ML043370117

From kanterella
Revision as of 12:38, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

TS Pages for Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR
ML043370117
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/08/2004
From:
NRC/NRR/DLPM
To:
Wang A, NRR/DLPM, 415-1445
Shared Package
ML043370155 List:
References
TAC MC3233
Download: ML043370117 (2)


Text

TECHNICAL SPECIFICATIONS 3.0 SURVEILLANCE REQUIREMENTS 3.3 Reactor Coolant System and Other Components Subiect to ASME Xl Boiler &

Pressure Vessel Code Inspection and Testing Surveillance Applicability Applies to in-service surveillance of primary system components and other components subject to inspection and testing according to ASME Xi Boiler & Pressure Vessel Code.

Obiective To ensure the integrity of the reactor coolant system and other components subject to inspection and testing according to ASME XI Boiler & Pressure Vessel Code.

Specifications (1) Surveillance of the ASME Code Class 1,2 and 3 systems, except the steam generator tubes inspection, should be covered by ASME Xl Boiler & Pressure Vessel Code.

a. Not Used
b. Surveillance of the reactor coolant pump flywheels shall be performed as indicated in Table 3-6.
c. A surveillance program to monitor radiation-induced changes in the mechanical and impact properties of the reactor vessel materials shall be maintained in accordance with 10 CFR Part 50 Appendix H.(') Examinations results shall be used to update the PTLR.

(2) Surveillance of Reactor Coolant System Pressure Isolation Valves

a. Periodic leakage testing* on each valve listed in Table 2-9 shall be accomplished prior to entering the power operation mode every time the plant is placed in the cold shutdown To satisfy ALARA requirements, leakage may be measured indirectly (as from the performance of pressure indicators) if accomplished in accordance with approved procedures and supported by computations showing that the method is capable of demonstrating valve compliance with the leakage criteria.

3.3 - Page 1 Amendment No. 16,76,104,112,157,176,221 230

Not Used 3.4 - Page 1 Amendment No. 230