|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196G4021999-06-18018 June 1999 Comment on FRN Re Rev of NRC Enforcement Policy NUREG-1600, Rev 1 & Amend of 10CFR55.49.Concurs with Need to Provide Examples That May Be Used as Guidance in Determining Appropriate Severity Level for Violations as Listed ML20206H1881999-05-0606 May 1999 Exemption from Requirements of 10CFR50,App K Re ECCS Evaluation Models. Commission Grants Licensee Exemption ML20206H2221999-05-0404 May 1999 Exemption from Requirements of 10CFR50.60 That Would Allow STP Nuclear Operating Co to Apply ASME Code Case N-514 for Determining Plant Cold Overpressurization Mitigation Sys Pressure Setpoint.Commission Grants Exemption ML20206M5111999-04-30030 April 1999 Comment Supporting Draft RG DG-1083 Re Content of UFSAR IAW 10CFR50.71(e). Recommends That Listed Approach Be Adopted for Changes to Documents Incorporated by Ref CY-99-007, Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-0071999-02-22022 February 1999 Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-007 TXX-9825, Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps1998-12-14014 December 1998 Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps ML20195C7541998-11-0505 November 1998 Order Approving Application Re Proposed Corporate Merger of Central & South West Corp & American Electric Power Co,Inc.Commission Approves Application Re Merger Agreement Between Csw & Aep ML20155H5511998-11-0202 November 1998 Exemption from Certain Requirements of 10CFR50.71(e)(4) Re Submission of Revs to UFSAR ML20154C4101998-09-30030 September 1998 Comment Re Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors.Comanche Peak Electric Station Endorses NEI Comment Ltr & Agrees with NEI Recommendations & Rationale ML20248K5051998-06-0909 June 1998 Confirmatory Order Modifying License (Effective Immediately).Answer for Request for Hearing Shall Not Stay Immediate Effectiveness of Order ML20216E1051998-04-0707 April 1998 Comment Supporting Draft RG DG-1029 Titled Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safety-related Instrumentation & Control Sys NOC-AE-000109, Comment on Proposed Rule 10CFR50 Re Rev to 10CFR50.55a, Industry Codes & Standards.South Texas Project Fully Endorses Comments to Be Provided by NEI1998-03-30030 March 1998 Comment on Proposed Rule 10CFR50 Re Rev to 10CFR50.55a, Industry Codes & Standards.South Texas Project Fully Endorses Comments to Be Provided by NEI ML20217H3611998-03-26026 March 1998 Comment Opposing Draft GL 97-XX, Lab Testing of Nuclear Grade Charcoal, Issued on 980225.Advises That There Will Be Addl Implementation Costs ML20198Q4851998-01-16016 January 1998 Comment Opposing PRM 50-63A by P Crane That Requests NRC Amend Regulations Re Emergency Planning to Require Consideration of Sheltering,Evacuation & Prophylactic Use of Potassium Iodide for General Public ML20211A4871997-09-12012 September 1997 Changes Submittal Date of Response to NRC RAI Re Proposed CPSES risk-informed Inservice Testing Program & Comments on NRC Draft PRA Documents ML20149L0311997-07-21021 July 1997 Comment on Draft Guides DG-1048,DG-1049 & DG-1050.Error Identified in Last Line of DG-1050,item 1.3 of Section Value/Impact Statement.Rev 30 Should Be Rev 11 ML20140A4871997-05-27027 May 1997 Comment Opposing Proposed Rule Re Safety Conscious Work Environ.Util Agrees W/Nuclear Energy Inst Comment Ltr ML20137U3531997-04-0808 April 1997 Order Approving Application Re Formation of Operating Company & Transfer of Operating Authority ML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20135B7881996-11-29029 November 1996 Order Approving Corporate Restructuring of TU to Facilitate Acquistion of Enserch Corp ML20128M8011996-10-0303 October 1996 Comment Opposing Proposed NRC Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20116B8871996-07-19019 July 1996 Transcript of 960719 Predecisional Enforcement Conference Re Apparent Violations of NRC Requirements at Plant ML20097D7321996-02-0909 February 1996 Comment Opposing Petition for Rulemaking PRM-50-63 Re CPSES Request for Amend to Its Regulations Dealing W/Emergency Planning to Include Requirement That Emergency Planning Protective Actions for General Public Include Listed Info ML20094Q6421995-11-28028 November 1995 Comment Supporting Petition for RM PRM-50-62 Re Amend to Regulation Re QAPs Permitting NPP Licensees to Change Quality Program Described in SAR W/O NRC Prior Approval If Changes Do Not Potentially Degrade Safety or Change TSs ML20094H4801995-11-0808 November 1995 Comment Supporting Nuclear Energy Inst Comments on Proposed Rules 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel or high-level Radwaste TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20091M6441995-08-25025 August 1995 Comment Opposing Proposed Rule Re Review of Revised NRC SALP Program.Believes That NRC Should Reconsider Need for Ipap or SALP in Light of Redundancy ML20086M7921995-07-0707 July 1995 Comment Supporting Proposed GL Process for Changes to Security Plan Without Prior NRC Approval ML20084A0181995-05-19019 May 1995 Comment Suporting Proposed Rule 10CFR50 Re Containment Leakage Testing.Supports NEI Comments ML20077M7311994-12-30030 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Nuclear Power Reactors ML20077L8711994-12-22022 December 1994 Comment Supporting Proposed Rule 10CFR50,55 & 73 Re Reduction of Reporting Requirements Imposed on NRC Licensees ML20073B6951994-09-19019 September 1994 Affidavit of Cl Terry Authorizing Signing & Filing W/Nrc OL Amend Request 94-016 ML20073B6731994-09-19019 September 1994 Affidavit of Cl Terry Re License Amend Request 94-015 ML20072P5441994-07-13013 July 1994 Testimony of Rl Stright Re Results of Liberty Consulting Groups Independent Review of Prudence of Mgt of STP ML20092C3911993-11-15015 November 1993 Partially Deleted Response of Rl Balcom to Demand for Info ML20092C4031993-11-15015 November 1993 Partially Deleted Response of Hl&P to Demand for Info ML20058E0561993-11-10010 November 1993 Comment on Proposed Rule Re Staff Meetings Open to Public. Believes That NRC Has Done Well in Commitment to Provide Public W/Fullest Practical Access to Its Activities ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML20045D8321993-06-11011 June 1993 Comment Supporting Proposed Rules 10CFR50 & 54, FSAR Update Submittals. ML20044F3271993-05-21021 May 1993 Comments on Draft NRC Insp Procedure 38703, Commercial Grade Procurement Insp, Fr Vol 58,Number 52.NRC Should Use EPRI Definitions for Critical Characteristics ML20044D3311993-05-0404 May 1993 Comment Supporting Proposed Generic Communication Re Mod of TS Administrative Control Requirements for Emergency & Security Plans ML20056C0831993-03-19019 March 1993 Texas Utils Electric Co Response to Petitioners Motion to Stay Issuance of Full Power License.* Licensee Urges NRC to Reject Petitioners Motion & to Deny Petitioners Appeal of 921215 Order.Motion Should Be Denied.W/Certificate of Svc ML20056C1881993-03-17017 March 1993 Order.* Directs Util to Respond to Motion by COB 930319 & NRC to Respond by COB 930322.W/Certificate of Svc.Served on 930317 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20128D9651993-02-0303 February 1993 Memorandum & Order.* Stay Request Filed by Petitioners Denied.W/Certificate of Svc.Served on 930203 ML20128D4651993-02-0202 February 1993 Texas Utils Electric Co Response to Emergency Motion to Stay Issuance of low-power Ol.* Petitioner Request Should Be Denied Based on Failure to Meet Heavy Burden Imposed on Party.W/Certificate of Svc ML20128D3391993-02-0202 February 1993 Emergency Motion to Stay Issuance of low-power Ol.* Petitioners Specific Requests Listed.W/Certificate of Svc ML20128D6321993-01-29029 January 1993 Memorandum & Order.* Denies Citizens for Fair Util Regulation for Fr Notice Hearing on Proposed Issuance of OL for Facility.W/Certificate of Svc.Served on 930129 ML20128D3461993-01-29029 January 1993 NRC Staff Notification of Issuance of OL for Facility.* Low Power License May Be Issued by 930201.W/Certificate of Svc ML20128D6111993-01-26026 January 1993 Joint Affidavit of I Barnes & Ft Grubelich Re Borg-Warner Check Valves.* Discusses Issues Re Borg-Warner Check Valves Raised by Cfur & Adequacy of Actions Taken by TU Electric 1999-06-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20116B8871996-07-19019 July 1996 Transcript of 960719 Predecisional Enforcement Conference Re Apparent Violations of NRC Requirements at Plant ML20072P5441994-07-13013 July 1994 Testimony of Rl Stright Re Results of Liberty Consulting Groups Independent Review of Prudence of Mgt of STP ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20244C9131989-03-28028 March 1989 Transcript of 890328 Meeting in Rockville,Md Re Discussion/ Possible Vote on Full Power Ol.Pp 1-65.Supporting Documentation Encl ML20055G7801988-11-10010 November 1988 Investigative Interview of La Yandell on 881110 in Arlington,Tx.Pp 1-13.Related Info Encl ML20055G7151988-11-0909 November 1988 Investigative Interview of J Kelly on 881109 in Arlington, Tx.Pp 1-35.Supporting Documentation Encl ML20055G7831988-11-0909 November 1988 Investigative Interview of R Caldwell on 881109 in Arlington,Tx.Pp 1-27.Related Info Encl ML20055G7881988-11-0909 November 1988 Investigative Interview of AB Earnest on 881109 in Arlington,Tx.Pp 1-90.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20148K0271988-03-21021 March 1988 Transcript of 880321 Discussion/Possible Vote on Full Power License for South Texas Nuclear Project,Unit 1 (Public Meeting) in Washington,Dc.Viewgraphs Encl.Pp 1-73 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20235H8341987-08-0505 August 1987 Transcript of 870805 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 128-224 ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235H8031987-07-27027 July 1987 Transcript of 870727 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 1-127.Supporting Documentation Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20097J5141987-01-22022 January 1987 Partially Deleted,Transcript of 870122 Sworn Statement in Bay City,Tx.Pp 1-101 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20097J4821986-11-0606 November 1986 Partially Deleted Transcript of 861106 Sworn Statement in Lake Jackson,Tx.Pp 1-63 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl 1996-07-19
[Table view] Category:DEPOSITIONS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20116B8871996-07-19019 July 1996 Transcript of 960719 Predecisional Enforcement Conference Re Apparent Violations of NRC Requirements at Plant ML20072P5441994-07-13013 July 1994 Testimony of Rl Stright Re Results of Liberty Consulting Groups Independent Review of Prudence of Mgt of STP ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20244C9131989-03-28028 March 1989 Transcript of 890328 Meeting in Rockville,Md Re Discussion/ Possible Vote on Full Power Ol.Pp 1-65.Supporting Documentation Encl ML20055G7801988-11-10010 November 1988 Investigative Interview of La Yandell on 881110 in Arlington,Tx.Pp 1-13.Related Info Encl ML20055G7151988-11-0909 November 1988 Investigative Interview of J Kelly on 881109 in Arlington, Tx.Pp 1-35.Supporting Documentation Encl ML20055G7831988-11-0909 November 1988 Investigative Interview of R Caldwell on 881109 in Arlington,Tx.Pp 1-27.Related Info Encl ML20055G7881988-11-0909 November 1988 Investigative Interview of AB Earnest on 881109 in Arlington,Tx.Pp 1-90.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20148K0271988-03-21021 March 1988 Transcript of 880321 Discussion/Possible Vote on Full Power License for South Texas Nuclear Project,Unit 1 (Public Meeting) in Washington,Dc.Viewgraphs Encl.Pp 1-73 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20235H8341987-08-0505 August 1987 Transcript of 870805 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 128-224 ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235H8031987-07-27027 July 1987 Transcript of 870727 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 1-127.Supporting Documentation Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20097J5141987-01-22022 January 1987 Partially Deleted,Transcript of 870122 Sworn Statement in Bay City,Tx.Pp 1-101 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20097J4821986-11-0606 November 1986 Partially Deleted Transcript of 861106 Sworn Statement in Lake Jackson,Tx.Pp 1-63 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl 1996-07-19
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20116B8871996-07-19019 July 1996 Transcript of 960719 Predecisional Enforcement Conference Re Apparent Violations of NRC Requirements at Plant ML20072P5441994-07-13013 July 1994 Testimony of Rl Stright Re Results of Liberty Consulting Groups Independent Review of Prudence of Mgt of STP ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20244C9131989-03-28028 March 1989 Transcript of 890328 Meeting in Rockville,Md Re Discussion/ Possible Vote on Full Power Ol.Pp 1-65.Supporting Documentation Encl ML20055G7801988-11-10010 November 1988 Investigative Interview of La Yandell on 881110 in Arlington,Tx.Pp 1-13.Related Info Encl ML20055G7151988-11-0909 November 1988 Investigative Interview of J Kelly on 881109 in Arlington, Tx.Pp 1-35.Supporting Documentation Encl ML20055G7831988-11-0909 November 1988 Investigative Interview of R Caldwell on 881109 in Arlington,Tx.Pp 1-27.Related Info Encl ML20055G7881988-11-0909 November 1988 Investigative Interview of AB Earnest on 881109 in Arlington,Tx.Pp 1-90.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20148K0271988-03-21021 March 1988 Transcript of 880321 Discussion/Possible Vote on Full Power License for South Texas Nuclear Project,Unit 1 (Public Meeting) in Washington,Dc.Viewgraphs Encl.Pp 1-73 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20235H8341987-08-0505 August 1987 Transcript of 870805 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 128-224 ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235H8031987-07-27027 July 1987 Transcript of 870727 Deposition of Bp Garde in Bethesda,Md Re Plant.Pp 1-127.Supporting Documentation Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20097J5141987-01-22022 January 1987 Partially Deleted,Transcript of 870122 Sworn Statement in Bay City,Tx.Pp 1-101 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20097J4821986-11-0606 November 1986 Partially Deleted Transcript of 861106 Sworn Statement in Lake Jackson,Tx.Pp 1-63 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl 1996-07-19
[Table view] |
Text
"
FPC DOCKET NO. ER76-587 PREPARED TESTIMONY OF DAVID A. SPRINGS 1 Q. PLEASE STATE YOUR NAME AND PLACE OF RESIDENCE.
2 3 A. David A. Springs, 4514 North Peachtree Road, Chamblee, Georgia 4
5 Q. WOULD YOU STATE YOUR EDUCATIONAL BACKGROUND?
6 7 A. I graduated from Georgia Institute of Technology in 1948 with a 8 Bachelor of Electrical Engineering Degree, and again in 1949, with a 3 Degree of Master of Science in Electrical Engineering.
10 11 . WOULD YOU STATE BRIEFLY YOUR ENPERIENCE?
12 13 A. During graduate work at Georgia Tech, I worked 15 months as Assistant 14 Operator of the Georgia Tech AC Network Calculator. At that time, the 15 calculator was the most advanced tool for studying the overall operations 16 of power systems. This experience gave me a very early understanding 17 of load flow and stability problems on large utility systems.
18 19 After graduation, I worked for Southern Engineering Company of Georgia 20 in Atlanta, Georgia, for approximately three years, doing distribution 21 design work, transmission system design, and long range power supply 22 planning.
23 24 From 1952 to 1963, I was with the South Carolina Public Service Authority, 25 first as supervisor in charge of wholesale billing and then for a period
( 26 of t'x years as their planning engineer. One of my responsibilities 27 with the South Carolina Public Servi.ce Authority was to rework and update 28 the " rule curve" of
- Pinopolis Hydroelectric Plant Reservoir as steam 29 generation was added - the system.
30 31 Since returning to Southern Engineering Company of Georgia in 1963, I 32 have been in charge of the power supply planning and power system plan-33 ning section. I have been involved as a principal engineer in power 34 system planning or power supply planning for existing or potential sys-35 tems in the following states: Maine, Vermont, Virginia, North Carolina, 36 South Carolina, Georgia, Florida, Alabama, Mississippi, Oklahoma, Kansas, 37 Illinois, Kentucky and Ohio. I am a Vice President of Southern Engineer-38 ing Company of Georgia.
39 40 Q. HAVE YOU EVER TESTIFIED BEFORE ANY REGULATORY COMMISSIONS?
41 42 A. Yes, I have testified before this Cotmission in Carolina Power and Light 43 Company, Docket No. E-7564; Georgia Power Company, Docket Nos. E-7548, 44 E-9091, E-9521; Florida Power Corporation, Docket No. E-7679; Duke Power 45 Company, Docket No. E-7720; and Central Vermont Public Service Company, 46 Docket No. E-7685. I have testified before the Atomic Energy Commission 47 (n w the Nuclear Regulatory Commission) in Alabama Power Company, 48 J seph M. Farley Nuclear Plant, Units 1 and 2, Docket Nos. 50-348A and 49 50-364A. I have also testified before the Public Service Board of the 50 State of Vermont on two occasions.
L 1013 082 79092600 M
1 Q. ARE YOU A REGISTERED PROFESSIONAL ENGINEER?
C 2 3 A. Yes, I am registered in the States of Georgia and Kansas.
4 5 Q. TO WHAT SCHOLASTIC AND PROFESSIONAL SOCIETIFS DO YOU BELONG?
6 7 A. I am a member of IEEE and the Georgia Society of Professional Engineers, t 8 I am also a member of Tau Beta Pi (Scholastic Engineering) and of Eta 9 Kappa Nu (Scholastic Electrical).
10 11 Q. WHAT WERE YOUR ASSIGN'4ENTS IN THIS PROCEEDING?
12 13 A. My assignments were in two areas. The first was to demonstrate why Georgia
( 14 Power Company (GPC) should adjust its generating resources for Period II 15 (January through December 1976) to reficct only those generating resources 16 (capacity and associated energy) available to GPC in meeting its terri-17 torial load responsibility. Neither CPC's PR-2 rate filing with respect 18 to capacity charges nor its actual energy billing under PR-2 reflected 19 adjustments for certain transactions with others through the Southern 20 Company Pool.
21 22 My second assignment was to express an opinion as to whether GPC was 23 correct in its PR-2 rate filing to provide that OEMC should be billed 24 for its annual capacity responsibility based upon an estimated peak demand 25 contribution rather than OEMC's actual peak demand contribution.
( 26 27 Q. PLEASE ENPLAIN YOUR FIRST ASSIGNMENT AS TO UHY GPC SHOULD HAVE MADE 28 CERTAIN ADJUSTMENTS IN ITS PR-2 RATE FILING AND liS ENERGY BILLING UNDER 29 THE PR-2 RATE.
30 31 A. GPC prepared its PR-2 rate filing based upon a projected territo.-ial 32 generating capability " stack" (and related annual cost other than fuel) 33 including generating units owned solely by GPC and units jointly owned 34 by GPC and OEMC plus certain other Pencrating resources contractually 3 available to GPC during Leriod II including its purchase of 75,000 kW 36 from South Carolina Electric and Gcs Company, its purchase from Southern 37 Electric Generating Company of 522,950 kW, and its 157,795 kW share of L 38 the TVA seasonal exchange. GPC also included in the monthly energy 39 " stack" used for computing monthly energy billings to OEMC under the 40 PR-2 rate, the energy (and the fuel costs of such energy) provided by 41 each such generating resource-during each month. GPC did not reflect 42 in its projected annual terri.orial generating capacity " stack" nor its 43 monthly energy " stack" other transactions through the Southern Company 44 Pool which definitely either subtract from or add to the capacity and 45 energy resources of GPC and which should be recognized in establishing 46 the net resources available to GPC in meeting its territorial load 47 responsibility.
48 49 I have had prepared under my direct supervision OEMC Exhibit No. (DAS-1) 50 for the purpose of identifying the other transactions referred to above
<Ql-
.ss
., ,t 1013 083
so that they n _ght be analyzed separately. From this analysis I will
(' ' 1 identify certain capacity related transactions which GPC should reflect 2
3 in the annual territorial generating capacity " stack". I have recom-4 mended to Witness Solomon that he include appropriate adjustments for 5 such capacity amounts in his annual capacity cost responsibility com-6 putations. These capacity related transactions will have a substantial 7 effect upon the capacity cost responsibility of OEMC under an appro-8 priately modified PR-2 filing as Witnesses Solomon and Gross testify.
9 10 From the analysis of OEMC Exhibit No. (DAS-1) certain energy trans-11 actions will also be identified which GPC should take into account 12 monthly in arriving at the energy " stack" actually available to GPC to 13 meet territorial load responsibility. OEMC Exhibit (DAS-2) has 14 been prepared under my direct supervision to show the effect of such 15 energy " stack" adjustments on the OEMC monthly billing for the months 16 o f August, September, October and November of 1976, 17 18 Q. WOULD YOU UOW DESCRIBE OEMC EXHIBIT (DAS-1) AND IDENTIFY THE TRANS-19 ACTIONS WHICH GPC HAS NOT TAKEN INTO ACCOUNT.
20 21 A. Page 1 of OEMC Exhibit (DAS-1) is a copy of Schedule B, sheet 1 of 22 2 from the Southern Company System 1976 Interchange Contract Analysis 23 for the Contract Year 1976 covering the period January through May. This 24 shows on line B1(c) that GPC was a " surplus capacity" pool member with 25 respect to " peak period" capacity and associated energy In the amount 26 of 314,853 kW and therefore contracted to sell this " surplus" capacity
(- 27 and associated energy to " deficit" pool members. Line B4 shows that 28 GPC was "short" of " peak hour" capacity in the amount of 43,842 kW and 29 contracted to purchase such shortage from those pool members long on 30 " peak hour" capacity. The method used for GPC to receive payment for 31 the " surplus" capacity sale is to include a portion of such capacity 32 Payments in the pricing of surplus energy (as exchange energy) and the 33 net remaining difference as an adjustment to the other fixed payments 34 of GPC for the period (see lines B2 through B5) .
35 36 Page 2 of OEMC Ex5Lbit (DAS-1) is a copy of Schedule B, sheet 2 of 37 2 from the South ( n Company System 1976 Interchange Contract Analysis for 38 the Contract Year 1276 cvcering the period June through December 1976.
39 This is similar tc Page 1 described above except it shows GPC selling 40 792,516 kW of " surplus peak period" capacity and as:sciated energy and 41 purchasing its shortage of 200,878 kW of " peak hour" capacity.
42 43 These capacity sales and purchases of GPC should be respectively removed 44 from and added to the annual capacity " stack" of GPC to obtain the net 45 territorial capacity " stack" of GPC available to meet territorial load 46 responsibility. I have recommended to Witness Gross that he make such 47 adjustments.
48 49 Page 3 of Exhibit DAS-1 is 'a listing of the transactions of GPC with 50 others for the month of August 1976 as recorded in the Operating Report 1013 084
( l 2
of GPC for August 1976. Starting with the total transactions for the month in both dollars and kWh (see line 2) we first remove those trans-3 actions with others which GPC has included in the capacity " stack" and 4 monthly energy " stack" (line 2A through line 2I). We then removed the 5 fixed payments (and' credits) GPC makes to the pool including the " peak 6 hour" capacity purchase payments and rentals but the adjustment to the 7 surplus capacity and energy sale (see line 3A) described as Pesk 8 Period Equivalent Payments is carried down and credited to the " surplus" 9 capacity and associated energy sale (see line 4B). The " surplus" trans-10 action for the month is now complete (see line 4C). By removing the 11 capacity related cost (see line 4D) the remainder is the revenue received 12 for " surplus" energy sold (see line 4E).
13 14 The "other variable" cost related to this " surplus" energy sale is
. 15 assumed to be 1.158624 mills /kWh ir accordance with Witness Solomon's 16 OEMC Exhibit No. (JBS-3). After removing the "other variable" 17 cost the remaining fuel cost (dollars and associated KWH) should be 18 removed from the appropriate energy resource in the energy " stack" 19 for August, 1976. This is shown on line 21 of page 1 of OEMC Exhibit 20 No. (DAS-2).
21 22 Next we removed pool capacity energy sold, and added that purchased, 23 adjusting the respective dollars cost or credit by the "other variable" 24 cost factor related to pool capacity energy exchanges in accordance 25 with page 14 of Witness Solomon's OEMC Exhibit No. (JBS-3) , (s ee 26 line SA through 5F). The remaining fuel cost (dollars and associated
( 27 KWH) shculd be removed from s. added to the appropriate energy resource 28 as was done previously for "surplua" energy (see lines 31 and 32 of 29 page 1 of OEMC Exhibit No. (DAS -2)) .
30 31 The same procedure was followed to add, or remove, economy energy 32 purchases or sales, (see line 6A through 6F) adjusting for "other 33 variabic costs" in accordance with the testimony of Witness Solomon 34 (see lines 26 and 28 of page 1 of OEMC Exhibit No. (DAS-2)).
35 36 Line 7 of OEMC Exhibit No. (DAS-1) described as "other exchanges 37 with associated companies" and line 8, described as "other interchange 38 transactions with non-associated companies" have not been adjusted 39 in the energy " stack" for August, 1976 since the information available 40 to us was insufficient to determine the proper resource of resources 41 to be adjusted. However, sufficient information to properly account 42 for these transactions is available to GPC and should be used to 43 properly apply the transactions as adjustmen r 1.
44 45 The sales on line 9A and 9B are comm.ittents of GPC which are considered 46 in'the territorini load responsibility and therefore generating 47 resources to supply these commitments should remain in the " stack". Line 48 9C however, should be added to the " stack" as a resource. This is 49 shown on line 5 of page 1 of OEMC Exhibit No. (DAS-2).
50 L
k (((f 1013 085
9 1 The resulting revised energy " stack" for August 1976 is then used to 2 determine the energy cost by category for a recomputation of the 3 August 1976 energy billing for OEMC shown on pages 2 through 6 of 4 OEMC Exhibit No. (DAS-2).
5 6 The same procedure as illustrated on pages 3 and 4 of OEMC Exhibit 7 No. (DAS-1) for the month of August was repeated for the months 8 of September, October and November 1976 in developing revised energy 9 " stacks". These revised " stacks" were then used in recomputing energy 10 billing for OEMC for each month as shown on pages 7 , 8 and 9 ,
11 respectively, of OEMC Exhibit No. (DAS-2).
12 13 Page 10 of OEMC Exhibit No. (DAS-2) shows a comparison of energy 14 billing to OEMC for the four months as actually billed, as recomputed 15 herein, and the difference between the two. It will be noted that 16 the recomputed billing is $163,193 less than the actual billing.
17 18 Q. PLEASE EXPLAIN YOUR SECOND ASSICRIEhT AS TO MIETilER GPC WAS CORRECT 19 OR INCORRECT IN ITS PR-2 RATE FILING BY PROVIDING FOR ODIC TO BE BILLED 20 ON AN ESTDIATED, RATHER THAN AN ACTUAL PEAK DEMAND C0hTRIBUTION.
21 22 A. It is my opinion that GPC was incorrect in providing for OEMC to be 23 billed on an estimated peak basis. GPC and OEMC will be continuously 24 Pl anning together to meet their respective power requirements and
( 25 responsibilities. To penalize OEMC for overestimating its peak demand 26 and require that it pay for capacity and reserves that it did not 27 require means that OEMC will bear costs which should be carried by 28 thers. Additionally this will require OEMC to consistently under-29 Stim t their exP cted Peak demand in order to ensure that they d n t pay f r cap city and reserves they do not require.
30 31 32 For GPC and OEMC to jointly plan for their future needs requires 33 that both parties estimate their future demands as accurately as 34 Possible. OEMC, as well as GPC, will be disadvantaged if OEMC is 35 r quir d to plan for future requirements based on underestimates of 36 its peak demand because of this incorrect provision in the PR-2 rate filing.
3,i 38 39 40 41 42 43 44 45 46 47 48
.49 30 1013 086
UNITED STATES FEDERAL POWER C0:011SSION DOCKET NO. ER76-587 STATE Oi GEORGIA )
) SS:
COUNTY OF FULTON )
I certify that the attached testicony and exhibits in this docket vere prepared by me or under my supervision and that the answers con-tained in such testimony and exhibits are true and correct to the best of my knowledge and belief.
I J ~ nn/
David A. Sppfngs /
{
(
( Subscribed and sworn to before me this k
@ [d b f x.y Nott)ry Public flotary Peb"e, G orril St:t? ct t.arge