
9 ITP Overview
- Current focus is procedure development
- Project first power block testing in last half of 2018 10
Crediting China for First Plant Only and First Three Plant Only Tests (ITP-1)
- The VEGP 3&4 Combined Licenses (COLs) currently require First Plant Only Tests (FPOTs) be performed on both Unit 3 and Unit 4.
- If Licensee would like to credit a test performed at a previous plant (unit), a LAR is required.
- SNC would like the option to credit testing completed on the China AP1000 units.
- The SNC intent is to submit LARs covering China FPOT/F3POT applicability.
- The LAR scope will be split:
- Start-up tests Technical Exchange between SNC and NRC was held on 03-08-2018 Planned ITP-1 LAR Submittal for Pre-Operational Test Scope 07-31-2018 11
Revision to Natural Circulation and PRHR Startup FPOT LAR 84 (LAR 17-041)
- This LAR splits Natural Circulation test into two phases: one portion remains in low power testing, the other will be moved into power ascension testing.
- The proposed change in test phase creates more suitable plant conditions to run the test while ensuring safe plant operations.
Submitted 11-17-2017; Requested Approval 11-18-2018 12
PRHR Heat Transfer and IRWST Heat Up Test Acceptance Criteria Change LAR 155 (LAR 17-033)
- The proposed changes revise the methodology and acceptance criteria for the IRWST heatup preoperational test. The 3 specific changes are below:
- Proposed change to allow for the observation of the IRWST thermal profile during both natural circulation and forced flow PRHR heat exchanger tests.
- The current acceptance criterion requires the data from the IRWST heatup test to verify the RCS safe shutdown temperature criterion. The newly proposed acceptance criterion requires the test to demonstrate that the average IRWST heatup is consistent with the PRHR heat exchanger heat transfer.
- Update to reference in COL.
- This change allows for a one-to-one comparison between the as-built plant and the safety analysis Submitted 10-06-2017; Requested Approval 08-21-2018 13
Tier 1/Tier 2* Editorial LAR LAR 148 (LAR 17-042)
- Supplement to this LAR(submittal, RAD) will propose changing the DCD, Rev. 19, references in COL to UFSAR references
- Enable use of existing 50.59 /
departure evaluation process when making changes to Chapter 14 sections referenced in COL
- Discussed during 03/01/18 Public Call 14