Letter Sequence Approval |
---|
|
Results
Other: LIC-03-0164, Response to a RAI on Measurement Uncertainty Recapture Power Uprate, LIC-04-0006, Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 1, LIC-04-0061, Notification of Technical Issues Associated with License Amendment No. 225, ML032870394, ML040210313, ML040400333, ML040490383, ML041060362, ML041310501, ML041390246, ML043370117, ML050530011, ML050600428, ML050610222, ML050750059
|
MONTHYEARLIC-03-0067, Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate2003-07-18018 July 2003 Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate Project stage: Request ML0328703942003-10-14014 October 2003 Withholding from Public Disclosure, Calculation Number FC-6896-P, Secondary Calorimetric Uncertainty Analysis Project stage: Other ML0328705202003-10-14014 October 2003 RAI, Measurement Uncertainty Recapture Power Uprate Project stage: RAI LIC-03-0148, Response to Request for Additional Information - Measurement Uncertainty Recapture Power Uprate2003-10-31031 October 2003 Response to Request for Additional Information - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LIC-03-0164, Response to a RAI on Measurement Uncertainty Recapture Power Uprate2003-12-15015 December 2003 Response to a RAI on Measurement Uncertainty Recapture Power Uprate Project stage: Other LIC-03-0166, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate2003-12-22022 December 2003 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0402007572004-01-16016 January 2004 Issuance of License Amendment 224 Revising the Renewed Operating License and the TSs to Increase the Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal (Mwt) to 1524 Mwt Project stage: Approval ML0402103132004-01-16016 January 2004 Tech Spec Pages for Amendment 224 Revising the Renewed Operating License and the TSs to Increase the Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal (Mwt) to 1524 Mwt Project stage: Other ML0404003332004-02-0909 February 2004 Fort Calhoun Station, Unit 1 - Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML0404903832004-02-13013 February 2004 Amendment, Changes Implementation Date from 30 Days to 120 Days for Amendment No. 224 Issued on 01/16/2004 That Approved Measurement Uncertainty Uprate to Increase Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal to 1524 Project stage: Other ML0405803462004-02-18018 February 2004 RAI, License Amendment Request Administrative TS Changes (Tac. MC1535) Project stage: RAI ML0410603622004-04-14014 April 2004 Memo to File, E-mail Regarding Fort Calhoun Emergency Diesel Generating Starting Air System Project stage: Other LIC-04-0061, Notification of Technical Issues Associated with License Amendment No. 2252004-05-0505 May 2004 Notification of Technical Issues Associated with License Amendment No. 225 Project stage: Other ML0413105012004-05-10010 May 2004 5/10/04, Fort Calhoun, Unit 1 - Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML0413901262004-05-14014 May 2004 5/14/04, Fort Calhoun, Unit 1 - TS - Issuance of Amendment Project stage: Approval ML0413902462004-05-14014 May 2004 License Amendment, Amendment Restores Licensed Thermal Power from 1524 Mega Thermal Project stage: Other LIC-04-0073, Response to Request for Additional Information Regarding License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generator Lubricating Oil, & Diesel Generator Starting Air Requirements2004-07-0202 July 2004 Response to Request for Additional Information Regarding License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generator Lubricating Oil, & Diesel Generator Starting Air Requirements Project stage: Response to RAI ML0421202032004-07-23023 July 2004 Tech Spec Pages for Amendment 228 Various Administrative and Editorial Changes Project stage: Acceptance Review ML0421104112004-07-23023 July 2004 Issuance of License Amendment 228 Various Administrative and Editorial Changes Project stage: Approval ML0424300272004-08-27027 August 2004 RAI, Modify Technical Specification 2.3.(4) Project stage: RAI ML0430205742004-10-21021 October 2004 Issuance of License Amendment No. 229, Changing TS 2.7, TS Table 3-5 and TS 5.0 to Modify Requirements for the Diesel Generator Fuel Oil for Consistency with Improved Standard TS Project stage: Approval ML0433501352004-10-21021 October 2004 Tech Spec Pages for Amendment No. 229, Changing TS 2.7, TS Table 3-5 and TS 5.0 to Modify Requirements for the Diesel Generator Fuel Oil for Consistency with Improved Standard TS Project stage: Acceptance Review LIC-04-0102, Request for Additional Information (RAI) Regarding License Amendment Request (Lar), Trisodium Phosphate (TSP) Dodecahydrate Volume.2004-10-29029 October 2004 Request for Additional Information (RAI) Regarding License Amendment Request (Lar), Trisodium Phosphate (TSP) Dodecahydrate Volume. Project stage: Request ML0432705302004-11-0808 November 2004 Issuance of License Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR Project stage: Approval ML0433701172004-11-0808 November 2004 TS Pages for Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR Project stage: Other LIC-04-0133, Response to NRC RAI on Trisodium Phosphate (TSP) License Amendment Request2004-12-16016 December 2004 Response to NRC RAI on Trisodium Phosphate (TSP) License Amendment Request Project stage: Response to RAI ML0505300112005-02-18018 February 2005 Tech Spec Page for Amendment 231 Elimination of Requirements to Provide Monthly Operating/Annual Occupational Radiation Exposure Reports Project stage: Other ML0505500612005-02-18018 February 2005 Issuance of License Amendment 231 Elimination of Requirements to Provide Monthly Operating/Annual Occupational Radiation Exposure Reports Project stage: Approval ML0506004282005-03-0101 March 2005 Amendment, Revision of TS Section 2.3(4) & TS Section 3.6(2)d.(i) Project stage: Other ML0506102222005-03-0101 March 2005 Technical Specifications, Revision of TS Section 2.3(4) & TS Section 3.6(2)d.(i) Project stage: Other ML0507500592005-03-11011 March 2005 Tech Spec Pages for Amendment 233 Revising TS 5.9.5 to Be Consistent with Specification 5.6.5 of NUREG-1432 Project stage: Other ML0507505342005-03-11011 March 2005 Issuance of License Amendment 233 Revising TS 5.9.5 to Be Consistent with Specification 5.6.5 of NUREG-1432 Project stage: Approval LIC-04-0006, Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 12005-07-0101 July 2005 Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 1 Project stage: Other 2004-02-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, SHPO; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML20071E1042020-03-25025 March 2020 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration ML19297D6772019-12-11011 December 2019 Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18068A1652018-03-0909 March 2018 Correction to Page 1 of Attachment to Enclosure 1 for Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17179A1782017-06-29029 June 2017 Correction to Technical Specification Definitions - Page 7 for Amendment No. 286, Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and ... LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16139A8042016-06-0808 June 2016 Issuance of Amendment No. 288, Request to Adopt Technical Specifications Task Force (TSTF)-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6b & 6c ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1015202962010-06-0202 June 2010 License Amendment, Issuance of Amendment No. 265, Revise Technical Specification 2.15, Table 2-5, Note C for Safety Valve Acoustic Position Indication (Emergency Circumstances) ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0919005692009-07-24024 July 2009 Unit No.1 - Issuance of Amendment No. 261, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j ML0916205692009-07-24024 July 2009 Issuance of Amendment 262, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0912801022009-07-22022 July 2009 Issuance of Amendment No. 260, Modification of Surveillance Requirements in TS 3.6(3), Containment Recirculating Air Cooling and Filtering System & Removal of License Conditions ML0832606972009-05-12012 May 2009 Issuance of Amendment No. 259, Revise Technical Specifications to Correct Typographical Errors and Make Administrative Clarifications ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0730903612007-12-17017 December 2007 Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses ML0720400972007-07-26026 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies of Commission Order EA-02-026 (Tac No. MD4534) ML0720402832007-07-26026 July 2007 Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML24019A1682024-01-31031 January 2024 Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31
[Table view] |
Text
March 11, 2005 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT (TAC NO. MC4304)
Dear Mr. Ridenoure:
The Commission has issued the enclosed Amendment No. 233 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 7, 2004.
The amendment revises TS 5.9.5, "Core Operating Limits Report," to be consistent with Specification 5.6.5 of NUREG-1432, "Standard Technical Specifications Combustion Engineering Plants." In addition, the list of core reload analysis methodologies contained in TS 5.9.5b used to determine the core operating limits has been updated. Many of these references were moved to the Omaha Public Power District core reload analysis methodology documents OPPD-NA-8301, 8302, and 8303, which are also listed in TS 5.9.5b. However, OPPD-NA-8302 has been revised to incorporate use of the code CASMO-4 in lieu of the previously approved CASMO-3 code.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosures:
- 1. Amendment No. 233 to DPR-40
- 2. Safety Evaluation cc w/encls: See next page
March 11, 2005 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT (TAC NO. MC4304)
Dear Mr. Ridenoure:
The Commission has issued the enclosed Amendment No. 233 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 7, 2004.
The amendment revises TS 5.9.5, "Core Operating Limits Report," to be consistent with Specification 5.6.5 of NUREG-1432, "Standard Technical Specifications Combustion Engineering Plants." In addition, the list of core reload analysis methodologies contained in TS 5.9.5b used to determine the core operating limits has been updated. Many of these references were moved to the Omaha Public Power District core reload analysis methodology documents OPPD-NA-8301, 8302, and 8303, which are also listed in TS 5.9.5b. However, OPPD-NA-8302 has been revised to incorporate use of the code CASMO-4 in lieu of the previously approved CASMO-3 code.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:
PUBLIC GHill (2)
Enclosures:
- 1. Amendment No. 233 to DPR-40 PDIV-2 Reading
- 2. Safety Evaluation RidsNrrDlpmPdiv (HBerkow)
RidsNrrPMAWang cc w/encls: See next page RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (K. Kennedy)
TBoyce RidsNrrDlpmPdiv2 (RGramm)
TS: ML050750059 NRR-100 PKG.: ML050750567 ACCESSION NO.: ML050750534 NRR-058 OFFICE PDIV-2/PM PDIV-2/LA IROB/SCA OGC PDIV-2/SC NAME AWang LFeizollahi TBoyce RWeisman RGramm DATE 2/4/05 2/4/05 2/9/05 2/ /05 2/ /05 DOCUMENT NAME: E:\Filenet\ML050750534.wpd OFFICIAL RECORD COPY
OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 233 License No. DPR-40
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Omaha Public Power District (the licensee) dated September 7, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-40 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance, and shall be implemented within 60 days from date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Robert A. Gramm, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 11, 2005
ATTACHMENT TO LICENSE AMENDMENT NO. 233 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
REMOVE INSERT 5.0 - Page 8 5.0 - Page 8 5.0 - Page 9 5.0 - Page 9 5.0 - Page 10 5.0 - Page 10
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 233 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285
1.0 INTRODUCTION
By application dated September 7, 2004, Omaha Public Power District (OPPD) requested changes to the Technical Specifications (Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would revise Technical Specification (TS) 5.9.5, "Core Operating Limits Report," to be consistent with Specification 5.6.5 of NUREG-1432, "Standard Technical Specifications Combustion Engineering Plants." In addition, the list of core reload analysis methodologies, contained in TS 5.9.5b and used to determine the core operating limits, would be updated. Many of these references were previously moved to the OPPD core reload analysis methodology documents OPPD-NA-8301, 8302, and 8303, which are also listed in TS 5.9.5b. In addition, OPPD-NA-8302 would be revised to incorporate use of the code CASMO-4 in lieu of the previously approved CASMO-3 code.
2.0 REGULATORY EVALUATION
The proposed technical specification changes are primarily intended to achieve consistency with Standard Technical Specifications or to consolidate the list of Nuclear Regulatory Commission (NRC) approved analytical methods of TS 5.9.5b into OPPD core reload analysis documents. TS 5.9.5b requires that the analytical methods used to determine core operating limits shall have been approved by the NRC. As such, the OPPD core reload methodology documents, which are several of the analytical methods referenced in TS 5.9.5b were submitted for NRC approval. The applicant is proposing to revise the OPPD core reload methodology documents to incorporate references removed from TS 5.9.5b, delete characters designating the documents as proprietary/approved, and incorporate a description of the CASMO-4 computer code for use for Cycle 23 core reload analysis.
OPPD originally intended to incorporate the CASMO-4 methodology into OPPD-NA-8302 under the provisions of 10 CFR 50.59, as set forth in section 4.3.8 of NEI 96-07, Revision 1, "Guidelines for 10 CFR 50.59 Implementation," dated November 2000. NEI 96-07, Revision 1 was endorsed by the NRC in Regulatory Guide 1.187, "Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments," dated November 2000. However, subsequent
discussions with NRC staff concluded that a license amendment request was needed to incorporate the CASMO-4 methodology as the staff concluded that going from CASMO-3 to CASMO-4 was an upgrade to the CASMO code rather than a revision.
The licensee states that the adoption of the CASMO-4 computer code complies with FCS Design Criterion 6, Reactor Core Design, which is similar to 10 CFR Part 50, Appendix A, General Design Criteria (GDC) 10 for Nuclear Power Plants, "Reactor Design." FCS Design Criterion 6 states that the reactor core shall be designed to function throughout its design lifetime without exceeding acceptable fuel damage limits, which have been stipulated and justified. The core design, together with reliable process and decay heat removal systems, shall provide for this capability under all expected conditions of normal operation with appropriate margins for uncertainties and for transient situations which can be anticipated, including the effects of the loss of power to recirculation pumps, tripping out of a turbine generator set, isolation of the reactor from its primary heat sink, and loss of all off-site power.
Similarly, the licensee states that the adoption of the CASMO-4 computer code complies with FCS Design Criterion 7, "Suppression of Power Oscillations," which is similar to 10 CFR Part 50, Appendix A, GDC 12, "Suppression of Reactor Power Oscillations." FCS Design Criterion 7 states the core design, together with reliable controls, shall ensure that power oscillations which could cause damage in excess of acceptable fuel damage limits are not possible or can be readily suppressed.
Finally, the licensee states that the adoption of the CASMO-4 computer code complies with FCS Design Criterion 8, "Overall Power Coefficient," which is similar to 10 CFR Part 50, Appendix A, GDC 11, "Reactor Inherent Protection." FCS Design Criterion 8 states the reactor shall be designed so that the overall power coefficient in the power operating range shall not be positive.
3.0 TECHNICAL EVALUATION
By letter dated September 7, 2004, the OPPD requested an amendment to the TSs. The proposed amendment request four changes, of which the first three changes are administrative in nature. The first proposed change would revise TS 5.9.5, "Core Operating Limits Report," to be consistent with Specification 5.6.5 of NUREG-1432, "Standard Technical Specifications Combustion Engineering Plants" (Reference 1). The staff has reviewed these changes and agree that the proposed revisions are editorial and do not change substantive requirements, and therefore are acceptable. The changes are consistent with NUREG-1432.
The second proposed change would revise pertinent references in TS 5.9.5b and relocate them to OPPD core reload analysis methodology documents (References 2, 3, 4). These changes are purely administrative in nature in that they incorporate several non-OPPD core reload analysis methodologies by reference into OPPD-controlled documents that are set forth in the COLR methodologies, and delete the methodologies no longer applicable to FCS. The staff has reviewed these changes and agree that the revised list of core reload methodologies are consistent with the previous TS in that the references have been either relocated to the OPPD core reload methodology documents or were deleted because they were no longer applicable.
Therefore, and since these OPPD documents are controlled by 10 CFR 50.59, the proposed changes are acceptable.
The third proposed change revises three OPPD core reload analysis methodologies by removing the "P" and the "A" designations that designate proprietary and approved. OPPD has reviewed these documents and determined that they no longer contain proprietary information and that the approved designation is no longer necessary. The staff agrees that the removal of these designations is administrative in nature and does not change substantive requirements, and therefore, are acceptable.
In the forth proposed change, OPPD requests NRC approval to utilize the CASMO-4 computer code for core reload analysis. The currently approved OPPD core reload analysis methodologies (References 2,3,4) use the Studsvik Scandpower codes, MICBURN-3 and CASMO-3 for cross-section generation, and SIMULATE-3 for core simulation. The licensee has stated that the implementation of the CASMO-4 computer code in the OPPD core reload analysis methodology is consistent with the requirements set forth in 10 CFR Part 50, Appendix A, GDC 10, GDC 11, and GDC 12.
OPPD has extensively evaluated the CASMO-4 computer code utilizing the guidance of Generic Letter 83-11, Supplement 1 (Reference 5). To this end, OPPD performed cold critical benchmarking with CASMO-4 (Reference 6), as well as benchmarking against plant-specific data calculated with CASMO-3 (Reference 7). These calculations demonstrate that the CASMO-4/SIMULATE-3 model does not provide any margin gains. In addition, the uncertainties associated with the peaking factors do not change, and therefore, CASMO-4 does not reduce any previously approved margins.
The approval of the use of CASMO-4 for core reload analysis is based on the FCS reactor core analyses over the range of operating parameters that span the plant specific FCS data to verify the neutronic model. Accordingly, this safety evaluation is limited to the operating conditions at FCS, and is not applicable to any other nuclear power plant. The licensee submitted extensive benchmarking analyses comparing the CASMO-4 code and the CASMO-3 code results. This benchmarking included comparisons of various core parameters at the beginning of cycle, hot zero power, hot full power and end of cycle. The results demonstrate that the CASMO-4/SIMULATE-3 code model does not provide any margin gains, or reduce any previously approved margins. Therefore, the staff finds that the requested changes comply with the conditions set forth in FCS Design Criteria 6, 7, and 8, which are similar to GDC 10, 11, and 12 of 10 CFR Part 50, Appendix A, and therefore are acceptable. In addition, the application of the CASMO-4 code in core reload analysis has been approved by the NRC for cross-section generation at the Palo Verde power station of the Arizona Public Service Company, the Prairie Island power station of the Nuclear Management Company and the North Anna and Surry power stations of Virginia Electric Power Company.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment relates to changes in record keeping, administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such
finding (69 FR 60683; dated October 12, 2004). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. U.S. Nuclear Regulatory Commission, "Standard Technical Specifications Combustion Engineering Plants," NUREG-1432, Revision 3, March 2004.
- 2. Omaha Public Power District, "Reload Core Analysis Methodology Overview," OPPD-NA-8301.
- 3. Omaha Public Power District, "Reload Core Analysis Methodology, Neutronics Design Methods and Verification," OPPD-NA-8302.
- 4. Omaha Public Power District, "Reload Core Analysis Methodology, Transient and Accident Methods and Verification," OPPD-NA-8303.
- 5. U.S. Nuclear Regulatory Commission, "Licensee Qualification for Performing Safety Analyses," NRC Generic Letter 83-11, Supplement 1, June 24, 1999.
- 6. Omaha Public Power District, "B&W Cold Critical Experiments with CASMO-4," OPPD Engineering Analysis EA-FC-02-027, Revision 0.
- 7. Omaha Public Power District, "CASMO-4 Benchmarking," OPPD Engineering Analysis EA-FC-03-146, Revision 0.
Principal Contributor: Y. Orechwa Date: March 11, 2005
Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 401 SW 7th Street, Suite D Des Moines, IA 50309 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Centential Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.