Other: LIC-03-0164, Response to a RAI on Measurement Uncertainty Recapture Power Uprate, LIC-04-0006, Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 1, LIC-04-0061, Notification of Technical Issues Associated with License Amendment No. 225, ML032870394, ML040210313, ML040400333, ML040490383, ML041060362, ML041310501, ML041390246, ML042120203, ML043350135, ML043370117, ML050530011, ML050600428, ML050610222, ML050750059
|
MONTHYEARLIC-03-0067, Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate2003-07-18018 July 2003 Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate Project stage: Request 05000285/LER-2003-002, Regarding Inadequate Testing of Diesel Generators Due to Air Start Systems Unique Design2003-08-28028 August 2003 Regarding Inadequate Testing of Diesel Generators Due to Air Start Systems Unique Design Project stage: Request ML0324505182003-08-28028 August 2003 Revision of License Amendment Request, Measurement Uncertainly Recapture Power Uprate Project stage: Request LIC-03-0142, Completion of Recirculation Actuation Logic Channel Functional Test Circuitry Modification2003-10-14014 October 2003 Completion of Recirculation Actuation Logic Channel Functional Test Circuitry Modification Project stage: Request ML0328705202003-10-14014 October 2003 RAI, Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML0328703942003-10-14014 October 2003 Withholding from Public Disclosure, Calculation Number FC-6896-P, Secondary Calorimetric Uncertainty Analysis Project stage: Other LIC-03-0148, Response to Request for Additional Information - Measurement Uncertainty Recapture Power Uprate2003-10-31031 October 2003 Response to Request for Additional Information - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LIC-03-0077, License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generating Lubrication Oil, and Diesel Generator Starting Air Requirements2003-12-0101 December 2003 License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generating Lubrication Oil, and Diesel Generator Starting Air Requirements Project stage: Request LIC-03-0159, November 2003 Monthly Operating Report for Fort Calhoun Unit 12003-12-15015 December 2003 November 2003 Monthly Operating Report for Fort Calhoun Unit 1 Project stage: Request LIC-03-0164, Response to a RAI on Measurement Uncertainty Recapture Power Uprate2003-12-15015 December 2003 Response to a RAI on Measurement Uncertainty Recapture Power Uprate Project stage: Other LIC-03-0166, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate2003-12-22022 December 2003 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0402007572004-01-16016 January 2004 Issuance of License Amendment 224 Revising the Renewed Operating License and the TSs to Increase the Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal (Mwt) to 1524 Mwt Project stage: Approval ML0402103132004-01-16016 January 2004 Tech Spec Pages for Amendment 224 Revising the Renewed Operating License and the TSs to Increase the Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal (Mwt) to 1524 Mwt Project stage: Other LIC-04-0015, Response to RAI Regarding Fort Calhoun, Unit 1, License Amendment Request, Various Administrative and Editorial Changes2004-02-0909 February 2004 Response to RAI Regarding Fort Calhoun, Unit 1, License Amendment Request, Various Administrative and Editorial Changes Project stage: Response to RAI ML0404003332004-02-0909 February 2004 Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML0404903832004-02-13013 February 2004 Amendment, Changes Implementation Date from 30 Days to 120 Days for Amendment No. 224 Issued on 01/16/2004 That Approved Measurement Uncertainty Uprate to Increase Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal to 1524 Project stage: Other ML0405803462004-02-18018 February 2004 RAI, License Amendment Request Administrative TS Changes (Tac. MC1535) Project stage: RAI ML0410603622004-04-14014 April 2004 Memo to File, E-mail Regarding Fort Calhoun Emergency Diesel Generating Starting Air System Project stage: Other LIC-04-0061, Notification of Technical Issues Associated with License Amendment No. 2252004-05-0505 May 2004 Notification of Technical Issues Associated with License Amendment No. 225 Project stage: Other ML0413105012004-05-10010 May 2004 5/10/04, Fort Calhoun, Unit 1 - Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML0413902462004-05-14014 May 2004 License Amendment, Amendment Restores Licensed Thermal Power from 1524 Mega Thermal Project stage: Other ML0413901262004-05-14014 May 2004 5/14/04, Fort Calhoun, Unit 1 - TS - Issuance of Amendment Project stage: Approval LIC-04-0073, Response to Request for Additional Information Regarding License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generator Lubricating Oil, & Diesel Generator Starting Air Requirements2004-07-0202 July 2004 Response to Request for Additional Information Regarding License Amendment Request, Addition of Diesel Generator Fuel Oil, Diesel Generator Lubricating Oil, & Diesel Generator Starting Air Requirements Project stage: Response to RAI ML0421202032004-07-23023 July 2004 Tech Spec Pages for Amendment 228 Various Administrative and Editorial Changes Project stage: Other ML0421104112004-07-23023 July 2004 Issuance of License Amendment 228 Various Administrative and Editorial Changes Project stage: Approval ML0424300272004-08-27027 August 2004 RAI, Modify Technical Specification 2.3.(4) Project stage: RAI LIC-04-0094, Supplemental Response to the Requests for Additional Information on the Fort Calhoun, Unit 1 Security Plan and Safeguards Contingency Plan2004-08-27027 August 2004 Supplemental Response to the Requests for Additional Information on the Fort Calhoun, Unit 1 Security Plan and Safeguards Contingency Plan Project stage: Supplement ML0433501352004-10-21021 October 2004 Tech Spec Pages for Amendment No. 229, Changing TS 2.7, TS Table 3-5 and TS 5.0 to Modify Requirements for the Diesel Generator Fuel Oil for Consistency with Improved Standard TS Project stage: Other ML0430205742004-10-21021 October 2004 Issuance of License Amendment No. 229, Changing TS 2.7, TS Table 3-5 and TS 5.0 to Modify Requirements for the Diesel Generator Fuel Oil for Consistency with Improved Standard TS Project stage: Approval LIC-04-0102, Request for Additional Information (RAI) Regarding License Amendment Request (Lar), Trisodium Phosphate (TSP) Dodecahydrate Volume2004-10-29029 October 2004 Request for Additional Information (RAI) Regarding License Amendment Request (Lar), Trisodium Phosphate (TSP) Dodecahydrate Volume Project stage: Request ML0433701172004-11-0808 November 2004 TS Pages for Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR Project stage: Other ML0432705302004-11-0808 November 2004 Issuance of License Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR Project stage: Approval LIC-04-0133, Response to NRC RAI on Trisodium Phosphate (TSP) License Amendment Request2004-12-16016 December 2004 Response to NRC RAI on Trisodium Phosphate (TSP) License Amendment Request Project stage: Response to RAI ML0505300112005-02-18018 February 2005 Tech Spec Page for Amendment 231 Elimination of Requirements to Provide Monthly Operating/Annual Occupational Radiation Exposure Reports Project stage: Other ML0505500612005-02-18018 February 2005 Issuance of License Amendment 231 Elimination of Requirements to Provide Monthly Operating/Annual Occupational Radiation Exposure Reports Project stage: Approval ML0506004282005-03-0101 March 2005 Amendment, Revision of TS Section 2.3(4) & TS Section 3.6(2)d.(i) Project stage: Other ML0506102222005-03-0101 March 2005 Technical Specifications, Revision of TS Section 2.3(4) & TS Section 3.6(2)d.(i) Project stage: Other ML0507500592005-03-11011 March 2005 Tech Spec Pages for Amendment 233 Revising TS 5.9.5 to Be Consistent with Specification 5.6.5 of NUREG-1432 Project stage: Other ML0507505342005-03-11011 March 2005 Issuance of License Amendment 233 Revising TS 5.9.5 to Be Consistent with Specification 5.6.5 of NUREG-1432 Project stage: Approval LIC-04-0006, Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 12005-07-0101 July 2005 Closure of NRC Tack Issues for Fort Calhoun Station Unit No. 1 Project stage: Other 2004-02-13
[Table View] |
Text
.-..
Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 December 16,2004 LIC-04-0133 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
References:
- 1.
Docket No. 50-285
- 2.
Letter from OPPD (R. L. Phelps) to NRC (Document Control Desk) dated May 2 1,2004, Trisodium Phosphate (TSP) Dodecahydrate Volume, Letter from NRC (A. B. Wang) to OPPD (R. T. Ridenoure) dated August 27, 2004, Request for Additional Information (RAI), (TAC No.
Letter from OPPD (R. L. Phelps) to NRC (Document Control Desk) dated October 29,2004, OPPD Response to NRC MI, (LIC-04-0102)
(LIC-04-0045)
- 3.
MC3214) (NRC-04-0111)
- 4.
SUBJECT:
NRC RAI on Trisodium Phosphate (TSP) License Amendment Request As requested by the NRC, this letter provides documentation of a teleconference held on December 6,2004 between the NRC and OPPD. Two questions concerning OPPDs Response (Reference 4) to an NRC Request for Additional Information (Reference 3) were discussed during the teleconference.
The two NRC questions and OPPDs responses are attached.
I declare under penalty of perjury that the forgoing is true and correct. (Executed on December 16, 2004). No commitments to the NRC are made in this letter.
If you have any questions or require additional information, please contact Tom Matthews at (402) 533-693 8.
R. L. Phelps Division Manager Nuclear Engineering RLP/MLE/mle Attachment Employment with Equal Opportunity
LIC-04-0133 Page 1 NRC Question 1:
In your response to [Reference 31 question 2, you stated that you have determined that enhanced administrative controls are needed to ensure that the maximum mass-equivalent limit of TSP for EEQ is not exceeded in the future. The staff requests the licensee to explain the administrative controls that will be taken in response to this issue.
OPPD Response:
OPPD has revised the surveillance test (CH-ST-CH-0002) to incorporate an upper limit of 135.71 ft3 for the total effective volume of TSP allowed in the TSP baskets. This limit supports current EEQ requirements by ensuring that containment sump pH does not exceed 7.5 should a loss-of-coolant accident (LOCA) occur at end of cycle. Total effective TSP volume is the cumulative volume of TSP initially placed into the baskets and the volume of TSP added to top-off the baskets (due to the effects of settling) during subsequent refueling outages.
CH-ST-CH-0002 records the cumulative volume of TSP added to the TSP baskets from cycle to cycle. At the point where topping off one or more baskets would cause the total effective volume limit to be exceeded, the densified TSP in one or more baskets is changed out. This ensures that the limit is not exceeded and preserves the accuracy of the calculation for subsequent surveillance tests.
NRC Question 2:
In your response to [Reference 31 question 3, you stated that the assay TSP is 92 weight YO minimum with a total moisture of 47 - 52%. If the moisture content of the TSP is going to be anywhere between 47 - 54.2%, shouldnt the amount of TSP be between 45.8 and 53%?
Please explain.
OPPD Response:
OPPDs purchase specification requires a minimum of 92-weight percent Na3P04, which allows up to 8 percent inert matter. The purchase specification also allows moisture content between 47 and 54.2 percent in the product supplied by the vendor. The moisture content percent and minimum 92-weight percent Na3P04 are not directly related. If there were no inert matter, the amount of Na3P04 would be between 45.8 and 53 percent as stated in the question, based on subtracting the moisture content from the total mass. However, the inert matter slightly reduces the resulting percentage of Na3P04.