VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 50-10 FOR THE MONTH OF OCTOBER, 1980 s
55100 l
l l
OPERATING DATA REPORT 00CKET NO. 50-271 DAIE 801111 CCMPLETED BY F.C. Beers TELEPHONE 617-366-8811, X2215 OPERATING STATUS Notes
- 1. 'init Name:
Vermont Yankee
- 2. Reporting Period:
October
- 3. Licensed Thermal Power (MWt):
1593
- 4. Naseplate Rating (Gross MWe):
540
- 5. Design Electrical Rating (Net MWe): 514 (open)504 (closeil)
- 6. Maximum Oependable Capacity (Gross MWe):
535
- 7. Maxi =ue Depenfable Capacity (Net MWe):
504
- 8. If C.anges Occur in Capacity Ratings (!te=s Nu=ber 3 Through 7)Since Last Report, Give Reascns:
- 9. Power Level to Which Restricted,If Any(Net >Me):
- 10. Peascns For Restrictions, If Any:
This Month Yr-to-Date Cuculative
- 11. Hours In Reporting ?eriod 745.00 7,320.00
- 12. Number Of Hours Reacter Was Critical 0.00 6,266.89 57,425.28
- 13. Raactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6,200.00 55,527.88
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Cross Thermal Energy Generated (MWH) 0.00 9,347,971.00 78,572,584.00
- 17. Gross Electrical Energy Generated (MWH) 0.00 3,136,006.00 26,105,676.00
- 18. Net Electrical Energy Generated (MWH) 0.00 2,972,808.00 24,741,173.00
- 19. Unit Service Factor 0.00 84.70 78.08
- 20. Unit Availability Factor 0.00 84.70 78.08
- 21. Unit Capacity Factor (Using MDC Net) 0.00 80.58 69.03
- 22. Unit Capacity Factor (Using DER Net) 0.00 79.01 67.68
- 23. Unit Forced Outage Rate 0.00 1.85
- 6.02
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling in progress, QLast month's report was incorrect.
Item 23 should have been 6.02. nor 6.40.
- 25. If Shut Down At End Of Report Period, Estimated Late of Startup:
Early December
- 26. Units In Test Status (Prior to Cc=mercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCFCERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCY2T NO. 50-271 UNIT Vermont Yankee DATE 801111 COMPLETED BY F. J. Burger TELEPHONE 802-257-7711, X 137 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
0 2.
0 18.
O i
3.
0 19, 0
i 4.
0 20.
0 5.
0 21.
0 6.
0 22.
O s
7.
0 23.
0 0
8.
24 O
t 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 0
13.
29.
0 0
14.
30.
0 15.
0 31.
0 16.
O INSTRUCTIONS-On this format, list the average daily unit power level in MWe-Net. for each day in the reporting month.
Compute to the nearest whole megawatt.
9 i
l u
r tD m
mm
,O o
y r
t y
mm
~
nQ C* M nn am ea 8
e C.
cn e
Cea i
9 m
7 1
=Immeoa>m Typed i
I s e i e I m OC>c2m2mm r* 'c c.ac m e o.
'n "O
5 m ao m >= C C
@ M== n C C 3
-3 y
Duration En 3 m-4 M~
D e
at n - n a ~ e $ **
(Hours) 2 u
m - m o f,
o
,m monnoa=a 4
a xsn n om s n 2
u o a >< s a
n Reason en
-we am
=
m m < =m m
m
-m o=
.m.::
Cn anmam n-e Method of 5-o vm
-n o
en a =m Shutting 3
-E H
a ao >-
am m
n m
Down Reactor 5
m en a n N
m m
z M
1"* C M
8 C
a
-a
=
=
n a
e
=
e-0 z
xm:
n c
-m
_m < n m
v C
v
.r e
a
,f g-f 7
m a
M
,, n e u...
2 e
n 5
g C
t C
1 s
O It System y
.i w
Code' E
8 w
m 1
1
- k. V. N.
m i c.
e o>zz m
Compon n:
3
-= uu s.
-=
i<
Code ee=c x
M E D D N &W
^ fT m - en M O n
=
>a e4 Q Q n5 Z
O c
- 4,2
m e=
vs e-e-z e.
mm
c ai mi
=m E-O C O Z *I 2
m tuas 3 2
=< M D: O V
m o
j m
a ao m ce < u m
-mmmm
= <= eM a>g e,
s a =
F C@ tv Pt Y onc a
C' M n s N C*
=, n
.u q
w M3 M y
g r
-e u
W D W
O N **
C N
tn n
3 4.Mi E
O "
"Jt: 3 C I, C F
E n
m o
N Pt
~
,2, e 4 Sn E
Ch C 2 at i t
-M r' D g
p p:=
v rt a fN -
pg n
m e4
>* 3 g
n m
m amO m x
3 m,3 Q'
FC m
N O =
C4 V r* m n s
O
~
n i
C "f! n C -
M
- = S C C n
>== 3 M 3 G
C @ m CD C
a 9
0 r
+, - - ~
w
DOCKET NO.
50-271 UNIT vermnat..Yankaa DATE 801111 CottPLETED BY FJ J urger TELEP110NE 802-257-7711 X 13Z___
r e
SAFETY RELATED itAINTENANCE_
Page 1 of 6 i
NATURE OF
!!ALFUNCTION EQUIPMENT MAINTENANCE tHIM11ER
(' AtlS E RESIILT CORRECTIVE ACTION li" Standby Liquid Control Corrective N/A Construction Arc Pitting of the Repaired by Welding s
Line, SLC-9 MR 80-186 Strike Pipe but not Below Minimum t
Wall Thickness MS2V 80 A Preventive
,N/A Worn Guide Rods and Potential Sticky Replaced Guide Rods MR 80-249 Springs on Valve Operation and Springs Actuator
- IIPCI Pump, P 44-1A Corrective N/A Vibration Oil Line Leakage Repaired by Welding MR 80-403 but Pump Operabic Scram Solenoids, 18-19 and Corrective N/A Normal Operation Noisy Solenoids Replaced Solenoids 10-07 MR 80-484 and 80-485 Respectively HPCI Pump, P 44-1A Corrective N/A Normal Operation Seal Leakage Replaced Outboard Pump MR 80-703 Seal Control Rod 14-11 Corrective N/A Normal Wear Sticky Relay Replaced Relay Relay 3A-K12 MR 80-731 RWCU Valve V12-19A Corrective N/A Worn Parts Leakage Replaced Seal Ring &
HR 80-733 Repacked Valve
{
l
DOCKET NO.
50-271 l! NIT Vermont Yankee DATE 801111 COMPLETED BY F.J. Burger TELEril0NE 802-257-7711 X 137 P
SAFETY RELAT_ED !!A f NTENANCE _
Page 2 of 6
"^ I' LER OR OUTAGE EAllSE RESilLT CORRECTIVE ACTION EQllIPMENT MAINTENANCE NIIMBER Control Rod Drive llCU 26-35 Corrective N/A Worn Parts Leakage Replaced Accumulator MR 80-760 "A" RHR Pump Discharge Corrective N/A Worn Parts Leakage Repaired by Welding Chrck Valve V10-48A MR 80-914 "A" RWCU Pump Corrective N/A Worn Parts Seal Leakage
- Replaced Seal MR 80-922 IIPCI Isolation Valve Corrective N/A Vibration Intermittent Adjusted Position v23-15 Position Indication MR 80-935 Indication Indication Switch i
"b" SBGT Train Preventive N/A N/A N/A Changed out Charcoal MR 80-937 Cartridge In Test Cel LPRM 08-33A Corrective N/A Loose Power Supply Pailed LPRM Rescated Power Supply MR 80-945 Module Module IRM's C & D Corrective N/A Loose Connectica Erratic Indica-Replaced Connector MR 80-961 tion llPCI Valve V23-19 Corrective N/A Vibration Loss of Indica-Adjusted Position Position Indication MR 80-969 tion Indication Switch "A" Service Water Preventive N/A N/A N/A Inspected & Overhaule.
4 Pump, P7-1A MR 80-974 Pump
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 801111 COMPLETED BY F..I. Burger TELEPIIONE 802-257-7711 X 137 r
SAFETY RELATElj llAINTENAlHL Page 3 of 6 NATURE OF MALFUNCTION R OR OU' RACE EQUIPMENT MAINTENANCE NUMBER C USE RESULT CORRECTIVE ACTION CAD Valve VG-22B Corrective N/A Normal Wear Leakage Lapped Plug & Seat MR 80-981 Installed New Caskets Drywell Floor Drain Valve Corrective N/A Dirt & Corrosion Leakage Disassembled and V20-83 MR 80-984 Cleaned Valve Containment Sampling Valve Corrective N/A Worn Parts Leakage Replaced Disc Assembl FSO-76-A MR 80-987 Shock Suppressor MS-24 Corrective LER Worn Parts Fluid Leakage Replaced Seals and MR 80-989 80-31/3L Orfico Block RCIC Valve V 13-15 Corrective N/A Warn Parts Leakage Replaced Bonnet Seal MR 80-993
& Repacked Valve Shock Suppressor CU-2 Corrective N/A Vibration Loose Pipe Clamp, Tightened Nut MR 80-998 Snubber Operable Core Spray Valve V14-5B Corrective N/A Vibration / Wear Broken Valve Replaced Bolt l
Valve Operator MR 80-1008 Operator Mount-ing Bolt HPCI Valve V23-18 Corrective N/A Worn Packing Leakage Repacked Valve MR 80-1025 RCIC Valve V13-22 Corrective N/A Worn Packing Leakage Repacked Valve MR 80-1026
DOCKET No.
50-171 6
UNIT Vermont Yankee DATE 80111L C0!!PLETEI) BY F.J. Burger TELEPIIONE 802-257-7711 X 137 r
SAFETY REI.ATED MAINTENANCE
'Page 4 of 6 NATURE OF MALFUNCTION ER OR OUTAGE EQUIPMENT MAINTENANCE NUffilER CAllSE RESULT CORRECTIVE ACTION Refueling Bridge Auxiliary Corrective N/A Worn Parts Broken Swivel Replaced Connector lloist Cable MR 80-1027 Connector RilR Valve.V10-18 Preventive N/A N/A N/A Repacked Valve MR 80-1033
'RilR Valve V10-29 Preventive N/A N/A N/A Replaced Seal Ring i
MR 80-1034 and Repacked Valve RilR Valve V10-88 Preventive N/A N/A N/A Repacked Valve MR 80-1035 Service and Instrument Preventive N/A N/A N/A Disassemble and Clean-Air Valves V72-898 & C MR 80-1038 ed Valvas I
RllR Valve V10-32 Preventive N/A N/A N/A Repacked Valve 1
MR 80-1043 RHR Valve V10-31A Preventive N/A N/A N/A Repacked Valve MR 80-1044 l
' Reactor Protection Corrective N/A Worn Parts Relay Inoperable Replaced Relay Relay KilB MR 80-1046
DOCKET NO.
50 _271 UNIT Vermont Yankee DATE 801111 COMPI.ETED BY F.J. Burger TEl,EPil0NE
'802-DJ-2))L)L132 l
l SAFETY REl.ATED MAlHTEN_AN_CE,
~
Page 5 of 6 NATURE OF MAI.FIINCTION ER OR OU'I' AGE EQUIPMENT MAINTENANCE NilHilER dAllSE RESilLT CORRECTIVE ACTION HPCI Valve V23-15 Preventive N/A N/A N/A Repacl:ed Valve MR 80-1052 Core Spray Valves Preventive N/A N/A N/A Repacked Valves V12-14A & B MR 80-1067 l
"A" Diesel Generator' Corrective N/A Wern Parts Failed Relay Replaced Relay Power Failure Alarm MR 80-1069 Core Spray Valve Corrective N/A Worn Parts Contacts Arcing Replaced Parts as V14-12B Breaker MR 80-1070 Breaker Operable Necessary "C" RilR Pump Seals Preventive N/A Seal Material N/A Replaced Pump Seals MR 80-1072 Not Compatibic l
With Radiation Environment "A" Diesel Generator Corrective N/A Vibration Leaking Fuel Tightened Fitting MR 80-1078 011 Fitting Containment Sampling Corrective N/A Dirt / Corrosion Valve Would Disassembled & Cleaned Valve FSO 75-D MR 80-1080 Not Shut Valve
?
Reactor Jet Pump #8 Corrective LER See LER Cracked Beam Replaced Beam I
Hold-down Beam MR 80-1082 80-33/3L
DOCKET NO.
50-271 UNIT Vermog tlanksg_______,
DATE 80111_1 COMPl.ETED BY F.J. Burycr TEl.EPil0NE 802-257-7711 X 137 P
SAFETY REl.ATEtt MAINTENANCE Page 6 of 6
"^ ""
1.ER OR OUTAGE CAUSE RESULT CORRECTIVE ACTION IgUIPMENT MAINTENANCE NUMBER "A" Diesel Cenerator Corrective N/A Dirt / Set Point Diesel Could Cleaned and Timed Rela-Shutdown Relay MR 80-1084 Drift Not be Shutdown l.
Control Rod Drive Corrective N/A Worn Seals Leakage Replaced Valves liCU Cartridge Valves MR 80-1089 (10-15, 14-19, 18-19, l
22-23, 38-31)
Control Rod Drive Corrective N/A Worn Seal Leakage Replaced Accumulator i
Accumulator 18-43 MR 80-1092 l
"B" Diesel Air Valve Corrective N/A Loose Packing Leakage Adjusted Packing 19 C MR 80-1101 l
Scram Discharge Volume Corrective N/A Failed Components Would Not Reset Replaced Mercury Lsvel Suitch 3-231D MR 80-1103 Switch L
l Fuel Pool Cooling Valve Corrective N/A Worn Parts Leakage Replaced Diaphragm l
V 19-77 MR 80-1118 Fuel Pool Cooling Valve Corrective N/A Worn Parts Leakage Tightened Body to V 19-20A MR 80-1121 Bonnet Jolnt i
l IIPCI Valve V23-19 Corrective LER Overload Trip Valve Inoperable Reset Overload Trip MR 80-1166 80-26/3L Tripped, Carise Unknown l
DOCKET No. 50-271 UNIT Vermont Yankee i
DATE 801111 4
I COMPLETED BY F. J. Burger I
TELEPHONE 802-257-7711, X137 i.
l REPORT MONTH October l
SIDDfARY OF OPERATING EXPERIENCES
- f During the reporting period, the plant was shutdown for refueling and maintenance.
]
4 I
}
i i
i s
s e.
f l
s 1
-<r.c
,e_.
r-
, + -
,p-y