Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
)
()
l VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 50-10 FOR THE MONTH OF OCTOBER, 1980 s
l l
55100 '
l
1 l
l OPERATING DATA REPORT 00CKET NO. 50-271 DAIE 801111 CCMPLETED BY F.C. Beers TELEPHONE 617-366-8811, X2215 OPERATING STATUS Notes
- 1. 'init Name: Vermont Yankee
- 2. Reporting Period: October
- 3. Licensed Thermal Power (MWt): 1593
- 4. Naseplate Rating (Gross MWe): 540
- 5. Design Electrical Rating (Net MWe): 514 (open)504 (closeil)
- 6. Maximum Oependable Capacity (Gross MWe): 535
- 7. Maxi =ue Depenfable Capacity (Net MWe): 504
- 8. If C .anges Occur in Capacity Ratings (!te=s Nu=ber 3 Through 7)Since Last Report, Give Reascns:
- 9. Power Level to Which Restricted,If Any(Net >Me):
- 10. Peascns For Restrictions, If Any:
This Month Yr-to-Date Cuculative
- 11. Hours In Reporting ?eriod 745.00 7,320.00
- 12. Number Of Hours Reacter Was Critical 0.00 6,266.89 57,425.28
- 13. Raactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6,200.00 55,527.88
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Cross Thermal Energy Generated (MWH) 0.00 9,347,971.00 78,572,584.00
- 17. Gross Electrical Energy Generated (MWH) 0.00 3,136,006.00 26,105,676.00
- 18. Net Electrical Energy Generated (MWH) 0.00 2,972,808.00 24,741,173.00
- 19. Unit Service Factor 0.00 84.70 78.08
- 20. Unit Availability Factor 0.00 84.70 78.08
- 21. Unit Capacity Factor (Using MDC Net) 0.00 80.58 69.03 ,
- 22. Unit Capacity Factor (Using DER Net) 0.00 79.01 67.68 l
- 23. Unit Forced Outage Rate 0.00 1.85 *6.02 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): l i
Refueling in progress, QLast month's report was incorrect. Item 23 should have been 6.02. nor 6.40. l
- 25. If Shut Down At End Of Report Period, Estimated Late of Startup: Early December
- 26. Units In Test Status (Prior to Cc=mercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCFCERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCY2T NO. 50-271 UNIT Vermont Yankee DATE 801111 COMPLETED BY F. J. Burger TELEPHONE 802-257-7711, X 137 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
., (MWe-Net) (MWe-Net)
- 1. 0 17. 0
- 2. 0 18. O i 3. 0 19, 0 i
- 4. 0 20. 0
- 5. 0 21. 0
- 6. 0 22. O s
- 7. 0 23. 0 0 O
- 8. 24 t
- 9. 0 25. 0
- 10. 0 26. 0
- 11. 0 27. 0
- 12. 0 28. 0
- 13. 0 29. 0
- 14. 0 30. 0
- 15. 0 31. 0
- 16. O INSTRUCTIONS-On this format, list the average daily unit power level in MWe-Net. for each day in the reporting month. Compute to the nearest whole megawatt.
1 i
9 i
l .
u r tD mm m o
,O t
y y r mm ~
nQ C* M nn am
- _. 8 e
C.
cn e C
e a -
i 9
m
=Immeoa>m i
7 OC>c2m2mm I s e i e I m Typed 1 r*"O'c c.ac m e o . 'n 5 m ao m >= C C
@ M == n C C 3 -3 at En 3 m-4 y
D Duration e n - n a ~ eM~$o ** u (Hours) 2 monnoa=a m - m o f, -
xsn n om s n a
2
,m 4
u o a >< s a n Reason en
=
-we m am m m
anmam m< -m =mo=
n- .m.:: e Cn vm -n Method of o o en a =m 5-
, ao >- am H Shutting 3 a - -Em m
n m -
m en a n Down Reactor 5
- m M 1"* C M z N a -a = 8 C
- n - = ,
a e = ,
- - e- 0 v
m :- z xm: n c
m :
C v _m.r <n e a ,
m M
,f ng-fe 7
a 2 g e n u...
5 C t
- C 1 s O System y .i It w - ;
- $ Code' E !
8 w m 1
- 1
- k. V. N. i c.
m o>zz
-= uu s. -
=-= = , i< Code 3 ee=c x ,
M E D D :
N &W
^ fT m - en M O n
= ,
>a e4 Q O Q n5 Z c
= *4 m ,2 e
vs e- e-mm
c ai z e..
mi
=m E-O C O Z *I 2 >>
m tuas 3 2 V * =< M D: O m o a
j m -mmmm m a>g ao m ce <
a =
u F
= <= eM C@ tv Pt Y onc e, sa w C'
M3 M M n s N C*
=, n y .u - g $ q
- O N ** r -e u W D W E C N n F O " "Jt: 3 C tn I, C
~ 3 4 .Mi E n m o N Pt *<
Ch C 2 at i t -M r' D ,2, e 4g Sn p
E p:=
v rt a fN - pg n e4 >* 3 g
. m m amO m n m 3 FC m,3 m
% x N O = $"" $ Q' .
C4 V r* m n s O ~ n i C "f! n C -
M #= S C C n >== 3 M 3 G C @ m CD C
a 9
0
- - + , - - ~ ,
DOCKET NO. 50-271 ,
UNIT vermnat..Yankaa DATE 801111 CottPLETED BY FJ J urger TELEP110NE 802-257-7711 X 13Z___
r e
SAFETY RELATED itAINTENANCE_
Page 1 of 6 i
. NATURE OF , !!ALFUNCTION
- EQUIPMENT MAINTENANCE tHIM11ER (' AtlS E RESIILT CORRECTIVE ACTION li"s Standby Liquid Control Corrective N/A Construction Arc Pitting of the Repaired by Welding Line, SLC-9 MR 80-186 Strike Pipe but not Below Minimum t Wall Thickness MS2V 80 A Preventive ,N/A Worn Guide Rods and Potential Sticky Replaced Guide Rods MR 80-249 Springs on Valve Operation and Springs Actuator
- IIPCI Pump, P 44-1A Corrective N/A Vibration Oil Line Leakage Repaired by Welding MR 80-403 but Pump Operabic Scram Solenoids, 18-19 and Corrective N/A Normal Operation Noisy Solenoids Replaced Solenoids 10-07 MR 80-484 and 80-485 Respectively
, HPCI Pump, P 44-1A Corrective N/A Normal Operation Seal Leakage Replaced Outboard Pump MR 80-703 Seal Control Rod 14-11 Corrective N/A Normal Wear Sticky Relay Replaced Relay Relay 3A-K12 MR 80-731 RWCU Valve V12-19A Corrective N/A Worn Parts Leakage Replaced Seal Ring &
HR 80-733 Repacked Valve l
DOCKET NO. 50-271 .
l! NIT Vermont Yankee DATE 801111 COMPLETED BY F.J. Burger TELEril0NE 802-257-7711 X 137 P
SAFETY RELAT_ED !!A f NTENANCE _
Page 2 of 6 LER OR OUTAGE
"^ I' "
EQllIPMENT MAINTENANCE NIIMBER EAllSE RESilLT CORRECTIVE ACTION -
Control Rod Drive llCU 26-35 Corrective N/A Worn Parts Leakage Replaced Accumulator MR 80-760 "A" RHR Pump Discharge Corrective N/A Worn Parts Leakage Repaired by Welding Chrck Valve V10-48A MR 80-914 "A" RWCU Pump Corrective N/A Worn Parts Seal Leakage
- Replaced Seal MR 80-922 IIPCI Isolation Valve Corrective N/A Vibration Intermittent Adjusted Position v23-15 Position Indication MR 80-935 Indication Indication Switch i "b" SBGT Train Preventive N/A N/A N/A Changed out Charcoal MR 80-937 Cartridge In Test Cel LPRM 08-33A Corrective N/A Loose Power Supply Pailed LPRM Rescated Power Supply MR 80-945 Module Module IRM's C & D Corrective N/A Loose Connectica Erratic Indica- Replaced Connector MR 80-961 -
tion llPCI Valve V23-19 Corrective N/A Vibration Loss of Indica- Adjusted Position Position Indication MR 80-969 tion Indication Switch 4
"A" Service Water Preventive N/A N/A N/A Inspected & Overhaule.
Pump, P7-1A MR 80-974 Pump
DOCKET NO. 50-271 .
UNIT Vermont Yankee DATE 801111 COMPLETED BY F . .I . Burger TELEPIIONE 802-257-7711 X 137 r
SAFETY RELATElj llAINTENAlHL Page 3 of 6 NATURE OF MALFUNCTION R OR OU' RACE EQUIPMENT MAINTENANCE NUMBER C USE RESULT CORRECTIVE ACTION CAD Valve VG-22B Corrective N/A Normal Wear Leakage Lapped Plug & Seat MR 80-981 ..
Installed New Caskets Drywell Floor Drain Valve Corrective N/A Dirt & Corrosion Leakage Disassembled and V20-83 MR 80-984 Cleaned Valve Containment Sampling Valve Corrective N/A Worn Parts Leakage Replaced Disc Assembl FSO-76-A MR 80-987 Shock Suppressor MS-24 Corrective LER Worn Parts Fluid Leakage Replaced Seals and MR 80-989 80-31/3L Orfico Block RCIC Valve V 13-15 Corrective N/A Warn Parts Leakage Replaced Bonnet Seal MR 80-993 & Repacked Valve Shock Suppressor CU-2 Corrective N/A Vibration Loose Pipe Clamp, Tightened Nut MR 80-998 Snubber Operable Core Spray Valve V14-5B Corrective N/A Vibration / Wear Broken Valve Replaced Bolt l Valve Operator MR 80-1008 Operator Mount-ing Bolt HPCI Valve V23-18 Corrective N/A Worn Packing Leakage Repacked Valve MR 80-1025 RCIC Valve V13-22 Corrective N/A Worn Packing Leakage Repacked Valve MR 80-1026
DOCKET No. 50-171 6
UNIT Vermont Yankee DATE 80111L C0!!PLETEI) BY F.J. Burger TELEPIIONE 802-257-7711 X 137 r
SAFETY REI.ATED MAINTENANCE
'Page 4 of 6 NATURE OF MALFUNCTION ER OR OUTAGE EQUIPMENT MAINTENANCE NUffilER CAllSE RESULT CORRECTIVE ACTION Refueling Bridge Auxiliary Corrective N/A Worn Parts Broken Swivel Replaced Connector lloist Cable MR 80-1027 Connector RilR Valve .V10-18 Preventive N/A N/A N/A Repacked Valve MR 80-1033
'RilR Valve V10-29 Preventive N/A N/A N/A Replaced Seal Ring i MR 80-1034 and Repacked Valve RilR Valve V10-88 Preventive N/A N/A N/A Repacked Valve
, MR 80-1035 Service and Instrument Preventive N/A N/A N/A Air Valves V72-898 & C Disassemble and Clean-MR 80-1038 . ed Valvas I
RllR Valve V10-32 Preventive N/A N/A N/A Repacked Valve 1
MR 80-1043 RHR Valve V10-31A Preventive N/A N/A N/A Repacked Valve MR 80-1044 l
' Reactor Protection Corrective N/A Worn Parts Relay Inoperable Replaced Relay Relay KilB MR 80-1046
DOCKET NO. 50 _271 UNIT Vermont Yankee _ . .
DATE 801111 COMPI.ETED BY F.J. Burger TEl,EPil0NE
'802-DJ-2))L)L132 l
l SAFETY REl.ATED MAlHTEN_AN_CE ,
~
Page 5 of 6 NATURE OF ER OR OU'I' AGE MAI.FIINCTION EQUIPMENT MAINTENANCE NilHilER dAllSE RESilLT CORRECTIVE ACTION ,
HPCI Valve V23-15 Preventive N/A N/A N/A Repacl:ed Valve MR 80-1052 -
Core Spray Valves Preventive N/A N/A N/A Repacked Valves V12-14A & B MR 80-1067 l
"A" Diesel Generator' Corrective N/A Wern Parts Failed Relay Replaced Relay Power Failure Alarm MR 80-1069 Core Spray Valve Corrective N/A Worn Parts Contacts Arcing Replaced Parts as V14-12B Breaker MR 80-1070 Breaker Operable Necessary "C" RilR Pump Seals Preventive N/A Seal Material N/A Replaced Pump Seals MR 80-1072 Not Compatibic l With Radiation Environment "A" Diesel Generator Corrective N/A Vibration Leaking Fuel Tightened Fitting MR 80-1078 011 Fitting Containment Sampling Corrective N/A Dirt / Corrosion Valve Would Valve FSO 75-D Disassembled & Cleaned MR 80-1080 Not Shut Valve
?
Reactor Jet Pump #8 Corrective LER See LER Cracked Beam Replaced Beam Hold-down Beam MR 80-1082 80-33/3L
DOCKET NO. 50-271 ,
UNIT Vermog tlanksg_______,
DATE 80111_1 COMPl.ETED BY F.J. Burycr
! TEl.EPil0NE 802-257-7711 X 137 P
SAFETY REl.ATEtt MAINTENANCE Page 6 of 6
"^ ""
1.ER OR OUTAGE IgUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "A" Diesel Cenerator Corrective N/A Dirt / Set Point Diesel Could Cleaned and Timed Rela-Shutdown Relay MR 80-1084 Drift Not be Shutdown l.
Control Rod Drive Corrective N/A Worn Seals Leakage Replaced Valves liCU Cartridge Valves MR 80-1089 (10-15, 14-19, 18-19, 22-23, 38-31) l Control Rod Drive Corrective N/A Worn Seal Leakage Replaced Accumulator i
Accumulator 18-43 MR 80-1092 l
"B" Diesel Air Valve Corrective N/A Loose Packing Leakage Adjusted Packing 19 C MR 80-1101 l
Scram Discharge Volume Corrective N/A Failed Components Would Not Reset Replaced Mercury
- Lsvel Suitch 3-231D MR 80-1103 Switch L
l Fuel Pool Cooling Valve Corrective N/A Worn Parts Leakage Replaced Diaphragm l V 19-77 MR 80-1118 Fuel Pool Cooling Valve Corrective N/A Worn Parts Leakage Tightened Body to V 19-20A MR 80-1121 Bonnet Jolnt i !
l IIPCI Valve V23-19 Corrective LER Overload Trip Valve Inoperable Reset Overload Trip MR 80-1166 80-26/3L Tripped, Carise Unknown l
DOCKET No. 50-271 UNIT Vermont Yankee i
DATE 801111 4
I COMPLETED BY F. J. Burger I TELEPHONE 802-257-7711, X137 i
l REPORT MONTH October ,
l SIDDfARY OF OPERATING EXPERIENCES
- f During the reporting period, the plant was shutdown for refueling and
- ! maintenance.
] .