MONTHYEARML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-06-25025 June 2018 Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)2018-02-15015 February 2018 Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14) ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML13102A1262013-04-23023 April 2013 Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)2013-02-0707 February 2013 Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12) NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)2012-05-0909 May 2012 Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04) NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)2012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval ML1109803472011-04-20020 April 2011 Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection Interval ML1108109482011-04-0707 April 2011 Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection Interval ML1108400762011-04-0505 April 2011 Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection Interval NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)2010-10-18018 October 2010 Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)2010-09-20020 September 2010 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) ML1021500772010-09-0202 September 2010 Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) ML1006208692010-03-24024 March 2010 Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange Weld ML1005395882010-03-12012 March 2010 Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)2009-03-12012 March 2009 Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) ML0827502202008-12-0909 December 2008 Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 ML0827707852008-11-12012 November 2008 Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems ML0824901602008-09-26026 September 2008 Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System Piping ML0735410722008-01-10010 January 2008 Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay Repair ML0731204462007-11-30030 November 2007 Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System Piping NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2007-10-0202 October 2007 Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For... ML0708510082007-04-30030 April 2007 Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) ML0706500752007-03-15015 March 2007 Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program Interval ML0704400592007-03-0101 March 2007 Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography Examination ML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0610907542006-05-25025 May 2006 Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C ML0609702402006-05-12012 May 2006 Relief, RR-ENG-2-41 TAC No. MC8279 NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)2005-07-19019 July 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) ML0506205052005-03-15015 March 2005 Request for Relief from Requirements of ASME and Pressure Vessel Code RR-ENG-IWE-07 NOC-AE-04001817, Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)2004-11-0909 November 2004 Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05) 2022-09-12
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
AN Nuclear Operating Company Sooth Tex7ss Pr/ ectkdc CeneratIng Station /. Bo. 289 15 d5Sroh. Texas 77483 November 9, 2004 NOC-AE-04001817 File No.: G25 10CFR50.55a U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 208952 South Texas Project Unit 2 Docket No. STN 50-499 Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section Xl Requirements (Relief Request VRR-05)
Reference:
Letter from John Crenshaw, STPNOC, to NRC Document Control Desk, dated September 30, 2004, "Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section Xl Requirements (Relief Request VRR-
- 05) (NOC-AE-04001747)
This submittal revises the basis for Relief Request VRR-05 from 10CFR50.55a(a)(3)(i), as described in the referenced correspondence, to 10CFR50.55a(a)(3)(ii). Changes are identified 1 with change bars in the margin.
In accordance with the provisions of 10CFR50.55a(a)(3)(ii), the South Texas Project requests authorization to use an alternative to the requirements of ASME Section Xl 1989 Edition (OM Code 1987 Edition with 1988 addenda). The ASME Code requires stroke-time testing of motor-operated valves on a quarterly basis and after maintenance. However, surveillance testing on one Unit 2 motor-operated valve as specified by the Code is not appropriate at this time.
The subject valve has been identified as a source of leakage inside containment. The leakage rate when discovered was approximately 5 gallons per day. A flaw on the stem has been identified as the probable cause of damage to the valve packing when the valve is stroked, resulting in a packing leak. Tightening the packing reduced the leak rate to an acceptable level.
However, until the flaw is repaired, further surveillance tests by stroking the valve may cause additional damage to the valve packing and contribute to more leakage. The valve can not be repaired without plant shutdown, fuel removal, and draindown of the reactor vessel below the nozzle line. Consequently, the South Texas Project requests relief from stroke-time testing the valve quarterly and after maintenance until the valve is repaired.
There are no commitments included with this letter.
STI: 31807552
NOC-AE-04001 817 Page 2 of 3 The attached relief request includes a discussion of the basis and justification for the relief request as well as an implementation schedule. NRC approval is requested by December 1, 2004.
If there are any questions, please contact either Mr. Philip L. Walker at (361) 972-8392 or me at (361) 972-7074.
John W. Crenshaw Manager, Plant Engineering PLW
Attachment:
Revised Request for Authorization to Use an Alternative to the ASME Boiler and I Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)
NOC-AE-04001 817 Page 3 of 3 cc:
(paper copy) (electronic copy)
Bruce S. Mallett A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 J. J. Nesrsta Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission David H. Jaffe Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff C. A. Johnson Bureau of Radiation Control AEP Texas Central Company Texas Department of State Health Services 1100 West 49th Street Jon C. Wood Austin, TX 78756-3189 Cox Smith Matthews Jeffrey Cruz C. Kirksey U. S. Nuclear Regulatory Commission City of Austin P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 R. K. Temple City Public Service C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 STI: 31807552
NOC-AE-04001817 Page 1 of 3 SOUTH TEXAS PROJECT UNIT 2 REQUEST FOR AUTHORIZATION TO USE AN ALTERNATIVE TO THE ASME BOILER AND PRESSURE VESSEL CODE, SECTION Xi REQUIREMENTS (RELIEF REQUEST VRR-05)
- 1. ASME Code Component Affected Systems: Residual Heat Removal (RHR) System and Safety Injection (SI) system Valve ID: 2-RH-0031A Function: This valve is normally open to provide low head safety injection flow to the cold leg of the Reactor Coolant System under accident conditions.
The valve is closed during switchover of recirculation flow from the cold leg to the hot leg of the RCS.
Under normal cooldown procedures, this valve is closed during initiation of residual heat removal operation. The valve is opened to provide RHR flow to the RCS.
Class: ASME Code Class 2
- 2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition (OM Code 1987 Edition and 1988 addenda)
- 3. Applicable Code Requirements ASME OM Code, 1988 Addenda, Part 10:
3.4 Effect of Valve or Actuator Replacement, Repair, and Maintenance on Reference Values When a valve or its control system has been replaced, repaired, or has undergone maintenance that could affect the valve's performance, a new reference value shall be determined or the previous value reconfirmed by an inservice test run prior to the time it is returned to service or immediately if not removed from service, to demonstrate that performance parameters which could be affected by the replacement, repair, or maintenance are within acceptable limits.
4.2.1.1 Exercising Test Frequency:
Active Category A and B valves shall be tested nominally every 3 months....
4.2.1.4 Power-Operated Valve Stroke Testing:
The limiting value(s) of full-stroke time of each power-operated valve shall be specified by the Owner.
The stroke time of all power-operated valves shall be measured to at least the nearest second.
4.2.1.8 Stroke Time Acceptance Criteria 4.2.1.9 Corrective Action
NOC-AE-04001817 Page 2 of 3 (a) If a valve fails to exhibit the required change of obturator position or exceeds the limiting values of full-stroke time, the valve shall be immediately declared inoperable.
(b) Valves with measured stroke times which do not meet the acceptance criteria of para. 4.2.1.8 shall be immediately retested or declared inoperable....
4. Reason for Request
Currently, the valve is subject to stroke time testing quarterly and prior to return to service after maintenance, as described in section 3. In addition, following valve or actuator maintenance, post-maintenance testing is applied which consists of the following:
- MOV Diagnostic testing - MOV is stroked, with diagnostic test equipment installed, to obtain data for analysis to verify the condition of the MOV.
Diagnostic testing requirements are based on the maintenance performed.
Data collection may require removal of the actuator's limit switch compartment cover, in which case a valve stroke is performed following restoration of the actuator to verify that restoring the limit switch compartment cover did not damage any wires.
- Other post-maintenance testing as required for the maintenance performed.
The valve has a blemish on the stem in the packing area, which is postulated to be the source of damage to the valve packing and causing leakage of borated water at this location. Although the valve is not currently leaking, surveillance testing with full valve strokes increases the potential for damage to the valve packing.
In normal plant configuration, the only pressure on the valve is static head pressure from the Refueling Water Storage Tank. However, quarterly inservice testing of the associated Residual Heat Removal pump and Low Head Safety Injection pump pressurizes the line incorporating the valve, which could exacerbate the leakage rate if the packing has been damaged by stroke time testing.
Valve 2-RH-0031A is in a line connected directly to the Reactor Coolant System. To separate the high-pressure RCS from the low-pressure components of the Residual Heat Removal System, two check valves are located in series downstream of the motor-operated valve. While they meet their design intent, the check valves are not appropriate for use as isolation valves. Without isolation from the Reactor Coolant System, repairing the flaw in the valve stem will require shutdown of Unit 2, removal of the fuel, and draining the reactor pressure vessel below the nozzle line. The next scheduled drain down of Unit 2 does not occur until 2RE12 in March -April 2007.
Consequently, the South Texas Project requests relief from full stroke time testing of this valve.
- 5. Proposed Alternative STP proposes to defer quarterly stroke time testing for this MOV until repairs can be accomplished as described in the previous section.
NOC-AE-04001 817 Page 3 of 3
- 6. Basis for Use Safety analyses do not assume a specific closure time for the valve.
The South Texas Project has confidence in the continued performance of the MOV based on a review of the data from MOV diagnostic testing, and work history for A2SIMOV0031A. Work history revealed the actuator has performed satisfactorily since the completion of the GL 89-10 program. MOV diagnostic testing data review shows consistent performance with no adverse trends or anomalies noted. Most recent full As-Left testing performed revealed an actuator close margin of HIGH per the MOV JOG methodology.
During the next refueling outage (2RE1 1, October 2005), the MOV must be operated as part of required surveillance on the Safety Injection System. After required testing has been completed, South Texas intends to perform a packing adjustment or repack the valve as necessary. Following this maintenance activity, a static diagnostic test will be performed as required by STP procedure and stroke time testing will be performed as required to demonstrate operability in accordance with Technical Specification 4.0.1.'
The MOV will then be placed in the normal position for operation and returned to service. At this point, the South Texas Project will be confident that the valve is operable and not leaking. Approval of the proposed relief will preclude the need to stroke the valve for surveillance testing over the ensuing Unit 2 operating cycle and consequently minimize the likelihood of packing damage that would cause the valve to leak. The valve history described above provides a high level of confidence in the continued operability of the valve.
Based on the high level of confidence in the operability of the valve without performing stroke-time surveillance testing and the hardship associated with the off-load and drain-down described in section 4 that would be necessary to repair the valve, the South Texas Project concludes the criteria of 10CFR50.55a(a)(3)(ii) are met.
- 7. Duration of Proposed Alternative The South Texas Project requests NRC approval to use this alternative approach for testing this valve for the remainder of the current Unit 2 refueling cycle and the duration of the subsequent refueling cycle. The valve is expected to be repaired during the refueling outage in March - April 2007 (2RE12) when the reactor pressure vessel is drained down below the nozzle line. Consequently, the proposed relief will expire at the end of 2RE12.
- 8. Implementation The South Texas Project requests permission to implement the proposed alternative described above immediately following approval of this relief request. Approval by December 1, 2004 is requested in order to minimize the number of times the valve is stroked for surveillance testing and post-maintenance testing until the repair is completed. The next surveillance test of this valve is currently scheduled for no later than December 23, 2004.
'This is not regarded as a commitment in the context of NEI 95-07. The static diagnostic test and the stroke-time test are existing STP programmatic requirements for restoration of the valve to service and would be performed whether the South Texas Project was asking for relief or not.