Williams Q&A - Request #24 - Iwl Exam - 6 Tm Tendon Survel Test Rept
ML102720651
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/30/2009
From:
Florida Power Corp
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102720651 (329)


Text

{{#Wiki_filter:1jH 20 rie

           ~~'      ~    20TH YEAR SURVEILLANCE OF THEFord POST-TENSIONING SYSTEM AT THE                  Florida CRYSTAL RIVER NUCLEAR PLANTuT                  Power d 66UNIT               3                           CORPORATION SI. SURVEILLANCE PROCEDURES Volume 2, Section 9, Appendix F of the 20th Year Physical Surveillance Report contains the detailed procedures for conducting the tendon surveillance. The surveillance consists of the following steps:
1. Visual examination of casing filler grease.
2. Analytical testing of casing filler grease samples.
3. Inspection of the anchor assembly of each of the surveillance tendon ends for deleterious conditions such as corrosion, cracks, broken or missing buttonheads.
4. Inspection of concrete surrounding the bearing plate.
5. Measurement of the liftoff force for each of the surveillance tendons.

6". Removal of one wire from the surveillance tendons which are detensioned for examination and testing.

7. Retensioning of the detensioned tendons and measuring the corresponding tendon elongation.
8. Visual inspection for corrosion, pitting, or any significant physical change of wires removed from the tendons.
9. Testing of wires removed from tendons for yield strength, ultimate strength, and percentage elongation at failure.
10. Resealing tendon cans and replacement of lost sheathing filler into the j tendon duct and grease can.
11. Evaluation of test and inspection results to assess the general condition of the post tensioning system.

i1

20TIH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida

   --                               CRYSTAL RIVER NUCLEAR PLANT                                       Power UNIT 3                                         COPORATON lI. SHEATHING FILLER ANALYSIS A sample of sheathing filler (grease) was removed from each end of the surveillance tendons.

Chemical tests were performed on each sample by Suburban Laboratories, Inc., the results are presented in Appendix B and are summarized in Table 1. The maximum acceptable limits are 10 percent by weight for water content and 10 parts per million for water-soluble chlorides, nitrates and sulfides. All samples met the acceptance criteria as stated above in all respects except 51H25 field end which had a water content result of 14.9%. As there is a limited amount of grease available for testing in this grease cans, due to the large shim volume, and a leaking gasket. The small quantity of grease did not allow for additional samples and the water penetration was in the area of gasket failure. This result is not necessarily indicative of the tendon grease condition

          ýthroughout the tendon. Inspection of the tendon end anchorage, shims, and buttonheads showed no abnormal corrosion which would indicate a moisture problem. The gasket was replaced and the anchorage refilled with new grease.
  '~j      Tendon 53H2 samples were unavailable for testing.

Also included was the report of the neutralization number of each grease sample. This test is generally performed by grease manufacturers on new batches of the product. It is a method of determining the overbase additives in the grease. Degradation of the sheathing filler will yield a change in the acidity of

  • the filler material as well as an increase in the ion content. The required neutralization number is
           >3mg KOH/g and has been achieved by all samples in this test.

The large range in the neutralization numbers found between various tendons is indicative of different types of grease, such as P2 and P4, where P2 was originally installed and P4 added during latter work. This is not a sign of grease or system degradation. qj 2

20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT TIIE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION lI TABLE I: LABORATORY ANALYSIS OF SHEATHING FILLER TENDON END ION CONCENTRATION (PPM)  % WATER NEUTRAL No. I CHLORIDE NITRATE SULFIDE CONTENT mg KOHI/g 12VI SHOP/TOP <0.50 1.24 <0.50 0.1 42.1 FIELD/ BOTT. <0.50 1.02 <0.50 0.4 42.1 23V2 SHOP/ TOP <0.50 1.46 <0.50 0.2 46.6 FIELD/ BOTT. <0.50 2.02 <0.50 0.1 47.1 61V21 SHOP/TOP <0.50 1.02 <0.50 0.2 50.5 _FIELD/BOlT. <0.50 1.46 <0.50 <0.1 24.1 D113 SHOP/NEAR 2 <0.50 0.79 <0.50 <0.1 36.5 FIELD/NEAR 6 <0.50 1.13 <0.50 0.1 39.3

      '.15     SHOP/NEAR 2                 <0.50         1.68           <0.50        0.2      40.9 FIELD/NEAR 6               <0.50         1.13           <0.50        0.2      43.2 D212        SHOP/NEAR 1                <0.50         1.13           <0.50        0.1      26.4 FIELD/NEAR 3               <0.50         0.68           <0.50        0.1      40.9 i

D304 SHOP/NEAR 4 <0.50 0.79 <0.50 0.3 40.9 FIELD/NEAR 2 <0.50 0.68 <0.50 0.1 33.7 D311 SHOP/NEAR 4 <0.50 1.02 <0.50 0.3 47.7 L FIELD/NEAR 2 <0.50 0.68 <0.50 0.1 33.7 J Acceptance Limits Test Limits Water Soluble Chloride Less than 10.0 ppm Water Soluble Nitrates Less than 10.0 ppm Water Soluble Sulfides Less than 10.0 ppm Water Content Less than 10% Dry Weight Neutralization No. Greater than 3 mg KOH/g 3

20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE I: LABORATORY ANALYSIS OF SHEATHING FILLER TENDON END ION CONCENTRATION (PPM)  % WATER NEUTRAL No. I CHLORIDE NITRATE SULFIDE CONTENT mg KOII/g 42H18 SHOP/BUTT 4 <0.50 1.02 <0.50 0.1 11.8

! FIELD/BUTT 2 <0.50 1.02 <0.50 0.1 41.5 42H32 SHOP/ BUTT 4 <0.50 0.68 <0.50 0.1 33.7 FIELD/

I_ BUTT 2 <0.50 0.79 <0.50 <0.1 42.1 42H44 SHOP/ BUTT 4 <0.50 0.68 <0.50 <0.1 42.1 FIELD/BUTT 2 <0.50 2.13 <0.50 <0.1 21.3 5IH25 FIELD/BUTT5 <0.50 3.25 <0.50 14.9 30.8 511126 SHOP/BUTT 1 <0.50 3.58 <0.50 0.1 1112 FIELD/BUTT 5 <0.50 1.02 <0.50 <0.1 42.1 53H46 SHOP/ BUTT 5 <0.50 0.68 <0.50 <0.1 36.5 FIELD/BUTT 3 <0.50 1.13 <0.50 <0.1 4.49 62H41 SHOP/BUTT 2 <0.50 1.24 <0.50 <0.1 40.9 FIELD/ BUTT 6 <0.50 2.69 <0.50 <0.1 28.0 62H46 SHOP/BUTT 2 <0.50 1.35 <0.50 0.2 38.7 FIELD/ BUTT 6 <0.50 0.90 <0.50 <0.1 6.17

  *t o

t Acceptance Limits Test Less than i0.0 ppm Water Soluble Chloride Less than 10.0 ppm Water Soluble Nitrates Less than 10.0 ppm Water Soluble Sulfides Water Content Less than 10% Dry Weight Neutralization No. Greater than 3 mg KOH/g 4

  • 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power coroAn IIl. ANCHORAGE COMPONENTS In the following discussion, all procedures referred to are included in Volume 2, Section 9, Appendix F of the 20th Year Physical Report while all data sheets are included in Section 4, Appendix A.

Inspection of the anchorage components began with the removal of the grease can (PSC Procedure SQ 6.0). Complete grease coating (100%) was found on all surveillance tendons except 42H18 field end with 70% of grease can coated, 42H32 field end with 60% of the grease can coated, 62H41 shop end with 60% of the grease can coated and 62H41 field end with 70% of the grease can coated. The percentage of grease coverage was recorded on Data Sheet SQ 6.0 with the results tabulated in Table I!. During removal of the grease can and physical inspections of the anchorage assemblies water was detected during removal of a can, or inside it, on only one tendon end. Tendon 51H25 fiild end exhibited drops of water in the grease can. No water was detected in any other surveillance or grease repair tendon. Water Inspections were recorded on Data Sheet SQ 6.1 and are summarized in Table III. The anchorage components (anchorhead, bushing, shims, buttonhead and bearing plate) were inspected for corrosion level and cracks per PSC Procedure SQ 8.0. The results were recorded on Data Sheet SQ 8.0 and are summarized in Table IV. Corrosion levels on all items was either level I -

    "bright metal, no visible oxidation", or level 2 - "reddish brown color, no pitting". No evidence of cracking was observed in any of the anchorage components.

5

20Thl YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE 6"Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 o Power CORPORATION 4 Ill. ANCHORAGE COMPONENTS The buttonheads were inspected for their physical condition and a count was made of protruding or missing buttonheads per PSC Procedure SQ 8.0. The results of these inspections are also recorded on Data Sheet SQ 8.0, and summarized in Table V.

  \.-   d Tendon 12VI shop end was found' to have one wire protruding 0.6" and NCR No. FN604-001 was.
  • .1 written to address this.

Tendon 51H26 (field end shown) was found to have one broken wire 6.05"

 *1                                                long    after  initial  liftoff    was performed. NCR No. FN604-003 was generated to document this finding and the broken section was later removed during detensioning.

A continuity test was conducted and all remaining wire were found to be continuous

201TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATTION IIl. ANCHORAGE COMPONENTS t This picture of 51H27 field end shows the two small buttonheads reported on Data Sheet SQ 8.0 in red. The wires circled in green were found to be protruding after liftoff and removed. The pieces were found to be 6.15" long and NCR No. FN604-007 was raised to document this occurrence. .! a ,o°g. Tendon 62H41 was also found to have two broken wires after detensioning, NCR No. FN604-015 recorded this finding.

  )-I      No other missing or protruding wires not previously reported were found.

Cans were also removed to the shop end of 43V4 and the field end of 51H41 where "domed" or bulging can ends were found. Inspection revealed no apparent abnormalities and the anchorage, shims and buttonheads were found to be acceptable in all respect. 7

20Til YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3 S-oe Florida III. ANCHORAGE COMPONENTS

  • j

~1

   'I
  • I d
  • I
-j
*I Scratches found on the face of the anchorhead on 52H46 shop end were reported on Data Sheet SQ 8.0 9

20TH YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION Ill. ANCHORAGE COMPONENTS

           --i - -

JB ,. *, 1 S

  • I
  • 4 The above 3/8" shim on tendon 51 H27 field end was found to be deformed at the shim gap which was 0.8" wide. This shim was replaced and the shim gap closed up during liftoff.

9

0.Power 20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT TIlE CRYSTAL RIVER NUCLEAR PLANT Florida -UNIT 3 1014F.. FCORPORATION III. ANCHORAGE COMPONENTS Pieces of rope found protruding from shim gap on tendon 51H28 field end. wr F, -f z 10

20TH YEAR SURVEILLANCE OF THlE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT Florida

                                                                             -owe UNIT 3 I

III. ANCHORAGE COMPONENTS The concrete was inspected around the bearing plates for cracks per PSC Procedure SQ 8.3 with the results being recorded on Data Sheet SQ 8.3 and summarized in Table VI. Two tendons exhibited cracks exceeding 0.010", D311 and 5 1H26 (shown on the next two pages). No cracks that had a width in excess

  • 1 of 0.010" were found to any other inspection tendon. Data Sheets SQ 8.4 detail the general containment exterior concrete inspection and at the time of the
  • 1 surveillance a contractor was on site making concrete repairs to the I containment buttresses.

Bearing plate ID's were either illegible or not found on several tendon ends.

  .1 11

20THl YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3 S~P ro- Florida CO"PORATION .1 III. ANCHORAGE COMPONENTS Crack found around the bearing plate at 5 1-H26 shop end. '1 See NCR No. FN604-004

  • 1

.1 I I 12

20TII YEAR SURVEILLANCE OF TIHE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3 ( ov"' 3WjjPower Florida 0#0004CORPORATION' J1 I1. ANCHORAGE COMPONENTS

                  ~-wi-~1
                                                             *,t.'jL Cracks found on tendon 52H26 field end.

See NCR No. FN604-002 ri *'~.. '~

 *1
              '4-.,..-.
  • J ,-.. ~
                                                                                                       .,  .1 g
                -. ~., .. ~'
                                                                                       *%.1 1,        *                      ,
                                .8 0.   ,Ord All
                                                ~1
  • y
  • L
  • J
                                                                                                                     -. 1 4
                                             ~*  -....

C> -.

              .8*

13

                      "    20TH YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT TIlE             Florida
          -  ~

CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE II:

SUMMARY

OF DATA SHEETS SQ 6.0 GREASE CAN REMOVAL. TENDON END GREASE COATING (%) GREASE BUTTON- ANCHOR- SHIMS BEARING CAN -HEADS HEADS PLATE '1 12VI SHOP/TOP 100 100 100 100 100 FIELD/BOT. 100 100 100 100 100 23V2 SHOP/TOP 100 100 100 100 100 FIELD/BOT. 100 100 100 100 100 61V21 SHOP/TOP 100 100 100 100 100 FIELD/BOT. 100 100 100 00 100 V4 SHOP/TOP 100 '00 100 100 100 D113 SHOP/NEAR 2 100 100 100 100 100 FIELD/NEAR6 100 100 100 100 100 DI1 SHOP/NEAR 2 100 100 100 100 100 FIELD/NEAR 6 100 100 100 100 100 D212 SHOP/NEAR 1 100 100 100 100 100 FIELD/NEAR 3 100 100 100 100 100 D304 SHOP/NEAR4 100 100 100 100 100 FIELD/NEAR2 100 100 100 100 100

..1 D311       SHOP/NEAR 4 FIELD/NEAR 2 100 100 100 100 100 100 100 100 100 100 14

20TI! YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3

                                                                   ?Florida  Power CORPORATION

.1 TABLE If:

SUMMARY

OF DATA SHEETS SQ 6.0 GREASE CAN REMOVAL TENDON END GREASE COATING (%) GREASE BUTTON- ANCHOR- SHINMS BEARING CAN IHEADS lHEADS PLATE 42H!8 SHOP/BUTI 4 100 100 100 100 100 Ii FIELD/BUTT 2 70 100 100 100 100 42H29 SHOP/BUTT 4 100 100 100 100 100

  • j FIELD/BUTT 2 100 100 100 100 100 42H30 SHOP/BUTT 4 100 100 100 100 100 FIELD/BUTT 2 100 100 100 100 100 421131 SHOP/BUTT 4 100 100 100 100 100 FIELD/BUTT 2 100 100 100 100 100 42H32 SHOP/BUTT 4 100 100 100 100 100 FIELD/BUTT 2 60 100 100 100 100 421133 SHOP/BUTT 4 100 100 100 100 100 FIELD/BUTT 2 100 100 100 100 100 421134 SHOP/BUTT 4 100 100 100 100 100 FIELD/ BUTT 2 100 100 100 100 100 42H35 SHOP/BUTT 4 100 100 100 100 100
  'U FIELD/BUTT 2        100       100         100        100         100 42H36      SHOP/BUTT 4         100       100          100       100         100
   .1 FIELD/BUTT 2        100       100          100       100         100 42H37      SHOP/BUTT 4         100       100          100       100         100 FIELD/BUTT2          100       100         100        100        100
   .1
     .1 15

20TI" YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT TIlE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power 0 CORPORATION

  !    TABLE II: 

SUMMARY

OF DATA SHEETS SQ 6.0 GREASE CAN REMOVAL TENDON END GREASE COATING (%) GREASE BUTTON- ANCHOR- SHIMS BEARING CAN HEADS HEADS PLATE 42H44 SHOP/BUTT 4 100 100 100 100 100 ! 1 FIELD/BUTT 2 100 100 100 100 100 51H25 SHOP/BUTT 1 100 100 100 100 100 '1 FIELD/BUTT 5 100 100 100 100 100 511126 SHOP/BUTT 1 100 100 100 100 100 FIELD/BUTT 5 100 100 100 100 100 511127 S...OP/.BUTT 100 100 100 100 100 FIELD/BUTT 5 100 100 100 100 100, 51H28 SHOP/BUTT 1 100 100 100 100 100 FIELD/BUTT 5 100 100 100 100 100 53112 SHOP/BUTTS 100 100 100 100 100

  • g FIELD/BUTT 3 100 100 100 100 100 531146 SHOP/BUTT 5 100 100 100 100 100 FIELD/BUTT 3 100 100 100 100 100 62H41 SHOP/BUTT 2 60 100 100 100 100 FIELD/BUTTI6 70 100 100 100 100
1 621146 SHOP/BUTT 2 100 100 100 100 100 FIELD/BUTT 6 100 100 100 100 100 51H41 FIELD/BUTT 5 100 100 100 100 100 b

o 16

20THl YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT Power J UNIT 3 Florida CORPORATION

 .1  TABLE III: 

SUMMARY

OF DATA SHEETS SQ 6.1 INSPECT FOR WATER TENDON END WATER QUANTITY 12VI SHOP/TOP NONE -' I- FIELD/BOT. NONE 23V2 SHOP/TOP NONE FIELD/BOT. NONE 61V21 SHOP/TOP NONE FIELD/BOT. NONE 43V4 SHOP/TOP NONE Lm SHOP i 12VI J 23V2 61V21 I NONE FOUND I 43V4 0 10 , 20 30 40 50 60 70 OUNCES 17

i 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3 TABLE III:

SUMMARY

OF DATA SHEETS SQ 6.1 S~Po Florida CORPORATIN INSPECT FOR WATER. TENDON END WATER QUANTITY D113 SHOP/NEAR 2 NONE FIELD/NEAR 6 NONE D115 SHOP/NEAR 2 NONE FIELD/NEAR 6 NONE D212 SHOP/NEAR 1 NONE FIELD/ NEAR 3 NONE D304 SHOP/NEAR 4 NONE FIELD/NEAR 2 NONE 311 SHOP/NEAR 4 NONE FIELD/NEAR 2 NONE .0 SllOP FIELD DI13 I NONEFOUND I D212 D304 D311 0 10 20 30 40 50 60 70 OUNCES 18

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT3 Power CORPORATION TABLE III:

SUMMARY

OF DATA SHEETS SQ 6.1 INSPECT FOR WATER. TENDON END WATER QUANTITY 42H18 SHOP/ BUTT 4 NONE '*1 FIELD/ BUTT 2 NONE 421129 SHOP/BUTT 4 NONE '1 FIELD/BUTT 2 NONE 421130 SHOP/ BUTT 4 NONE FIELD/ BUTT 2 NONE 421131 SHOP/BUTI 4 NONE FIELD/ BUTT 2 NONE 1132 SHOP/ BUTT 4 NONE FIELD/BU1Tr 2 NONE SHOP I F--EnLD J 421118 421129 a' 421130 NONE FOUND[ 421131 42H32 0 10 20 30 40 50 60 70 OUNCES 19

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida

 *CRYSTAL                             RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE III: 

SUMMARY

OF DATA SHEETS SQ 6.1 INSPECT FOR WATER. TENDON END WATER QUANTITY 421133 SHOP/ BUTT 4 NONE FIELD/BUTT 2 NONE 421134 SHOP/ BUTT 4 NONE FIELD/ BUTT 2 NONE 42H35 SHOP/ BUTT 4 NONE FIELD/ BUTT 2 NONE 421136 SHOP/ BUTT 4 NONE FIELD/ BUTT 2 NONE SHOP/ BUTT 4 NONE r 1H37 FIELD/ BUTT 2 NONE SIIOP FIELD 421133 421134 421135 NONE FOUND I 42H36 42H37 0 10 20 30 40 so 60 70 OUNCES 20

                       . 20TH YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT TIIE         Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power COPORMATION TABLE III: 

SUMMARY

OF DATA SHEETS SQ 6.1 INSPECT FOR WATER TENDON END J WATER QUANTITY 42H44 SHOP/ BUTT 4 NONE FIELD/BUTT 2 NONE 51H25 SHOP/BUTT 1 NONE FIELD/ BUTT 5 DROPS 511126 SHOP/BUTT I NONE FIELD/ BUTT 5 NONE 511127 SHOPI BUTT I NONE FIELD/ BUTT 5 NONE 1128 SHOP! BUTT 1 NONE FIELD/ BUTT 5 NONE M s1lop 421144 E:1 IFIELD 51H25 i t 51H26

                         ]

51H27 51H28 0 10 20 30 40 50 60 70 OUNCES K- A

 .I 21

20TIH YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE III:

SUMMARY

OF DATA SHEETS SQ 6.1 JI INSPECT FOR WATER TENDON END WATER QUANTITY 53H2 SHOP/BUTT 5 NONE FIELD/BUFT 3 NONE 531146 SHOP/ BUTT 5 NONE FIELD/ BUTT 3 NONE i 62H41 SHOP/ BUTT 2 NONE FIELD/ BUTT 6 NONE 621146 SHOP/ BUTT 2 NONE FIELD/ BUTT 6 NONE H41 FIELD/BUTT5 NONE ~1 SHOP t 53112 53H46 I1 621141 INONEFOUND I 621146 511141 i 0 10 20 30 40 50 60 70 OUNCES 22

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT Power aFlorida UNIT 3 s., CORPORATION TABLE IV:

SUMMARY

OF DATA SHEETS SQ 8.0 ANCHORAGE CORROSION CONDITION TENDON END ANCHOR BUTTONHEAD CORROSION LEVEL, CRACKS I.D. CORROSION ANCHOR- SHIMS BEARING CONDITION HEAD PLATE 12VI SHOP/TOP CR650/PCI21 1 1, NONE 2, NONE 21 NONE FIELD/BOT. NOT FOUND 1 2, NONE 2, NONE 2, NONE 23V2 SHOP/TOP CR736/PC121 1 2, NONE 2, NONE 2, NONE FIELD/BOT. CR239/PC120 1 2, NONE 2, NONE 2, NONE 61V21 SHOP/TOP CR957/PCI121 1 2, NONE I, NONE 2, NONE FIELD/BOT. CR189/PC120 1 1, NONE I,NONE I, NONE 43V4 SHOP/TOP CR788/PCI21 N/A NONE NONE NONE

     '%113       SHOP/NEAR 2          CR41I/PCI21         I     2, NONE     I,NONE       I,NONE FIELD/NEAR 6 CR1075/PCI21                1     2, NONE     2, NONE      2, NONE D1I1        SHOP/NEAR2           CR675/PCI21         I     2, NONE     I,NONE        2, NONE FIELD/NEAR 6 CR1231/PCI22                I     2, NONE     1, NONE      I, NONE D212        SHOP/NEAR I         CRI032/PCI21         I    LNONE        I,NONE        2, NONE FIELD/NEAR 3 CR1214/PC122                I    1, NONE       I, NONE     1, NONE D304        SHOP/NEAR4           CR479/PCI21         I     2,NONE      1,NONE       I,NONE FIELD/NEAR 2         CR696/PCI21         1     I, NONE     INONE        2, NONE
  • D311 SHOP/NEAR4 CRI040/PCI21 I I,NONE I,NONE 2, NONE FIELDD/NEAR2 CR636/PCI21 I 1, NONE 1, NONE 2, NONE t

1 Bright metal; no visible oxidation. 2 Metal redish brown color, no pitting 3 Patches of red oxide, no visible pits. 23

POST-TENSIONING SYSTEM AT THE Florida

                             'ý
                             .         20TII  YEARRIVER CRYSTAL          NUCLEAR OF SURVEILLANCE UNIT 3 PLANT TilE             Power CORPORATION TABLE IV: 

SUMMARY

OF DATA SHEETS SQ 8.0 ANCHORAGE CORROSION CONDITION TENDON END ANCHOR BITMONIIEAD CORROSION LEVEL, CRACKS I.D. CORROSION ANCIIOR- SHIMS BEARING CONDITION HEAD I PLATE 42H18 SHOP/BUTI4 CR615/PCI21 2 2, NONE 2, NONE 2, NONE -e t FIELD/ BUTT 2 CR906/PC121 1 2, NONE 1, NONE 2, NONE 42H29 SHOP/ BUTT 4 CR606/PCi21 N/A NONE NONE NONE FIELD/ BUTT 2 CR1208/PCI22 N/A NONE NONE NONE 421130 SHOP/BUTT 4 CR569/PCI2I N/A NONE NONE NONE FIELD/BUTT 2 CR1143/PC122 N/A NONE NONE NONE 421131 SHOP/BUTT 4 CR368/PC121 N/A NONE NONE NONE FIELD/ BUTT 2 CR1233/PC122 N/A NONE NONE NONE

      '-42H32        SHOP/ BUTT 4        CR564/PCI21         1        2, NONE   2, NONE      2, NONE FIELD/BUTT 2         CR123/PCI20         I       2, NONE   1, NONE      1, NONE 421133       SHOP/ BUTT 4         CR546/PC121       NIA        NONE      NONE         NONE FIELD/ BUTT 2        CR934/PCI21       N/A        NONE      NONE         NONE 42H34       SHOP/ BUTT 4         CR525/PCI21       N/A        NONE      NONE         NONE FIELD/BUTT 2 CR1207/PC122              N/A        NONE      NONE         NONE 42H35       SHOP/LBUTT 4         CR547/PCI21       N/A        NONE      NONE         NONE FIELD/ BUTT 2 CR1229/PCI22             N/A        NONE      NONE         NONE 42H36       SHOP/BUTT 4          CR522/PC121       N/A         NONE      NONE        NONE t                FIELD/BUTT 2 CR1174/PC122              N/A         NONE      NONE        NONE 42H37       SHOP/BUTT 4          CR559/PCI21       N/A         NONE      NONE        NONE FIELD/BUTT2 CR! 175/PC122             N/A         NONE      NONE        NONE I Bright metal; no visible oxidation.

2 Metal redish brown color,no pitting 3 Patches of red oxide, no visible pits. 24

20TI! YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE *Florida CRYSTAL RIVER NUCLEAR PLANT UNIT3 Power CORPORMTION G TABLE IV:

SUMMARY

OF DATA SHEETS SQ 8.0 ANCHORAGE CORROSION CONDITION TENDON END ANCHOR BUrrONIIEAD CORROSION LEVEL, CRACKS I.D. CORROSION ANCHOR- SHIMS BEARING CONDITION HEAD PLATE 42H44 SHOP/BUTT4 CR572/PC121 1 I, NONE 2, NONE 2, NONE FIELD/BUTT2 CR1230/PCI22 1 1, NONE 2, NONE I, NONE 51H25 SHOP/ BUTT I CR26/PC120 N/A NONE NONE NONE FIELD/BUTT5 CR1126/PCI22 I 1, NONE 2, NONE 2, NONE 51H26 SHOP/BUTT I CR384/PCI21 1 2, NONE 1, NONE 1, NONE FIELD/BUTT 5 CR897/PCI21 I 1, NONE 1, NONE 1, NONE 51H27 SHOP/BUTT I CR366/PCI21 N/A NONE NONE NONE FIELD/BUTT 5 CR1088/PC12I .N/A NONE NONE NONE

    -1H28        SHOP/BUTT' I         CR49/PCi20        N/A     NONE       NONE         NONE FIELD/ BUTT 5 CR1 173/PC122            N/A      NONE      NONE         NONE 53112        SHOP/BUTT 5          CRI35/PCI20        1     2, NONE    1, NONE     1, NONE FIELD/BUTT 3         CR646/PC12I        1     2, NONE   2, NONE      I, NONE 53H46        SHOP/BUTT 5          CR660/PCI2I        1     2, NONE    1, NONE     2, NONE FIELD/BUTT 3 CR1197/PCI22               I     1, NONE    1, NONE     2, NONE 62H41        SHOP/BUTT 2          CR355/PCI20        I     1, NONE    I, NONE     2, NONE FIELD/BUTI"6         CR454/PCI21        I     I, NONE    1, NONE     1, NONE 62H46       SHOP/BUTT 2          CR!56/PC120        2     2, NONE   2, NONE      1, NONE
  • 1 FIELD/BUTT 6 CR979/PCI21 I 1, NONE 1, NONE 1, NONE
-.1 51H41       FIELD/BUTT_5        CRi222/PC122       N/A      NONE      NONE         NONE I Bright metal; no visible oxidation.

2 Metal redish brown color, no pitting 3 Patches of red oxide, no visible pits. 25

                                                              -.-.      ~

C C 20TI YEAR SURVEILLANCE OF TIIE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power-COMPOAMIN TABLE V:

SUMMARY

OF DATA SHEETS SQ 8.0 - BUTTONHIEAD COUNT TENDON END ORIGINAL AS FOUND AS +LEFT J REMOVED TOTAL EFFECTIVE EFFECTIVE PROTRUDE BROKEN/ PROTRUDE BROKEN/ PROTRUDE BROKEN/ FOR WIRES WIRES MISSING MISSING MISSING TESTING AS FOUND ASLEFT 12VI SI1OPfTOP 1 0 1 0 1 0 0 1 162 162 FIELD/BOT. 0 1 0 I 0 1 0 1 162 162 23V2 SHIOPfrOP 0 0 0 0 0 0 0 0 163 163 FIELD/DOT. 0 0 0 0 0 0 0 0 163 163 61V21 SHOP/TOP 0 0 0 0 0 0 1 1 163 162 FIELD/DOT. 0 0 0 0 0 0 1 1 163 162 43V4 SIIOPfrOP 0 0 0 0 0 0 0 0 163 163 D113 SI1OP/NEAR2 0 0 0 0 0 0 0 0 163 163 FIELD/NEAR 6 0 0 0 0 0 0" 0 0 163 163 DIIS SIIOP/NEAR2 0 0 0 0 0 0 0 0 163 163 FIELD/NEAR 6 0 0 0 0 0 0 0 0 163 163 D212 SIIOP/NEAR I 0 1 0 1 0 1 0 1 162 162 FIELD/NEAR 3 0 1 0 1 0 1 0 1 162 162 D304 SHOP/NEAR 4 0 0 0 0 0 0 0 1 163 162 FIELD/NEAR 2 0 0 0 0 0 0 0 1 163 162 D311 SIIOP/NEAR4 0 0 0 0 0 0 0 0 163 163 FIELD/NEAR 2 0 0 0 0 0 0 0 0 163 163

B J C 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power COMRPOIAMro TABLE V:

SUMMARY

OF DATA SHEETS SQ 8.0 - B1UTTONHEAD COUNT TENDON END ORIGINAL AS FOUND AS LEFT REMOVED TOTAL EFFECTIVE EFFECTIVE PROTRUDE BROKEN/ PROTRUDE BROKENi/ PROTRUDE BROKEN/ FOR WIRES WIRES MISSING MISSING MISSING TESTING AS FOUND ASLEFT 421118 SltOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/ BUIT 2 0 0 0 0 0 0 0 0 163 163 421129 SHOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTr 2 0 0 0 0 0 0 0 0 163 163 421130 Sl IOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTr 2 0 0 0 0 0 0 0 0 163 163 421131 SllOP! BUTT4 0 0 0 0 0 0 0 0 163 163 FIELD/BUrT 2 0 0 0 0 0 0 0 0 163 163 421132 SIIOP/ UWTT4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 2 0 0 0 0 0 0 0 0 163 163 421133 S1lOP/1BUT"4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 2 0 0 .0 0 0 0 0 0 163 163

                                                 =                  --   .'

C 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT Power CORPORAITON UNIT 3 a TABLE V:

SUMMARY

OF DATA SHEETS SQ 8.0 - BUTrONHEAD COUNT TENDON END IORIGINAL AS FOUND AS LEFT REMOVED TOTAL EFFECTIVE EFFECTIVE PROTRUDE BROKEN/ PROTRUDE BROKEN/ PROTRUDE BROKEN/ FOR WIRES WIRES MISSING MISSING MISSING TESTING AS FOUND AS LEFT 421134 SIIOP/1B3UT4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 2 0 0 0 0 0 0 0 0 163 163 421135 SIIOP/ BUTT 4 0 0 0 0 0 0 1 1 163 162 FIELD/BUTT 2 0 0 0 0 0 0 1 1 163 162 42H36 SIIOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 2 0 0 0 0 0 0 0 0 163 163 421137 SIliOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/BBUIT 2 0 0 0 0 0 0 0 0 163 .163 421144 SIIOP/BUTT 4 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 2 0 0 0 0 0 0 0 0 163 163 511125 SIIOP/ BUTT 1 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 5 0 0 0 0 0 0 0 0 163 163 511126 SIIOP/BUTTFI 0 0 0 0 0 1* 2 163 161 FIELD/IBUTT 1 0 0 0 0 0 1* 2 2 163 161

  • FOUND BROKEN AFTER LIFTOFF
                        *m      P*                                                           J C.                                                   C                                              C 20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE                Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE V: 

SUMMARY

OF DATA SHEETS SQ 8.0 - BUTTONHEAD COUNT TENDON END ORIGINAL AS FOUND AS LEFT REMOVED TOTAL EFFECTIVE EFFECTIVE PROTRUDE BROKEN/ PROTRUDE BROKEN/ PROTRUDE BROKEN/ FOR WIRES WIRES MISSING MISSING MISSING TESTING AS FOUND AS LEFT 511127 SHOP/BUTTI 0 0 0 0 0 2'* 2 2 163 161 FIELD/BUTr 5 0 0 0 0 0 2&* 2 2 163 161 511128 SIIOPI BUTTI1 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 5 0 0 0 0 0 0 0 0 163 163 53112 SHOP/BUT' 5 0 0 0 0 0 0 0 0 163 163 FIELD/BUT 3 0 0 0 0 0 0 0 0 163 163 531146 SHOP/BUTT 5 0 0 0 0 0 0 0 0 163 163 FIELD/BUTT 3 0 0 0 0 0 0 0 0 163. 163 621141 SIIOP/BUTT 2 0 0 0 2* 0 3 3 3 163 160 FIELD/BUTT 6 0 0 0 2& 0 3 3 3 163 160 621146 SIIOP/BU1T2 0 0 0 0 0 0 0 .0 163 163 FIELD/BUTT 6 0 0 0 0 0 0 0 0 163 163 511141 FIELD/BUTT 5 0 0 0 0 ".0 0 0 0 163 163

  • FOUND BROKEN AFTER LIFTOFF
  • FOUND BROKEN AFTER DETENSIONING

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE VI:

SUMMARY

OF DATA SHEETS SQ 8.3 CONCRETE INSPECTION. TENDON END BEARING CRACKS WITII WIDTHS >0.010" PLATE ID QUANTITY MAX. MAX. WIDTH I LENGTH (IN) (IN) 12VI SHOP/TOP CR973 NONE N/A N/A FIELD/BOT. CRI I8/PC58 NONE N/A N/A 23V2 SHOP/TOP NOT FOUND NONE N/A N/A FIELD/BOT. CRI 14/PC58 NONE N/A N/A 61V21 SHOP/TOP NOT FOUND NONE N/A N/A FIELD/BOT. NOT FOUND NONE N/A N/A

   !D113          SHOP/NEAR 2     NOT FOUND         NONE         N/A           N/A FIELD/NEAR 6    NOT FOUND         NONE         N/A           N/A DI5           SHOP/NEAR 2     NOT FOUND         NONE         N/A            N/A FIELD/NEAR 6     CR919/PC91       NONE         N/A            N/A D212          SHOP/NEAR I      CR910/PC88       NONE         N/A           N/A FIELD/NEAR 3     CR764/PC91       NONE         N/A            N/A D304          SHOP/ NEAR 4    NOT FOUND         NONE         N/A            N/A FIELD/ NEAR 2   NOT FOUND         NONE         N/A            N/A D311          SHOP/NEAR4       CR846/PC91       NONE         N/A            N/A FIELD/NEAR 2    NOT FOUND          TWO          24"         <0.050 I

.4 0*SEE NCRN FN604-016 30

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida ms CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORJPORATION TABLE VI:

SUMMARY

OF DATA SHEETS SQ 8.3 CONCRETE INSPECTION. TENDON END BEARING CRACKS WITH WIDTHS >0.010" PLATE ID QUANTITY MAX. MAX. WIDTH ILENGTlH (IN) (IN) 421118 SHOP/ BUTT 4 CR300/PC87 NONE N/A N/A

'~1 FIELD/ BUTT 2   CR3731PC87        NONE         N/A           N/A 42H32          SHOP/ BUTT 4    CR2541PC88        NONE         N/A           N/A FIELD/ BUTT 2   CP654/PC76        NONE         N/A           N/A 42H44          SHOP/ BUTT 4    CR689/PC77        NONE         N/A           N/A FIELD/BUTT 2    CR163/PC77        NONE         N/A           N/A 5IIH26
  • SHOP/ BUTT I CR217/PC77 TWO 15" 0.30"
     -        **    FIELD/BUTT 5    CR616/PC77         ONE         15"           0.10" 53112          SHOP/BUTT 5     CR51I/PC76        NONE         N/A            N/A FIELD/ BUTT 3   CR539/PC76        NONE         N/A            N/A 53H46          SHOP/ BUTT 5    CR705/PC77        NONE         N/A           N/A
  .1                FIELD/ BUTT 3   CR439/PC76        NONE         N/A            N/A 62H41         SHOP/ BUTT 2    CR202/PC76        NONE         N/A            N/A FIELD/ BUTT 6   CR1 87/76        NONE         N/A            N/A 62H46          SHOP/ BUTT 2   NOT FOUND         NONE         N/A           N/A FIELD/ BUTT 6  CR549/PC76        NONE         N/A            N/A
  • SEE NCR# FN604-004
        ** SEE NCR# FN604-002

'I 31

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION

  • t IV. HYDRAULIC JACK CALIBRATIONS Precision Surveillance has developed a program for calibrating hydraulic jacks utilizing regression analysis (PSC Procedure QA 12.8.G-W). This is a process where a straight line is mathematically best fitted to a set of data points (in this case, force verses gauge pressure). This results in calculating ram area (slope) and constant (y-intercept) for each jack calibration. Completed calibrations for all of the hydraulic jacks used are contained in Appendix C and are summarized in Table Vii.
'*1 A before and after comparison of the stressing jacks' ram areas revealed that none of the jacks' calibrations varied by more than 0.77% indicating that they were in a properly calibrated status.
.1        Note that the force exerted by a jack can be calculated as follows:

Force = Area x Pressure + Constant (F). (in2 ) (KSI) (K) I

 -a 32

( C C 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORAMNON TABLE VII: HYDRAULIC JACK CALIBRATIONS JACK BEFORE SURVEILLANCE FORCE AFTER SURVEILLANCE FORCE MAX VARI ID DATE AREA CONSTANT (Fi) DATE AREA CONSTANT (Ff) PRESSURE  % (in') (kips) (in) (kips) 8778 10/9/97 333.423 1.640 1835466.5 1/20/98 333.564 -7.497 1827105 5500 0.46 8833 10/9/97 335.178 -0.321 1843158 1/20/98. 335.008 -3.148 1839396 5500 0.20 9501 12/I 1/97 368.689 1.554 1918736.8 1/20/98 372.715 4.549 1933569 5200 0.77 7702 2/17/98 1.542 0.120 13227 3/23/98 1.552 0.068 13260 8500 0.25 RAM 7702 USED FOR WIRE TESTING

                                                                             /

20TH YEAR SURVEILLANCE POST-TENSIONING SYSTEM OF AT THE THE Florida

      *',/UNIT              CRYSTAL RIVER NUCLEAR    3         PLANT                       POwer' co"oPA-No V. TENDON LIFTOFFS AND DETENSIONING A liftoff is performed on each surveillance tendon to monitor the force exerted by the tendon onto the structure. PSC Procedure SQ 9.0 (Volume 2, Section 9, Appendix F) details the steps to be taken to perform a liftoff. The results are documented on Data Sheet SQ 9.0 and are summarized in Table VIII.

It should be noted that performing a liftoff has only a localized effect on a tendon; therefore, it is acceptable to use the same jacks for both ends of a tendon by executing the liftoff on separate occasions. Vertical tendon liftoffs were found to be above the base value except for 12VI which was above 95% of base, and all dome liftoff averages were above the base value. Horizontal lifloffs revealed two isolated areas 421130 to 42H36 inclusive and 51 H26, 51 H27 where average tendon lifloffs were between 90% and 95% of base value. Two tendons, 42H35 and 51H26, were found to be below 90% of base value and detensioned for continuity test per FPC requirement. This continuity test revealed that all of the wires were continuous, one wire was removed from each tendon for testing and one broken wire removed from 51 H26 was also tested. After testing the tendons were restored to base value -0% +6%. All other tendons found between 90 and 95% of base value were subsequently restored per procedure to base value -0% +6%. These low liftoff results were documented on NCR's -010, 011, 012,.013, and 014 for 421-130 - 36 and NCR 005 for 511-126. All other tendon liftoffs were either above base value or 95% of base value and therefore acceptable. The average normalized liftoff for each group, vertical, dome and horizontal, exceeded the minimum required and is acceptable. After completion of lifloffs, protruding wires were found to tendons 51 H26(I), 51 H27(2) and 62H46(2). These wires, once removed, were found to have broken behind the anchorhead. No corrosion was found to indicate wire failure due to deterioration and it is suspected that slight tendon head rotation while setting back down sheared the wires against the shims. In all cases the broken wires were on the outer comer edge of the tendon bundle and no gauge movement was noted to indicate failures during liftoff. These wires were probable "pinched" during original installation and additional work on these tendons has broken the wires. NCR's FN604-003,007 and 015 recorded these occurrences. 34

K;o .

  • I:. .*

( C ( 20TIl YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE VIII:

SUMMARY

OF DATA SHEETS SQ 9.0 TENDON LIFTOFFS TENDON END EFFECT. JACK PRESS. LIFTOFF AVE. BASE 95%, 90% NORMALIZING ACCEPT WIRES No. LIFTOFF VALUE BASE BASE FACTOR 12VI silopfroP 162 8833 4390 1471 1471 1530 1453 1377 -9 YES 23V2 siloPfroP 163 8778 4820 1609 1609 1482 1408 1333 37 YES 61V21 SHlOPf/OP 163 8833 4550 1525 .1525 1482 1408 1334 38 YES D113 SIIOP/2 163 8778 4267.5 1424.7 1427 1369 1301 1232 -35 YES FIELD/6 163 8833 4265 1429 YES DIIS SIIOP/2 163 8778 4062.5 1356 1380 1347 1280 1213 -12 YES FIELD/6 163 8833 4190 1404 YES D212 SHOP/I 162 8833 3820 1280 1335 1317 1252 1186 15 YES FIELDI3 162 8778 4160 1389 YES D304 SIIOP/4 163 8778 4810 1605 1598 1397 1327 1258 -64 YES FIELD/2 162 8833 4748 1591 YES D311 SIIOP/4 163 8778 4220 1409.5 1408 1335 1269 1202 0 YES FIELD/2 163 8833 4200 1407 YES

C C ( 20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power C01POIA.JO0N TABLE VIII:

SUMMARY

OF DATA SHEETS SQ 9.0 - TENDON LIFTOFFS TENDON END EFFECT. JACK PRESS. LIFTOFF AVE. BASE 95% 90% NOR3MALIZING ACCEPT WIRES No. JLIFTOFF VALUE BASE BASE FACTOR 42HI8 SIIOP/4 163 8778 4690 1565 1476 1495 1420 1346 -56 YES FIELD/2 163 8833 4137 1386.5 YES 421129 SIIOP/4 163 8778 4500 1502 1448 1445 1373 1300 -7 YES FIELD/2 163 8833 4160 1394 YES 421130 SlIOP/4 163 8778 4355 1454 1389 1469 1396 1322 -32 NO FIELD/2 163 8833 3950 1324 NO 421131 SiHOP/4 163 8778 4100 1369 1338 1460 1387 1314 -21 NO FIELD/2 163 8833 3900 1307 NO 421132 SIIOP/4 163 8778 4320 1442 1355.5 1452 1380 1307 -15 NO FIELD12 163 8833 3785 1269 NO 421133 SIIOP/4 163 8778 4490 1499 1361 1474 1400 1326 -35 NO FIELD/2 163 8833 3650 1223 NO 421134 SIIOP/4 163 8778 4240 1415 1377.5 1452 1380 1307 NO FIELD/2 163 8833 4000 1340 NO

                                                            -. 4    .- ,

C (I ( 20TH YEAR SURVEILLANCE OF TIHE POST-TENSIONING SYSTEM AT TIHE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPJMOTI"II TABLE VIII:

SUMMARY

OF DATA SHEETS SQ 9.0 - TENDON LIFTOFFS TENDON END EFFECT. JACK PRESS. LIFrOFF AVE. BASE 95% 90% NORMALIZING ACCEPT WIRES No. LIFTOFF VALUE BASE BASE FACTOR 421135 SIIOPI4 163 8778 4110 1372 1296.5 1455 1382 1309 -17 NO FIELD/2 163 8833 3693 1221 NO 421136 SIIOP/4 163 8778 4490 1499 1408 1503 1428 1353 -65 NO FIELD/2 163 8833 3930 1317 NO 42H37 SIIOP/4 163 8778 4310 1439 1401.5 1452 1379 1306 -14 YES FIELD/2 163 8833 4070 1364 YES 421144 SI1OP/4 163 8778 4510 1505 1471.5 1427 1356 1285 10 YES FIELD/2 163 8833 4291 1438 YES 511125 SHOP/I 1 163 8833 4090 1370.5 1363 1401 1331 1261 38 YES FIELD/ 5 163 8778 4060 1355.5 YES 511126 SHOP/I 163 8833 4190 1403.5 1320 1514 1438 1363 -75 NO FIELD/5 163 8778 3705 1237 NO 511127 SHOP/1 163 8833 3787 1269 1265.5 1368 1300 1231 71 NO FIELD/51 163 8778 3780 1262 1 NO

                                                                      * * ,,d C                                                 (                                                 (

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORAZON TABLE VIII:

SUMMARY

OF DATA SHEETS SQ 9.0 - TENDON LIFTOFFS TENDON END WIRES JACK EFFECT. AVE. No. PRESS. ILIFTOFF LIFTOFF BASE VALUE 95% BASE 90% BASE NORMALIZING FACTOR ACCEPT 511128 SHOP/ 1 163 8833 4445 1489.5 1450.5 1518 1442 1367 80 YES FIELD/5 163 8778 4230 1412 YES 53112 SIIOP/5 163 9501 4400 1624 1611 1424 1353 1281 12 YES FIELD/3 163 9501 4330 1598 YES 531-146 SHlOP/5 163 8833 4340 1454 1459.5 1472 1399 1325 -35 YES FIELD/3 163 8778 4390 1465 YES 62H41 SHOP/2 163 8778 4230 1412 1426 1422 1351 1280 16 YES FIELD/6 163 8833 4297.5 1440 YES 621146 SHOP/2 163 8778 4280 1429 1485 1465 1392 1318 -27 YES FIELD/6 163 8833 4600 1541 - L YES

                         -.                                            ~--,,

20Tll YEAR SURVEILLANCE OF TIHE POST-TENSIONING SYSTEM AT-THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION . V. - WIRE INSPECTION AND TESTING One wire was scheduled for removal from each deiensioned tendon for visual inspection and tensile testing. PSC Procedure SQ 10.3 outlines the details involved with the wire testing and the data was recorded on Data Sheets SQ 10.2 and SQ 10.3 with the results summarized in Table X. All wire diameters were within the acceptance criteria of 0.27559 +/- 0.002". The corrosion condition of all samples was level I - "bright metal; no visible oxidation" and the Ultimate Strength exceeded the minimum strength criteria of 240,000 psi (240 ksi) for all wire samples tested. k,,/

  *I 40

C. C C 20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE X:

SUMMARY

OF DATA SHEETS SQ 10.2 & 10.3 - VISUAL INSPECTION AND TENSILE TESTING OF WIRE TENDON SAMPLE CORROSION SAMPLE DIAMETER YIELD ULTIMATE *ACCEPTABLE No. LEVEL LOCATION (IN) STRENGTH STRENGTHI (Fr) (PSI) (PSI) 61V21 1 1 20-29 0.275 210,770 249,197 YES 2 1 90-99 0.275 210,251 251,793 YES 3 1 170- 179 0.275 209,212 242,966 YES D304 1 1 20-29 0.2755 213,614 244,138 YES 2 1 60-69 0.2755 213,614 241,552 YES 3 1 100- 109 0.2755 217,236 250,864 YES 421135 1 1 20-29 0.276 210,286 241,219 YES 2 1 70- 79 0.276 210,802 246,375 YES 3 1 140- 149 0.276 212,864 253,077 YES 51H26 1 1 10-19 0.2745 210,512 254,293 YES 2 1 70-79 0.2745 209,990 248,560 YES 3 1 140-149 0.2745 216,766 243,869 YES 511126 IA. 1 10-19 0.2745 215,202 250,645 YES 2A 1 70-79 0.2745 214,160 253,251 YES 3A 1 146- 155 0.2745 220,415 257,942 YES 621141 1 1 20-29 0.2755 211,545 247,760 YES 2 1 70-79 0.2755 213,614 245,173 YES _ 3 1 140-149 0.2755 214,390 241,552 YES

20TH YEAR SURVEILLANCE OF THlE POST-TENSIONING SYSTEM AT TIlE Florida CRYSTAL RIVER NUCLEAR PLANT Power UNIT 3 CORPORATION VII. TENDON RETENSIONING AND RESEALING Those scheduled tendons that had previously been detensioned for wire removal, (61V21, D304 and 62H41) along with additional detensioned tendons 42H35 and 51 H26 were retensioned per PSC Procedure SQ 11.0 (Volume 2, Section 9, Appendix F). The results of the retensioning process were recorded on Data Sheets SQ 11.0 and the results are summarized in Table XI. '1 All new elongations were compared to original elongations and found to be acceptable (within + 10%) except tendon 51 H26 whose elongation was -11.6%, NCR No. FN604-009 was raised to record this. All tendons were locked off at forces greater than those initially found or above base value whichever was higher, and all liftoffs were within -0%+6%. After completion of all inspections, the anchorage components were hand coated with cold grease to ensure complete coverage, the cans were reinstalled with new gaskets, torqued to the required value, and the necessary amount of sheathing filler (grease) was added. In all cases, the same amount or more grease was added than removed. Results of the grease replacement were recorded on Data Sheets SQ 12.1 and are summarized in Table XII. A greater amount than 5% of the duct volume was added to dome tendons D212 (12.12%), D304(18.3%), D311(19.1%) and horizontal tendons42H30(6.58%) and 421134(5.53%). NCR's FN604-0!8, 019, 020, and 021 were written to record this. All other tendons took an amount less than 5% ofthe tendon duct volume. 42

8 qll*l *... C ( ( 20TH YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power coORPAInON TABLE XI:

SUMMARY

OF DATA SHEETS SQ 11.0 TENDON RETENSIONING TENDON END ORIGINAL OBSERVED  % ACCEPT LIFTOFF RETENSIONING  % ACCEPT ELONGATION ELONGATION VARI. BEFORE VARI._ EACH TOTAL, EACH ITOTAL, RETEN. JACK PRESS. L/OFF 61V21 SHOP - 12.125 11.3 -6.80 YES 1525 8833 4740 1588 +4.13 YES D304 SHOP - 8.125 3.55 7.95 -2.15 YES 1605 8778 4860 1622 +1.06 YES FIELD - - 4.40 - - 1591 8833 4837.5 1621 +1.89 YES 621141 SHOP - 10.25 4.75 9.40 -8.29 YES 1412 8778 4460 1489 +5.45 YES FIELD - - 4.65 - - - 1440 8833 4380 1468 +1.94 YES TENDONS RE-TENSIONED AFTER WIRE REMOVAL TENDON END ORIGINAL OBSERVED  % ACCEPT BASE RETENSIONING  % ACCEPT ELONGATION ELONGATION VAR]. VARI. EACH TOTAL EACH TOTAL VALUE JACK JPRESS. IIOFFI AVE. 421135 SHOP - 10.25 4.80 9.80 -4.40 YES 1455 8778 4597 1534 1539 +5.77 YES FIELD - - 5.00 - - - - 8833 4610 1545 - - 511126 SHOP - 10.75 4.70 9.50 -11.6 NO 1514 8833 4703 1576 1589 +4.59 YES FIELD - - 4.80 - - - 8778 4800 1602 - -

  • SEE NCR No. FN604-009

C C 20TII YEAR SURVEILLANCE OF TIHE POST-TENSIONING SYSTEM AT TIHE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE XI:

SUMMARY

OF DATA SHEETS SQ 11.0 - TENDON RETENSIONING TENDON END LIFTOFF BEFORE RETENSIONING AVERAGE BASE RETENSIONING AVERAGE % ABOVE ACCEPT JACK PRESSURE LIFTOFF LIFTOFF VALUE JACK PRESSURE LIFTOFF LIFTOFF BASE 421129 SHOP 8778 4500 1502 1448 1445 8778 4500 1502 1493 +3.32 YES. FIELD 8833 4160 1394 - 8833 4430 1484.5 - 421130 SHOP 8778 4355 1454 1389 1469 8778 4560 1522 1520 +3.47 YES FIELD 8833 3950 1324 - 8833 4530 1518 - 421131 SHOP 8778 4100 1369 1338 1460 8778 4605 1537 1547.5 +5.99 YES FIELD 8833 3900 1307 - 8833 4650 1558 - 421132 SHOP 8778 4320 1442 1355.5 1452 8778 4540 1515 1506.5 +3.75 YES FIELD 8833 3785 1269 8833 4470 1498 421133 SHOP 8778 4490 1499 1361 1474 8778 4490 1499 1513.5 +2.68 YES FIELD 8833 3650 1223 - - 8833 4560 1528 - 421134 SHOP 8778 4240 1415 1377.5 1452 8778 4520 1509 1512.5 +4.17 YES FIELD 8833 4000 1340 - 8833 4525 1516 - - 421136 SHOP 8778 4490 1499 1408 1503 8778 4700 1569 1572 +4.59 YES FIELD 8833 3930 1317 - 8833 4700 1575 421137 SIIOP 8778 4310 1439 1401.5 1452 8778 4570 1525 1521.5 +4.79 YES FIELD 8833 4070 1364 1 I - 8833 4530 1518 1 1

O* C C ( 20TIi YEAR SURVEILLANCE OF TIlE POST-TENSIONING SYSTEM AT THE Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE XI:

SUMMARY

OF DATA SHEETS SQ 11.0 -TENDON RETENSIONING TENDON END LIFTOFF BEFORE RETENSIONING AVERAGE BASE RETENSIONING AVERAGE % ABOVE ACCEPT JACK PRESSURE LIFTOFF LIFTOFF VALUE JACK PRESSURE LIFTOFF LIFTOFF __BASE 511125 SHOP 8833 4090 1370.5 1363 1401 8833 4250 1425 1442 +2.93 YES FIELD 8778 4060 1355.5 8778 4370 1459 - 511127 SHOP 8833 3787 1269 1265.5 1368 8833 4145 1389 1399 +2.27 YES FIELD 8778 3780 1262 - - 8778 4220 1409 - 511128 SHOP 8833 4445 1489.5 1450.5 1518 8833 4645 1557 1563 +2.96 YES FIELD 8778 4230 1412 - - 8778 47,00 1569 - -

20TH YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE 0 Florida CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power COR*PORATION TABLE XII:

SUMMARY

OF DATA SHEETS SQ 12.1 GREASE LOSS Vs GREASE REPLACEMENT TENDON GREASE REMOVED GREASE REPLACED DIFF. NET  % SHOP FIELD TOTAL SHOP FIELD TOTAL (GAL.) VOLUME (GAL.) I (GAL.) t 12VI 2.00 36.75 38.75 40.75 0.75 41.50 +2.75 143.46 1.91 23V2 0.75 9.75 10.50 11.50 0.00 11.50 +1.00 142.52 0.70 61V21 0.75 88.50 89.25 20.25 72.50 92.75 +3.50 144.03 2.43 43V04 0.50 0.00 0.50 7.50 0.00 7.50 +7.00 N/A N/A D113 4.50 4.00 8.50 6.20 3.50 9.70 +1.20 115.11 1.04

   -D0115       4.50       4.50        9.00   7.00     4.00  11.00  +2.00   117.17        1.71 D212      6.50       4.00        10.50 20.00     4.50  24.50 +14.00   115.55      12.12.

D304 12.00 7.25 19.25 38.20 0.00 38.20 +18.95 103.68 18.30' D311 24.00 4.00 28.00 46.50 3.50 50.00 +22.00 115.12 19.104 4 SEE NCR No. FN604-018, 019, 020 o

  • 45
  • 20TII YEAR SURVEILLANCE OF THE POST-TENSIONING SYSTEM AT THE Florida dCA CRYSTAL RIVER NUCLEAR PLANT UNIT 3 Power CORPORATION TABLE XII:

SUMMARY

OF DATA SIlEETS SQ 12.1 GREASE LOSS Vs GREASE REPLACEMENT TENDON GREASE REMOVED GREASE REPLACED DIFF. NET  % SHOP FIELD TOTAL SHOP FIELD TOTAL (GAL.) VOLUME _ (GAL.) _ (GAL.) 42H18 3.75 2.00 5.75 5.25 5.25 10.50 +4.75 121.40 3.91 '1 42H29 3.50 3.25 6.75 5.25 6.25 11.50 +4.75 121.48 3.91 42H30 3.00 3.00 6.00 7.00 7.00 14.00 +8.00 121.59 6.58. 42H31 2.50 3.00 5.50 5.25 5.75 11.00 +5.50 121.84 4.51 42H32 3.75 2.50 6.25 6.25 4.75 11.00 +4.75 121.36 3.90 42H33 3.00 3.00 6.00 6.25 4.75 11.00 +5.00 120.38 4.15 42H34 3.00 3.00 6.00 6.50 6.25 12.75 +6.75 121.99 5.53

  • t t iR~q A AAA*E rTL* A f iAA .[ At 1*

a)l*Ia *lt 14z r.31.3 .1.A.,. F..3U 1.I'., ".7v J.3.v hVU.hU *.I't LZI.Z/ 4.v., _ ------------- .L

   '"-42H36              4.00          4.00        8.00     4.00       5.75      9.75       +1.75      121.62           1.44 42H37              4.50          4.50        9.00     6.20       5.00     11.20       +2.20      120.44           1.83 42H44              4.75          3.50        8.25     5.30       4.90     10.20       +1.95      121.08           1.61 51H25           I 3.50            3.50        7.00     8.00       4.50     12.50       +5.50      120.73           4.56 51H25*               3.00          4.00        7.00     4.50       4.00      8.50       +1.50      120.73           1.24 511H26             4.50          3.75        8.25     5.25       4.50      9.75       +1.50      121.43           1.24 51H27               3.50         3.25        6.75     5.30       5.70     11.00       +4.25      121.60           3.50
.4   51H28
  • 3.50 4.00 7.50 4.50 4.75 9.25 +1.75 120.46 1.45
.1 51H28*                4.00         4.00        8.00     4.50       4.00      8.50        +0.50     120.46           0.42 53H2               4.50         4.00        8.50     5.75       6.25      12.00       +3.50     121.32           2.88 53H46              3.25         3.50        6.75     6.00       5.25      11.25       +5.25     121.60           4.32 62H41              4.00         4.00        8.00     7.10       5.30      12.40       +4.40    *121.37           3.63 62H46              3.50         4.50        8.00     6.25       6.50      12.75       +4.75     121.11           3.92 51H41              N/A           3.50       3.50     N/A        4.00      4.00        +0.50       N/A            N/A GREASED 11/18197
  • SEE NCR No. FN604-021 GREASED 12/18/97 46
                   *[**"    "       20THi POST-TENSIONING YEAR SURVEILLANCE SYSTEM AT  OF TIlE THlE           a          Florida CRYSTAL RIVER NUCLEAR PLANT                                    -Power UNIT 3                                        coRORAMoN VIII. COMPARISON WITH ORIGINAL INSTALLATION DATA A comparison of the liftoff forces from this surveillance to the original installation lock-off forces is made in an effort to detect any evidence of system degradation. The lock-off forces are compared in order to detect any abnormal force loss which would possibly indicate an underestimation of the creep, shrinkage and/or elastic shortening effects in the Containment Building.

Three tendons were excluded from the results due to inconsistencies. Tendons 23V2 and 53112 both reported higher liftoffs now than at installation. Both ofthe original reported lifloffs appear to be lower than the group average at installation,'the horizontal by almost 5%, which could indicate an error in recording the original result. Tendon D304 lost only 12 kips from the original recorded liftoff. In no case were any conditions found that would indicate problems with the wire condition or forces found. These results are not considered detrimental to the structure. Due to these results being inconsistent with the rest of the results they have been omitted from the group averages. The losses for the tendon groups were found to be 9.08% for the vertical tendons, 11.72% for the horizontal tendons and 16.63% for the dome tendons. Despite two of the horizontal tendons being Sbelow the expected base value at liftoff (subsequently retensioned to base -0% +6%) these losses are as expected for a containment of this age and do not indicate any degradation of the system. The following three pages show the graphs of the normalized average liftoffs taken from page 39 for each of the tendon groups. These trend graphs allow a high degree of confidence that the liftoff values will remain above the minimum requirement throughout the next surveillance. I 47

20TH YEAR SURVEILLANCE OF TIHE POST-TENSIONING SYSTEM AT THE CRYSTAL RIVER NUCLEAR PLANT UNIT 3 S~Po Florida ep..304CORPOR~ATION TABLE XIII: COMPARISON OF ORIGINAL LOCKOFF FORCES TO AS FOUND FORCES TENDON LIFTOFF FORCE LOSS PERCENTAGE AVERAGE ORIGINAL @ 20 YEARS (kips) _PERCENTAGE 12VI 1675 1471 204 12.18 23V2 1598 1609 +11* 9.08 61V21 1622 1525 97 5.98

  • t D113 1676 1427 249 14.86 Dl15 1700 1380 320 18.82 D212 1600 1335 265 16.56 16.63 D304 1610 1598 12*

D311 1682 1408 274 1629 421118 1664 1476 188 11.30 421132 1626 1356* 270 16.61 42H44 1605 1472 133 8.29 51H26 1661 1320 ** 341 20.53 11.72 53H2 1555 1611 +56* 53H46 1628 1560 68 4.18 621141 1609 1426 183 11.37 621146 1645 1485 160 9.73

  • REMOVED FROM THE AVERAGES DUE TO INCONSISTENCIES.

t 48

S -- 4. C ( (Page 1 of 3) HISTORICAL LMEDOME TRENDS TENDONS FPC - Cry=Iat RivWr Unit #3 Tendon Surveillance Program 06000 Aq. An rate". In S~ku. Dome Group Trend of Los2es MUE AFTER AVERAGE DATE OF CONCRETE OoUE PLACME4T (YARS) I 10 1-400. .r./m

                                                                                                                   >rn<

9 130-1100 to 21 35 41 a 8 t to 30 SCWEDULIED SURVEULA*CE- PERIOD (YEADS AFTER SfT) 201 SP-182 (Total Rewrite) Rev. 13 Page 92 do C W(O

( C C ENCO (Fage f3 TEN-ON HISTORICAL TE FIPC - Cryatol River Unit J3-Tendon Surveillonce Program AMgAl Vnes Ini Swavv.Mmb Vertical Group Trend of Losses 1U£E AFTER AVERAGE DATE OF CONCRC*I WALL PLACEMENT (YEARS) 10 3I 4

                                *4                 S    S t Doc 0

1600 e M- 7 1400 1200 1 1 4 11 K ~ps -_ _ - S. -=_ - - -

                                                                                                                          "X91 am 1000                                                           9         It            IS to     as  "   3S  4 I       I SCREDMuED 5U. VU*         CE PERIOD (YArs AFTER SI Rev. 13                            Page 93                                 ~0O SP-182 (Total Rewrite) goo~
           ... . .       .- 4  41.                                              t-   a~.4     ~~-4

/- (7 C TRM(Page 3 oof 3) ENCLOSU3RE HISTRICA TEDNHISTORIALTRND Unit #3 FPC - Crystal River Program A I Tendon Surveillance - 10W mq= MAW Aw Fame Hoop Group Trend of Losses UJE AFr AVERACIE DATE OF CONCREM WALL PLC:::EJNT (YEARs) 1 10

                                                                                                                                    -4 wr 84 0

I Pot .

                                                                                                                                >      r
r. >

20 M0 " 46 1 3 a so@t SURVEJUANCE P-ERIOD 01CARS AF1M SIT) SCHIDIJLL Rev. 13 Page 94 (LAST PANE) SP-182 (Total Rewrtte)

INTEROFFICE CORRESPONDENCE AC-XMnLWM Nuclear Engineering NT61) 240-1511 office MAC- Telephone

SUBJECT:

Crystal River Unit 3 Ouality Records Transmittal - Analysis/Caeculation TO: Records Management - NR2A The following analysis/calculatlon package Is submitted as the OA Record copy: DOCNO UPC DOCUM T 1r0 MINT

                                   -CATIONUWM M        RV.                       5YS1rI*                     rOrM PMGES TMX* WIn' D S 95-0082                                  3                          MX                               68 6th Tendon Surveillance - Generation of Tendon Force Curves 9WOS S WIW KWORDS FOR LAin AYlTRMEVAU Tendon, Surveillance OXRP AEFP       CESOR FO          P IE- UST FWi       RAFRL REA 97-1975 REA 97-2110
     ,REA    97-2129 VUSO fWENOOS NAMO5v~o                                   oumrIse           D~l                         T8ie:lE       Oi'ET     OaF FPC (from Parsons Power)                         N/A                                                     NIA TAG
                                                                         'ART NO0.

COMM0ITS JUBAGE R'SMiNCMONS. PROPIEITANY. ETCJ Revision by FPC to Parsons Power calculation (using FPC format). NOTE: Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34, DCH-99), otherwise; use Part number field (i.e.. CSC14599. AC1459). If more apace Is required, write *See Attachment" and list on separate sheet.

                                           "FOR RECORDS MANAGEMENT USE ONLY*

Quallty Record Transmittal received end Information entered Into SEEK. Entered by: Date (Return copy of Quality Docment Transmittal to NOE Supprt Specialist.) 'U

 )  cc:    Nuclear Projects Of MARICGWR/PEERE Return to Sernice RelaledI)    E Yes 0 No           Calculation Review form Part III actions roquird (OfYes, send copy of the form to Nuclear Regutalor Astsurance and a No Supervisor. Conflg. Mgt. Inlo.                          copy of the Calculation to the Responsible Organizatlonls) Identified in Mgr.. Nucl. Operatio.m Eng. lOriginan) wlettach         Pert Ofion the Calculatlon Review form.1 Pew. 12197

ANALYSISICALCULATION AC-UJmM3 -*.

SUMMARY

 ,~4m~a=~e DOCUMMT IDEWTIaiCATION W      E        FI           s                   95-0082                        3 C1ASS3MBCATION KS(!  ONOI

[ Safety Related 0 Non Safety Related 6th Tendon Surveillance - Generation of Tendon Force Curves NIA:*~mZ Wm N/A VENMMOR DOCUN UM.M NIA APPROVAL PRINTED SIGNATURES NAME Design Engineer John D. Shubert. Jr. Date Verification Engineer1A Lc Date A__._ __._ _ __,_ Supervisor - Dan Jopling Date -/ j \ ,'I"Ms ARMVISE

  )(see   'Revision Description She"' for revision 31 Determine Tendon Force losses and prepare Tendon Force Curves for additional Tendons required J

for the 6th Surveillance Inspection. The data for the following Tendon's Is added by Revision 3: Dll, D302. D306. 42H29. 421130, 42H34, 42H35, 421368,42H37, 51H28e 51H29, 62139, 62H43 and 62-44. diSULTS SUMMiARForce Curves are plotted and attached. Additional

4...SeAI... CALCULATION REVIEW cunVJmm Page 1 of 2 S 95-0082 Revision 3 PART I- DESIGN ASSUMPTION/INPUT REVIEW: APPUCABLE [] Yes 0 No The following organizations have reviewed and concur with the design assumptions and Inputs Identified for this calculation: Nuclear Plant Technical Support MIA System Engr t~uw*Vm Nuclear Plant Operations N/A 0OTHtMU N/A

                                                               &qNIA PART II -         RESULTS REVIEW: APPUCABLE [] Yes 0 No The following organizations have reviewed and concur with the results of this calculation and understand the actions which the organizations must take to Implement the results.

Nuclear Plant Technical Support System Engr Nuclear Plant Operations NIA Nuclear Plant Maintenance Q Yes [ N/A Nuclear Ucensed Operator Training D Yes 0 N/A Manager. Site Nuclear Services

                              - Yes            t@ N/A Sr. Radiation Protection Engineer vgwmummmai

[] Yeas NIA Nuclear Plant EOP Group [I Yes 0 NIA S~N/uA~l >5 OTHERS: N/A fty. 12197

CALCULATION REVIEW Page 2 of 2 1 CDJ.CAATIOtd NOAMEV. S 9"-0082 Revision 3 PART IIl- CONFIGURATION CONTROL: APPUCABLE [] Yes 0 No The following Is a list of Plant proceduresflesson plans/other documents and Nuclear Engineering calculations which require updating based on calculation results review: Document Date Required Responsible Organizetion m Upon completion, forward a copy to the Manager, Nuclear Regulatory Assurance Group for tracking of actions Nf _ any Items are Identified In Part III. If calculations are listed, a copy shall be sent to the original file and the calculation log updated to reflect this Impact. PART IV - NUCLEAR ENGINEERING DOCUMENTATION REVIEW The responsible Design Engineer must thoroughly review the below listed documents to assess if the calculation requires revision to these documents. If "Yes.' the change authorizations must be listed below and Issued concurrently with the calculation. Enhanced Design Basis Document " Yes No UrCA Vendor Oualiflcation Packaegae Yes 0 NoIV/Pa) FSAR ID Yes 19 No 9Mt~6 Topical Design Basis Doc. [0 Yes 0 No flCi Improved Tech. Specification 03 Yes Ig No f5,w' EISOPM 03 Yea M No M(TCi Improved Tech. Spec. Bases [3 Yes 0 No Uawf) Other Documents reviewed: Config. Mgmt. Info. System 03 Yes 0 No C e I 0 Yes QsNo ~(aMMO. DOC.im~tmmNCO Analysis Basis Document I( Yes 0 No EVC,) ni

                                                                     .*iCHMIDC Yes r No_   _           _~ N Design Basis Document            C] Yes 0& No (TCA)                                          0  Yes [0 No

{A~MGI DCC. MMNfJC8K Appendix R Fire Study 13 Yes 0 No nC¢ 0 Yes [3 No 4;CaMM4ICC.* IIIM/ENCm Fire Hazardous Analysis E3 Yes 19 No PcO 03 Yes 03 No (aWEmGIIDOC.Mlf(OF~CSI iF A Code Carnce Document 03 Yes [ No (Ic [] Yes [0 No___________ tCAAIOU SOC.UhlMJNC8U PART V - PLANT REVIEWS/APPROVALS FOR INSTRUMENT SETPOINT CHANGE PRC/DNPO approval is required If a setpoint is to be physically changed In the plant through the NEP 213 process. PRC Review Required Q Yes 0 No NIA PRC Chairman /Data

  / DNPO Review Required              r    Yes          0  No                      N/A DNPO                                         /Date DaS"   VMINIDATE                                                  OIf.SJGNt4NEER - PWWNTED NAME John D. Shubert. Jr.                                             I
  • M CALCULATION VERIFICATION REPORT Crystal River Unit 3 CALEWYMPM Page 1 of 1 iCALCULATION W"MBIR S 95-0082 Revision 3 86th Tendon Surveillance - Generation of Tendon Force Curves YES NO NIA
1. X [3 [ Are Inputs, Including codes, standards, regulatory requirements, procedures, data. and Engineering methodology correctly selected and applied?
2. [3 Q Have assumptions been Identified? Are they reasonable and Justified? (See NEP 101, V.c, for discussion on references).
3. 0 0Q Are references properiy Identified, correct, end complete? (See NEP 101, V.c., for discussion on assumptions and justification.)
4. 0[1 [3 Have applicable construction and operating experiences been considered?

5.', 0 [3 Was an appropriate Design Analysis/Calculation method used?

6. Q [3 In cases where computer software was used, has the program been verified or reverified in accordance with NEP 136 for safety related design applications and/or are Inputs, formulas, and outputs associated with spreadsheets accurate?

Y~ 7. 00

  • Is the output reasonable compared to Inputs?
8. [ 3
  • Has technical design Information provided via letter. REA, IOC or telecon by other disciplines or programs been verified by that.discipline or program?
9. 0 0
  • Has technical design Information provided via letter or telecon from an external Engineering Organization or vendor been confirmed and accepted by FPC?
10.
  • E] Do the calculation results indicate a non-conforming condition exists? If 'Yes,* immediately notify the responsible Supervisor.
11. 0]

El Do the results require a change to other Engineering documents? If "Yes," have these documents been identified for revision on the Calculation Review Form? I have performed a verification on the subject calculation package and find the results acceptable. VERIFICAK O DATI BUCATS

                             -A~/                           OA$/`
                    ,Florda                                     INTEROFFICE CORRESPONDENCE
                   'Power COb WO Aa I3 A-CxMRlJrVJ Nuclear Engineering                                  NT6D            240-1511 Office                                      MAC             Telephone fN~j   SUBJECT- Crystal River Unit 3 Quality Document Transmittal - Analysis/Calculation TO: Records Management - NR2A The following analysis/calculation package is submitted as the OA Record copv:

D V DYS M TOTAL PACESTPANSMT710 S 95-0082I 2 MX 153 6th Tendon Surveillance - Generation of Tendon Force Curves KWWS IOIMY MWO F0R LAT1 1.1VIVoMJ Tendon, Surveillance D0mET UIW!ThES 0* PIES . IST PI*IRARY PiL2 ERST) VV0 WVifll" Ma vl!I=N DOCUMfT. ""ER (OXPEPI SUPEMSEDED 0oCoIDnTS (DXRE FPC (from Parsons Power) N/A NIA TAG COUMINTS RSAGE REITRCTION2. PpRIWTAny. ETCJ Revision by FPC to Parsons Power calculation (using FPC format) NOTE: Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34, DCH-99). otherwise; use Part number field (i.e., CSC14599. AC1459). If more space is required, write "See Attachmento and list on separate sheet. .0-t. (W,1!ýtEI..fk DATE Ir ot VATE Lppv4s* AR DATE

                                            '9--1541                                        .U-Pil 11,4.1                -L             ý- 2-?,-91 cc:    Nuclear Projects (If MARICGWR/PEERE                       CelU1ltlon Review form Par Ila e      n             7     Yes [ No Retwn to Service Related)          - Yes    0 No       (If Yes, send copy of the form      Nuclar I      egulatory As*rance and a
  .)          Supervisor. Config. Mgt. Into.

Mgt., Nucl. Operations Eng. fOriginall wlattach COPY of the Calculation to the Responsible Orgunlz@tlon(sl Identified In Port III on the Calculation Review form.) IeN. 3197

ANALYSISICALCULATION

SUMMARY

AMt, n ICwRNM~O ,K-"YLE.M 1-)VOCUMEHT IDWNIFICATION NUMBER S 9 5-0082 2 TriLE CUA I'WOTOC-ECK 0N 6th Tendon Surveillance - Generation of Tendon Force Curves 0 saf1ty R*lated Q Non Safety Related MARWAOGWMEIRE NUMBM n/a VUDON OCUMENTI NIJUERI* APPROVAL PRINTED SIGNATURES NAME Design Engineer "' ,C11I* I John D. Shubert, Jr. Date __ __._ts__i_ Verification Engineer _.a ,p-tmt.1CxzM 4 Date °t-7--arl ^) Supervisor ___________1__________ Date.9 rIEMS P1V15E0 (see aRevisfon Description Sheet' for revision 2)

  'VPU* OSE. 

SUMMARY

Determine Tendon Force losses and prepare Tendon Force Curves for Tendons for 6th Surveillance Inspection. RESULIS

SUMMARY

Force Curves are plotted and attached.

  )

a... SA1

Eladda

 'WEP.W...e.r.                               CALCULATION REVIEW CDACEViJM Page 1 of 2 CDLCU.A11ON NOJ~EV.

S 95-0082 Revision 2 I PART I - DESIGN ASSUMPTION/INPUT REVIEW: APPLICABLE [Q Yes JR No The following organizations have reviewed and concur with the design assumptions and inputs Identified for this calculation: Nuclear Plant Technical Support 6qnni~a~. System Engr Nuclear Plant Operations OTIEIMM PART II - RESULTS REVIEW: APPLICABLE [] Yes 0 No The following organizations have reviewed and concur with the results of this calculation and understand the actions which the organizations must take to implement the results. Nuclear Plant Technical Support System Engr owwMaefte Nuclear Plant Operations Nuclear Plant Maintenance 51"IUtMVAt [o Yes Q3 N/A Nuclear Licensed Operator Training 13 Yes ON/A Manager. Site Nuclear Services 0 Yes [I N/A Sr. Radiation Protection Engineer slwwNbuf 0 Yes 0 N/A OTHERS: 6.gnawNdD.W ) R", ,?

CALCULATION REVIEW Page 2 of 2 L.i CAMWUTION HOJREV. I PART III

                       ~S 95-0082 Revision 2              .i CONFIGURATION CONTROL- APPLICABLE 0 Yes [] No I

The following Is a list of Plant procedures/lesson plans/other documents and Nuclear Engineering calculations which require updating based on calculation results review: Document Date Reauired Responsible Ornanization SP-182 11-1-97 Nuclear Engineering Programs Upon completion, forward a copy to the Manager. Nuclear Regulatory Assurance Group for tracking of actions if any Items are Identified In Part Ill. If calculations are listed, a copy shall be sent to the original file and the ,_,calculation log updated to reflect this Impact. PART IV - NUCLEAR ENGINEERING DOCUMENTATION REVIEW The responsible Design Engineer must thoroughly review the below listed documents to assess if the calculation requires revision to these documents. If "Yes," the change authorizations must be listed below and Issued concurrently with the calculation. Enhanced Design Basis Document '1Yes 0 No rTc' Vendor Qualification Package MGMOPA FSAR [3 Yes 0 No &~I0M1 Topical Design Basils Do. ryesY* NofICf) improved Tech. Specification (3 Yes E2 No 9,40) EMSOPM [3 Yes 0 No rTCh) Improved Tech. Spec. Bases r3 Yes 0 No I0-0 Other Documents reviewed: Config. Mgmt. info. System 0l Yes 0[ No Ioxwl _ ._ Yes 0 No... WANU DOC.tmZco Analysis Basis Document [3 Yes 0 No fTCJI 0 Yes E3 No

                                                                                                                         ,o,       mwaCo 00C.

Design Basis Document 0 Yes MNo (T") _ _ _ _ Yes E3 No 4CW,. DCC.NMFIMNC Appendx R Fire Stud 1 Yes 0 No Ic~n _-_ Yes El No IM DWC. WM*4MM Fro Hazrdous Analysis E Yes N No ITcff [0 Yes [3 No WFPA Code Conformance Docurenrt [ Yes 10 No MRc __ _ Yes E3 NoG________________ ICH"MV¢r r4FMCfJ PART V - PLANT REVIEWSIAPPROVALS FOR INSTRUMENT SETPOINT CHANGE PRC/DNPO approval Is required If a setpoint Is to be physically changed In the plant through the NEP 213 process. PRC Review Required 9 Yes 10 No PftC Chairman /Date DNPO Review Required 0 Yes 0 No ONPO loate

                                                                        -I DISEW.INl I

IR - PRWINTONAME 17-1-T, John D. Shubert. Jr. Rev. 847

CALCULATION VERIFICATION REPORT g*spum Ala. Crystal River Unit 3 CALWMP^M Page I of 1 I CALCULATION tJUMMI S 95-0082 r PRWJECI!TWE Revision 2 6th Tendon Surveillance - Generation of Tendon Force Curves I ! YES YES 1.1* NO NO D0 NIA N/A I Are inputs, Including codes, standards, regulatory requirements, procedures. date, and Engineering methodology correctly selected and applied? 2.4 0 0 Have assumptions been Identified? Are they reasonable and justified? (See NEP 101, V.c, for discussion on references). 3.*M 0 0 Are references properly Identified, correct, and complete? (See NEP 101, V.c., for discussion on assumptions and justification.)

4. ~001 Have applicable construction and operating experiences been considered?
6. 0 0 Was an appropriate Design AnalysislCalculation method used?

In cases where computer software was used, has the program been verified or reverified in

6. o00 accordance with NEP 135 for safety related design applications and/or are inputs, formulas, end outputs associated with spreadsheets accurate?

Is the output reasonable compared to inputs?

8. 0 01 Has technical design information provided via letter. REA, IOC or telecon by other disciplines or programs been verified by that discipline or program?
9. 0 0 Has technical design Information provided via letter or telecon from an external Engineering Organization or vendor been confirmed and accepted by FPC?

Do the calculation results Indicate a non-conforming condition exists? If "Yes," Immediately notify the responsible Supervisor. 11.0 t r0 Do the results require a change to other Engineering documents? If "Yes,w have these documents been Identified for revision on the Calculation Review Form? I have performed a verification on the subject calculation package and find the results acceptable. ION VNGINEER DATES$UP $IJCLEARNGM13MG DATE P".3/97 lA$1I.IClSI~lWI, 9NrT:-OPOMW 912247

IM 19 U Florida INTEROFFICE CORRESPONDENCE Power CORfP ON A" ION Nuclear Engineering Dcsia.n NA!E 240-3568 Office MAC Telephono sugMCr: Crystal River Unit 3 Quality Document Transmittal - Analysls/Calculatlon TO: Records Management - NR2A "he following analysis/calculailon package is submitted as the QA Record copy: DOCNO fFPC DOCUMNu T C*rMT1 AIo4 IuMU [l F. WS, Mp TOTAL PAGES TRIAMM S-95-00821 MX . .51W 3 f6t Tendon SurveUlance - Generation of Tendon Force Curves KWa

  • K MOEMY FO
                                    -oR UTTER FMVM)

Tendon Surveillance

         =iMMcV            CM FM      - LIU FPUAY PFU FIr SP-182 VLM aom                                                          TWMEE #MS                                                         "&Fb 8OLW I)                 NOON M0VV FPC (from Parsons Power)                                       NIA                                                  NIA TAG COMkt4TS (OWSE RESTIVCTIONS. PAOPFIETARY, ETI Parsons Power caic revision using FPC format.

NOTLM Use Tag number only for valid tag numbers (I..,RCV-8, SWV-34, DClI-99), otherwise; use Pan number field (i.e.,CSC14599, AC1459)." If more space is required, write *See Attachment" and list on separate sheet. EMI U0NGIEER DAIl I TERECATON &I(OMNER A DATE A-.h~~3-? (1M

                           %IOffice  Rom~eost   13u ye          No       Plant Dooument Updates R*quired !1Yes ý,Yo at Yjind copy of M,,
)           "1 ot. Nud. Confmg. Mgt Mgr., Nucl, Eng. Design Calculation Review form to Nuclesar Lcensing and a copy of the Calculatlon to tve Sopo'ah Otgulzon(4 Identfed in Pa i an toe Caulcjon Review fam)

(Orilinal) wlaflach NE 13Y.. ENo (If yes. Transmft w/attach) AW 6" nw IVFWN. SRS .9 PMsFIF Wuchi'b Wqk.m~

Florida Powerho ANALYSIS/CALCULATION

SUMMARY

                                                                              ,,mFK       "m                          LVE.- ,

DOCUMENT IDENTIFICATION NUMBER STRUCTURAL S-95-0082 lCuUlW.A8IWTAflO1HN O a Safety Related PREPARATION 01 TENDON FORCE CURVES FOR 6TH TENDON Q3 Ron Safety Reloead SURVEILLANCE INSPECTION REVISION MS REVISED _APPROVALS Design Engineer L Date Verification Engineer _ _ _ ... Date/Method* 7-Z/s, .... Superisor._ _.__....___.._ Date 10 r.I6. 1- _

    *VERIFICAION METHODS:                   Design Review, A - AJtemate Calculation T - Oualiflcatlon TestinO K /

0ICRIS, BELOW OF METhOQ OF WER4FICATION WAS OTHER TH1ANOESIGN REVIEW DETERMINE TENDON FORCE LOSSES AND PREPARE TENDON FORCE CURVES FOR TENDOISFOR 6TH SURVEILLANCE INSPECTION KMLTS UWAWR I FORCE CURVES ARE PLOTTED AND ATTACHED 9) r~m.Gin RM Lft of Pwo MW *A1w A 06 1q

PARSONS POWER GROUP INC. , ,:.r.inaron c4 Gl.be-tConmoq'.-.a In ano Parsons Man

   '175 "1,viantrranln Road Rfeao.n9 PA1 7e, -O1,0;835.2000 - Fax. t610 855-2001 February It, 1997 FCS-14771 Contract N00821AD, WA048 Mr. W. W. Nisula Contract Manager Florida Power Corporation (NAIB) 15760 West Power Line Street Crystal River, FL 34428M6708 Attention: Mr. J. Lese                                        Re:      Crystal River Unit 3 6th Tendon Surveillance Force Curve Calculation

Dear Mr. Nisula:

Please frind attached calculation S-95-0082 Revision 1, which documents the generation of the tendon force curve.is tO aVtwnh~idtc ihe 1 )1ClMoJ.tJ inspection date of early March 1997. Included are disks with related electronic files used in the preparation of the data and force curves. \-) Should there be any questions please feel free to contact Dr. Samir Serhan at (610) 855-3209. Very truly yours, Samlr J. Serhan, Ph.D., P.E. Supervising Engineer Roy W. Adler RWAISJSIbmb Project Manager Attachment cc: W. W. NLul3 (NAIB) D. L Jopling (NAIE) J. A. Lese (NAIE) R. E. Vaughn I FPC Records Management (CL Only) R. W. Adler(2) P. 1. Hamilton S. 3. Serhan E PARSONS

Florida INTEROFFICE CORRESPONDENCE Power COMPORAKION Nuclear Engineering NAlE 240-3568 Office MAC Telephone GL.*ecTr- Crystal River Unit 3 Quality Document Transmittal - Analysis/Calculation TO: Records Management - NR2A The following analysIs/calculation package Is submitted as the QA Record copy: S-95-0082 0 MiX 383 6th Tendon Surveillance - Generation of Tendon Force Curves KWMI OCNI1Y I~WOIFV POMLAWE1 WAL)4 Tendon Surveillance D0fF I)PB*CE* OR FM -UUt PMWAR PU FPE M VEtO KVEOA NAkdc VEOMn OJMENT NU.5 0 I M9MEEO0GUU9 PwI~n ) FPC (from Parsons Power) NuA N/A TAG PART NO. MM AMI A*f P EMONTON, 9TC-J Force Curves for 6th Tendon Survetiillance NOTE: Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34, DCH-99), otherwise; use Part number field (i.e., CSC14599. AC1459). If more space h required, write See Attachment" and~list 9*s Mrate4 slect. PA, Mgr. Office (f MARMgt. Nuct Config. Relatedo 1IYeo 9 No Plant Document Calculation forn toRequired Updates Review 3 Yes 0and Nuclear Uceneing (1fYe)Aend Noa copy colý oftheto W the Calculation Mgr., NucL Eng. Deaign the Poimnle OW& (o@ t Clcuaion PeAwmi Idleidn h PsU ionhe (Orlg"ln wlaftach NE 13 Yes I No (f yea. Tansmilt w/*efac m,,Nm

CALCULATION REVIEW Page 1 of 2 IC.AA5N.MNO fJJUV. S-95-0082/Rcvision #0 PARTI - DESIGN ASSUMPTION/INPUTREVIEW The following organizations have reviewed and concur with the design assumptions and Inputs Idcntified for this calculation: e I Nuclear Plant Technical Support System Engr Nuclear Plant Operations ontt'n PART !1 - RESULTS REVIEW The following organizations have reviewed and rcocr ,with the results of this calculation and understand the actions which the organizations must take to implement the results. Nuclear Plant Technical Support System OIA. Engr - F Nuclear Plant Operations a- 0/A Nuclear Plant Maintenance U-Q1Yes IXJ NIA Nuclcar Uccmcd Operaor Training a-mb

                           - Yes              l N/A Manager, Site Nuclear Services o  Yes            IZJ N/A Sr. Radiation Protection Engineer U-mb O   Yes            I]  NIA OTHERS:

SIg~'~m YE1r Lie o~flW NWI. d..eEnlwmpa"

CALCULATION'REVIEW P Page 2 of 2 S-95.0082/Revision #0 PART M - CONFIGURATIONCONTOL The following is a list of Nuclear Engineering and Plant procedures/lesson planslotber documents which require updating based on calculation mults review: Document Date RMuired Resnonsible Organization SP-182 3/1/98 Nuclear Engineering Design (A. Petrowsky)

)

Upon 0"pnCkon, forward a COpy to the MMager, Nucle IJeemW ig for traking of ctonM iffauy items are Idetified In Pt IIL PARTLY - PLAKrREVIEWS/APPROVALS FOR FIELDSIFPOINT CHANGE PRC review Is required if a full IOCFRSO.59 Safety Evaluation is performed. DNPO approval is required if a setpoint is to be physically changed In the plant. PRC Review Required Q Yes F5 No PRC Cbhakmn 100t4 K; DNPO Review Required [ Yes No DNPO /Date DEON7 M 4 ~ (J Pý &4M~ M': IM. o PRam NO Nude* Enuahom na

AdffAlk Eladds 9= ANALYSIS/CALCULATION

SUMMARY

mLE AU11CnAT8pWlclCWCK0i

                           *D*',*,~t,   F"/L.*AwFee                           Cuxvcj.                           SdaVWde KAMEN OR     SP-     9,2.                                                                         ___,__

DU~0I !1IQ lii V7*L 1.ffti V L9- *-- _ _ _ _ _ _ _ _ __i DeigM *J nAl nl

                                                                          ,do         *_-___        ____
 )  -m     rATmON IETnOo         "   Design I9"ew A - AlPtrmatm CuicutaWf        T - OuaIflcaton Totno
M&AAA/ 4 ZAtl 22MAW/ 6A*EGP
              .       .(dtL 7IA~fx        f!*.tl._    7  7h,sj,,*                 f*.-    J*/,-*,,_",*,A     ,,1.o.*,_PdA         -

aj&.M WW.W*7~t 77WO

                      .*        Cc
                                ,a ',             A    -      dM                   l_,

f ,,OAL _*.. ... im i cSi A'C ArfA y

 )

I PiA. e/m

               =raOOu DESIGN ANALYSIS/CALCULATION Crystal River Unit 3 VE&A.C.Me

) Page 1 S-950082 3 Revision No.: 3 This page followed by page LA The follow in Items have been revised in the current revision: Revised I Affected Add Replace Remove Description/Purpose of Revision Payes [Sections I I x 1 add *Revision Description Sheet" for revision 3 change page number on revision 2 "Revision X Description Sheet" from page 1 to page 1A and State that 'page 1 follows" change page number on revision 1 "Revision le X Description Sheet" from page JA to page 10 and. state that "page iC follows" change page number of Table of Contents from page 1C X 13 to page IC and add item for Revision 3 Description Sheet change data Input tile names to correspond to 11 X. current names (i.e. DCNER3.XLWI etc) and add note change data Input file name to correspond to 20 X current name (DOWIR3.XLW), add data for Tendons __ ___Dill. D302, 0306 and state that "page 20A follows" 20A-20B X add spreadsheet and curve for Tendon Dill 49 X state that "page 49A follows" 49A-498 X add spreadsheet and curve for Tendon D302 55 X state that "page SSA follows" S"SA-SSB X add spreadsheet and curve for Tendon 0306 change data input file name to correspond to 63-64 X current name (HOOPER3.XLW) and add data for Tendons 42H29. 42H30, 42H34 thru 42137. 51H28. S2H29. 62H39. 62H43 and 62H44 70 X state that "page 70A follows" JOA-700 X add spreadsheets and curves for Tendons 421129 and 42H30 76 X state that "page 16A follows" 76A-7611 X add spreadsheets and curves for Tendons 42H434 thru 42H37 94 X state that "page 94A follows" 94A-940 x add spreadsheets and curves for Tendons 511H28 and _5129 112 X state that "page 11ZA follows" 112A-13ZB X add spreadsheet and curve for Tendon 62H39 113 X state that "page LI1A follows" ISA-118D X add spreadsheets and curves for Tendons 62t143 and 62044 159 X Include "Original Stresses data" for Tendons D111, D302 and 0306 and change data Input file name to correspond to current name (DOMER3.XLW) 160 X Include "Original Stresses data" for Tendons 42HZ29. 42030, 42H34 thru 42137, 51H28, 52H29. 62H39, 62H43 and 62H44 and change data Input file name to correspond to current name (IIOOPER3.XLW) 894-B010 X add Tendon History Sheets for Tendons DILI, D302. 0306. 421129. 42H30. 42H34 thru 42H37, 5128, 52H29, 62H39. 621143 and 621144 K2 X change data Input names to correspond to current names (i.e. OOKER3.XLW, etc...) and add note REVISION TYPE'. Superseded by Calculation Number (check one) [3 Full Revision 0 Page for Page "s~l MWOw Ef.gew," Itrs: Uk of PntW MESr,.

MRoda wPower DESIGN ANALYSIS/CALCULATION Crystal River Unit 3 OuS&CJ!I Page iA N WC O ~ O S 9 ~ 8 .i ,=~f0

                                                     ,.at             ,v a         --      =

Revision No.: 2 This page followed by page 1.L The following items have been revised in the current revision: Revised AffeCtSd Add Replace Pages] Sectionsl - e Remove Description/PurPose of Revision M3 1 x add "Revision Description Sheet' for revision 2

                                                                    !              (Change page "numberon revision I "Revision 1A                                                 X                       Description    Sheeto thaT "eaoe ta follows" from page 1 to page 1A and state lchange page number of Table of"-Cont'ents 1B                                                                                                                             from page X                       1A to page 18 and add Item for Revision 3    ...                                                                                                                     2 x"                      change    start date fSheoe aescrtdteon               p froml Spring 1.99? to Fall 1997 8                                             -   X                       Change Start date from Spring 1997 to Fail 1997 Change reference to Enclosure 30.to 3uS%

9 state X Original Stressing Data' change start date from March 199? to November 10 x 1997 and change numerical values to correspond November 1997 to 11 change data Input file names to correspond X current names (i.e. OCKER2.XLW. etc...) to revise the discussion about the interpolation 18 beteen data tn the spreadsheets 20 x change data Inprr file name to correspond current name (DCNER2.XLW) to 21 x revise spreadsheet for November 1997 start date revise spreadsheets and curves for November 23-61 199? X start date 64 X change data Input file name to correspond current name (400.PERZ.XL. to revise spretadshee*s and curves for' ovember 65-124 1997 X start date 126 X change data input file name to correspond to current he" sERTRI._M reviSe spreadsheets and curves for November 127-156 199? X start date iS7 1 change reference to Enclosure 30 to 3ust "Original Stressing Data- state

                  , _       _state                                                                               and Enclosure 29 to just
                                                                                          *data sheets" 159-161                                                                        change reference to Enclosure 30 to 3ust X                                                                            state
                                                                                  -Original Stressing Data* and change data file names to correspond to current names Input

____E _.XLW, etc...) (i.e. change reference to Enclosure 30 to Just 162 state X "Orlginal Stressing Data" and Enclosure State s "data sheets-29 to just change data input -fle names to correspond K2 x to current names (i.e. DOMERZ.XLW. etc...) / REVISION TYPE: OI Superseded by Calculation Number (check one) o Full Revision 0 Page for Page "I$ OC- welof O~WN litso, N.aw I -g '06 "

FDESIGN FlPower ANALYSISICALCULATION Crystal River Unit 3

              *,MW,                                      b,,Page                                                                %.

b-J-I5M-0 "0 C cuuLaoT ] Calculation 3-95-0082 3 Revision No.: I This page followed by page 1C A3 This *brrn shall be used to record the purpose or reason for the revision. indicart the revision pages and/or affected sections and give a short description of the revision. Check (X) the appropriate function to add. r.placc or remove the afiectzsd pages. Revised Affected Add Replace Remove Description/Purpose of Revision Pages Sections - 1 X -- _ Add revision description sheet. LA x Change page number from t to MA. Add icmm for revision description sheet.

                                                                      "Tochange start date for the 6th surveillance d
                                            ...... _              inspection from March 1993 to March 1997 10                                          X                  To change start date for the 6th surveillance inspection from March 1993 to March 1997 IS                                          X                  To change start date for the 6th surveillance inspcction from March 1993 to March 1997 21                                          X                   To change start date for the 6th surveillance inspection from March 1993 to March 1997 23-61                                          X                  To change start date for the 6th surveillance inspcction from March 1993 to March 1997 65-124                                         x                  To change start from date   for1998 Martch  the 6th    surveillance to Match       1997
                   ~inspetion 127-156          271inspection                  X                 To change from start date  for 1993 Mlarch    the 6th   surveillance to March       1997       A'
          -_/                 l1   -   -_ I        -           -

I REVISION TYPE: I I SUPERSEDED BY CALCULATION NUMBER I) 1check ow)l I I FULL REVISION I X I PAGE FOR PAGE ae? . pq 2 wg4 *dSPh.V ,a

I-1 I' 6 Florida Power o0ctmENT DE 1IGA11ON NO. DESIGN ANALYSISICALCULATION Crystal River Unit 3 Page IC REVIMSN Calculation S-95-0082 3 CTION TITLE PAGE CALCULATION COVER SHEET REVISION #3 DESCRIPTION SHEET 1 REVISION #2 DESCRIPTION SHEET 1A REVISION #1 DESCRIPTION SHEET 1B TABLE OF CONTENTS IC 1.0 PURPOSE 3 2.0 DESIGN INPUT 3 3.0 COMPUTER CODES 4 4.0 ASSUMPTIONS 4 5.0 SCOPE AND TENDON SELECTION 4 6.0 CALCULATIONS 9 6.1 GENERAL BACKGROUND & SCHEDULE 9 6.2 FORCE CURVE GENERATION PROCEDURE 11 6.2.1 PREPARATION OF INPUT DATA 11 6.2.2 PROCEDURE FOR DETERMINATION OF TENDON LOSSES 11 6.3 DOME TENDONS 19 TENDONS LISTING & DATA INPUT TABULATION 20 INDIVIDUAL TENDON LOSSES WORKSHEET & CURVES 21 6.4 HOOP TENDONS 62 TENDONS LISTING & DATA INPUT TABULATION 63 INDIVIDUAL TENDON LOSSES WORKSHEETS & CURVES 64 6.5 VERTICAL TENDONS 125 TENDONS LISTING & DATA INPUT TABULATION 126 y-A. INDIVIDUAL TENDON LOSSES WORKSHEETS & CURVES 127

   )                         6.6    CALCULATIONS SUPPORTING SP-182                             157 REt: U.                     B~gIn..tina 1Plaill RgSF~ N~aehuu a-'

fu" RE1*

  • of hWR9$P'.WW; 9 "Mtlrlgle

DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 K Page 2 Calculation 8-95-0082 -- 7.o SECTION TIflE

7.0 CONCLUSION

S 162

8.0 REFERENCES

162 to 163 9.0 ATTACHMENTS A. DESIGN INPUT FOR 6TH SURVEILLANCE Al TO AI8 F. TENDON DATA HISTORY SHEETS FOR 6TH SURVEILLANCE BI TO B92 C, TENDON STRESSING SEQUENCES Cl TO C24 D. EFFECTIVE WIRE SUMMARIES AND TENDON WIRE DATA DI TO DIO E. ELASTIC SHORTENING REFERENCES DATA El TO E9 F. WIRE STRESS RELAXATION REFERENCE DATA F1 TO FS G. CONCRETE CREEP REFERENCE DATA

  • G1 TO GI4 H. CONCRETE SHRINKAGE REFERENCE DATA HI TO H8 L NORMALIZING FACTOR REFERENCE DATA 11 TO 123 J. HOOP GROUP PLOT OF TENDONS Ji TO Js X. ELECTRONIC FILES INFORMATION & DISKETTES Kl TO K3
  )

j mtLidi PIm RIU*P N. Cm*4'ngrneMU

I Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 C M 1Mf I Page 3 DOCUtEM*4 VEMC~InM DFtm MQ0 aIEVW Calculation S-95-0082 2 1.0 PURPOSE AND OBJECTIVE 70e CR3Crs.DoC (Word 6.0) The purpose of this calculation is to provide tcndon force curves for Florida Power Corporation for the Crystal River Unit 3 facility in support of the upcoming 6th tendon surveillance period scheduled for the Falll of 1997. Specific tasks to be performed as part of this scope include the following: A.) Determine the predicted tendon losses and develop forceltimc curves for cach of the sclected tendons for the upcoming sixth surveillance period. Generate the tendon force curves for the sclected tcndons, the tendons adjacent to the selected tendons, and alternate tendons. Alternate tendons are tendons not specifically scheduled for this surveillance but force curves are prepared to be available in casc a substitute tendon should be required during the survcillance. In addition, force curves for a group of tendons deferred/exempted from the previous surveillance will also be prepared. These are discussed in detail in Section 5.0. B.) In addition to the force curve development, other calculations which are requircd to support Enclosures included within Surveillance Procedure SP-182 will also be prepared within this same calculation. 2.0. DESIGN INPUT Design input information has been reviewed and is included as Attachment A to this calculation. Note that thre ar no significant changes to the basic criteria and related documentation which address the licensing of the CR3 plant with respcct to the tendon surveillance program. The previous surveillance efforts complcted various studies and addressed the CR3 tendon program and its' compliance with U.S. Regulatory Guide 1.35, Revision 3, since it was formally issued in July 1990. Based on FPC licensing efforts and Technical Specification revisions performed at the time of the last surveillance period, as well as recent discussions with the NRC, FPC has now committed the CR3 tendon surveillance program to be performed in accordance with U.S. NRC Regulatory Guide 1.35, Revision 3 (Reference 3). U.S. Regulatory Guide 1.35.1, Revision 0 (Reference 4) is a daughter document referred to by the above Reg. Guide and deals specifically with the calculation of individual tendon losses and the generation of tendon force curves. While calculation efforts for the CR3 tendon force curves have followed closely with both of these Regulatory Guides as they evolved through the 1970's and 1980's, the format and current procedure for the preparation ofthe force curves is not in exact compliance with Regulatory Guide 1.35.1 Revision 0 as issued in 1990. The method and approach used in the generation of the CR3 force curves is superior to that of the Reg. Guide in that a specific curve is generated for each individual tendon. Based on the discussions held with the NRC and the results of thcir review, the method and approach used for these calculations shall be the same as used for previous surveillances. Sec the Attachment A information for further discussion and references to recent correspondence and documentation with the NRC on various issues related to the tendon surveillance program. Applicable Technical Specification sections, as well as FSAR sections were also reviewed for this effort. They support the position noted above on the FPC commitment to KG. 1.35, Rev. 3 and are discussed and referenced within the Attachment A information.

Florida DESIGN ANALYSISICALCULATION SPower Crystal River Unit 3 Calculation S-95-0082 o 3.0 COMPUTER CODES This calculation package is being prepared using Microsoft Word, Version 6.0 and Microsoft Excel, Version 5.0. Spreadsheets from earlier surveillance efforts were prepared using Lotus, 123, Release 2.01 and 3.0 and were converted to Excel format for this calculation. All input and calculations are manually checked and verified, thercfore, verification of computer programs is not applicable or necessary. 4.0 ASSUMPTIONS Any assumptions made are noted and contained within the calculation package. None require future confirmatio. 5.0 SCOPE AND TENDON SELECTION Tendons were selected for the sixth surveillance period in accordance with the requirements of Reg. Guide 1.35, Revision 3 and using the same methodology as was used in the past surveillance. Basically, a random but representative sample was selected and checked at the site for accessibility. Specific criteria used for this selection process is summarized as follows: 1 Tendon Selection Process The tendon selection process has remained the same as that completed for the last several surveillances where a random but representative sample is selected for inspection and testing. The intent is to get as many new and never tested tendons in the sample population, but still keeping one control tendon from each major t=don group to be investigated in each surveillance. Note that this current method differs from methods used during the early life of the plant where some tendons were repeated for inspection every third surveillance. Basically, the selection criteria and process used considers the following: 1.) Select tendons based on Reg. Guide 1.35 Revision 3 Based on the good results of prior surveillances, the Reg. Guide requires a minimum of I I tendons to be inspected, including 5 hoop, 3 vertical and 3 dome. Tendons should be selected which were never previously inspected or tested. Previously deteusioed and retensioned tendons should not be included (unless there is a specific need to investigate the tendon per item 3 below). In addition to being selected at random, tendon selection should be representative of various areas and conditions. For example, the hoop tendons selection was based on random selection but also considered what tendons were inspected in the past and in what hoop area. A plot of previously inspected hoop tendons was prepared to track tendons inspected by grouping (i.e. 13's. 42's, 35's, 46's. 5 l's, and 62's). Therefore, the selection process considered those sections not equally represented by as many tendons as completed within other sections from prior surveillances. See Attachmcnt J for various plots and information of the hoop group. The same procedure was applied to the dome group (i.e. 100's, 200's & 300's groups) and to the vertical group (i.e. 12's, 23's, 34's, 45's, 56's & 61's & quadrants). See Attachment D for groups information. I. . . . - MUT:UI d PNts REUM Nadw EnommuW

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 5 VOC4MEN1

              *.l.* 10's ~nO.MCalculation S-96-008                                                                      a NEWdSinO 2.) Maintain Control Tendons to be completed each surveillance.

The Reg. Guide also requires a control tendon from each group to be inspected every surveillance for comparative purposes. CR3 has rot had control tendons since the first surveillance. The concept was introduced probably in the fourth surveillance. Tendons D212, 12VI and 5 1H26 were probably the original control tendons since about the time of the fourth surveillance. They were intended to be inspected during the fifth survo'llance but the group of tndons selected was based on the surveillance being performed during an outage. FPC decided to complete the 5th surveillance during normal plant operation and the original tendons selected were affected because many tendons were located within the area of the plant steam vent zone. This included the above three control tendons, and three new control tendons, D215, 34V6 and 461129 were selected for completion of that surveillance. A problem with 461129 during the 5th surveillance forced the selection of another control tendon, 461121, for the hoop group. New control tendons may need to be selected periodically if the tendon has a problem and is ever detensioned and/or retensioned. As earlier surveillances on CR3 did repeat some tendons, the selection of these other control tendons was easily done from several good candidate. New control tendons should be selected from those previously inspected as far back as possible and cannot be one previously detensioned and/or retensioned. A tendon inspected in more than one prior surveillance is preferred. Based on the above, It is recommended that both of the above two sets of control tendons be used by FPC as control tendons, with one set of three to be utilized in the 6th surveilance during a plant outage, and for

 )               the other thre to be used in any frture inspections scheduled to be performed on-line.

3.) Consider any tendons with problems or abnormal conditions as reported by plant pcrsonMel. Any leaking tendons or tendons with any reported problems should be considered within the scope of the surveillance. Also, past inspection reports and records should be checked for open items, recommendations, or noted problem tendons. 4.) In the selection of tendons for detensionin& (oe per group is required per 1LO.) consider the numfber of effective wires as recorded in the tendon history sheets and summarized in the effctive wire summary in Attachment D to thii calculation. As any tendon is to be considered lneffective if it has less than 155 effective wires per the FSAI, it is therefore not desirable to select a tendon with many missing. cut or ineffective wires. Unless there was a specific need to detension that particular tendon, doing so could therefore render the entire tendon as out of service. Only a maximum of 3 tendons are allowed out of service at one time per criteria in the FSAIL 5.) The reduced force dome tendons are not normal candidates for normal liftoff testing per SP-1 82, Enclosure a. 6.) Tendons adjacent to the selected tendon may require testing and should also be feasible to inspect and test. Adjacent tendons in the dome should not include any reduced force dome tendons. Jump to the next regular dome tendon for the required adjacent tendon. Also, adjacent tendons of the lowest hoop tendons (#1) shall be considered as the two'directly above the selected tendon. Adjacent tendons of the highest hoop tendons (fi47) shall be considered as the two directly below the selected tcndon.

 )

7.) One alternate tendon should bc selected from each group, and the two adjacent tendons of these alternates at least considered for possible inclusion. I We: Lf o M"i neaaw. Mckv 0"""~

I I*M. Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 6 OCM EYWCA1MQN NO RE60 Calculation S-95-0082 e In addition to the above selection criteria, there are several other factors which have influenced the scheduling of actual ficld inspection and testing. These include: A.) Steam Vent Zone - Plant steam venting can impose a safety hazard to personnel during plant operation and early modes of shutdown. Tendon work in the range between 0 and 120 degrees Is affected during plant operation by the potential steam venting of the plant. Tendon work in this area must be held off until the potential hazard is eliminated or other approval is obtained from plant operations. Note that for the fifth surveillance per FPC operations, this even includes the outside tendon caps of the affecte butresses at 0 and at 120 degrees. B.) Fuel Pool Area-Work over the fuel pool can only be performed while missile shields are in place. (Nureg 0612 rcqmt.) C.) PlantInteror Work-Work inside some plant areas is difficult due to access problems, high radiation areas, nerences, ram accessibility, etc. Ieferred/ExemDted Tendons After the tendons were selected for the fifth surveillance for an outage survelllance, it was decided that the 5th surveillance would be completed during normal plant operation. A group of tendons originally selected for inspection during that surveillance had to be exempted florn that surveillance due to their proximity to the main steam vent zone and the associated hazards with wowUing in that area. FPC discussed this issue with the NRC and has documented the following 8 tendons as defrred tendons: nrr~ LI. d Ph.i ~ M~dmt Eqbwulng No aim RIM*.ue edoPlsM Jqe5. Ifce Frsq! eoes

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 1W CONIOMPage 7 Calculation 6.95-0082I o D1 15 Never inspected in any surveillance. D212 Inspected in Surveillance 3 and 4. Considered as Control Tendon for outage condtion. D311 Never inspected in any surveilance. 12VI Previously included for liftoff testing in the 3rd and 4th surveillances. Considered as Control Tendon for outage condition. 421-144 Never inspected in any surveillance. 511126 Previously included for liftoff testing in the 3rd and 4th surveillances. K-, Considered as Control Tendon for outage condition. 53H46 Never inspected in any surveillance. 62H46 Never inspected in any surveillance. As FPC has comnitted to the NRC to address tbe above tendons within the upcoming 6th survelllance, these tendons were considered in the scope of this calculation. The 6th surveillance is scheduled to be completed during an outage. Since three of the above exempted tendons were also previous control tendons, it was considered that these tendons can again be used as control taenons for this surveillance instead of the 3 control tendons used in last surveillance (when the surveillanc was done on-line). Therefbre, the three exempted control tendons can be considered as three of the 11 tendons required per Reg. Guide. A total of 16 tendons should be inspected during the surveillance with three additional alternates selected. Note however that the scope ofthis calculation will include force curves to be rqgnerated for the other control tendons, D215, 34V6 and 461121. A complete historical record of all tendons included in all prior surveillances, along with the list of selected adjacent, exempted and alternate tendons which are planned for in the 6th surveillance is provided on the following Table.

 )

! m MEr: ife 40 Pleme RUMSP. Mkee EngmIe

C-cou TDEIO)I SwcVtLKA)NE I CIIC-ALutmR X4q4 SVVAMLANCZ) P I ST SIVEC.LA)4CE 210 EMV3ELANCK SXD SUMflUANE 4TH StRIEUZAWX 31 fnSIRVUJAWM 47 MIIMUR .ANIC lurawnro"M YWO@TO 51%w *111TO31231 2FIPITOIW117 ZIV"To L9 d FAZLLIWI I~ YEARS Al'T0SSIT . vamilaSclool gri ITTVYAR iSYEARS SWARS II WARS II WARS 21iW-ai . E)*MARZI ATA KE4qU3W TO INSECT It YOT.IGUVY.SD 23TMQT.IUV.SD 21TOT.101WSVA II TOT-SIUV.30 II TOT4MIUV.D *II TOT-WT3.3O *.I TO!T-M4VAlD 0 23 ZT-)El.V.41) 231071.UI.W.SD 211ur.IG~tv.fl2 I I TOT-511,31Jo s4g11)vV.S* DcL6IUDva u 33 910TT4)HWV2D ACIUALJ* D4SPSCITD 9 BASIS fl-ill) 310-49 SM4in a-in3 M35.3 SP-112 *TOTAL. It sp.)m "1434 PlY- RVVd IEV? 1XVIDAII CC PZIORY DATE 3.2740 &4801 51" Snwn1 311*11SI 0* t-Dl23 DIOS ID PIMS P.c *21Di. CX . 22DOMETENIX) C2 DOU1DNOOM Do"? Din IDYTMAL Dill P140 P25 It P112 P.C Vol II *M024 * ?WECTED 0o.. Dt 33 un 3 3321 DM U= A Otis . TO DATE SOROWSOV41 Doom 2805.3203 vur 3332 Din D3 Otis It DM23 371331 .Dv itl DIV4 *Dill VUERIAL1OIDOWS IVI? W13Y1 IIVt SVI D.C 74YE P.C IV 3M .CJ u~VET. WowoH 144TOTAL tr~im 12V210 at "WV R 34W IS 33 . 4IV21 33

  • DISPEC tivit DIm IdVIt 33 SV3 D3 SIV14 6 2MV TO DATE
$GOXMROF24 31MI              4W16I                                                       **1vi           A                                   "I IZi4.34D3.45.1          IMVS 34"4                     45V4              5VII 56VI                     NVI          DA
                                                                                                                                                                                   .4
£IIONV.WTAv~toD          MUGo                    M12         3109~     n        a   13112                 IlIt                      I:8101     I.C.        awor
                                                                                                                                                           -3 2S5£TED oS          S
                                                                                                                                                                                   *1 210TOTAL                131139                   1381,32           13114            131"4           D    42)11
  • 42W3
  • LullS L3*1 411W0 S1106 a Goal2 am") 42113
  • DATZ o(ROlWS0411OI 131147 S11110 421140 511111 46112 ADI.? 41144, E 11, K It46.11.42 STED~ONSKRIl" 511111 S31022 WIN 451139 miug 3.C(II.D #a 62119 5183 131914 46100 ADL *401143 P 48W32 33124 $AD$5 4014? 33 Q% 92i 4800o $31012 ""340 62111
  • 33*

4601 D ti114" 4"014 ,gU A TOTALTENDON -50 dams434 461112 441810 33 TUTALINSPEC1W 22 22 21. it 14 16.IAT. i* 71W TOTAL. I1WM- A. ALTERNATE AmfADMCEITr CONTRU. D. DETE*410NW a 171NSmoE L.*EPEMtlVEUSRR3 r21 FIT)SURv. W.331!ATEP %RIUod4o1 I co

I Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Kjj DOCUM cOAWPRAlPae 10TMVEN11ICAn N0. Page 9 AEIMION CalculaUon S-95-0082 2 6.0 CALCULATIONS 6.1 General Background and Schedule Information General Background Tendon forces curves are to be prepared for the upcoming 6th tendon survcillnce pcriod at CR3. From the basic criteria as presnted in the Design Input Section, as well as from several discussions with Mr. Joc Lese of Florida Power & Light, it was determined that the criteria for this surveillance period has not changed since the last surveillance efforts. A review of Tech Spec and FSAR criteria confirms the FPC positions with respect to the tendon program. Supporting work for this survillance period will be based on the same criteria that was used and accepted in the previous surveillance periods. Tendon losses have been calculated in the past per the Refcrence 9, 9, 10 and I Idocumcntation. Individual tendon losses include the following-

          " Force loss due to elastic shortening of the containment as a result of the prestressing process and the particular sequcncc of tendon stressing.
          " Force loss due to the stress relaxation of the tendon wires.
  • Loss of prestress force due to the creep characteristics of the concrete structure.

Loss of prestress force due to the shrinkage of the concrete structure. L Based on some earlier calculations made for tendon losses per the Reference 11 document, Lotus spread sheet templates were prepared for tendon losses calculations for the 4th tendon surveillance calculations. See References 9 & 10. These templates were reran and tested for their accuracy and validity for the fifth surveillance. In addition, the procedure for the gathering of all input data was automatcd in the fifth survillance to the format presented herein. Numerous test cases were ran to duplicate force curves prcpared in the past. There were four master templates prepared for the fourth surveillance; one for the hoop tendons, one for the vertical tendons, and two for the dome tendons. The dome tendons are divided into two groups; one for tendons with an original stressing sequence below 27, and the other for tendons with stressing sequences above 27. Based on the work previously accomplished in the prior surveillances, new spreadsheets were prepared this surveillance using Microsoft Excel for the collection of input data and for the calculation of tendon losses needed for generation of force curves. The generation of the force curves was also automated this surveillance by using Excel to plot the graphs. The organization of most data used for this calculation was setup into Excel workbooks with subfiles built and included in each workbook. There is a separate workbook for each of the three tendon groups and each one contains the following:

           # Tabulated input data
  • Original tendon stressing sequences.
-1         & Eff-ctive wire summaries.
                "Original Stressing Data" calculations for SP-182.

o Separate files including each tendon loss spreadsheet, plot data and an individual force curve. Additional information on electronic file names etc. used in this calculation is provided in Attachment K.

K 0 WoWEPur wEHWCAWoN Florida Power DESIGN ANALYSISICALCULATION Calculation S-95-0082 Crystal River Unit 3 Page 10 IMp-wsC 2 Schedule Information The expected timing for the sixth surveillance is Fall 1997. A date of November 1, 1997 will be used as a L bases for dctermining the predicted values of base, 95% base and 90% base and labeling this information on the force curves. This allows for field usC and decisions to be made based on the requircmcnts of Survcillance Procedure, SP-182. The scales of the force curves are based upon previous survcillance cfforts. Thc x axis is a log scale in timn representing the time after average date of dome or wall concrete placement, in years. This scale is labeled at the top of each curve. Force curves arc plotted using the actual log scale points for the x axis (not the scheduled surveillance years after SIT) versus the calculated tendon forces in kips on the y axis. The scale at the bottom of the curve for scheduled surveillance periods after SIT are for case and rcadability relative to regular scheduled surveillances per Reg. Guidc 1.35, Revision 3. Most of the CR3 surveillances were performed on the regularly scheduled years, however, the 5th surveliance was actually performed in the 17th year after SIT. Note that the containment Structural Integrity Test (SIT) was performed in November 1976. For the dorac tendons force curves, the point on the bottom scale at SIT corresponds to the log scale at the top of 2.5 years. Therefore, a corresponding log scale data point must be determined for curve plotting for the period of the 6th surveillance. Based on a date of November 1. 1997 for the Fall 1997 surveillance, the length of time between November 1976 (@ SIT) and November 1, 1997 is 21 years. Since the dome group at SIT is at year 2.5 on the log scale, the 6th surveillance will correspond to (21.0 + 2.5) or 23.5 years on the log scale. L The same procedure must be performed for the hoop and vertical groups as they have different reference points on the log scale for time after concrete wall placement. Both hoop and vertical groups arc the same with SIT corresponding to year 4.4 on the log scale. Therefore, the 6th surveillance period will correspond to (21.0 + 4.4) or 25.4 years on the log scale. 2. A vertical line will be shown on the force curves at the point of the next surveillance and the calculated values of base, 95% base and 90% basc representing points on the curves at that timc will be included on each of the curves. RET: Lt PWi m3rFP:ku=bm

AFlorida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 11 Calculation S-95-0082 3 6.2 General Procedure for Force Curve Generation The same procedure within the calculation for the preparation of the force curves for the fourth and fifth surveillance pcriods will be followed. 6.2.1 Preparation of Data Input Spreadsheets In each of the Excel workbooks is a data input file where data from source calculations and current tendon history sheets has been tabulated. See DOMER.XLW (DOMEINP), HOOPR3.XLW (HOOPINP) & vERTR2.xLW (VERTINP). ' The compiled books of tendon surveillance historical information, as updated to include the results of the fifth surveillance, provide key input data for the dcvelopment of force curves. See References 12, 13 & 14. The selected tendon history sheets related to this surveillance have been included herein as Attachment B of this calculation. The Rcfcrcnce 11 calculation is essentially a source calculation for this procedure with the Refrece 8 & 10 calculations also providing information. Notes and references related to the tabulation of the data on these spreadsheets are shown on the individual sheets. The data input tabulations are presented as the first sheet within the following Sections 6.3, 6.4 & 6.5. 6.2.2 Procedure for Determination of Individual Tendon Losses The procedure for the tendon loss calculations, as derived from the reference documentation, is as follows: I.) Calculate original force in the tcndons The original force in the tendons is determined as follows: OC G.RORCE = 0.7

  • F Pressure x FireFactor Where:

4&- 240 Ksi, typical for all CR3 wires. Wire area - 0.07685 in2 per Appcndix F of the Reference 11 calculation. F,&(Kip Force)= Tendon Area (in2) x f&(Ksi) - 0.05985

  • 240 Tendon Area (in2) = Area/Wire (in2) x No. of Wires. (Considered by wire factor.)

Actual and prcdictcd original liftoff prcssures are obtained from Tendon History Sheets Refcrences 12, 13, . 14, with those within the scope of this calculation attached in Attachment B. Refer to the Appendix F part of the Reference 11 calculation, for source data of above formula. The above expression was used as the basis for the calculations for all the shop and field end forces calculated on the Data Input Spreadsheets. This procedure docs not apply to retcnsiooed tendons. RET Li. ~ Plud KkSP~ Nudest Engww~ em

 'U                                                                                                tElr: t.* d Ptm RZWP. M*-dsf E*

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 12 Calculation S-95-0082 Note that the wire factor as shown in the various spreadsheets is a value representing the tabulated number of effective wires over a total of 163. The number of wires is usually 163 unless cut, loose or considered ineffective. The number of effective wires as recorded from the original installation is documented on the tendon history sheets. The number of effective wires for each tendon has been updated, tabulated and presented in the Effective Wires Summary for each individual group within Atacunmnt D. This tabulation was updated to include the results of all previous surveillances. It does not imply each of the tendons was specifically checked for the numbers of effective wires as presented in the table. it represents only data from the original records and as made available from surveillance records and subsequent inspections. Note that the wire factor used is based on current information and is not based on the number of wires at the time of original installation, therefore the original Force calculated may not be the "original force" in the tendon back at that time. The effect of less effetive wires lowers the curve vertically. This is Insignificant at the current time as the curve of interest will be correct for use at this time. Another method would have been to plot the original value using the wire factor then and then to show a step down on the curve should a lower wire factor occur at some point later on the graph. 2.) Calculate Elastic Shortening Losses The elastic shortening Losses are a function of the stressing sequence number for the individual tendon. In addition, the tendon wire ftctors an also considered and used. The base expression used to calculate these for*es is the same as used in previous calculations and is already built into the basic spreadsheet templates. All the equations for elastic shorting were confirmed as being the same as established in prior calculations. Based on the review of the procedure for calculating these losses, it is concluded that the existing templates ame still appropriate and correct with the additional input ofstressing sequence data and wire factors to be input for the current group of tendons for this surveillance. Refcrcnce 10 & Reference 11 data and information on elastic shortening was included in Attachment E to these calculations. See Attachment C for original stressing sequences for all tendons and see the Data Input Worksheets & Attachment D information for tendon wire factors and source data. Elastic Shortening Losses for Dome Tendons Note there are two expressions used for elastic shortening for the dome tendons depending on the stress sequence numbers. For dome tendons in sequences I through 27, the Domelow template is used. For dome tendons in sequences 28 through 32, the Domehigh template is to be used. This is because of the two separate expressions used for the calculation. Elastic Shortening Losses-For Dome Tendons in Sequences I through 27- .j N - 27 Total Sequences a - Sequence of particular tendon. UU i'w~ R~SP~ IbI~W Mg1n~mg VM 6~ NET 4qg*. 1* 1PW*Itr3MbV Imwg.pm~ $@I*

Oa Florida DESIGN ANALYSISICALCULATION

  • Power Crystal River Unit 3 Page 13 GOCUMEW meww"M NO Calculation S-95-0082 Force Loss due to elastic shortening - Fs.

A, =N- 'x 827 +75]xWireFactor Elastic Shortening Losses. For Dome Tendons in Sequences 28 through 32-N - 5 (Sequences 28 through 32) n - Sequence number less 27 i.e. for sequece 29, n - I for sequence 29, n = 2 for sequence 30, n - 3 for sequence 31, n- 4 for sequence 32, n - S FIes = r[N - n x 47.4 - 13.7] x WireFactor The value for elastic shortening in kips declines as the stressing sequence increases. A review of the data for the dome group shows that values for the dome group go from 154.6 kips for sequence I tendons down to 75 kips for sequence 27 tendons, and further going down to -13.7 kips for the last sequence, sequence 32. Note that wi factor differmces between individual tendons will cause the calculated result to vary slightly for two tendons within the same stressing sequence. Elastic Shortening Losses for Hoop Tendons-N -60 Total Sequences n - Sequence ofparticular tendon. Force Loss due to elastic shortening - Fles=[( 134. 0. x WireFactor xN) A review of the data for the hoop tendon group shows that the range of values for the calculated elastic shortening go from 127.3 kips for sequence 3 tendons down to 0 kips for the last tendon sequence, sequence 60. K~P.LE. dPbui ME3~~ I~~w Emgmn.a~ng oer:.L" at PWOvREV, km. N A - 4

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 14 V60jWW "MVAMON NO SR~tWON Calculation S-95-0082 o Elastic Shortening Losses for Vertical Tendons - N 31 Total Sequences n - Sequence of particular tendon. Force Loss due to e*atic shortening-Fles= n) X735* x WireFactor A review of the data for the vertical tendon group shows that the range of values calculated for elastic shortening go frm 71.1 kips for sequene I tendons down to 4.7 kips for sequence 29 tendons. Tbcre are a total of 31 stressing sequences for the vertical tendons. 3.) Calculate Wire Stress Relaxation Losses Wire stress relaxation losses and the procedure for the determination of these losses for the 4th and 5th ) surveillances are addressed In the Reference 10 and 11 calculations. TMe original wire relaxation curve, as provided by test data from the wire vendor forms the bases for wire relaxation loss values (See also FSAR Figure 5-23). It was determined that the same procedures and figures as calculated in those prior calculations are still applicable for this surveillance. Applicable data from the reference sources was attached and included within this calculation as Attachment F. Note that ther were adjustments made to the original stress relaxation values from the vendor relaxation curve to allow for some conservatism and for temperature consideration of 100 degrees vs. 68 degrees F. Also, per the original design the wire factor or actual number of effective wires was considered as negligible for these losses and was not included. Note that values for stress relaxation range between 40 and 50 kips for the surveillance period for all three tendon groups. 4.) Calculate Creep Losses Concrete creep calculations in the Reference I I document are attached in Attachment G. The losses are based on the curve contained in the reference calculation. Creep values are different for each of the three groups of tendons. For the dome tendons in the coming surveillance period, creep values arc the same and are about 152 to 158 kips, hoop values are between 79 and 83 kips, verticals are 36 to 38 kips. 5.) Calculate Shrinkage Losses Attachment H contains source information for concrete shrnae from Reference 10, pg. I I and Refteence 11, cover page & Pages 13 & 14. The straight line shrinkage losses in micro inches per inch as calculatod in the above two references arc still applicable for this surveillance period. Tabulated values from these references were input into the dome, hoop and vertical spreadsheets. There are no additional variables or considerations and the same values are to be used for this calculation. From a review of the output information, the dome values are contant at 8 to 9 kips, hoop values are above 5 kips, verticals are also slightly above 5 kips. LIM WEtMO dPb R ESP.t#uem E Vgiu

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 K) 1WCWfPOftA?" Page 15 NICAUn5MrEV 9=A*WCNW $ON Calculation S-95.0082 6.) Total Losses Calculated force losses for elastic shortening, wire stress relaxatkm, creep and shrinkage arc added for a total of all losses. Also, a percent of this total of all losses is calculated based on the original average force in the tendon. 7.) Determine Predicted Forces for Base, 95% Base and 90% Base values The original forcc less the total of losses calculated yields the base predicted value for the subject period of surveillance inspection. The 95% and 90% values are then calculated based on the calculated predicted base value. 8.) Normalization Factors Normalization factors arm calculated based on the expressions and the source article contained in Attachment I of this calculation. This factor usually does not change much over the forty year time span of the calculation. The base expression for the dome nonrmization factor value is presented as follows: K) (A - B) x (I - C) + (D - 97.7)

 )        Where-.

A - Average of all Domes group B - Origina averne tendon force C = Wir Stress Relaxation Percentage D -Elastic Shortening As an example, Dome tendon D 112 calculates as follows: NormallzahonFactor= (163 9 -1676) x (I - 0.0257) + (D - 97.7) o NF = (-37) x (0.9743) +(-101.9) or NF - -138 which matches the spreadsheet calculation. Similar expressions are shown for the hoop and vertical tendons in the information in Attachment I. I Wr LDtd Puwft13

                                                                                                                 "   SW.ad&u EaM..

I A Florida DESIGN ANALYSISICALCULATIONz............... Power Crystal River Unit 3 K CocTn o~m~rPage 16 Calculation S-95-0082 9.) Plotting of Dam Only the data from Column B, L, M, & N are tabulated on a separate arca on the side ofthe spreadshcct. See Columns R1S, T & U; Rows 40 through 50. Only these values are selected for plotting on the force curves. Ths is for case of plotting and has no affect on the quality or accuracy of the plots. An example copy of this data immediately follows the first dome tendon. The plots of all dome curves with all the data points showed the force curve plot line as slightly crooked from a true linear plot. The large scale used showed some inflection points slightly off of linear. After investigation, the condition was avoided by omitting data points at year 10 and 15 after SIT for the final plotted figures. This was done only for presentation purposes and there is no affect on the accuracy of the plot or the base values calculated and presented on each curve. A column by column explanation of the losses calculation worksheet follows: K amMP A"Lfed PWai WESF# WcoErqw*WkW

Florida DESIGN ANALYSISICALCULATION Crystal River Unit 3

                                                                                        ~Page               17 Calculation S-95-0082                                                                    0 INDIVIDUALTENDON LOSSES LOSSES CALCULATION WORKSHEET NOTES AND LEGEND Individual tendon losses are calculated based on the procedure presented in the preceding section. The following notes explain the spreadsheet process, input and caculations performed for each of the columns presented. The shaded values on the losses worksheet ar extracted frora the data input worksheet.

Column" ROWRIMn A. Inspection Period after SIT Scale based on years after SIT which is shown on the bottom scale of each individual plot. Nowe that this information is providcd for easier readability with respect to SIT but is not the actual log scale used to construct the x axis of the plots. B. Years after Concrete Placement Scale ofyears after concrete placement as used for the x axis for plotting of the force curves and shown as the upper log scale at the top of each plot.. Note that one year after SIT for the dome tendons is 3.5 years on the log scale and for the hoop and vertical taxions is 5.4 ycars. See Section 6.1 of this calculation for further information. C. Elastic Shortening Calculated based on formulas presented in Section 622 and Attachment E information. D. Stress Relaxation Percent Calculated based on original wire loss curve percentages modified per the information presented in Attaclhmet F of this calculation. F. Stress Relaxation Forces Data input from the Reference 11 calculation page 12. See Attachment F. F. Creep Strain Strain value (x 0.000 IData input from the Reference 11 calculation. See Attacuncnt G ofthis calculation for data. G. Creep Strain Force Data input from the Reference I I calculation. See Attachment Gof this calculation for data. H. Shrinage Values Data input from the Reference II calculation based on the shrinkage curve. See Attachment Hof this calculation for data.

1. Shrinkage Force Data input from the Reference 11 calculation. See Attachment H of this calculation for data.
                                                                                      " i M." I f-A   JP -h

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page I1B D~u=M*r EEN.MaAT" NO. Calculation ,%95-0082 2

1. Total Force Lass Calculated value, Sum of columns C. E, GA 1 K Total Percent Loss Total loss in percentage, Column J / Average of original forces for shop & field ends calculated and shown above on the sprcadshcet.

L. Base TMw average original force for thc tendon noted above on the spreadsheet, less the total losses calculated in Column J. Note that total losses were not calculated on t row for the 17 year period, the 21 year 3 month period, as well as the 21 year period after SIT. These rows represent the fifth, the originally planned sixth and the current sixth surveillance periods and the values of Base were derived through linear intrpolation of above and below data prescnted on the sprmadsh=t. The quality and accuracy is not affected by this procedure. M. 95% Base 0.95 x Column L for thc same row. N. 90% Base 0.90 x Column L for the same row.

0. Nonralization Factor -

Calculated based on formula presented in this calculation and in the information presented in Attachment I. l' Ft*, Mkh CAPh"e RE IP,P %WSW**.neam"

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 KJ cofPo. Page 158 Calculation S-95-0082 Column H & I Calculated force values in Kips which represcnt ram pressure 1500 psi. These forces represent a zero slack starting point for both shop and field ends of each tendon and provide a basis for the start of any retensioning effort. The following expression is used to calculate these values: 0.7 0 Tendon Ultimate Strength ' 1500 1 Predicted lift-Off Prcssure at 0.7 Tendon Ultimate Stren't. See Reference 10 Calculation, page 34. Column J & K Calculated force values in Kips which represent forces at 80% ultimate based on the following expression: (Actual pressure @ 80% ultimate strength (Columns F or G)

  • 0.7 Tendon Ultimate Strength) I Predicted pressure @ 70% Utimate Strength.

Column L & M Actual elongation data, repeated from colnums 1 and C. In additoa, the following calculations support the ultimate strength values provided on these spreadsheets: Tendon wire ultimate strength Gfafor wire - 240 ksi

 ) Tendon Ulima Strength = Fg -f, for wire 0 Tendon wire area]
                                      -240 ksi ' (0.05985
  • 163 wires) , 2341.3 Kips 0.7
  • Fw, - 0.710234.3 = 1639.9 Kips 0.8
  • F,* - 0.8 02341.3 - 1873 Kips
 )

i W.Lf o PIMMKEW- Huaw Erewa*46

S, LORIDA POWER CORPORATION - CRYSTAL RIVER UNIT 3 DOC 0S-5-0082 z3UVREACTOR BUILDING PRESTLEMNG SYSTEM M*VSION 3 IN St 6th TENDON SURVEILLANCE PAGC I9 CALCMAT1ONS SUPPORTING SP-182' ORIINALSM*T USW-O DATA FOR THE DOME0-TENDOI(S GROUP 0.7 Tend~on Uqdzna Strength P,6"Kp _ _ _ _T _ _no__ F lr DOMER3.XLW _ _ ip-, Tmdom m  :' 2EE A:d I la dm (In.) E ldid M uplem Ulft-Off O j S0o%

                                                                      ?.n       d ee v                  E ro rlP-.U w 1 EKIp)

I "Or' d $sdn Dw a Raw a (Mips) Vein* Raw 3 (3L) (A) " "" ____ (E) (n 1 I) (1)

       -Dill D112 3

4-14l 5 68130 61800 _!110 684( 770 MO 7780 170 790 341

                                                                                             -So-361 359 1372 1873 1872 3867 3

4-3/4 5 s I~ 0D133 718 4-34 6400) a84 717 7M9 363 359 1873 1867 4-7/5 4-3/4 0114 3-1.11 4-SAS "m0 6140 777 7790 363 359 187) 1867 $-lie +-3/8 b)1is 1 5 6w4 6800 779 7770 339 363 1867 1873 5 3 0136 4-3/4 S-3/8 6760 4100 77m 775 364 363 18l 138611 4.3/ 5-1/5 D3130 S 5 687 6830 7330 7710 358 361 IS63 1372 5 3 D131 4-112 4.7/1 6730 6740 7660 7700 366 365 1871 1171 43112 4.7/I 4-32

                       +1          4.7/8      67630       6800        7720        7750         354       362         3572       18611    4-il_        "is8 D211            ".64      S-1)       "810        6870        "280        7110         361       351        1572        1863     3-1/4       5-1/l D21l           4-5/8      4.7/8      6m7         6770         7730       7720         363       363         167£       159      4-3/0       4-7/S 1 2mu            43/V4      4,V/4 1    6M4         600          7"790      777           m"       362        1807        Is"      4-314       *3/4
          £3114        4-3/4       4-7134     6670        6740        7600        7680         369       36         38t"        15611    4-3M4       4-7/

0213 4-34 31- ow0 4170 7800 7810 362 358 logo 1863 4112 5-1/4 0216 S 3 6100 WI10 777 7780 362 361 is?) 1372 S 3 5636mmccih myld rs ula u 6330 i3m u 7430 puam faASpeu u mjiaA ,1870 . W031 D3(73 3-3/8 4-1/4 5-7/8 S1134 6530 6760 6770 77M 7430 7730 376 364 378 363 187n

                                                                                                                                £371 1879 3-311 4.114 S-7/4 S-3/4 113
      . MD304           43/8         4-        6840       68w3         779        777          359       362          1867      1873     4-11           4 03m           43/3       4-3/36     6700        64M          76L30       760       -367        363          1867      187      4-218      4.3116 0300          4-3/4       4-3/4     6110          8130       7730        778         361       Sol          1872      137      43/4        4.314 0310          3          4-1/2     6770        6770         772         730         363       363          1869      17                     .1 0D313       4311116       4-5/8     6100        6840         7770-      7790         362       359          1873      1867    4-11116      4-518 0332          4-7/81      4-7/1       14 6840                7M9         777         339       362     r    3867      1873     4-7fi3      4.74
            -t 28-Jan-9 3:64 PM U
    *1

k.JnFLORIDA POWER CORPORATION- CRYSTAL RIVER UNIT 3 DOC I3:S-95-082 REACTOR BUILDING PRESTRSSIG SYSTEM REVISION 3

   )6t     TENDON SURVEMLLANCE                                                                                       PAGE 160 CALCULATIONS SUPPORTING SP.182 "ORIGINAL STRESSINO DATA* FOR THE 1lOOP TENDONS GRUMP 0.7 Tendon Ultiate Swmngd -

0.S Tendon Ultimbte Stent - Fie: HOOPR3.XLW it,! TendMI 1louad Actal (wn) 110 Pr.dced IUN-Off Prwmve 8go U Pemn (Wsu) au j Raw I (Kips) x" 2 oups) f tw Sfv-sIu 'orgm Struia Dowe-Rw 3 (In: 42fll -r57 4-5/8 U870 6810 0718 1 017=73180 333 1 36 1163 187 "T 4-5/8 42HI38 S 5.3/8 68410 6799 7810 77M 359 3Q2 1873 1865 3 5.3/8 0 42H329 5.3-/2 5.1/8 6170 6310 7810 7780 358 363 1863 1872 5-1/2 5-148 42H430 4-7/8 ".34 6870 6790 7810 7750 358 362 1863 1371 4-718 5-3/4 421131 51/J4 4-7/8 6870 U820 7830 7780 M5 363 1863 1872 S-1/4 4.7/8 421132 3-1i4 5-1/8 68M 6790 7310 7750 358 362 3863 1871 5-1/4 5-1/8 422433 5-3/8 5-1/4 6870 "830 7810 7780 358 1 361 2363 1372 5-3M 5-1/4 4244 5.112 5-3/8 6750 6660 7680 7600 364 36 1865 387 3-1/2 5-3/8 42)135 5 5-1/4 6830 6770 7760 7720 360 363 11162 1869 5 5-1/4 421336 5.1/8 5-1/1 6170 6790 7810 7750) 358 362 1863 2373 5-1118 5-818 421137 3-3116 4-7/8 6670 6130 17310 7710 338 361 1843 3872 5 -5/26 4-718 421H43 3-142 3-1/8 6870 6810 7110 7710 358 361 1863 1873 "-32 5-1/8 pi~ 421144 5.3/11 s 6790 6140 7750 7700 362 359 1871 1861 5-1/8 5 421145 3-7116 5 6870 6810 7810 7780 358 361 186 1372 5-7116 5 461320 53-/4 5-1/8 6640 6600 7700CD 7610 370 373 1901 1890 "14/ 5.1/8 461121 "is/ S-1/4 6720 6730 7700 7640 366 365 1878 1861 5-2/3 5.1/4 46242 "a5/ 5.114 672D 6730 7700 7640 366 363 1878 1363 5-M/ 3-1/4 51H25 5 5-3/8 -6770 6100 7720 7750 363 362 3869 1868 3 5-1/8 532H26 S-1/2 53-U4 6760 6760 7750 17700 364 364 31179 1861 5-112 543/4 533H27 5-3/2 4-7/8 6740 6670 7680 7600 365 369 3868 1861 "M3/ 4-7/8 5331221 512H29 5331

                       -1/8 5.1/2 5-3/4     1 5

4-3/4

                                     -/

6760 68310 6700 6750 6750 16760 7750 7710 7650 7700 7700 7720 364 361 367 1 364 364 364 1879 1872 2873 1870 1870 1872

                                                                                                                                     -3/I1 5-1/2 3-3/4 5

4-314 5.1/8 IR 53112 5-3J4 4-M1 6800 777 7760 7720 362 316 13870 1628 5.3/4 4-4/4 33H43 53138 4-1/8 6670 6710 7600 7660 369 366 3861 1873 5.3/8 4.1/8 533H45 3.1/4 5.3/4 644) 6800 77M 777 3550 362 1867 1873 3-1/4 5-1/4 S3311AA 4-718 5-3/8 6160 6130 7M3 16CA 344 365 33M 1365 4-7/8 5-311 531,147 4-3/4 3-M/2 6840 6800 779 7770 339 362 1867 1873 4-3/4 5.2/2 621223 3-13/ 4-314 6760 6700 7720 7650 364 367 1872 3871 5-1/8 4-11M 621M2 5-5/16 s 6800 6750 7770 7700 362 364 1873 1870 "11/6 5 62)42 3.1/8 F -114 680 6750 7770 1770M 362 364 1873 1370 1 5.2/8 5-1/4 623139 3-7/16 5-1/4 610D) 6750 7770 17700 362 36 18173 1870 1 37/16 5-1/4 62H440 5-3/8 4.718 68w0 6750 777D I 7700 362 364 1873 1870 1 5-3/5 4-7/8 621141 5-1/4 5 68310I 6750 7770 770 362 364 1873 1870 5.2/4 5 623142 5-3/8 5.3/16 6800 6750 7773 7700 362 364 13173 1870 J-3/11 5-2161; 62H443 5-3/8 4-7/8 6710 6670 7660 7600 3"6 369 3871 3863 5-3/8 4-718 621144 621145 5-1/2 5-3/16 4-7/8 5-1/8 6100 6760 6750 6700 77"0 7770 7700 7700 362 364 364 367 1873 1884 1870 1884 S-I/l 5.3/16 6-715 S-1/9 IR. 62H446 5-1/9 5-318 6100 6750 770 7700 362 364 1573 187 5-13/ 3-3Y8

         ,621147     5410/     1   4.3/2         6680   16640   17620     17M5          368        370         1870  1  1864   1 5.5/        4-1/2 baIa m     ul.,-       imI Ia b    wiled 1mw b ml -.d u           .ymaimum1J Im ebmuu Ab   4 3:24 PM
     )
 *y2  FLORIDA POWER CORPORATION - CRYSTAL RIVER UNIT 3 REACTOR BUILDING PRESTRESSING SYSTEM Dtot3M95=a2 REAS01 2

- 6th TENDON SURVEILLANCE PAGE 161 CALCULATIONS SUPPORTING SP-182 *ORIGINAL STRESSING DATA" FORTHE VERTICALTENDONS GROUP 1#1 0.7 Tendon Ultimate Strength r- K39I3ps 0.8 Tendon Ultimate Strength E 73Kips File: VERTR2.XLW For SP-182 "Original Stressing Vata' Tendon Actual ElngIaton (In.) Predicted Lift-Of Pressure (psi) 80% Ultimate Pressure(p) Row 1 (Kips Row 2 (KIps) Row 3 (In.) 197L ID~=w Vid Shp Fl--YP -o Fil o Shop il lo ield 23V24 17/8 NIA 6170 N/A 358 N/A 1863 N/A 12-7/8 N/A 12VI 12-1/2 N/A 680 N/A 7M7 NIA 362 N/A 1873 N/A 112-1n tI/A 12V2 12-112 N/A 6800 N/A 7770 N/A 362 N/A 1173 N/A 12-1/2 N/A 23VI 12-1/4 A 600 N/A 7770 WA 362 N/A 1873 NIA 12-1/4 NIA 23V2 13-1/3 NIA 6870 N/A '1810 N/A 338 N/A 1863 N/A 13-1/a M/A 23V3 13 N/A 6760 N/A 7750 NIA 364 N/A 1879 N/A 13 NA 34V5 32-5/8 NIA 6800 N/A 7770 N/A 362 NIA 1873 N/A 12-5/3 N/A 34V6 13 N/A 6810 WA 7780 N/A 361 M/A 1872 N/A 13 NIA 34V7 12-3/4 N/A 6870 N/A 7810 N/A 358 N/A 1863 N/A 12-3/4 N/A 61V9 12-5116 14/A 6860 N/A 7840 N/A 358 N/A 1873 N/A 12-5/16 N/A 61VD10 12-3/4 N/A 6870 N/A 78110 N/A 358 N/A 1863 N/A 12-3/4 N/A 61 VII 12-549 N/A 6710 N/A 7600 N/A 366 MIA 1873 N/A 12-5/8 N/A 61 V2 12-3I2 N/A 6870 N/A 71110 N/A 358 N/A 1863 N/A 112-1In N/A U_ OIV21 12-1/ 6V212-7/9 NA M/A 6870 6870 N/A N/A 7810 7810 1N/A N/A 358 358

                                                                                        ;NJA N/A 8863 1863 N/ZA N/A 12-1/8 12-7/8 N/A N/A Columns A through G are data Input extracted from the tendon history books (applicable sheets contained InAttachment B).

Columns H through M are calculated using the expressions noted below. Column Tendon within the scope of ths surveilbnce. Col.D&C Actual elongation daga taken from wtndon hisory shdets for shop and field ends respectively. For the verical tendons, only the shop end applies. CoI.D&E Predicted Liftoff Pressures taken from tendon history sheets for shop and field cnds respecdvely. CoI.F&O 809 Ultimate pressures takenfhom tendon Idsuory sheets for shop and feld ends respectively. Col H&I Columns H & I - Calculated force values In Kips for Orginal Stressing Data Row I which rqepre ram pressur @ 1500 psi. These forces represent a zero slack ataning point for both shop and field ends of each tendon and provide a basis for retensmklng efforts. The following expression Is used on calculate the values for Row I data: 0.7 " Tendon Ultimate Strength" 1500 1 Predicted Lift off Pressure at 0.7 tendon Ultimate Surngth. le. for,23V24: 1639 1500 16870 - 35t ColJ&K CalculaWed force values In Kips for OrilinslSuess Dat Row 2 data which reiwsent forces at 80% Utimate based on the following expression: I Actual pressure 0 80% Ultimate Strength (Cols. F or G)* 0.7 Ultimate Strength I Predicted pressure @ 70% UIL from Cols. D or E. e.for 23V24: 7810 1639 1670 - 1863 CoI.L& Actual elongation values repeated from Columns B & C for Row 3 of 'Oriinal Stressing Data".i -. 12-Sep-97 11%1-9:49 AM

   'I

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 AC 6Page 162 Calculation S-95-0082I r2v'

7.0 CONCLUSION

S Tendon Force/Time Curves have been generated from the results of this calculation. Final force curves arc presented and attached in Section 6.0 of this calculation. Force curves for the three control tendons were also gencrated by this calculation and were used for comparison and verification of data and spread shees with the same curves generated previously for the same tendons. The comparison was completed and the data sheets and force curve we found to be the same as that previously gcucratcd. Other calculations supporting the "Original Stressing Datae and "Data Sheets" in SP-! 82 were completed I and are presented in Section 6.6 of this calculation.

8.0 REFERENCES

The following refcrences are uscd in the preparation of this calculation:

1. G/C Lettcr to FPC, FCS-14594, Scope Document, Novcznber 24, 1995, for Preparation of Tendon Force Curves for the 6th Surveillance and site trip to CR3.
2. G/C Letter to FPC, FCS-12439, August 13, 199 1,Tendon Selection and Recommendations for the Fifth Surveillance.
3. Reg. Guide 1.35,Revision3
4. Reg. Guide 1.35.1, Revision 0
5. CR3 FSAR, Section 5.2
6. Technical Specification, Section 3.6.1.6 & Section 4.6.1.6.
7. Dcsisn Input for the 5th Surveillance, DI-55220-152.0 SE, Revision 2.
8. G/C Calculation of Force curves for the 5th Surveillance for SP-1 82, Revision 11.
9. Design Input 5500-528-1, Revision to SP-182 Procedure for Tendons and Calculations for Force-Time Curves for Surveillance 4, Revisions 0 and I, Jan.87 and Sept.87.
10. G/C Calculation 5500-528-1, Tendon Loss Calculations for Surveillance 4, Revisions 0 and 1, Jan.87 and Sept.87.

1i. GIC Calculation 04-4762-099, Tendon Loss Calculations and Appendices for CR3 Tendons, I.Fulton and G.T.DeMoss, 3/6/87 and 1980 calculations.

12. Dome Tendon History Sheets updated to the 5th surveillance.
13. Hoop Tendon History Sheets updated to the 5th surveillance.

em RELrU*. tc*P w n Pim1g "uEd "w&swIW

 ~Florida Power           DESIGN ANALYSISICALCULATION Crystal River Unit 3 Page9163 Calculation S-05-0082
14. Vertical Tendon History Sheets updated to the 5th surveillance.

I5. Effective Wirt Summany information, letter to FPC

16. Prescon Vendor Dmawn
17. SP-182, cv 11.

I S. Surveillance Report for the Fifth Inspection Period, VSL.

19. Engineering Report for the Fifth Tendon Surveillance, G/C Letter to FPC, FCS 14401, 6120/94.

) mor Lee d Pm owsp. WVffW exomwft

I Florida Power co"~Oul DESIGN ANALYSISICALCULATION Crystal River Unit 3 Page Al KEWN Calculation 3-95-00821 ATTACHMENT A DESIGN INPUT DATA FOR 6TH SURVEILLANCE K...i U.

     )

m: U.t 6 P"ai REVP.Nugmw nf

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 cox. _-_ ,, _ -__Page A42 Calculation S-95-=0*2 Design Input Information for the 6th Surveillance The Gilbcrt/Commonwealth Design Input document prepared for the 5th surveillaUce is stil applicable Since it was prepared at the time FPC 0d4ressed new licensing and Tech Spec revisions conceing the CP,3 Tendon Surefllance Progmm. TM document and some of it's anachments are attacbed beriw. Also. correspondence from the NRC esudting from It's review of CR3 tendon program issues is attached for reference. The following Tech Spec sections were reviewed and are applicable to the tendon surveillance program. Section 3.6.1.2. Amenadment 149 Section 5.6.2.7. Amendment 149 FSR Sections applicable include: Sections 5.2 & 14.2.2 Fiue 5-24 and 5-25 K-I Ow ',.'l: 9 olt ý IKZSP"; k'4~ ELqwew

hpa A3 rs 09 03:6M . A*?V.*ri B.lDG

                                                                                             ".2 PA%8ý "aFPO%.

WA4-" Q,*&el %ll4r,11. 117ED STAT28 - q0WA ldft

  %         '* .            NUCLEAR REG        UKULATORY COMMISSION WrON. D.C. "u"&a"                  "So         Mm July 28. 199S IMr. )erc~y N. Beard, Jr.

Senior Vice President, Nuclear Operations (HAZl) SUBJ EDT ,,, ire sdLh~t Florida Power Corporation FILE NO.: W .LLLU. ATTNo Managir, Ituclear Licensing 15760 V Power Line Street Crystal Rtivert Florida 344Z8.-708 SUDJECT: REVIEV OF THE FIFTH 7TINOO SURVEILLUNCE REPORT - CRYSTAL RIVER IUCLEAR GENERATIN9 PLAJNT UIT 3 (TAC NO. 14O91S)

Dear Mr. Beard:

By letter dated August 12, 1293, as supplemented 0ecember 16, 1994 and ay i5,1!0995 you submitted for Staff review .& report on the "esults for the Mfth seventeenth year after structUral integrity test (SIT)) thysical surveil lance of the Crystal River 3 (CR) Plant contalinmet LI dlg post-tensioning system. Tou performed the surveillance In accordance with the requirements of the original plant technical specifications (TS) for tendon surveillance and etgulatory IWld (119) 1.35 Revision 3. On the basis of your surtiSllance and Inspection of the various elemnts of the post-tensioning sstem, you concluded that the surveillance results demonstrate the intetrity Ofthe containment tendon system. We have copleted our review of your submittal and we concur with your conclusion vith certain exceptim0s. Your surveillance revealed grease leakage, corrosion of exchor5eads and bearing plates and spslli and circking of concrete, all of which could be detrimental to the contaiment tendon system. Please submit an action plan to rectify the undesirable conditions as Identified and to implement apprpriate actions to rectify them before the next. scheduled inspection. Our evaluation Is-enclosed. This completes our review undar the TAC No. 1010195 and, therefore, the TAC Is This requirement effects nine or fewer respondents, and therefore, t Isnot subject to Office of Manloement and Budget review under PL. "-5 L. Msghbv as Project Nilanager " Project Directorate 11-1 Division of Reactor Projects _/1l1 Office of Nuclear Reactor Regulation Yr Docket No. 50-302

Enclosure:

As shtatd cc w/enclosume: See next page n%

AW 29 so 03Q7?Pf ttic AM*IN BLDG IsP A4 K->. or, dera N. leaN crystal,lver Unit No. 3 FloridaPower Corporation senerating Plant cc:* Rr. .rald A. Williams Kr. *oo4 ers, Director Corporate Counsel Division tf Emergoecy Proparedness Florida Power Corporation flhepartsnt of Coinrty Affatir MAC-Am 3740 Contervtew Drive P.O. tax 1444t Tallhassee, Florida 2S24-t100 St. Petersburg, Tiorida 3373? Nr. lutimler 4. Hickle truce lant Girector operations (Oltk) Modr of County Comissioysers, Florida Pomer Catpoialon Citrus County Cr1stal liver Energ Ctoplex 110 Not M Apopka Avenue 1760 V. Power Line Street Inverness, Florida 32550 Crystal River, Florida 34418-5708 Nr. Robert 5. lorsum Hr. Larry C. Kelley, Director DM Nuclear Technologies Nuclear Operations Site Support 1700 Rockville Pikes Suite 525 Rockville, Maryland 20852 Florfde Power Corporation Crystal Ittver Energy C&Vlex 16760 V wowr Line Street Crystal liver, Florida 34411-706

                 .Sgitonal Maiistrator, "egion it     Senior bsident ltssctor U.So Ncler _Regulatory tomission              t*aI-u* VWMI 101 *irletts Street N.V., Suite 1900   U.S. Nuclear Reg1latoy Commission Atluta, U ioyta 30323                    741i N. 1111ahassee Road Crystal lver, IFltorid 34415 Mr. s1i1 Passtti                       Wr .- U7v3o4ts, vice Prusident     -

office of ladiation Control Nutiaces Pr~noduti Stun) POop~ %of Health And florida Pomp Crpdorat 1ihab1iitative Services 14 River Enrg coWieX 1)17 VIneVood Blvd*,. IN Pover Lime Street, lallaabuse., Florida 33399-070A crystal liver, florida 344256708 Attorney Seneral Depart t of Legal Affairs T1e Capital Tallahassee, Florida 32304 (..

09 'lei Wssiti tc ruqrt 9LDG PW AS lhe perfoming (CR3) plant River 3 tendon Crystal periodit speclfications technicalConsisting surveillance (IS) require of sheathing filler material Inspection, tendon lift-off force meAsurment. achora e caopoent inspections tU00% Wire InsPection and tensile testing$ grease leage checK, and tendon Metensloning and rettnsioning and reselling for & number of selected Undons. For the fifth survaillance, In addition to the three contro1 tendons (on* for each group), you randomly solecte two dome,, two vertical and four hooptendons ad subjected them to liftoffil, with one tendon In each group beig detensioned end reteansiloned. You perfaerd the surveillance in accordance with the requirements of the original plant IS for tendon surveillance and Regulstory guide (R) 1.3S Revision %. On the basis of your surveillance and tnspection of the various ema"nts of the post-tensioniug systes, you cofcluded that the surveillance results deaonstrats the Integrity 0f the contailmt tendon system. On the basis of our review of your submittal, we concur with your conclusion with certain exeoptions. Your surveillance revealed grease leakage, corrosion of anehorbeads and bearing plates and spaling and cracking of concrete, all of WhiCh could be detrimental to the contalnmeat tendon system. These tonditions are evaluated below.

1. Gresse Voids From the data on grease removed from and grease replaced into the tendon sheathings there appeared tU be an unusually high amount of frease voids or lea19ge1. the amount Of grease added ranged from 93.% to as high as 30S1. In a letter dated September Uts 19941, we inddicatid that the loss of grease appears to be unsually high in comparison to other plants with similar "istresseed oncrete Containment$s ad st-tensioning systas. Your response indicated that the losses closely matchthose of previous survoillances &W a tthoreugh investigation hid viot diteritned a root cause for the abn*mmality WoweVer, Frho the sYeical test st Individual tendon wires, te chemical *ets of the rouase Itself" and the lift-off tests, the tendon syste is msetaining Its integrity. furtievmors, there his beer no grase leakap observed on the outside surface of the contairument. On the basis of these observations. you reiterated that, in spite of the abnormally high amount of grease voids, the structural Integrity of the tendons has not bean affected.

We find, your response to be reasonable. hMwevr, in view of the detrimental effects of potential grease leakage, you should monitor more closely the grease Wnjection procedure in future surveillances and perform a thorough root cause investigation for grease loss.

2. Anchorage Assembly and lendon Vire Your surveillance revealed high levels of corrosion on the anchor heads on five of the tendons (three an the field and and two on both ends) under surveillance. A Pitting condition existed on localiWed areas of these anchor

)heads, with no sigos of active oxidaticm cr bildp of crust or rust. No free ( moisture wais ob$*,¶" within the s*a*al cP3 ;f airy te.rIu. The bulk filler grease covered all tendon stressing anchor heads except for the top end of one

CAk40g.. S.qs4ms Z"), *95 SZ15zM NX Ptc r'&; %Aý Afwhw~., A lap A4 vertical tendon. Vou believe that this condition has existed since original installttion. You concluded that the observed conditions do not Indicate abnormal degridation Cd will not affect the function of the anchor heads. Your surveillance also discovered high levels of corrosion on bearing plates outside the seoled area of the tendon end caps of six tendons (on one and of three tendonsm id on both ieds of another three). The corrosion occurred extortor to the O-riag seal and has not progressed to the point of breaching the Integrity of Uth O-rij and affectiOU the tendon anchorage cWmonents. Repairs were me to the bearing platse to stop further degradation. The protection of the antchorage coopontnts Is assured W the function and sntagrity of the bearing plates Is 10aintained. However, based on our review of tendon surveillance reports of a number of plants' we find that the types of corrosion of anchorage components have not ton observed 14 other facilities and are uniqua to Tehrtforej we believe that it is necessiry for you to expand the inspection to anchorage assemblies, especially the bearing plites, of other tendons not under survoillance to insure timely repair of any adverse conditions. You Indicated that the cracking and spilling of concrete are Insnt ificant. i fHowever. this requires n#air before causing a further deterioratiso of concrete, and realforcemnt. It should also be also noted that yo report provided call general Stam*ents regarding moisture content and the detrimental chemical contents and does not give details of water content for each of the grease suples taken from the specific tendons and free water discovered uchorages and grease care. anW RG 1.35 requires such detailed Information and should be provided In future surveillance reports. One wire from each of the detonsioned dome, hoop and vertical tndons was tested. li addition, Ineffective wires and broken wires were remove for saPle selection and tettil. All of the tete satples exceeded the required minima values for _teld strength and elongation. All but one exceeded the required miniun ultimate strength. The cause for the broken wires was determined to be of a mechanical nature 6ot due to stress corrosion. The buttonhoads wire Inspected for their physical condition ad *ere found to be effective and acceptable.

3. london Lift-off forces VOe have roviewed the lift-off forces of three dome, three vertical nad five hoop tendons and also the Information on the correlation of force and elongation of the three detensioned and retensioned tendons. Uith the exception of one hoop tendon (46M29) which had only s8.1% of the base valum (less thin the 90% of the base value as required), the lift-off forces of ether tendons wter above the lower bound values established for these tendons.

Additional hoop tendons were lifted off to meet the requirements In MtU 1.35 under such a situation. The forces tno the corresponding elongations for the

 )    ~~three detensiopid Wr~ratosisoned tnnd~us wars roviewad, and for each tandon
         -W&             1ia * ,altA.-n bbq.ween the I-.

1:Ir.o *.jir It spp~irs to us thtat more

cr9ose-1!P J DMBD C~vem xs~4mW K,.). ?aww A? careful elongation measurements could have provided the required correct Information and assurance of the quality of the overall tendon s'rvitlllaCe performed. The purpose of tandon surveillance Is to determine If the ties dependent prestress losses such as creep and shrinkage of concrete aW relUation of tendon wires are within the predicted range. The trend of such losses can be obtained by performing a reression analysis of the tendon lift-off fOrtes for the tendons 10 A grouP froe all the surveillances conducted to date after the SIT. before performng the analysis it is .nessar, to correct the tAN seating force. This Is because during tendon installation and toaiotnir it is not possible to anchor all the tendons il a MOp at the sun force level and at the same tim. The tendons are insta1lh sequentially. VeM the containment Is subjected to the tendon force there will be elastic deformation. The tendon tensioned first will have lover force at completion of tensioning for the group thin those tnsioned list. Therefore, the Seating forct oust be corrected to reflect the tendon anchor force for the elastic shortening taking into consideration the tendon tensioning sequence. On the theory that the contetanmnt design Is based on the average tendon force of the group, an average of the corrected tendon anchor -forces Is determined. ly. iuoding this avors,: frce b each Individual corrected tendon force, a so-called nomIllt factor lffit obtaiMd. This NF isused to modify tM lift-off force of the tendoatobltain the average force whitch should be copared with the required tendon force. The NF for each tendon Is a coi'stant and will be used throughout all the surveillances. This appears to be t0 procedure used by a isaber of stilitits. Theoreticaly, all tendons In a group should have anfter rnoliziatoii, the same average value. Due to the method used In establishiig tUe lF and In obtaining the lift-off forces the tormalized tendon force Is at best approximate; but It should not vary .appreciably from the average value for the grovp. In contrast to the KF aproatch, the PS 1.31 asproach-to consider the prestress losses Is through the use of upper bound and lower bound of tendon fors as discussed is RB 1.35.1 and show IniF1. therein. The tverage of the tendon anchor forces tich are the tendon seating forces torretted far lStic l085sess can be used as the initial prestressing force. A grtah similar to tbat shown in Figt of PA 1.31.1 should be first tonstructed. TIe lift-off force obtitined for the of tendons vepresented by the graph should be plotted on the graph without any correction, Bly plotting the lift-off forces from consecutive tendon surveillance of the group of tendons, It becomes possible to perform a trending analysis of the tendon forces. In response our request for additional Information on normalization. you

     *rovidd a formula for the NF, thich     Is actually a tendon force correction and ncludee not only prestress loss due to elastic deformation but also the relaxation of the tendon wire. In view of this, the NF eii be different for each surveillance since It Involves the time factor. This only coaplicates the normalization procedure and does not improve the accuracy. If Ithe HNF invol.ve' relaxation of tendon wire, it appears the other tims.depondent W.strsr   "*;cs 4dvi to crete AM shri*.kAt Should O.o be Included. It is to

Cakddlse S4.C 09 P~It4~S ~ALMA.N. C~W1 A

                                                -4.

be Woted th*at correction is made to the statin force only for the elastic loss which Is not tim dependent and the normalization factor which isbased on the corrected tendon anchor forces Isused to todify the lift-off force to the average tendon force of the group. The HF procedure is based on the fact that after correction for elastic shorteaing loss each of the tendon forces and the average of these tendon forces for the group of tendons inr large toeared to the time-dependent prestress losses. 7Tirefore, the ratio$ iLe. the KF, between each tendon force vAd the average tendon force for the group after correction for elastic shortening loss will not vary asgnificantl from that after correction for the tivie-dependsrht o..o.s. The HF procedure s based on this promise. In response to our concerns regarding your normalization procedure &M use of thu average of lift-off forces for the tran! analysiS, you performad analyses for each of the following cases for each group of tendons: IIUsing lift-off averages, nomalized Using all data points, normaliztd Using lift-off averages, unmclhcralized )4) using all data points, namormulized The information ftr filt cast Weeplotted on a Oraph the sun a that shw. In fig. I of 10 _.n3.1 and a _regrssion analysis was performd for oasci case in each group. From the results of thoese antlyses we observed Issionificnt differences between the normalited cases (t ;ah (2) or the unnormlized cases () .and (4), and appreciable differences betmeen the normalized Wd the unaorml lz cdesea. However, based on the trend of all groups of tDoonss, no group of tendons vould be expected to go below its minrAm r*equird during the

   .4-yair plant life.

Is spite of the favorable outcome of the results as susuarized above, e believe that for future surveillances, the lift-off forces should be used for the trend analysls without averaging and noralization. Etch tendon lift-off force should be compared with the predetermintd values of base, hS bias, and 101 base as required by RO 1.3S. In cofclusion, we concur with your conclusion that the results of the surveillance demonstrated the Integrity of the containent tendon system. However, before the etxt surveillance you should resolve the probr* aof missing greasoand should under'Lke a program of inspection of the anchorage system which consists of the anchor heads and the bearing plates to assure that the pittiang of the anchor heads and the -corrosiot of the bearing plate$ uncovered In the surveillance are not wtdespread and would not jeopardize the integrity of the tendon anchorage system. You should repair the cracking and spilling of concrete so that there will be no further deterioration of concrete or reinforcement. for future surveillances, the trend stud.yof the

         .tendoer forces should be based on the lift-off forces without averagin and norM11111zjr.      Inretcnsionir- tendons, the elA aq atiofnis respondirg1     o toe
                           ~ carrul ly-Meawre@ so t2 t-r-u' 4feMW t btWt ths; two i S preserved. "17Ms can serv "is aiNadditional checK-on the tcurt. ty of the measurem*ts performed.

rFt 27 0% f9942PMi tic ADI"Dr1l v

                                        ..                                       Afomew~...

NqRC. aft 1o;d /jd~t"EJ Mr. Percy N. Beard, Jr. Senior Vice President, Nuclear Operations (SA) Florida Power Corporation ATTN: Manager, Xuclear Licensing 15760 V Pwer Line Street Crystal River, Florida 34428-6708 SVi3ECT: CRYSTAL RIVER MIXLEA SMIUERAINC PLANT INIT 3 - POSTPORNIENT OF SURVEILLANCE OF E[WIT 7TElIMS EXDIPTEO FROM THE FIFTH TEIQON SURVEILLANCE (TAC NO. M940561

Dear Mr. Beard:

ly letter dated October 23, 119S, you requested staff approval for postponing surveillance of

      .surveillance         eight tendons which were exempted from the fifth tendon performed     in 1193 to the sixth tendon surveillance. You had e imitted to Include the eight tendons In your sixth tendon surveillance which was orlginally scheduled to be performed In 123.           You now propose to perform
       -te sixth tendon surveillanhce Is 199S wtich Is less' this Syerfomti fifth tendon surveillance which was performed Ise wov er 1 . Accordingly, you are requestin staff approval to postpone the surveillance of the eight tendons to the 1?18 sixth tendon surveillance.

letter dated May 15 1919, you submitted results of your fifth tendon surveillance to demonstrate Integrity Of the containment tendon systme. In a letter dated July 28, 1935, we forwarded our evaluation of the Fifth Tendon Surveillance Report, and coftcluded that the trend of all groups of tendons Is such that no group of tendons will go below Its minimn required lift-off forces before the 40-yetar plant life. Our July 28, 119s letter also Identified certain undesirable conditions such as grese leakage, anchoraes bearing plate corrosion, cracking and spalling of concrete. In response to these concerns, you cemuited to perform, during Refuel 10 (In 11%), a complete valkdown of 549 tendons comprising the containment post-tesioni**g system. you also committed to perform visual inspection to monitor external corrosion, grease leakage, and monitor for spelling of concrete and take appropriate corrective actions where warranted. On the basis of the fifth tendon surveillance results and your couitment to perform visual inspection during the Refuel 10, we find t acceptable to perform the surveillance of the eight tendons duri %lnoTsixinWuuvir surveillance scheduled for Refuel 11 In 1398, which Is within the 3 year surveillance frequency. In this matter we also would like to draw your attention to the following. In November 1916, you performed the structural Integrity test (SIT) on the Crystal River 3 (CR3) prestressed concrete contaiment. Per Regulatory guide 1 i

      "M 27 '96   09:*42'I ttC n~rejl a=                                         AdM      ss Ae FarpA10 Mr. Percy W. luerd, Jr.                 -    .

(RG) 1.35, the tendon surveillances are to be performed 1, 3, and S years after SIT mnd ever$ 5 years thereafter. You have tomitted to follow the ft 1.35 criteria. omver, a review of the history of your tendon surveillance indicates that your 3rd, 4th and st tendon surveillances have been performed on Sri approximately 6-yar Interval. 011ie plant technical specifications allow schedule flexibility (IaZSX inspection interval extaesion survelIncss),#sunh A schedule extension should not be continuedforonconducting a loft-term basis. Also, the general Industry practice has been a plus or minus 6 montts sciedule variance. This completes our effort under TAD No. 194036 and the TAt Is closed. If you have any questions, pleast call me at (302) 415-147]. Sincersly., L.. Raghavan, Project Manager Project Directorate 11.1 Division of Reactor Projects - 1/11 y,*) Office of Nuclear Reactor Regulation So. 5tDavit

           @cc:t cc:   Sue ~e t papa p

cam s-nm4 Afteht" A,

                                                   !aghwwl~ng hIUbtaed"me. I                     10's AI KI)     (~)DESIGN           INPUT RECORD         SUBJECT Czsa  he     nt3-ý         5ý5 Tendon.Sumv inace Prop=am prelmntion DI-652045S2. SE Of Mic Calc'4atims and Surveillance Phowduw SP-e92 Struczurl 2241                              1 PAGE    I REVISION                                            0                   1                2                 3 ITEM(S) REVISED ORIGINATOR                                       ME Ots 0a                q     A DATE RAEMEW DATE                                             o      f3           auq            /   C APPROVAL (OCE)

DATE /. t ;V y,_ MS,% FUTUJRE CONFIRMATiON MEOWfED? N Y) M~cROIMWEO / DATE INMh CQS: tU;E'W/0rnfrruasNOTMAppuC0Am *4rFYITEMSt1IEOUIJN F'1UI*ECONRJMTION Bt CIRCLE ORCLOUD IMOMT FYWAS1D INFOI: lON BY* JTiCALuNE INF4GHT MAMI4 AND nEvI*N NUMB USEADOMnONAL SHUETS AS NECESSARY. I eg/jI,A,:, -Z 'kEP/$e2 fr4s /w~ no) Z'sym 14rnwei'~gwr z. COMMWS1ON RERO

          -         -      -        -        -      -          -w      EOR
                                                                        -     .El'E REV.       013cL'LUNEENRSm                                                    OTHERS M CIFMSR             LA=CrOll             Pm                             OCE     DR016- OPAFT REVIEW 0                                                     x I                                                    X 2                                                    K x
)

7THIS fS A PERMAN~f.h EStGN R mECORD GAS.=2 2-92V

Aftusu A EfngIn.e.ng InscUon No. I POPeAll DESIGN INPUT RECORD tOCfnMER DJ-5520-12.0 SE P.MV. 2 2 ov6 o CR3 P DESIGN INPUT FOR: 5TH TENDON SURVEILLANCE PERIOD REM%$ION. 2 CAM, 17NOV93

1. SCOPE OF THIS DIR; BASIC FUNCTIONS OF SYSTEM, STRUCTURE, OR COMPONENT:

This DIR presents Design Input documentation related to the 5th Tendon Surveillance Program for Crystal River Unit 3. The scope of this DIR is for the preparation of Force(Time Curves for individual tendons, misc. calculations supporting surveillance activities, as well as for the revision of Surveillance Procedure, SP-182, for the performance of site inspection activities. Revision 1 of this DIR will address the change in inputs required as a result of the NRC not accepting the FPC proposed Tech Spec revision for the CR3 Tendon Surveillance Program to complyWith the requirements of AME Section XI, Subsection IWL FPC's discussions with the NRC concluded that the FPC program requirements should be based on Reg Guide 135, Revision 3, issued July 1990. Revision 2 of this DIR will address the change In Inputs required as a result of several meetings at the CR3 site. FPCs discussions with the NRC concluded that the new EPC Tech ) Spec Program may not be implemented as soon as expected and that the current Tech Spec requirements are to be be addressed for this surveillance within the acceptance criteria of SP-182, Revision 11.

2. CLASSIFICATION; DESIGN CODE(S) AND STANDARDS:

Nuclear Safety Related Classification Existing FSAR 52Tech Spec 3.6.1.6 and 4.6.1.6, Amendment 29 & 31. Reg Guide 135, Revision 3, July 1990.

3. PERFORMANCE REOUIREMENTS AND SOURCE:

The Tendon Surveillance Program is controlled by Tech Spec Sections 3.6.1.6 and 4.6.1.6. However, FPC is currently going through aTech Spec Improvement Program and will possibly be implementing this Program In mid November in the nuddle of the surveillance. The new Tech Spec (See Attachment 1) will commit the Surveillance Program to Regulatory Guide 135, Revision 3 criteria. FPC has discussed this with the NRC, and it was agreed that the new acceptance criteria Is acceptable for use for this entire surveillance period. Therefore, the Reg. Guide criteria will be the basis for a revision to the existing Revision 10 of Surveillance Procedure SP-182. P-e .G0 iveet[4,4he-fhequiee.ae~ofh-the-ciurrentexis T pee-wiR net.ben

             "     ued-4nIherevfisio.o.SP-S24.geo-Atisehffiev*)- It was determined in mid November that the existing current Tech Spec requirements will have to be addressed in SP-182, Revision I I until the actual implementation of the new Tech Spec program takes place.,

T"his acceptance criteria is to be worked into SP-182 in addition to the Reg. Guide 135 acceptance criteria already built into the draft version. ) S - GCommonwaslh

                                                                                                  "-- :ze'
                                                                                              *uOA.5S:

T P£MM*EM

                       -I-S-        DESQGN R=R1O2                   QQ UQZ 12ESTRO

DESIGN INPUT RECORD or*wier DI-SS20-52..O SE

                      ,                                                        ~PAGE:~ 3.o46 ir4        I DESIGN     INPUT FOR:     CR3 STH TENDON SURVEILLANCE PERIOD                          AEVISION:   2 DATM    17NOV93
4. DESIGN MARGINS OR SAFETY FACTORS:

Design margins and safety factors are as included in the above Codes and Standards.

5. DESIGN CONDITIONS AND SOURCE:

There are no design activities.

6. OPERATING CONDITIONS AND SOURCE:

WTiS surveillance will be performed during normal plant operation. Tendons in the area between Buttresses I and 3, (00 to 1209) must be avoided due to the safety hazard of the main steam vents in that area. After numerous discussions with the site, it was determined that outside tendons with the following group/buttress numbers are to be considered inaccessible due to the steam venting problem: 13HXX, 42HXX, S1HXX, 53HXX, 62HXX. Inside tendons accessiblit~y must be individually confirmed through an FPC walkdown/concurrance. Radiological conditions, safety, and Interference with safety related systems and components may affect the selection of tendons inside the plant. Adequate consideration. must be given to the potential effects on safety related systems from any surveillance activity. FPC has been Informed by G/c that the tendon selection process can be sucessfully completed for this surveillance using the limitations on the tendon population as noted above, however, the next several surveillances caimg be performed during plant operation because of these effects on the random tendon selection process. In addition, the exempted tendons from the selection process of this surveillance must be reviewed and considered for inclusion in the next surveillance. The exact position for the resolution of many exempted tendons will depend on the final accepted position taken by the NRC on the proposed Tech Spec position taken by FPC. See the Attachment 3 letter, Attachment I. This position will not affect remaining work for this surveillance but will need to be considered In future work.

7. AMBIENT CONDITIONS AND SOURCE:

Ambient temperatures and pressures of the Reactor Building during normal operation of the plant are to be considered. Elevated temperature effects on the tendons may need to be considered. S. MATERIAL(S): Most tendon materials are replacement of original materials. A summary of tendon related materials can be found in FSAR Section 5,22.33 and In the CR3 Reactor Building Design Basis Document. uCommonweMCI= GIlbC THISLS a ERMANENTQMN RECORD DO NOT DESTROY

AUbdmk A

                                             &Vgln.e"ng InsucVon N4C !Ai4 1             O.

DESIGN INPUT RECORD IDENTIPER _ __,_ _ _ _ __r_...._DI-552CW 10 SE

                        '//*                                                   PACE. 4,1 6 D ES IG N INPU T FOR :    CR 3 STH TENDON SURVEILLANCE PERIOD                         REVISIOm:   2

____oAM 17NOV93

9. OTHER REQUIREMENTS:

The requirements of Reg Guide 1.35, Revision 3, are essentially the same as the requirements of ASME Section XI, Subsection IWL In many places, the ASME Code provides a greater level of detail than the requirements of the Reg Guide. The ASME Code document will be utilized as a reference In the interpretation of some Reg. Guide requirements and criteria. FPC administrative procedures noted In References 16, 17, and 18 are to be followed for the revision of SP-182. The normal 40 year plant life is to be considered. As yet, no consideration for plant life extension has been requested from FPC. Future retensioning or other tendons work may need to consider any FPC plant life extension plans or considerations.

10.

REFERENCES:

1. Design Input 5500-528-1, Revision to SP.182 Procedure for Tendons and Calculations for Force-Time Curves for Surveillance 4, Revisions 0 and 1,Jan. 87 and Sept. 87.
2. Calculation 5500-528-1, Tendon Loss Calculations for Surveillance 4, Revisions 0 and I Jan. 87 and Sept. 87.
3. J. Fulton and G. T. DeMoss Calculation 04-4762-099, Tendon Loss Calculations and Appendices for CR3 Tendons, 3/6/87 and 1980 calculations.
4. Vertical Tendon History Sheets
5. Hoop Tendon History Sheets
6. Dome Tendon History Sheets
7. SP.182, Revision 10.
8. SP-182, Revision 7. (Last surveillance proven revision)
9. ASME B & PV Code, Section XI, Subsection IWL
10. Regulatory Guide 135, Revision 3, Issued July 1990.
11. Regulatory Guide 1.35.1, Revision 0, Issued July 1990.
12. G/C Engineering Study on the CR3 Tendon Surveillance Program, FCS-13670, Marcd 5,1993.
                                                   -OGUw/Cowmonnwsallh

.I. TW I "EMANNT ESINBEORDDON IHQ!T OAJT523 2 41 1c

Amedwmkm I.*ka E.gln~wlg Instruavon NO. 1 P"*AJS DESIGN INPUT RECORD IotNHWIER DI-55S20-L.L. SE DESIGN INPUT FOR: CR3 PAM* 5o6

 'I                   5TH IEDON SURVEILLANCE PERIOD                             vim":      2 I                                                                            OAT*      1-NOV93
13. 0/C Study of ASME Section X), Subsection IWL for the CR3 tendon Surveillance Program, FCS-13892, June 2, 1993.
14. G/C Letter to FPC, FCS-12439, August 13, 1992, for Task I deliverables, Tendon Selection, General Report and recommendations for the 5th Surveillance.
15. Prescon Vendor Drawings- G/C Vendor Code 4680, Drawing Numbers 52-0026-OOI1A through 52-0026-0043P.
16. FPC Administrative Instructions, AI.402B, Procedure Writing (Except for EP/AP/VP), Revision 8, 10/25/91.
17. FPC Administrative Instructions, AI-400-C, Permanent Procedures Revisions, Revision 10, 11/19/92.
18. FPC Administrative Instructions, AI-701. Conduct of Inservice Inspection, Revision 9, 7/11/91.
19. G/C Memo, 10/27/93, D.L. Keiser to M. Marcellus, Calculation references for minimum required prestress forces.

20 Crystal River 3 Reactor Building Design Basis Document.

21. G/C Engineering Report for the 3rd Surveillance, By T.H. Noble, May 19, 1982.
22. G/C Engineering Report for the 4th Surveillance, By J. Herr, March 10,1988.
23. G/C Scope Document Letter to FPC, FCS-13766, 4/2/93.

ATTACHMENTS

1. Proposed and submitted FPC Tech Spec showing compliance to ASME Section XI, Subsection IWL, fax received from FPC on 9/24/93.
2. 5/C Letter to FPC, 10/8/93. FCS-14114.

M. Marcellus to J. Mascoll/B.Crane/B. Gutherman, Summary of G/C Design Input positions.

3. FPC Letter to the NRC, October 25, 1993, Withdrawat of Tech Spec Change 197 with attached revised Tech Spec, Changing from ASME IWL compliance to Reg Guide 1.35, Rev 3 compliance.

I Ob.bn/Co~mmnow.ui22 WINQT-ESThQY 0A423 2. 2 '

cd ha-9sma AwaawmsA EMnownl"n If'SUtswuag no0.I rap A16 DESIGN INPUT RECORD EWNW KY DI-S520-t5U. SE

 )         DESIGN INPUT FOR:     CR3A"-

STH TENDON SURVEILLANCE PERIOD I R O 2 cATL. 17NOV93 0/C Letter to FPC, 10/12/93, FCS.14119, M. Marcellus to J. Mascoll/B.Crane/B. Outherman, Revised summary of G/C Design Input positions.

5. G/C Letter to FPC, 10/27/93, FCS-14158, M. Marcellus to J.'lascoll/B.Crane, with G/C comments on the proposed Tech Spec.

K-,

 )

I G~bwtjComnWmonw. OAI523 22wo re,53PrAW-1; t;

diOS.,5400

                                                                                                          -Mdmw" A "4p A17 82o .12.o  SE ATTAC*MENT     4 Pagle I GilberlWCmmanmeaith *w,                       w,,

&IWI 0COMM. Cutw. ft.0 NUbsM AL PgWq. PA W10 ROY W.ADLER October 12, 1993 N,*eur Sutv'c FCS-14119 Work Order #D4520-152 2z. Contract NPMOOAD, WA 152 Mr. R. T. Bowles &. ne - 7-, ,1 Nudesla Prject Management Engineer Florida Power Corporation A77.,. J'IA X (Q~f APoIs&- P. 0. Box 14042/C2 St. Petaburg Florida 33733 Antentlo: J.0. MA=cB-. Cbm, B. (lutherman

                                                            *R P            y:al RIver 3 Tendon Surveilance Program ReL        VCS.14114 Dated October 7,1993 Action By:        FPC- October 13. 1993 Review and Comments, Unless N/A

Dear Mr. Bowles:

ey issues and criteria for the tendon surveilance prog-am were reviewed with you im the above referenced lener. Since then. the direction for implementation of our work has mif*m*tldy diazied based upon the NRC rejection of the Tech Spec for the Tendon Suzvelluout Prolraf. Based on dimusions with Bruce Crane, we will now perform a&I related tendon swuveillance tasks based on the following:

1. Revision 11 of SP.182 will now be perfonned to comply with Reg. Guide -1.35 Reviion 3, not ASME Section XI. Subseeton IWL An ealer review of the Reg. GuideMv the CR3 popum condcluded there were no sipfleant Issues oc disadvantages to comn*,mkth" to Reg Guide. Revision 3. However. until our review and revision is coMPhte, GIC 13 ronimendmg that FPC consider that there are some exceptons likely to be taken ainsvt the fil conplianc to the Reg. Guide by FMC. O/C will notify FPC as ay aicant
              =qeton Isidentified.
2. The documentation of the above position, acceptance Items and specific interpretations of the Reg. Guide acceptance criteria has not been decided at this time. It may be within CP-145. However, an Interim place is to kdude these positions within SP-182. 0/C will now include some of the general positions in the SP-1S2 document, but is uncertai whether all enlie *licing positions and acceptance criteria cam be properly placed InSP-182.

SP-182 has basicaly addressed site inspection activites in the past and has not addressed engineering/licensing Issues to any level of detail.

                       "Aift=: PFA IN             INOWN I.h mtI l.P.P 1V1SAU            WS'7             2375=.2al *i
  • Fv. 2uR2 17M-
   *"         ~SmJIhII        Ii. 1Oss~temum wt bin.S ZIO.0ahlgsgt~lP27 30
  • tdig: it 214-*G
  • F; ISU1751-,1

AVIdW= A 064M-1 2.0 SE

      ""                            OMNI*.                                                        ATTACHMENT 4 lo-*A "ram to Aý    M~A
  • w MVMA,. ba I M6'*,mam popq Page 2
3. It Is assumed that the Tech Spec Improvement Propgram wM be in place and acceptedby he N14C pror by to November 2nd. With the suweilanc rapidly approaching a Tech Spec revison that date Is tbqractiL TeM accq m critermi fo the interim period up to November 22 was dscwussed. ' d on the established CI3 Tendon Survela=co Pop=m as defined by SP-182 and other documents. it is assumed that this entire tendon surdlance csn be performed apinst the new critera. Therefo, the saoeptance aitemia within SP.182 which Is related to the ctisting Tech Spec positions w0l be removed and replaced by the Reg. Guide 135, Revision 3 positions. This wl involve new enclosures and calculastto witlhn SP-182.

Note that the above direction siplicandy changes m positions noted in the reference letter. However. Items 4,5, 6 and7 of that letter are unchanged for O/C to Implement the required cope of work. vic concurrece with the iabve positions by October 13 Isrequired for OjC to complet ow tWks in support of the surveMan. Any revision to the above wil Impact out completion of SP.182. Additional rework, endosures and verification resultn fr this dnge In criteria, as disussed abafe has impacted the schedul. Assuming no further change in basic aieria. SP1*.2 Revision 11 will be electroniclly transmitted to FPC on October 26 for review sad comments. In additIon, a copy of the document wi be Federal Ppressed aSt the same time. Should there be questions or d,,cussion on any of the above items, please feel free to cotaul us at your convedente. Very trul ymurs W(. $1.9k4 . ... - M . Marcellus

                                                             .9  StrsucmiulTask Enginee ILMascoe T.

IL Outheman ILW.AdAW

                      .LCrane                                     Pro4ee Manager FPC Rfcords Management (CL Onl)

P. W. AdM (2) C. N. Rentschler D. D. Krause. I I

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 AUAIOm Page BI Calculation S-95-0082 ATTACHMENT B TENDON HISTORY SHEETS FOR 6TH SURVEILLANCE I

  .)

!o

                                                                   ~40 arrTW* ft"P 0000 "."m m;Gw
                        .. ee~Odg_                                                                 ,     . u-~s~aasz Florida                    CRYSTAL RIVER U1lT NO. 3                                   rp P2 Power              REACTOR BUILDINZC PRE,:rESSNC SYSTE TENDON( 'ISTORY TENDON IDENTIFICATION NUBER                         2/a           --          CUT LENGTH    /    -.

SHOP WAS*ER ID: PC 1 l CR j FIELD WASHER ID*: PC )Q _. CR _L4

1. CAI/QA vendor Inspection cover letter number-FPC I /0/VO DATE -,,/i/',; _
2. Date tendon received on-site I ~ P3X9 R Number 0 3. Date Installed in conduit S-/-74 installation NcCF' Wires removed 0 Wires teplaced 0 Total Ineffective wires 0
4. Date buttonheaded ./-'74 L ButtonheadLng NCR's "

Bad wires 0 Accept. Reheads 0 Total Ineff ective wires 0

5. Date stressed 2/-1-7*J 'Stressing NCR's Date restressed Restressing NCR's .......

SHOP END FIELD END TOTAL L)Elongation (1500 psi to 80% ult.)-Pred./Act. -e4 _IqK _1 _L__ _ _ cj?-/ Lift-Off Pressure - Ptedicted/Actual W,00 i&Sl cWiOM VhIA Shim Thickness/80% Ultimate Pressure 7 J127 211Q 7ff / Unseated/Broken tires -- An Total effective wires after stressing JJ2 ,

6. Date Bulk-filled 775- " .1ulk-Filling NCR' a Time since Installation Inlet Pressure
                                                                 ,T,.          :           O..

utlet Temp. Date end caps refilled; Shop __ "___ . Field-_-

7. Data compiled by ~2 *A ~Or~ganization_______________

Date

8. Additional Coments:

11

            ;Florida                           CRYSTAL RIVER UIN1T NO.. 3                                             Fr1 Power                    REACrog BUDI GPRE: MRESSIC SYSTEH K-' oe * ,.*?                             TENDON itISTORY TENDON4 IDENTIFICATION NUMBER                        2)1/                             CUT LEHMn                 94 SHOP WASHER ID: PC 11 1 I                   CR   JFIELD                    WASUER ID: PC - 15Q I                        CR    I1      2-.-5._
1. CAI/QA vendor inspection cover letter number-FPC I /0/, 90 'DAZE Y../_/__Z
2. Date tendon received on-site ' 3 ..jg-- 7// RH1R Number_____________
3. Date Installed in conduit , -* - 741 Installation NCR's ____

Wires removed 0 Wires replaced 0 Total Ineffective wires 0

4. Date buctonheaded & -_-7M/ ButtonheadIng NCR's _

Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0 54 Date stressed In-aL .-4 , Stressing NCR's 11 17 bate restressed Restressing CR _NCR' SHOP END FIELD END T'oAL Ilongutlon. (1500 psi to BOX ult.;)-Prcd./Act. I_--J1_14'_____ Lif t-Off Pressure. - Predicted/Actual ..AbXJ1NIA Shim Mhckness/802 Ultimate Pressure -7 it L777 p R "II _V NIA Unseated/Broken Wires b Total effective wires after stressing Ha ?

6. Date Bulk-filled .... _,_.__ ___ Bulk-Filling NCR's ____ ... ...

Time since Inst;2lation M" Inlet Pressure Outlet Temp. Date end caps refIlled: Shop ,_Field __ -- __... ....

7. Data compiled by Organization O

Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ B. Additional Comments: _

cakvh w 4.u Florida CRYSTAL RIVER turqT NO. 3 14 Power REACTOR BUILDING PiLt"TRESSING SYSTEM

              )

C,* ** O*b.DA9.*- TENDON HISTORY TENDON IDENTIFICATION NUMBER CUT LENcTH SHOP WASiHER ID: PC_ Ci_ FIELD WASHER ID: PC_ ___ CR .....

1. CAI/QA vendor Inspection cover letter number-FPC I DATE
2. Date tendon received on-site _4R Number
3. Date Installed In cooduit Installation NCR's Wires removed. Wires replaced Total Ineffective wires
4. Date buttonheaded. ButtonheadnLg HCRO__

Bad vires Accept. Reheada ., Total Ineffective wires

5. Date stressed .__ _ Stressing NCR's Date restressed _ __ _ Restressing NCR's SHOP END FIELD END TOTAL V./'% Elongation (1500 psa to 802 ult.)-Pred./Act. L..

LIft-Off Pressure - Predicted/Actual LN........... K/A Shim Thickness/80 Ultimate Pressure L .* _ _H/A Unseated/Broken Wires Total effective wires after stressing

6. Date Bulk-filled -- __ __Bulk-Filling I$CW e .

Time since installation Inlet Pressure Outlet Temp. Date end caps refilled: Shop ..... ... Yield

7. Data compiled by .1? a 19._ _ OrganIzation Date __________________
8. Additional Comments: APw,e ,d^/"

F -IS n n 4 _- i_

      *  - -.,Floida                             CRYSTAL RIVER ur               NO. 3-
  • Por
                 ~  lw ~r          ~ REACOR ~ ~ BUILDIN:CTm PPRS!
                                                         *Nt,*       fi°".

ts'loRyr PE.SSUNG* SYSU s5 END04, DENT_______101;________D___4_ I CUT LEN4GTH I/'/- Zr~ HOP VASE.* ID: PCLRF______ _H 11) -. PC 1,2A CR 4706

  • CAI/Q& vendor inspection cover letter number-FPC I _____,._DATE _,____. __.

Date tendon r.ceived on-sit-D a /A - 74 S Number

3. Date Installed in conduit _7_... ____ Installation NCR's ....

Wires removed 0 Wires replaced 0 Total Ineffective vires 40

i. Date buttonheaded 1,0-I-74 ButtonheadLng NC4R's _ , _.__ _.

Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0

i. Date stressed .7-7 str//.

Stessing 11CR's /17,'./72 Date restressed /R?-//. 74 'estressIns UCR's SHOP END FIELD END TOTAL

      'ongation (1500.psi. to 60% ult.)-Pred./Act.                              IIAf ~IA                                                   .. L*..             9"&'~'

iftOfPressure - PridictedlActual ~" ?90n/A

                                                                                                                           ,6 Shia ThicknessO80 Ultimate Pressure                             .                  1 Z770               ,6                                          ,/A Unseated/Broken Wires ,                     _         ,_Total             effective *ires after stressing                                       L/62
6. Date Bulk-filled .3--,5.- 9' sulk-Filling NcR'__

Time gince Installation fi7/Xzd Inlet Pressure -.. ,4i. Outlet Temp. II Date end caps refilled: Shop /I-24.7& Field Y/I/2,0 -7

7. Data compiled by___ /_ _ _ _ Organization __ _ __._ .
8. Additional Colents: A tt ______________________dj__,;_
                             "S        I*              I      =l                                S                        I          rl        *         :m-

p

    $)Power 04M&

Florida CRYSTAL RIVER U1117 N0. 3 ItEACTOR BUILDINGC VL:TRESSIN4 TENlDO* l STORY SYSTEH cakmal5."4g AFtarmlu 56 A194I636 I SHOP WASHER IDN PC_ _ CR FIELD WASHER ID: PC CR. L. CATIQA vendor inspection cover letter number-FPC I DATE 2, Date tendon received cn-site RHR Humber

3. Date installed In conduit Installation NCR's Wires removed _ Wires replaced _ Total Ineffective wires 4, Date buttonheaded Buttonheading CRICs Bad vires ___Accept. Reheads _ Total Ineffective wires
5. Date stressed Stressing NCR's Date restressed Restressing NCR's SHOP END FIELD END TOTAL
                                                                                                                              /

Elongation (1500 psi to 80Z ult.)-Pred./Act. . - Lift-O[f Pressure - Predicted/Actual / ,, - I/A Shim Thickness/80 Ultimate Pressure I N/A Unseated/broken Wires Total effective wires after stressing

6. Date Bulk-filled ___Bulk-Fillitn NCRe's Time since installation Inlet Pressure Outlet Temp.

Date end caps refilled: Shop ...... _Field

7. Data compiled byS-1 .. ....... ... J I Orgailzatlon _

Date

8. Additional Comments: ".

AO / . A" -, i - /, lA - fs'I IP~ l _ L / -' (-_ /-/. .)

Florida CRYSTAL RIVER UrT NO. 3 Par-.,7

     .,    Power             REA(TOR BUILDING RE:,*rPssI                       sINCSYSTEM TENDION hISTORY TENDON IDENTIFICATION    ,NUMBER            L      1 /_*                          CUT LENGTH          /-le? 7 SHOP WASHER ID: PC_-_----         CR                      -',FIELD WASHER ID: PC                 M2           CR
1. CAIIQA vendor inspection cover letter number-FPC I ________,. DATE ______ _
2. Date tendon received on-site I-* -R .gg Number .37
3. Date Installed In conduit i-o2-1V Ins'tallation NCR's Wires removed 0 Wires replaced 0 Total Ineffective vires 0 A. Date buttonheaded 9*_.30-__ Buttonheading NCR'_

Bad vires 0 Accept. Reheads 0 Total Ineffective wires 0

5. Date stressed / -/ Stressing NCR's .....

Date restressed Restressing NCR.'s SHOP END FIELD END TOTAL I.ongatfon (1500 pat to 80 ult.)-Pred./Act. .. L 5Z 55 5 J 0 Lift-Off Pressure - Predicted/Actual IN"/00v!stm" N/A Shim Thicknes/80Z Oltimate Pressure Ir- N/A Unseated/Broken Wires (.). Total effective vires after stressing _*"

6. Date Bulk-filled - -*R -*1 Bulk-filling NCR's Time since installation &Inlet ressure Q _ Outlet Temp.

Date end caps refilled: Shop _. _,_Field _

7. Data compiled by  ? Organization_

Date 3/3o/7 7

8. Additional Comments:

Florida CRYSTAL RIVER 1,,11T NO. 3 rage.-s Power

  • o.,-006 REACTOR BUILDUIC PRLTRESSlIV TENDON IIISTORY SYSTE '

TENDON4 IDENTIFICATION4 t4UHflR CUOT LENGCTH _______ SHOP WASHER ID: PC_ CR _ _ FIELD WASHER ID: PC_... CR. .

1. CAI/QA vendor Inspection cover letter number-FPC I
  • DATE ____::_
2. Date tendon received on-site _ Wi__,Number NR
3. Date Installed In conduit .Installation NCR**_,_

Wires removed , Wives replaced Total Ineffective Wires

4. Date buttonheaded Buttonheading NCR's Bad wires ... . Accept. Rlheads ..... Total Ineffective vires
5. Date stressed Stressing NCR's Date restressed Restresslng NCR's SHOP END FIELD END TOTAL K-' Elongation (1500 psi to 807 ult.)-?red./Act. J . '! .

Lift-Off Pressure - Predicted-/Actual . . , .. ,..I.....A Shim Thickness/80Z Ultimate Pressure L/A N Unseated/Broken Wires Total effective vires after stressing .

6. Date Bulk-filled ,__ lk-Fillrng NCR's Time since Installation Inlet Pressure Outlet Temp.

Date end caps refilled: Shop___ _ Field

7. Data compiled by .. 2 ~Organization_____________

Date Addiiona e. 8a Additional Comments: Al.oe*. ,-. .. 29.4 d ý &AA V 7hf7/ K I

         '     Florida                           CRYSTAL RIVER UNIIT NO. 3                                         *,,,bfs tof Power                     REAcro. BUILDING Ptrrt.SSItG SSTEN ee*INN    40     I   so aB.sO                          TENDON iti IORf D'I ON IDENTIFICATION                                  ,UER     I-r               CUT LENGTH SHoP WASHER ID:         C.c                     __         _      FIE*W VASHER ID: PC                          CR
1. CAIIQA vendor inspection cover letter number-FPC I DATE
2. Date tendon received on-site __R Number _
3. Date Installed In conduit Installation lC ___

Wires removed Wi___Lres replaced Total Ineffective vires

4. Date buttonheaded Buttonhesding NCR's bad wires ...... .... Accept. Reheads Total Ineffective wires
  .,  Date stressed       ___,_Stressing                                          NCR's Date restressed                                                 Restressing NCR's SHOP? END              FIELD END             TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act.                                 .-..                                     , /

K~ Lif t-Off Pressure - Predicted/Actual - ,/A N Shia Thickness/80 'Ultimate Pressure ...L................N/A Unseated/JBroken Wires Total effective vires after stressing __

6. Date Bulk-filled - Bulk-Fillirg NCCs_

Tim~e since Installation ________Inlet PrelsAsure _____ Outlet Temp. ______ Date end caps r*[ftiled: Shop Field

7. Data compiled 'by Orga.U.ation FPC QVDate 1-30)- 72
8. Additional'Coments-: 1J fZPM AtAW-Tf Iba- -1 157 SUL-%1JC6 S

I 907 716

Vakqg.&f s.co

    *";
  • Florida CRYSTAL RIVER V'-IT NO. 3 A le-.3 Power REACTOr* UIJLDVIC Fki: fRESSINIG SYSTEM 00*94iTENDION hi1STORY TENDON IDENT*FZCATION NUMBER __ CU____

T LENGTH "-/ _ 0_/ _ SHOP WASHER ID: Pc Jj CQ

  • FIELD WASUER ID: PC ja C
1. CAI/QA vendor inspection cover letter number-FPC . /o/D, DATE __,P/MEL
2. Date tendon received on-site _ /_ Number____ Qe 79;?_
3. Date installed in conduit - 9 Installation NCR_'s Wires removed 0 WIres replaced 0 -Total Ineffective wires -
4. Date buttonheaded Or. 7_- Buttonheading NCR's Bad wires / Accept. Beheads 0 Total Ineffective wires S, Date stressed /,2 6- 7 / Stressing ICR's Date restressed .... Restressint NCR's SHOP END FIELD END TOTAL K..'Elongation -(1500 psiL to 80% ult.)-Pred./Act. ... L+/-A.1

_15 __.5 5.... 1 Litft-Off Pressure - Predicted/Actual 67 6) .1co 6 ze% NIA Shim Thickness/80l Ultimate Pressure -7 /7'7.'~o -7'A ,7160~ 14/A Unseated/Broken Wires (Q Total effective wires after stressing

  • J*
6. Date Bulk-filled .,-*-'7S Bulk-Filling NCR's Time since instaillation 816t_122 Inlet Pressure AM -s....OutletTemp. 0 Date end caps refilled: Shop Field ,
7. Data compiled by
  • Organization ____

Date 3te _/ 17

8. Additional Comments:

Ji -

Aodda CRYSTAL RIVER U'IIT NO. 3 Ahau1 B Power C@-U-UUI .f,, REACrOR BUILDING miI,.re-ssiNc sysTE TtI;I)ONH I'[STORY pw al tENDOtN IDENTIFICATION I4UHER____________ air LENCTH /4Z 2 7 SHOP WASHER ID: PC JJ. I CR Cr1 FIELD WASHER ID. Pc JP'C ) C .R

1. CAI/QA vendor inspection cover letter number-FPC I /42O07 DAfF, 411//1)V
2. Date tendon received on-site ,__"________ IlR Number. .3I'OgO
3. Date Installed in conduit ___,Installation NC 4s, Wires removed 0 Wires replaced 0 Total Ineffective Wires
4. Date buttonheaded _9 ,0-7j Buttonheading NCR's bad wires . Accept. Reheads 8 Total Ineffective Wires _,_ _,
5. Date stressed . 3,/-71Z/ Stressing NCR's _ _

Date restressed _ _ . _ _ _estressing NCR's SHOP"END FIELD ENT) TOTAL Elongation (1500 psi to 80% ult.)-Pred./Act. LV sjt 4;'" Lift-Off 'Pressure - Predicted/Actual ")of

                                                                                                *Q)0                            N/A Shim Thickness/801 Ultimate Pressure                                    5/7I6 it                     1i-,77_%o            1/A_

Unseated/Broken Wires Total ef ective wires after stressing *

6. Date Sulk-filled 4 4 $Bulk-Tilling N4CR's_______________

Time since Installation _1QXmokjL Inlet Pressure "55..p.2..Outlet Temp. _ Date end caps refilledi Shop .... _ Field

7. Data compiled by0-o..Z__a 4 , Organization _ _ _ _ _.

DatedtoaCees

6. Additional Comments:

w~.

/

4 Florida Power cP-.om.',e. CRYSTAL C0066MA146ftt R~EACTOR BUILDING RIVER UNIT KO. 3 V'itt' fRESSING S'YSTEH TENDON hISTORY

  • PV n
                                                                                                                                        ,s.B 4 t8 SIDON IDENTIFICATION 11UIMER                              7       13 /                        CUT LENGTH!                 /A10-SHOP WASIeR ID: PCJ                             CR _/ 0 0                 FIELD WASHER ID: PC_                 18'-              CR    1j-
1. GAI/QA vendor inspection cover letter number-FTC / 2. Io.L DA.T .________
2. Date tendon received on-site OARQ--4 TMR Number M, 01_
3. Date installed In conduit _ ./3-39 Ins tallation NC.'s ....

Wires removed 0 Wires replaced 0 Total Ineffective wires 0

4. Date buttonheaded _ _7_- _ buttonheading NCR's /1 1 ,

Bad wires /1 Accept. Reheads _____ Total Ineffective wires 2..

  .5  Date stressed                  /2           -7!/                        Stressing WCR's Date restressed                                                         Restressing NCR's SHOP END                    FIELD LZID              TOTAL Elongation (1500 psi to 8o0                   ult.)-Pred./Act.                          .'5*iN

~I Lift-Off Pressure - Predicted/Actual (U1017 00 .67O L( QD 1N/A ShIm Thickness/80X Ultimate Pressure M*j~b NIA Unseated/Broken Wires

  • _Total effective wires after stressing . .. .
6. Date Bulk-filled . Bulk-Filling NCR's _.....

TIme since Installation / 40- r1~k Inlet Pressure _3.L)5.... -Outlet Temp. 1 Date end caps refilled: Shop _._ Field

  • _.
7. Data compiled by . , Organization _-_ _ _ _ _

Date8__________n_______n S. Additional Comuents:

  )
           -   -.. ~% ~      .w-= ~-                 --       -.

Florda Power PxAcroiCRYSTAL RIVER UtIIT NO. 3 BumL= Pn=rassm sysE3 Ainaeb

.'j,0 "°"° t.,rsr TEN1DON HISTORY TENDON IDENTIFICATION NUMBCER/3/ . aeCT LENGTH SHOP UASEIER ID: PC__ CR FIELD WASHER ID: PC CR
1. CAI/QA vendor Inspection cover letter number-FPC I DATE,
2. Date tendon received on-site __ MR Number
3. Date Instal2ed In conduit Installation NCR'__

Wires removed _ Wires replaced _Total Ineffective wires

4. Date buttonheaded _-_ _ Buttonheadibg NCR's Bad wires .......... Accept. Reheada ___ Total Ineffective wires
5. Date stressed _____. _ Stressing NCRO' Date restressed ....... Restressing NCzR'.

SHOP END FIELD END TOTAL Elongation (1500 psi to 80Z ult.)-Pred./Act. Lift-Off Pressure - PredictedlActual I .IA Shim Thickness/802 Ultimate Pressure 1/IA N Unseated/Broken Wires ._ _ Total effective wires after stressing ....

6. Date Bulk-fIlled __Bulk-Filling NCR'. ._

Time since Installation Inlet Pressure Outlet Temp. Date end caps refilled: Shop Field 7, Data com~piled by .7Organization _______________ Date 1___11117_ _

8. Additional Coments: f9 *..e feO_ -_
       ,*,,      r4
                ,,,*         -6z              /,)            ir'"~
  • P*.* +"P /60 w/y*,' *i/

1Z24)

 ,*       *o. Floelda                         CRYSTAL RIVER UNIT NO. 3                                                     Mb.            0 0,.. -,     P wer                   IoEARCTOR BUILDI::G PO:SIRESSINCG SYSTEH                                              g3
                         ~Oa.~au.4sTENDQ!I 111SORY IDENTIFICATION ?uHDE.

N 13 .9A, CT LEC H ,G'T -

  • .1o0 WASHER ID: PC 42 / _ .-FIELD xD% C ___9,3_ ,___-_ C__

CAI/qA vendor inspection cover letter number-FPC 0,*O2._ _ DATE +11//17Y

. Date tendon-received on-sfte %3 - 7d RMf Number R3 'op 0 "

I. Date Installed in conduit . "- L Installation NICR's _ Wires rcoved 0 Vires replaced 7L 4 Total Ineffective wires 0 a t NCR's _

o. Date buttanheaded __________ sltonhe'dn C' ____________

Bad wires / ,Accept. Reheads 0 Total Ineffective wires __ bate stressed D. --3-74 Stressing NCR'. x .. . . Date restressed _Restressing NCR's SHOP END FIELD E:4D TOTAL OOPNlongation (1500. psi. to BOX ult.)-Pred./Act. ~. J I

        ,if t-Otff ressuzre   -    Predicted/Actual,                       6 Za 700              6&29 6 )60O                             NIA Shim Thickness/80Z Ultimate Pressure                                                            -,PC,                             N/A Unseated/broken Wires                      0               Total effective wires after stressing                               K_

Date Bulk-filled /" bulk-Frlln, B// g CR'ss_ ...... Time since Installation /__,__t_ Inlet Pressure g,,0eS/ Outlet Temp, 160 Date end caps refilled: Shop Field

  '. Data compiled by 22                                                   Organization _-,Xe__._..                                         ..

Date 1, -Additional Co-entst .... _ ..... r_* n n H -**

N% .,.ria CRYSTAL RIVER Uiu 110. 3Ac, , -

*¢ l . .;T FIACroa  ? Et:SS::

7*V:3:, SYST'EM 4O"a+.*.-..s- TFI:oO:' ItISTIY 1M. DENT1FATlo0l NLIER___________ 6i? LL-4(6TH A/'Z - o' 3P UASHER 10:; PC /AL . a -FIELD UASHER ID: PCJ .* CR /CR

 'GlIQ.A vendor inspection cover letter nu-ber-FPC                         ,   1 OZY5           _           DATE *'//o/7            .

Date tendon received on-site  :.?Q-7L R Number .__ ._____.... Date installed i:2 ccn.uLt Installation NCR 's Wires rc=oved 0 'Wires ra;laced 0 Total Ineffective vires 0 Date butch*-aded 104-107- Buttoheadin; N4CR's _ - Bad vwres 0 Accepr. rehoads 0 Total Ineffective vires Date stresse4 0-07 Stressing NCR's &ell. &42'3 Date.restress4- ._Restressing tiCR's SHOP E1,D FIELD M.; TOTAL

    '".nsation, (1500 psi to 60% ult .)-?:ed./Actb                    4    114~TV' 75                      I         9 k f/0        AV ressure - fredicted/Actual
               ?lf-Ol                                               /QMd7IO~.400                         'J4;               ll Shim Thickness/80% Ultirate Pressure                                 +I                              WNL2Z47.O            N"/I 11IA Unseated/Sroken Vires              ._J                Total effective wires oafer stressing                         ,9..-

Date Bulk-filled , gR"t,"'7*' Bulk-Filling N1CR's Time since Installation - ~~r~ Inlet Pressure Outlet Temp. ' Date end caps refilled: Shop __ ._,_. Field ... .. 0 Data compiled by. Organization _.._..._ Date ./+?/7. Additional Co-ents: e .

C~khe AttatImina..SS4M.O Florida CRYSTAL RIVER UNIT HNO. 3 Fg.UII Power gGAP466900" REACTOR BUILDIG PRUtESSINC SYSTE) TENDON*_-1ISTORY _ TENDON IDENTIFICATION I.HEER L ZA 7LT// . _E_ _ SHOP WAS*ER ID: PC CR FIELD WASHER ID: PC Ca

1. CAIIQA vendor inspection cover letter number-FPC f __. DATE ____
2. Date tendon received on-site _ .. Numiber ,._.
3. Date Installed in conduit Inatallation NCR's Wires removed Wires replaced Total Ineffective wires ...... .

A. Date bu'ttonheaded .. _ _ uttonheading NCR'e Bad vires ...... , Accept. Reheads Total Ineffective vires S. Date stressed . ..... _ Stressing HCDIs Date restressed __Reatressing NCR'sa SHOP END FIELD END TOTAL Elongation (1500 psi to 80% ult,)-Pred.IAct. ._ I. I LIft-Off Pressure - Predicted/Actual I MIlA. Shim ThicknessIa0 Ultijiate Pressure J - K/A Unseated/lBrokeu Wires . ... . Total effective vircs after stressing

6. Date Bulk-filled Bulk-FlIling NCR' Time since Installation Inlet Pressure . _ _ Outlet Tem PO Date end caps refilled: Shop Field
7. Data compiled by .. ........ Organization Date *9 4
8. Additional Couments: Pome. *joa,, -
                                                                                                                                .It A -c" l                /*7 YIr/n AK            n I!

r'.or~daCRYSTAL RIVER MITl NO. 3 REZAC,0O1 WLuxLEtC Pr~rE~SslM:: SYSTE-i ?W 817

M4~ IDEN'TIVICATWIl NtDER___________ CUT LENGTH 4' OP IWAS1IER 11)D-. P'CJ/ZI_.. Cit J~IZELD VASHER ID: PCj .:. C~

CAI/QA vendor inspecticui cover letter nmiber-IFPC I /OZ__________ DATE 40110Z71' Date tenidon received oti-sfta A9-7 WiR Num~ber 3 1~4 Date installed in cenduit __________Installation NCIK's /4 Wires V=Voed 0 wires replaced 0Total Ineffective wJires 0 Date buttonheaded /-7'gButtonheadin; 1CWs______________ Bad w'ir~er Acceptc. Rcheid~s 0TotaL Ineffective wires / Date stcessed I'j1 Stressing NCR' s_____________ Date. restressad ______________Restressing l:cR~s________________ SHOP E%*D FIELD END, TOTAL agoation (1500 psL to 60-4 ult.)-rred~.IAct. Z&~~

                                                                                     /,V               4           -/-

Uýft-'Off Pressure - Predicced/Actual &71LM&A7t G A Shia IhickaesslSO%. Ultimate Pressuve to1 1,7& 4A NI.i42~

    -UnseatedjBrokmu Wires                          0Total                      ef fective wires after stressing                                 2......
   *Date   Bulk-M liad                                                   'k-rillIng bui7'             ITCits_________________

Time since installation ..~G 4 tjLInlet Pressure. L ' outlet Temp. ____ Date end caps ref 1Usd: Shop __________Veld __________________

   *Data comtpiled by            .~                                     ~Organization                         _____________

bate _717 ______0177____

  • Additional Co~ents:______________________ __________

I

Chr/iTAd. UTS UWU~l l Lu" MUIR NUot3In Wil iio. 506 0212

                                                                                                                                                                                    .l !
                                                                     -_C     acmltmlatfJ0,  TIMUSt          S_

dw. - f " "113l661- a , .m .. l oolm11a-An. Si m o.Ibis f

                                 ,                                       Total                    "p.                               ?"*si "".tee lSda.
    "*Wpeuise                                                  ailo. lsfetlva        for"o      roves   TIhicsOs etinl.         atftetiv Tweetri¢.e of polld "a                lore         am Tolew!so                                                                        liv)      lt_. hi.W.

4 .. gCm s. S(ki..) .i...)_ V. -AT) WIOr. J(* I.) Mp fit) o*a S,. . op 9 9 2, 4 S tsit '0!31r 4 Sl" -A, ILA ALL ir ~2 I&L ilL. X&t. AL* JUL .9-A JLt 121174 161 .L 100 jL~4 L.. Ult-aft 9611 Sit VIA via 6 of& *2 33 1233 1333 & i14 VIA 162 V1I VIA - - T JS'7.4A 6p' At

    -ij-MIA                     A                I                                        4A"&Ae7T A 79      A4mob 4NA&Z           £ni3     Wd& (M7J               i5& jdA a        -                      -         -          .

i[[ Mi. 4, I

Florida Power CRYSTAL RIVER UNIr NO. 3 REACTOR BUILD1IC PERESrW*. sNG sYSTE

                                                                                                                 .,B19
             ,       ,                            TENDOM HISTORY TENDON IDENTIFICATION N4UMBER                   71)a                         OT LENGTH CU                        /          '*740 SHOP WASHER ID: PC              j       CR                 FIELD WASHER ID: PC            L       ICR                 879-        .

I. CAIIQA vendor inspection cover letter uumber-FC I /Ot*, DATE _J//O/,'

2. Date tendon received on-site  %-_____ -_ . , KR Number .... I4
3. Date installed In conduit to-/0-24 Installation NC __s Wires removed 0 , Wires replaced 0 Total Ineffective wires 0 A. Date buttonheaded /0 - /( 7 . Buttonheading NCR's Bad urtes, 0 Accept. Reheads 0 Total Ineffective wires 0 5, Date stressed 11J18-94 Stressing NCR's _______________

Date restressed Restressing N sCR'__ SHOP END FIELD END TOTAL I ongation

        ý~         (1500 psi to 80% ult.)-Pred./Act.                         44____    ______                      _____

Lift-Off Pressure - Predicted/Actual 6 .*Or5t N/.o1 tIA Shim ThicknessISOZ Ultimate Pressure A LI 7'? 1 7,770 NIA Unseated/Broken Wires 0 Total effective wires after stressing A(015

6. Date Bulk-filled _, fulk-Filling NCR's Time *since Installation 9ý vd Inlet Pressure 5/ j Outlet Temp.

Date end caps refilled: Shop_" Field ,

7. Data compiled by Organization _..... .

Date

8. Additional Comments: 0im! dLw34) eIV
                     * . -   .                                                                            en-4 KJ-2~

Florida CRYSTAL RIVER VNIT NO. 3 Power cS*P@,**,oW IEACrOR BUILDIN.OPl "TRESS 6c,

                                                          **TtDOR HItSTORY
                                                                                                                         ?.p32 TENDON{           rDENT1CATION   K         ..       4      2/3                   . o    Wu`TH           ..

SHOP ,*ASHER ID: PC_ __ C. ,_._ . FUELD VASHER ID: PC --. C_

1. GAIIQA vendor Inspection cover letter number-FPC 9 _ _ _ DkTE ....
2. Date tendon received on-site _ TIR Number __.....__ _
3. Date installed In conduit la. t__,alltion NCR's ln ____ __

Wires removed ... .. Wires replaced ,-Total Ineffective vires _-

4. Date buttonheaded Buttouheading NCR's Bad vires Accept. Reheads Total Ineffective wires _
5. Date stressed Stressina CR's _

Date restressed Restressing NCR'. SHOP END FIELD END TOTAL Elongation (1500 pal to 801 ult.)-Pred./Act. I . Lift-Off Pressure - ?redLcted/ltual . _ _ _ _ N_/L 14A Shim Thickness/801 Ultimate Pressure II N/A MIA Uaseated/Brokea wires___ Total effective wires after stressing _

 .6. Date Bulk-filled                     ....                   Bulk-Filling       NCR'    __,,_                            _    __

Time since Installation _ Inlet Pressure Outlet Temp. __ - Date end caps refilled: Shop - Field F.

7. Data compiled by J , Organization __304,4______"

Date'

8. Additional Comeents: A',me ke,, -
                              -       6 t4ere.       fi'~        -     Id          -(7//iY7~)

7, K M-9, 711;

S* -on.- CRYSTAL RIVER UNlIr :10. 3Aia5

     .    ~:REJCroR                               MULIMI= ?ris~rP*::s$I,%%#SYSTCi                                    plapzi TEUWON' HISTORY WlIPE.61TF1CATIo:1:1.-UER           CR6____                   ILDUS                IMIM T                                 _______

_____R ~nL AHRID: PC__ /(w GAIIQA. vendor inspection cover letter v'xber-FPC 16 / Y.< DATE __1___0 ___ Date tendon received on-site __________ .'Ru~ber 22___________ Date Installed In CCOdUitL to1-1 installation 11cr's_____________ Wires removecd _. '91res repl~ced 0 Total Ineffective wires / Date buttonheaded _10 -1(, -1 L4 Butiornheadin; ?:CR~s _____________ Bad wires /Accept. telloads CTotal. Ineffective wires / Date stressed Ip6-',Stressin;c.s_____________ Date* restressed _____ ________Res tressir-& lNCR $_______________ SHOP ~ FIELD EN~D TOTAL ptation (1500 psi to 60Z ult.)-Pred./Act. j"/ii$ M~~L~ 1_"9% LIEt-Off Pressure - ?rtdLcteJ/Actuasl "#7Q14fOAI6~'q 5 Shim Thickness/8011 Ulti~ate Pressure *720 Q 7,6o __ZON/

  • Unseated/Droken Wires QTotal, ef f ecti':m wires af ter stressing _24L....A.
  • Date Bulk-filled ____________ -7kFiln 6C6 _______________

Time since 17nstallation q netFesre44, Outlet Temp. Date end caps reftlled: Shop _________ ield___________________

  • Data com~piled by _2,;o5ý t62 Organization ______________

Date 3Z'

  • Additlonal Co= -ents: fPIUJ & ALMAJ UVAk QdAffIU) UeaLW.

Florida CRYSTAL RIVER U1I!T NiO. 3 lag. 8 s-22 Power Pt6A emmw ter REACTOR IUILDINC ?RE:'IRESSING SYSTEH Pap 822 TENDON IHISTORY TENDON IDENTIFICATION *U *_BER z /1z' T0.Unw._m SHOP WASHER ID: PC__ CR _ ZLD WASHER ID: PC CR_

1. CAZL/QA vendor inspection cover letter number-FlC I DATE
2. Date tendon received on-site I4R Numbe_
3. Date installed in co~dult Installation NCR's Wires removed . Wires replaced _ Total Ineffective wires .....
4. Date buttonheaded _ _ _Butonheading NCR'siP Bad wires Accept. Reheads . _ Total Ineffective wires S. Date stressed Stressing NCR's ______ ____

Date restressed RestreasIng NCR's_ SHOP END FIELD END TOTAL Qd

  • Elongation (1500 pst to 802 ult.)-Pred./Act. J -
  /

Lift-Off.Pressure - Predicted/Actual N/A Shim Thickness/80Z Ultimate Pressure N/A Unseated/Broken Wires Total effective vires after stressing

6. Date Bulk-filled ... .... Bulk-FIlling NCR's -

liue since installation_ Inlet Pressure Outlet Temp. Date end caps refilied: Shop____ ._,_ Field

7. Data compiled by _ , Organization Date
8. Additional Coments: 5o*v~ Kee*,Ae "-"
                                 /Z                       ...      r/-    2 r     z         o r: rre ..                    ~ce                    .'                e        J    _.Zr

_ --/ (,'1

        "'#% Florida                           CRYSTAL RIVER UNI r HO. 3                                            A*,mk      ,w
           'a   Power
              ,,,o,                  REACrOR BUILDING    TENDONT ?1ESIRESS11G 111SI ORY         SYSTE M.

TENIDONI IDENTIPICATIOII NUHER CUT LENGTH 4CT SHOP WASHER. lot PC 12.1 CIL _____ IELD WASHER tD: ?C______ C?.______

1. CAI,/QA vendor inspection cover letter number-TMC _ DATE
2. Date tendon received on-site MIR $umbor
3. Date installed in conduit Installation NCR'._

Wires removed ___ _Wires replaced __..__._ Total Ineffective vires __ _

4. Date buttonheaded _uttonheading NCR's Bad vires - _. Accept. Reheads _ Total Ineffective wires ___
5. Date stressed ... ._ _ Stressing NCR*as Data rest9resed _Restressian 1NCR't SHOP E2D FIELD END TOTAL Elongation (1500 psi to 80% ult.)-Fred./Act. I I Lift-Off Pressure - Predicted/Mttual .IA M Shim Thickness/002 Ultimate Pressure NI14A Unseated/Broken Wires _ Total effective vites after stressing .,
6. Date Bulk-filled ]_ulk-Filliug N4CR*.a Time since installation _ Inlet Pressure Otlet Temp.

Cu _ Date end caps refilled: Shop yield ___----__-

7. Data compiled by k AZ* 7Organization FPC-Date Yo,__ __ __ __ __7_

8, Additional Comments:27L) ?4C 441A 1($1 t nS9 /J 34g$W JL 4 CA Ky

                                                                                                                      "     907 716

Florida Po er CRYSTAL RIVER UNIT NO. 3 RAcrOR, oUniLD*I PlttSirESSInt SYSu£m AP*ag 3 TENDON hiLSTORY tENDOR IDENIFICATION NUMER J5 CU--?_ rT LENGMh U/ZI SHOP IlASIIEa ID: PC MZi_____ FIELD WASHER ID: PC IVCR

1. CAI/QA vendor inspection cover letter number-FPC 0 1/26 .ZY DATE _ _____
2. Date tendon received on-site R__-,.M-'7 -_ Number *M 424.
3. Date installed In conduit 6 -In - 14 Installation NCR's Wires removed 0 Wires replaced 0 Total Ineffective Vires 0
4. Date buttouheaded /0-kb'941 Buttonheading NCR's Bad vires 0 Accept. Reheads 0 Total Ineffective wires
5. Date stressed /"-4-7_ Stressing NCR'*__

Daie restressed _Restressung _ _CI__s SHOP END FIELD END 'TOTAL

       *.onsation (1500 psi to 80% ult.)-Pred./Act.                                ~~9~                                       9 LIft-Off Pressure      -   Predicted/Actual                   1,0     )/,9            t
                                                                                           *.fO    70O1,&00   z            I/A Shia Ihickness/8OZ 'Ultimaata Pressure                -           j   ~       ~    ~     ~   7/                       /
     'lnsestedlBroken Wires                0           Total effective wires after stressing                                      "
6. Date Bulk-fllled __ -,_ -___" Bulk-Filling NCR's Time since installation Inlet Pressure Outlet Temp. / . .

Date end caps refilled% Shop ._.____...._Field

7. Data compiled by'______________ Organization_______________

Date -V1IF7/7 S. Additional Coments: 0. K, t__-- nm,= _

CIdmhe Attathmega 595.006 3 Florida CRYSTAL RIVER U111T NO. 3 Cakuhideft B* -A ,r ~I!Ih Power REACTOR uxwnc PRtErREssxNc s~sJTI TENDON HISTORY TENDON IDENTIFICATIOtNUE NUMBER _ 9

                                                              /*                     air                __2_CUT SHOP WASHER ID: PC_____               CR. __      _         FIELD WASHER ID: PC__                            CR --                 _
1. CAI/QA vendor inspection cover letter number-FPC l DATE
  *2. Date tendon received on-site              __R                                 Humber     _
3. Date installed in conduit Installation NCR's Wires removed __ _Wires replaced _ Total ineffective wires
4. Date buttonheaded _uttonheading ICN8R Bad wires Accept. Reheads Total Ineffective wires
5. Date stressed Stressing NCRW . .__-.

Date xestressed .... leatressing st__ NCR's __ SHOP END FIELD E 'TOTAL Elongation (1500 psi to 801 ult.)-Pred./Act. I Lift-Off Pressure - Predicted/Actual IA Shim Thickness/80Z Ultimate Pressure . L.i I _ . . ./A Unseaced/Broken Wires _ Total effective wires after stressing ,

6. Date Bulk-tilled Bulk-FttlogNC KCR's Time since installation Inlet Pressure I _-Outlet Temp.

Date end caps refilled: Shop Field __,_ .

7. Data compiled by Organization __--__

Date _ B. Additional Comments .,

C~kM.1 S46-O41 Attfdm B fie Forodda CRYSTAL RIVER UNIT NO. 3 Per DU IPower 11ACTOR bUILDUIG ESTP, ESSIG SYSTEt TEINDON HISTORY M IDEMTXFICAT1O14 1fl_-ER Tb".o IMT -NG SHOP WASHER ID- PC______ CR _ FIELD WASHER ZD: PC_____ .__ CR _ I. CAZIQA vendor Inspection cover letter nmber-FPC I ,_DATE _

2. Date tendon received on-site _MR Number _
3. Date installed in cotiduit __Installation NC _ __

Wires ramved Wires replaced -_ Total Ineffective vires

  • 4. Date buttonheaded Buttonheadinc NCR's bad wires .__ ,__Accept.Reheads Total Iseffective wires _
5. Date stressed Stressing NCR's Date restressed Restressing HCWS SHOP END FIELD END MAOTL 2lOnlatiou (1500 psi to 801 ult.)-Pred./lct. / _

Lift-Of f 8149 Predicted/Atu1al (KMP) I' 3%.,/17.?i /33A. H/A LOCO -OF* rWIC 5(in4*" Shia Tbickness/80% Ultimate Pressure / I .IN/A Vaseated/Broken Wires _ Total effective wires after stressing 6_ _

6. Date bulk-fi1led ..... . ulk-TilliLng 's __NOVa Tlme since installation _I_ Inlet Pressure _ Outlet Temp. __

Date end caps refilled: Shop Z-6 Field 79

7. Data compiled by j0I ~O rganizatio a R Date*~I~-7 .

Add l tome,,., Ts era !j9V.-1JAsrE. (L3_-76) A MO)

              "*0o      "iJ)c4--'Q,              14       LS1         jT"               b-.

L W)0~ 'C~ACKINJ AT- AIrJCH~rLAI-

 )
                                                                                                                         "li p-
      -      jf~

S, s CITIlAL 1V02 WIT O. 2 23ACM, sUtLsiNO iUEIUUmoa srl 3W

                                                                                                          -                                TOWNll go*   1
                                                                     - Tumo-IMMM uuwuSpum    av WI! a" mIIT1oWN            -                                                          Reacto   lids.

Avg. -I- Slh - Ial: TOW Iloeetivo Teaperature o' lekaItilo hIleegive Porso Pee. Thibmeesj atia. yore. le.ee 161eblcsl as. E&t period a"d Z.IA, VA cigtil strassiag iA NAth

.LLLUz.4         4           670       166    1j          2...1 IM        3Q 16       NA                            VA    j ILA-                                          r62    PIA I.~               .313.3                                                                                        163      92     46 163       1054   1,33      4 316"    VI 16116     14            31140  NtL 21170-VIA                  r      VIA                           1. LC,.-off only d           ..                              7*     VIA 6      W14. VI .       _3             5
                                   *.1fM4                   b VL&"            16H13 p.          NIL
.IOI       X      ..1..   .h1)
   .5 1m                                                                                                                                         .3 4&&OEDO-C 6e'asc
                      -__S
                         , o                    i        NA A23? 722 P    I571      tESU                      I         &I                P1A         A          a      dI&

I!!

Florida CRYSTAL RIVER UNiTr NO. 3 ,.u --. Power REACtOR BUlLDC ?IESI'F.ssING SYSTE?1 A*U TENDON HISTORY rENDON IDENTIFICATION N4UMBER CUT LENGTH - 6 4'~ p/5"0 *~~m

HOP hASHER I
IN PC 4 CR 9/Z FIELD WAS'1ER ID: PC LAXI CK /Z3-i
1. GAI/QA vendor inspection cover letter number-FPC I /OZ.'Y DATE 91,1/74P
2. Date tendon received on-site 4- I-W RR Number J 9, 73
3. Date installed In conduit - ,-/0-r7A4I Installationt4CI's Wires removed 0 Wires replaced 0 Total Ineffective wires 0
4. Date buttonheaded /0 '.1/- Buttonheading NCR's Bad wires. 0 Accept. Reheads 0 Total Ineffective wires 0
5. Date stressed , / "3-_Q Stressing NCR' Date restzessed Restressing NCR's
  • SHOP END FIELD END TOTAL
    )  oflg5tion. (ISuOOs       to BXul.)-red./ct.                                                                 4..

V Lift-Off Pressure,110 - Predicted/Actual I OU to, N/ Shim ThicknessIBOX Ultimate Pressure 701/4?77 17710 N/A Unseated/Broken Wires 00 Total effective wires after stressing / ,.

6. Date Bulk-filled _B-'/i-7 Bulk-Fillinz VCR's Time since Ihstallation 9 Inlet Pressure
  • 4. ,. Outlet Temp.

Date end caps refilled: Shop' ___ _ __ Field

7. Data compiled by .- ?Organization_______________

Date 3/Z1/77

8. Additional Comments:

K;- I _ I n '*n

             'Io
 .      *..;r',      .                       CRYSTAL RIVER UNIi NO. 3                                               'kVua"'

aubdM S,* .- a REACTO. CUILDt::G Prr;sr-..sst:SS, SYSTE.M*

                .gd~wmTl!:rO!'                                 1l[STCRY 1/2__

'DON. IDENTIFICATIO:1 N-UQER C) 305 W LENIGTHI/5

                                                                                                               ?A IP UAS.ER MD: PC                         C.l cR                   FIELD WASHER . D: PC A =/                         CR       *._*..YL~i" CAI/Q,\ vendor inspectio-i cover letter numbor-YPC                          /023 S"7                   DATE,. _,/3,_/7,__   __

Date tendon recei-ed on-site LA -in-1*4 'R Number _ _ _l_,_ Date Ins:alled 1.* ccnduui__ ._ __________l_ Installation IICRI's ,_II Vires retoved 0 Wires replaced 0 Total Ineffective vires

  • Date bucttn.eaded AQ-[*-1-4. Butto...eadina t;CR's lad vires Accept. Reheads
                                     '.                           0          Total Ineffective vwijs                           /

Date stressed I I.l4-P4 Stressing NCR's 'lr) .. Date restressed Restressing NCR's SHOP rED FIELD END TOTAL 7,Sg,,, (1500 psi to 60 ult.)-Ped./Act... IAft-Off Pressure - Predi~cted/Actual, I___________T___N____ Shim Thickness/S0Z Ultimiate Zressure Z720 N/A Unseated/Broken Wires _ Total effecttile vires after stressing . Date Bulk-filled ,.3-*'7-7v 7,ulk-rilling . CR's /, . Time since Installation q4Inlet Pressulre- ~ Outlet Temp. Date end caps refilled: Shop _F_ Field ____ Data cor-piled by .?Organization __,, Date *ZeI17-Additional Co-ents: At'

                                                       +

Florida CRYSTAL RIVER NlIT NO. 3 Awadhme Power REACTOR BUILDWGC PRErRESSING SVSEI FWD"

  • P 5Ioh.l~ TENDON HISTORY TENDON IDENI*FICATIONI 1 E1 30,8 0CUT LE*GTH SHOP WASHER ID: PC CR ]FIELD WASHER TD: PC_
  • CR
1. CAI/QA vendor inspection cover letter number-FIC I DATE
2. Date tendon received on-site __R Number
3. Date Installed In conduit Installation NCR's Wires removed ,_ __ires replaced Total Ineffective -ires
4. Date buttooheaded __ _ uttonbead" NCR's bad vires ._ ___ Accept. Rehead. Total ineffective wites
5. Date stressed .... Stressing XCIC's ____

Date restressed _estressing NCRts SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. / * / Litft-Of Pressure - Predicted /tual I _ i/A Shim Thickness/80Z Ultimate Pressure NA N__/A____ A_ Unseated/Broken Wires -_ Tottal effective wires after stressing __ _

6. Date Bulk-filled _ alk-FIlliag NCR's Time since installation . _ Inlet Pressure , Outlet Temp.

Date end caps refilled: Shop ,., Field

7. Data compiled by - Organization- _. . ....

Date _____1 _________

8. Additional Comments: 4e. ..- ....

ArofeIle.

                              -~~                     ~zf 5iPP:),/oAn)(zn~

de/2'~s9 7O " '9 7

FIorida CRYSTAL RIVER UNIT 140. 3 ,a,,,,. a Power REAcTOR BUILDING PISTUSESINC SYSTEft P..,, TENDON HISTORY

*ENDON ID~ENTIFICATIO14 )4UH39R                                                  Q LENGTHI________

CUTO4 190? WASHER ID: PCJ. _ CR 42 9 FIELD ASIER IXD: PC - cm.( 26

 . GAI/QA vendor Inspection cover letter number-FPC                      . /03.                     _7      DATE ._.9/J30/761
.Date tendon received on-site 4 1........ RIMR Number.______________
1. Date Installed In condutt Installation NCRs .....

Wires removed 0 Wires replaced 0 Total Ineffective wires 0 Date buttonheaded /0" 11-74 ButtodheadInk NCR's Bad wires 0 Accept. Reheads ......... Total Ineffective wirces _____.,.

      *Date stressed             I"       4Stressing                        NCR's       ______710_____/_

Date restressed RestressIng NCR's SHOP END FIELD END TOTAL F'.1ongation (1500 psi to 80% ult.)-Pred./Act. %37/1/ 4 1,4 _310& . Pro' "Lift-Of f Pressure PredictedlActual 4'I/O /10 90/0(000,. N/A Shia 'Thicknessl8Ol Ultim~ate Pressure 7%'~l 1.7L.Z? MIA Vnseated/Broken WIires 0 Total effective wires after stressing "

  • Date Bulk-filled . S..." *ulk-Fillinzg NCR's Time since Installation g Inlet Pressure outlet Temp. ... 2...

Date end caps refilled: Shop ____Field .....

 '.      Data  compiled by ,z                    __                     Organization____

Date :0',_,_ _. I. Additional Coments: k-ip ,,L.

41 Florida Power CRYSUAL RIVER UIT N. 3 REACTOR DumpiLD PRLSiEssiNG sysm A Nr.

               °"oP'°"

4S _TENDON HISTORY TENDON IDENTIFICATION ?IUIER '~ UT LENGTHI__________ Ct SHOP WASHER ID: PC CR _ FIELD WASHER ID: PC________ CR

1. CAI/QA vendor Inspection cover letter nwuber-FPC I . DATE _
2. Date tendon received on-site __k_ R Number b
3. Date installed in conduit Installation OCR's .... .

wires removed _--- __Wires replaced Total Ineffective wires

4. Date buttonheaded B___uttonheading NCR's ... .

Bad wires _ Accept. Reheads ____ ___ Total laeffecftive wires ___ _

5. Date stressed Stressing NCR's Data restressed Restressing NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 60Z ult.)-Fred.(Act. I . . .

Lif t-Off Pressure - Predicted/ActumalL L . U/A Shim Thickness/802 Ultimate Pressure N/A Unseated/Btoken i _Wire Total effective vires after stressing __"

6. Date Bulk-filled -__..... .. _Bulk-FIlling NCR's -- _

Time since Installation Inlet Pressure Outlet Temp. Date end caps refilled: Shop _ F___ Field _.____._

7. Data compiled by,. *Organization 4J2 ,._4=--99_

Date 0____A_____

8. Additional Comments: O&A,,- dYff.#i 11.
                  #  A      -2.A/              tAe) r
    **:-     ~ ~raCYSTAL4                              d                  RIVER UNIT 10. 3                                 ~~s-
         ,..'vr..r*,Cra
               ,                                              DIUILDI::C PST..SSVU                      SYST£.'t                                    For33 IDENTIF1CAT1OI.'%-U:MER                                     7) 3 0.                                  CUT LENCDI                  1241 tAP IP WAISHER ID:..PC            420                CR                             FIELD WASHER ID: ?C                              j                  CR GAIIQ& vcnCor Inspection cover lector r~cber-T?C P                                                     /0.3 C7                    *.           DAT E    .9/340/79 Date iLI.,tendofi*

riceived on-site ________ S.r__sing _I.MR Number _____-____,________.______T___ Date 1insta .1e i cenduit __________Installation NCR.'s 4396 wires ve~oved /Wires rc~1aced 0Total Ineffective witres / Date buttcmbeaded /0BI'd uttonheadin;a NCR*&_______________ Bad wires .3 Accept. Rel-hcads / Total Inef fective wires 7. bato stressed SrsigNCR's_________________ Date restressad ______________Restressing NCR's ________________ SHIOP END FIELD E:D TOTAL "Iongatln (1500 psi to 60% ult.)-Pred./Act.. ...... Y. )"'-Llft-Off Pressure - Predicted/Actual ~tI Shia Thickness/8OX Ultimirate Pressure I Z& NI/A

*Unseated/Broken U11res                                  0                   Total effective wires after stressing                                             O Date Bulk-filled               ____.              ______                    bulk-Flilling         N.CILs        ______________

Time since installation I nlet Pressure ;2%. Outlet Temp. . Date end caps refilled: Shop _el___d____ Tieldo______ee_____________ Data compiled by -/?--* Organization_ _ _ __$ DateresY1e1s1_ 7ees____ Additional Co=ents:

Florida CRYSTAL RIVER URIT NO. 3 Power S09GAVIgON REACTOR BUILDINC nE33REsS1HG SYSTE1 PapS34 TENDON HISTORY TENDON IDENTIFICATION NUMBER /CU 3T' o LENGH SHOP WASHER ID: PC_ CR FIELD WASHER ID: PC_ F ___ CR .,

1. CAI/QA vendor inspection cover letter number-FPC , _._ PpAT_"
2. Date tendon received on-site -tH___________ aR Number _.
3. Date installed in conduit Installation NCR's Wý_tres removed Wires replaced _ Total Ineffective wires
4. Date buttonheaded
  • _,_ ButtonheadIng Nchts ,

Bad wires __Accept. Reheads . _ Total Ineffective w1res _ S. Date stressed Stressing NCR's __ Date Testressed _Restressian NCl K __. dl SHOP END FIELD END TOTAL Elongation (1500 psi' to 80% ult.)-Pred./Act. , L

  • Lift-Off Pressure - PredictedlActual J.. HI/A Shim Thickness/80 Ultimate Pressure . H/A Unseated/Broken Wires Total effective wires after stressing "
6. Date bulk-filled Bulk-FIllIng NCR's Time since installation Inlet Pressure , Outlet Temp. --

Date end caps refilled: Shop _Fie Feld . ... 7 Data compiled by Organization Date 7,ý/?

8. Additional Comments: N l m
                           -     200 ~                 V    2 j~;.
                                                                       ,   6~'    ,9c2'z%81 5

Florida CRYSTAL RIVER UNIT NO. 3 owubim.l* Power RrAcOR BUiLDmlrET1GSSitsi IuG SYSTEH AN.%,,M COMP646140ft TENDON HISTORYto 3 ZEFIDECTIFNCATON NUER CURLHE//"CT L cA 1140? WASHER ID: PC /4 Z 6! IL WSE D. CC GAI/QA veidor Inspection cover letter number-FPC I "' /035 ? . DATE- -f-3#/7 , !. Date tendou'recelved on-site 1PNumber P*_________7____ 7___ I__ ....

1. Date Installed' in conduit %T-2244.-T Installation NCR's _.

Wires removed 0 Wires replaced 0 Total Ineffective wires 4

a. Date buttonheaded 9-74 Buttonheading NCRI's Bad wires Accept. Reheada 0 Total Ineffective wires /
*. Dote   stressed           /1-A 7.9.                   Stressing NCR's.                             _

Date restressed Restressing NCR's SHOP END FIELD END TOTAL

     ',longation (1500 psi to 80% ult.)-Pred.IAct.             7                        1                             I
       ýLf*OfPressure - Predicted/Actual                      6,7 4                 e7?tI7      6.                   NLA Shim Thickness/8o% Ultimate Pressure                      16                             L                      N/A Unseated/Broken Wires          _
  • Total effective vires after stressing Bulk-filled 3 Bulk-Filling NCR's -nDate TMe since Intllto ~ Inlet Pressure 3C if..Out~et Temp, Date end caps refilled: Shop ,_Field ,_J I. Data compiled by Z92Organlzation _._ _._

Date ______________z____z_ I. Additional Comnents:

Florida O 5-95s.00 Ant.*ru,u5 CRYSTAL RIVER UNIT 140. 3

 )            Power conpOiAleft            REACTOR BUILDIIC PALSTRESSIiIG SYSTEM TENDON HISTORY TENDON IDENTIFICATION NUMBER                   .          s.-/49            .. . -,CUT     LENGTH SHOP WASHER ID: PC                    CR                            FIELD WASHER ID: PC.                      CR
1. CAI/QA vendor inspection cover letter number-FPC I DATE
2. Date tendon received on-site _ 1MNumber
3. Date installed in contduit _Installation NCR!s Wires removed Wires replaced .. _ Total Ineffective wires
4. Date buttonheaded ¶ Buttonheading NCR's Bad vires .... _Accept. Reheade Total Ineffective vires
5. Date stressed Stressing NCR's Date restressed .... ...... Restressiug NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred.IAct. II
 )     Lift-Off Pressure - Predicted/Actual                                      _               _    .  !                    N/A Shim Thickness/80I      Ultimate Pressure                                      I             ,      ,/A Unseated/Broken Wires                                         Total effective     vires after stressing
6. Date Bulk-filled bulk-Fill.ng NCR' a Time since Installation Inlet Pressure ..... Outlet Temp, _ _

Date end caps refilled: Shop __F___ ield

7. Data compiled by organization Date *V//77 S. Additional Cemmentsz _&0",e ,

I *

  • Floidda CRYSTAL RIVER UNIT NO. 3 *"'

Power R.EACTOR BUILDING PILESTatSSlNG SYSTEH

-.IDENTPOIFICATIONa TENDON 11IStORY

,)o A NUMBER .3 soWT C.U LENGTH /.

'HOP WASHiER ID: PCJ                 ~         CR   JlQ               FIELD WASHER ID: PCj~                       CR CAI/QA vendor Inspection cover letter number-FPC I                                /O3                 IDATE.. 930/,       "
1. Date tendon received on-site __ -_ _' _ 4tR Number 3915:7
3. Date Installed In conduit: Inst'allation NCR's Wires removed 0 'Wires replaced 0 Total Ineffective vires 0
1. Date buttonheaded _ _ -_*_ __ Buttonheading NCR's _

DBad vires' 0 Accepft. Reheads 0 Total Ineffective wires 0

 ;.      Date stressed                 j,-il..g                           Stressing     NCR's_

Date restressed Restressing NCR's SHOP END FIELD END TOTAL

   ^R.longation (1500 psi to 802 ult.)-Pred./Act. LiI /LI11                                                in            q      1
         ),Ift-Off Pressure - Predicted/Actual                                                       jI2         b/          NIA.Qb/J_9O Shim Thickness/80% Ultimate Pressure                                   !21s' 7770'       J621-17:2                 N/A Unseated/Broken Wires                                    Total effective vires after Stressing               *     *3
  *.      Date Bulk-filled                                   __    Bulk-Filling B__,__-             NCR's Time since installation /0fr.0dXL-                       Inlet Pressure _`9Q) 9=                Outlet Temp.

Date end caps refilled: Shop . Field

1. Data compiled by .~ ~Organization_______________

Date _Y///7_7

3. Additional Coments:

K .. ,

                  *        .   .     -   -     nn        m  a      am     m        =-,

Cakuhi. 84.4m Florida CRYSTAL RIVER UWIT NO. 3 Aft .*homw Power oasem*beou REAcroR BunLDiG Pa.SrREssiNc sysT TENDON HlISTORY TENDON IDENTIFICATION NUMBER dO 331/_ CUT LENGT ,,H_ SHOP WASHER ID: PC C _ FIEL WASHER ID: PC Cl

1. CAIIQA vendor inspection cover letter n=uber-FPC I . DATE
2. Date tendon received on-site HR Number I__
3. Date installed in condult instaLlation NCRIs Wires removed Wires replaced -Total lneffective wires A. Date buttonheaded Buttonheadin$ NCR's ,_, _ __

Bad wires _ Accept. Reheads Total Ineffective wires

5. Date stressed __ _Stressing Ct.R.S Date restressed _Restressins NCR's. _

SHOP END FIELD END ,OTAL 4 Elongation (1500 psi to 801 ult.)-Predo/Act. . I Lift-off Pressure - Predicted/Actual I j NIA Shim Thickness/lOX Ultimate Pressure IW NA Unseated/Broken Wires .... _ Total effective vires after stressing .__,_ "_-_-

6. D&teL Sulk-filled Bulk-Filling NCR's. __

Time since Installation Inlet Pressure Outlet Temp.... Date end caps refilled: Shop ...... _Field . . _. .. _

7. Data compiled by Z *Z,4 _ Organization _._*_.* _ _,_

Date _-_

8. Additional Coments: _._,,'. ,
                         *                -  .,_/#L            _!
       .LI-Or . 'e
         ,L4,       a:-t"n l . "-
                !Zr/Vv                ./ , * #kf     '.(7f/s rf7./

K/

  )

AedawW Power REACOR BUILDING rV.S.-rSSING SYSTEH

   ,'*X Rorda  ,ewo,* ,,go                               CRYSTAL              UNir NO. 3 .

RIVER )JISTORY TENDON 339 CAktA*&53 M rAL ýKIDENTIFICATION IUNMER 2,3 aT LIN=~ CU /-V ! .- r3/ WFf0 WASHER ID: PCJJ. CR FIELD WASHER ID: PC j Cd5

t. GAI/QA vendor inspection cover letter numbe-,FPC U /03SV7 DATF. ____.__._7_

Z. Date tendon received on-site 4 -IIt'o THR Number, 3g 7S'

3. Date installed In con'duit _ . I__-___

installation NCR's ___, Wires removed Uires replaced W 0 Total Ineffective wires 0

 .. Date buttonheaded                      /0"9274                      Buttonheadlng NCR's Bad wires              0              Accept. Reheads                    0           Total Ineffective wires                        <

Date stressed Stressing NCR _ _t Date restressed _____________Restressing NCR's _______________ SHOP END rIELD END TOTAL r'ý'Elongation (1500 psi to 80Z ult.)-Pred. /Art. 'A~ N ,ILI -, ( If t-Of f Pressure - ProdietedlActual U,7,01Ulo9F N/-A Shist Thicknesa/SOZ Ultimate pressure 24-17190 . .L2 i:ZOt/ Unseated/Broken Wires 0. . Total effective vires after stressing 1: Date Bulk-filled 3-,2'-'7' Bulk-Filling NCR's _ Time since Installation, O..AA,,* Inlet Pressure

                                                                                   'e,=5.l 4                       Outlet Temp.              4 Date end caps refilled:                      Shop                              Field
    . Data compiled by                          4-;                                  Oo2-Organization       .

Date _ _ _ _ _ _ _ _ A.dditional Comments:

    )
                     -~r..*r                                         -. r.

Floida CRYSTAL RIVER UNIT NO. 3 ,.,.., Power EAC70oR BUILDINC ,tsus s1 Si STEX Ra 'P TENDON HI1STORY

   )I jIO   DFEtTIF1CAIOI    iuiw NUMBE              J         M /Y7                CUT LENGTH        /6_____-f__

SHOP WASHER ID: PC /Z/ cR e74' FIELD WASHER ID: PC / Z.- /_ __

1. CAIIQA vendor Inspection cover letter nu.ber-FPC 9IZ/ D . _//L/7
2. Dote tendon received on-site /2-ZP. 73 VMR HNuber YS'1'r
3. Date Installed In conduit /-_z-7.* 7_ Installation NCR's ....

Wires removed Wires replaced w 0 Total laeffective.wires 0

4. Date buttonheaded _-/7 - 2y buttonheadimg NCR's ,

bad wires _ _ Accept. Reheads 0 Total Ineffective wires

5. Date stressed 2e.. - 7* Stressing NCR's Date restressed _Restressing NCR's SROP E*4D FIELD END TOTAL
 *?I% Elongation (1500 psi to 801 ult.) -Prod. /Act.                                       Y       IV~V~7 0.~          D     ,(/

Lift-Off Pressure - ?redicted/Actual 6F-70 170*'6 !dPO0 1$'/o IM Whin Thickness/80X Ultimate Pressure 7 WO 4, 7780 H/A Unseated/Broken Wires, 0 Total effective wires after stressing /63

6. 'Date Bulk-filled 7-2 oG-719 Bulk-Filling NCR9s Time sin~e Installation 4:; Inlet Pressure , Outlet Temp. lI Date end caps refilled: Shop Field _-
7. Da ta compiled b$-Z ~Organization Date .Z 7 72
8. Additional Coments:

(-T 907 716

             * *e* )FIOIkt                 CRYSTAL RIVER UNIT            0. 3NO.

Power GO~eae.'.. REACTOR BUILD11tG PAESTRESSING SYSTEM

                                                  ._TENIDON IHISTORY he,Ow gON IDENTIFICAT*lON t              _         4,'Z_2- H/el                         CU      T              /S$         -

SHOP WASVER ID: PC 1Z/ CR 6 /$1" FIELD WASUERID: PC /C-t ca 904o 1, AI/QA vendor Inspection cover letter number-FPC I _.____ DAT_._____

2. Date tendon received on-site 4/2 20 - 7.3 MOR Nimber .7-f -- r
3. Data Installed In conduit /-2Z-7,/' Installation NCR'S ___

Wires removed _ Wires replaced . Total Ineffective wires

4. Date buttonheaded ,/,.7b . uttonheadipg NCR's .

Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0

5. Date stressed 3'4f-7.. Stressing NCR's .

Date restressed Restressing NCR'_s SHOP' END FIELD END TOTAL

    £lang-tion (1300 psi to 813 ult.)-Pri.d..Ac..
    'Z                                                                 SFna Lif t-Off Pressure      -  Predicted/Actual                      4,00L 17/ 0                 4~7"      1*47SO                 "N/A-Shim Ihickness/80% Ultimate Pressure                              6YI          WO7?/ 63 YS-177"                     ~           K/A Unseated/Broken Wires                 0              Total effective wires after stressing                                  /63
6. Dote Dulk-filled 7- 2 f- / Bulk-Filling NCR's Time since installation g Inlet Pressure /3 outlet Temp. /'V?

Date end caps reflfled: Shop .... Field

7. Data complied by _ Organization ___ ._ ---- _,_,

Date 1_________________

8. Additional Comments:.

907 716

Caksomm

              "  odd                        CRYSTAL RIVER UNIT NO. 3                                                 Anuebsa Power                REACTOR SUILDIVIG FI-STRFSSINC SYSTE, TENDO,4  10STORY

.453DOH IDENTIFICATION NUMBER /7~ anwcr CUT IM9T ________ SHOP WASHER ID: PC /Z/ CR 5S YIELD WASHER ID: PC 17- / "CR ./00 2

1. CATIQA vendor inspection cover letter number-FPC ?P2f
                                                                                         ?                         D&TF.      _.212_,_
2. Date tendon received on-site.  ? o2 P - 7 ,7_ RHR Numbet ._ _" ___-___
3. Date Installed In conduit 12.-7Y
                                             /-                        Installation NCRIs Wires removed  _                   Wires replaced       _                 Total       Ineffective vires                             O
4. Date buttonheaded 4-/I'.-7_y buttonheading NCR's Bad wires " Accept. Reheads 0 Total Ineffective vires 0 So Date stressed __ z -__- _______Stressing NCR_*s_

Date restressed .Restressing NCIRes SHOP END FIELD END TOTAL Elongation (1500 psi to 80% ult.)-Pred./Act. 0*0/5/,

                                                                                                                                      /o1I /0/y' Lift-Off Pressure - Predicted/Actual                          4P70,&?DO               6_f19                 0                     H/A Shim Thickness/80Z Ultimate Pressure                          7"r,/7         D0       -t          j ,77ro Unseated/Broken Wires                0              Total effective vires after stressing                                   f         3
6. Date Bulk-filled 7-2-C. -790/ Bulk-Filling NCR's O Time since Installation _.*,"_i; inlet Pressure r Outlet Temp. ,

Date end caps refilled: Shop Field ....

7. Data compiled _______________ Organization _________________

Date __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ S. Additional Comments:

 )

qn7 716

Florda CRYSTAL RIVER UI1T NO.3 NOW Power 1EACrOR BUILDRIC PRESTRESSING SYSThL TENDON HIISTORY'

  • eE

.Ij 0H IDENTIFICATION *RUHER 4/2.13 / aMT 3.I t / C5- , A* SHOP WASHE£R ID. PC /Z./ CR 3F W YIELD WASRER ID: PC /22" CiR _'Z3 . 1, CAI/QA vendor inspection cover letter number-FePC I DATE.///r/;3 11S

2. Date tendon received on-site /DV -- Y - 7 . .i 5K Number 33 3 $3 6
3. Date Installed in conduit Z/2 1- 70/ Installation YCRIs Wires removed 0 Wires replaced _ _ ._ Total Ineffective wires 0
4. Date buttonhesded *- 25-4a C - . Buttonheading NC10s ....

Bad wires 0 Accept. Reheads 0 Total ineffective wires

5. Date stressed 21.3 - 7*_ J Stressing NCR's . . . ..

Date restressed ,_--_ Restressing MCR*s ___ SOP END FIELD END TOTAL Elongation (1500 psi to 80% ult.)-Prtd.IAct. t, ,fý e. ve /0~4/d, 'OI"

   *.)    ift-Off Pressure - Predicted/Actual                              CU.?O /700           *P.'o            _                    N/A Shim Ihicknesu/80Z Ultimate Pressure                                GZ.G     ,7t/         J>'Vr77t PO                           /A Unseated/Broken Wires             0                  Total effective wires after stressing                              /63
6. Date bulk-filled. 7-.31 -7 4 Bulk-Filling OCR's Time since installation * '.

Inlet Pressure 2_ . Outlet Temp. /780 Date end caps refilled: Shop Field

7. Data compiled organization_____________

Date _ _ _ _ _ _ _ _ _ _ _ _ _

8. Additional Comments: _ _._ .-
 )

907 716

Rofda CRYSTAL RIVtR ,ITl NO. 3 F"r-S Power REACTOR BUILDI11C P,,STRSSING S.STE1 TENDON HISTORY

 ý..ZDOM IDENTIFICATION NUMER                          112 H13 ZY          .                  LENGTH        _      _'        _      __-

SHOP WASHER ID: PC /Z/ CR 3'6 1 FIELD WASHER ID: PC ,ZC CR /Z I. CAIIQA vendor inspection cover letter number-FTC F 9?20 DATE.LZ/2 0/7y'

2. Date tendon received on-site . - 7- Number 3.. V
3. Date installed in conduit ___/-_17-7_ _ _ Installation NCR's Wires removed _ . Wires replaced 4:_ Total Ineffective vires
4. Date buttonheaded _ _-27_-7_/ Buttonheadfing NCR's _

Bad Wires 0 Accept. Reheads _ Total Ineffective Wires

5. Date stressed -2I f- 7.r Stressing MCI's Date restressed _Retresslug NCR's SkOP END FIELD END TOTAL Elongation (1500 psi. to 80! ult.)-Pred./Act. ~ $ t 1iY~ ~ 4/I Lift-Off Pressure - Predicted/Actual ' 4C A Shim Thickness/80Z Ultimate Pressure e,,- 7'/o vo , "9 HA Unseated/Broken Wires 0 Total effective Wires after stressing /63
6. Date Bulk-filled P 7,0/ Bulk-Filling NCR'*

Time since installationZ wo"A"i f,$ Inlet Pressure ._ _0j'_ Outlet Temp. /5777 Date end caps refilled: Shop Field. . ___

7. Data compiled by ., Organilzation _

Date 9/Y*, ,77

8. Additional Comments:
 )

I 907 716

Florda+ ) CRYSTAL RIVER UNIT NO. 3 hpS4s

                                                                                                     ~CW901mbes-tw.4m*

Power REACTOR BUILDING PiYSTRESSING SYSTEM (*42- C48600949%TENDON e II STORY .-4F *DON lDETIFICATION NUmBER A/2 ut LENGTH C3U3 ,-s - SHOP VASHER ID: PC /Z CR 594 FIELD 'WASHER ID: PC /,/i CR ?34

l. GAT/QA vendor inspection cover letter number-jPC 1 7 ,2 0 .DAT_ 51
2. Date tendon received on-site /-1*470 HRLNumber ._ ___,,____
3. Date installed In conduit /-/f " ?e Installation NCR's_ _

Wires removed 0 Wires replaced 0 Total Ineffective wires

4. Date buttonheaded & 2-)7 -71y Buttonheading NCRs' Bad wires 0 Accept. Reheads 0 Total Ineffective tdires
5. Date stressed 7-/'/o 7r Stressing NCRos Date restressed __ Restressing NCRts SHOP END FIELD ENiD TOTAL Elongation (1500 psi to 80% ult.)-Pred./Act. /,eIfJ d'/ - sr 10,  ;"/Y / 10~

Llft-Off Pressure - Predicted/Actual *170 /7000 4f/# 14"1 ToIA Shim Thickness/8OZ Ultimate Pressure 1/8 /780 W NI/A Unseated/Broken Wires 0 Total effective wires after stressing /S3

6. Date Bulk-filled $- - 7/ lulk-FiIling NCR's8 Time since installation 7 *#v1-4', inlet Pressure A/A? Outlet Temp. /60 Date end caps refilled: Shop Field
7. Data compiled by 4?d Organization-_______ __ _ _ _

Date , 17

8. Additional Comments:
              ---                                                         - l_                _                     _ll
       )          :    * -:    :"I            * "* :

Florda CRYSTAL RIVER UNIT NO. 3 I"p5 Power caeo*maow REACrOR DUILDIC ?PESTRESSI1NC _TENDONt 11STORY STE. ,..TENIDON IDENTIFICATION NUHBER 13W CUT/ LENGTH / s~~ SHOP WASHER 1D: PC /Z . CR z* }nELE) WASHER ID: PC /2/ CR 917 r

1. CAIIQA vendor inspection cover letter nunber-F1CI 9 0 DATE- 2/1o/T7
2. Date tendon received on-site /-/4 70/' MR Number 0403/
3. Date Installed in conduit /-2/- 7./ Installation SCR's Wires removed Wire V replaced 0 Total Ineffective vires
4. Date buttonheaded _ 7._
                                    -,P_   70/             uttonheading NCR's Bad wires        0        Accept. Reheads            0          Total Ineffective wires .0
5. Date stressed Z-tf-7" Stressing NCR's Date restressed Restressintg 1CRI_
                     "                                              SHOP END              FIELD END                   TOTAL
          -longation (1500 pot to 80o ult.)-,red./Act.             r'Ary                5A-        ,   rye-'               1/,0,o IY Lift-Off Tressure - fredicted/Actual                    ro    D/o/7fO        *H               9P7        .         A Shim ThLckness/80    Ultimate Pressure                  7H/& / 7I'_          .      /f I7                        H/A UnseatedlBroken Wires _                       Total effective vires after stressing                          /,3
6. Date Bulk-filled 7.71 Y. Bulk-FLIling NCIR's Time since Installation 4 *s,1: Inlet Pressure "P '/ Outlet Temp. /3G.

Date end caps refilled: Shop -yield

7. Data compiled by .. ? ~Organization _______________

Date i S. Additional Comments: 907 716

Florida CRYSTAL RIVER UNIT lit.3 Pop be Power 41AcTOR BUZLDUC PR,:STP.SSINC SYSTEH

                    -,TENDON                                   hIISTORY

'TEtIDOM IDE.NTIFICAT ION NUHfBER 4'2 Cui/ r LEnGm s~ ~ SHOP WAShIIR ID: PC /22. CR /230 FIELD WASIIER ID: PC / - CR _ ____

1. CAI/QA vendor inspection cover letter number-FPC I 9 0 DATE ZA,,/7o_
2. Date tendon received on-site /-/' - 7&/, tR Number 3.7 03/_
3. Date Installed in coniduit /- I - 76/ Installation NCR.'_

Wires removed 0 Wires replaced __....._Total Ineffective wires 00

4. Date buttonheaded 77-/v - 7' Buttonheadlas NCR's Bad wires 0 -Accept. Reheads 0 Total Ineffective wires 6
5. Date stressed 7. _.1"
                                - Z_       7                       Stressing NCR's Date restressed                                              Restressing NCR's SHOP END                 FIELD END                      TOTAL Elontation (1500 psi to 801 uIlt.)-Pred.IAct.                          sin         /I         f/'A       j                   _____
 )     Lif t-Oif Pressure - Predicted/Actual                                 47?d 164COO           4f                      p                N/A Shim Thickness/80Z Ultimate Pressure                                  6/.    /775"              7        1                          NIA Unseated/Broken Wires              0                 Total effective wires after stressing                                     "'
6. Date Bulk-filled -J,- 7J Bulk-Filling NCR's Time since installation 6 #w..W Inlet Pressure 1V ~ -Outlet Temp.~9 Date end caps refilled: Shop ........ . Field
7. Data compiled by . t4 1 Organization_______________

Date __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

8. Additional Coments_

on? 71m

Flofd8 CRYSTAL RIVER UNIT NO. 3 Arsatn

          *. f,--gS-,.@-           R RCOR    RPower    TEDOHI PP*.STRESSING UILDX,,G       hilSTORY       SYSTEM                       P

.. TEMDON IDENTIFICATION NUMBER 4'- Z Al-/ . LENGTH ,,/, 7 SHOP IASHE R ID: PC /Z/ CR 5_, ' FIELD WASHER ID: PC /ZZ_ ci _ _ __ I. CAIIQ vendor inspection cover letter nwuber-FPC 1 OM' DA*h_. ____

2. Date tendon received on-site /-/6 - 7Num PHR ?4ber 36 0 3$'
3. Date Installed In conduit /-Z.' 740 Installation NCRts'a Wires removed 0 Wires replaced 0 'Total Ineffective *ires 0
4. Date buttonheaded 7-/0 - 7%/ Buttonheading NCRI__'s Bad wires 0 Accept. Reheads 0 Total Ineffective Wires 0 S. Date stressed 7.. -*O -7f' Stressing NCR's _

Date restressed Restressin* NCR's SHOP END FIELD END TOTAL (1500 pot to 801 ult.)-Pred./Act. ' _Elongation Lift-off Pressure - Predlcted/Actual P'7/17000 Wr/' /16P4 NI/A Unseated/Broken Wilres ,, 0 .. Total effective a ires after stressing & .

6. Date Bulk-filled 7o-3/ - 7y' ulk-Flling NCR's ....

Time since installation _ ,.=ýA Inlet Pressure /Z Outlet Tep. /./0 Date end caps refilled: Shop . ... _ Field . ....

7. Data compiled by :2~2~r~Organization _

Date 7

8. Additlonal Comments:

907 716

Florida CRYSTAL RIVER UNIT NO. 3 Ca Sf.t*=.5 Power REACIOR BUILDIZIG PIlrSTRESSINC SYSTEM fte U TENDON .1ISTORtY SHOP WASHE-R ID: C /Z0 CR 7Y FIEL WASHER ID: PC . CR, //_3 $*'

1. GAI/QA vendor Inspection cover letter number-FEC I ?2W5' DATJ /a13/Z.73
2. Date tendon received on-site 71 7 - 3 RfR Number'. ;t (6
3. Date installid In conduit 1!5;-1-/ Installation NCd' Wires 'removed , Wires replaced 40 Total Ineffective vires8
4. Date buttonheaded 1- l -7 L1 . 'uuttonheading NCR's Bad vires /3 Accept. Reheads /Z- Total Ineffective vires /
5. Date'stressed - -7 !j Str.essin' NCR's Date restressed Restressing NCR's SUOP LNID FIELD END TOTAL l Elongation (1500 pst to 80% ult.)-Prel./Act. C __ /0,
    -Lif t-Off ?ressure - Predicted/Actual *P                     /4w¥              1 463:                    NIA, Shim Thickness/80Z Ultimate Pressure                  7 '/j'   7700    e.         /                      N/A Unseated/Broken Wires     .-                  Total effective wires after stressing          __-              __
6. Date Bulk-filled I *I' Bulk-Filling NCR's .... ._'"

Time since Installation J4:1 t iekiInlet Pressure _C).,4i~j Outlet Temp. /_0 Date end caps refilled: Shop I -lk 2l 75 Field ~ /l. ,~

7. Data compiled by Za ize4Organization_______________
8. Additional Comments:
       ...                                                   -                                          M      71s;   -

Florida CRYSTAL RIVER UNIT NO. 3 C,.,.. ,..*.

               ,  Power co..o...oe            REroR BUILDItnC PI;STItESSINC
TENDON HIISTORY SYSTEH AMhmow e.~
   .)4DOM    IDENTIFI*CATION M4UNER                                                        OT LENGTH -______V__

CU#2 SHOP WASHER ID: PC /20 CR 14Z FIELD WASNER Mr: PCL 122,....... i 1, CAIIQA vendor inspection cover letter number-FPC I _ __DATE_

2. Date tendon received on-site I 0 - I/5 - -73 Number 33( e /16
3. Date Installid In conduit * "- " Jntallation Ins- NCR's Vires removed 0 Wires replaced 0 Total Ineffective wires .(t
4. Date buttonheaded - 4-
                                                     " 4,/Cf            Buttonheadtjn; NCR's bad wires
  • Accept. Ieheads 0 Total Ineffective vires /

5, Date stressed -72""7  !"

                                              ".,*"                       Stressing NCR's             ,

Date restressed ,_Restressing HCR's _ SHOP END FIELD END4! TOTAL Elongation (1500 psi to 8D0 ult.)-Pred./Act. 4re/r/ r f,-ý f, /o07y,/ lo .Y Lift-Off Pressure - Predicted/Actual 47ZO 16700 4730 [**O Ni/A Shim ThicknesslO80 Ultimate Pressure rll- /7700 S-YI& H7'/O iIA Unseated/Broken Wires C7 Total effective wires after stressing /47..

6. Date Bulk-f Illed I 1- y- - -7 4 Bulk-Filling CK-' ......

Time since Installation kh rviojjj" Inlet Pressure 45".4pnil.outlet Temp. 3..... Date and caps ref 1Usd: Shop h--75" Field -- 14--'. 7., Data compiled by . 4 S4.LOrganization-______________ Date S. Additional Comments:

  • 1I _ 1 L !II I .. . ..  :

nn7 71 A

     ,**         Floflda Power CRYSTAL RIVER UNIT N. 3 I.&Cr0R BUILDING PRESTRESSING SYSTEM 3,.,5W k   )_         6SgOýg~                             TENDON HISTORY TENIDON IDEMTIICATION NUNBER                      //2/*                       CUT N           RIo SHOP WASHER-     D: PC_      _        _  CIL                 FIELD WASHER ID: PC-                        C_
1. GAI/QL vendor Inspection cover letter number-FPC I DATE "
2. Date tendon received on-site . ..... M tber_.

M.. um

3. Date installed in conolui_ Installation NCr!' "

Vires reeovod _ Virte replaced Total Ineffeitive irires.

 '4. Date buttooheaded         __uttoeadling                                  NCRI_,

Bad vires _ Accept. Raheada Total Zuefiective Vixes _

5. Date streased 8treating NCMIR ,.

Date restressed _estressIng NCR's_ SHOP END nELD END 7oTAL Elongation (1500 psi to 801 ult.)-?red./Act. " - Lift-oUfPresuwe - redicted/Actual. (an jqZSP, 2S* .1~'S (f ____ Shia Thickness/802 Ultimate Pressure X/A_______ I- 640 VLOV. Unseated/Brokeu Wires Ca.- IT *'*V. Total effective vites after streesing 4 2-.

6. Date Bulk-filled .. Bulk-Tillifg XCR'.

Tine since installation laet Pressute -Outlet Temp. Date end caps refilled: Shop WYeld ____1_____--___

7. Data compiled by O'rganOrg.izaton.

Vbats 5-

8. Additional Comzents: %6!57PCff:( MW7- :214VezLg J 4 0 76../O8 9)~6- _jN2 LCA rOaJ -E -P9-V4r-- COeRROMTV

_Ž)_&ut.-oFP SOR9 (srr o,~A Mw - IS2oV x T 00 _-W_ b1RM rJ Or-- C9ALYn~J, Ar- A+/-JCftfj46E5 907 716

I

                                                                       =MYSAL sItM        It~t Vi 3 SIACTOS 361L315          11531138813     1133

_-ZM w~ -fg tufAci tt9 T aIfO No. _ LGH21 WhiE Avis. glees- local ha008 Ildi. 4pOptlloa Moittilve tomperoare, of rletvil s6 lforce U1411itit ile itlle ,,w ?..tl O itoC 2hiekaeee atiesf Force OvllSMl S-4 1624. St.. lie stressing Sl 14 1456 $ 314 U/A 1456 5 314 $/A lot S 0916 I/A 2163 114 1556 S 9126 VIA 106 41 7Foi 1541 1502 77/ S- L I. - , -" d'*oetsc Aoupa oa

                                                                                                                                                        ýýSwVr.
                                                                                                     -         na                   -      -
                                                                                                              -        -           -      -           S i

INTEROFFICE CORRESPONDENCE AC-XMTLWAM Nuclear Engineering NTSD 240-1511 Office MAC Telephone

SUBJECT:

Crystal River Unit 3 Quality Records Transmittal - Analysis/Calculatlon TO: Records Management - NR2A The following snalysis/celculation package Is submitted as the QA Record copy: 01OC0* PC DOCUMENT 1o4TlfCATlON NUABI REV. smutClT" OrTAL PAG=STRW4M4rJW S 95"0082 3 MX 68 6th Tendon Surveillance - Generation of Tendon Force Curves IWOS OEM" KE**S MR LAT"N RETIrEVAU Tendon, Surveillance IDXR FPWWEICUCA FLES -1

                                 - ST      FMINY FINSli REA 97-1975 REA 97-2110 REA 97-2129 VUO (INOMMMNAMe                                    E40f DocW4   MMW 1DWF1                                 mWcsMWW Docu,.UMw      1DXAEF FPC (from Parsons Power)                         WIA                                                     NIA TAG PART 140 CoMmENTS 5J5AWE   RSTINUMrO. PNOMAEArMY. UTCJ Revision by FPC to Parsons Power calculation Juslng FPC format).

NOTE: Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34. DCH-99), otherwise; use Part number field (i.e., CSC14599, AC1459). If more space Is required, write "See Attachment" and list on separate sheet.

                                             "FOR RECORDS MANAGEMENT USE ONLY**

Quality Record Transmittal received end Information entered Into SEEK. Entered by: Date (Return copy of Quality Docment Transmittal to NOE Supprt Speclaltst.) DA!IVERM1ATtON JýWNEtDT 4(.iEN.)DT K2 I) cc: Nuclear Projects (If MAR/CGWR/PEERE Nuclearrequirld formIIItoactions No a 0'- and Return to Service Relatled) Yes 0 No copy ofform OlfYes, sendReview Calculation the Part RegulatorWAssurance Supervisor. Conflg. Mat. Info. coPY of the Calculation to the Responsible Organizatlon(a) Identified In Mgr.. Nucl. Operatihmn Eno. (Originsl" wlsnach Pert 0l on the Calculation Review form.1 ~.1 Paw. 12197

yVh=IOapO ANALYSISICALCULATION AC.,SJM lM~

SUMMARY

DOCUMENT IDENTIFCATION NUMBER I 1W U S 95-0082 NO. CIP,*IODNTROL NlEWSOM Z 3 TI1J CLMIFICATION 2O!Ch= ONO 0 Safety Related 0I Non Safety Related 6th Tendon Surveillance - Generation of Tendon Force Curves NIWA M1 Mses NIA VV4O0R IDOCUIMB NWM9E NIA Design Engineer John D.Shubert, Jr. Date Verification Engineer ,. Date __.____ 3__ b A__ supervisor Dan Jopling Date "lMS RVISE.D -- (see 'Revision Description Sheet" for revision 31 PURPOE SUMMAR Determine Tendon Force losses and prepare Tendon Force Curves for additional Tendons required for the 8th Surveillance Inspection. The data for the following Tendon's Is added by Revision 3: Dll.o D302, D306, 42H29, 42H30, 42H34, 42H35, 42H36,42H37, 51H28, 51H29, 62H39, 621,43 and 62H44. AdSULTSionalFo Additional Force Curves are plotted and attached.

4aM.SAI.. CALCULATION REVIEW CuCfYVM Page 1 of 2 S 95-0082 Revision 3 PART I - DESIGN ASSUMPTIONIINPUT REVIEW: APPLICABLE j" Yes 0 No The following organizations have reviewed and concur with the design assumptions and inputs Identified for this calculation: Nuclear Plant Technical Support System Engr NIA Nuclear Plant Operations O_ sL _ _ _ _ Wou0M WA PART It- RESULTS REVIEW: APPLICABLE [] Yes [] The following organizations have reviewed and concur with the results of this calculation end understand the actions which the organizations must take to Implement the results. Nuclear Plant Technical Support NIA Vý System Engr sGvgw~gt"M Nuclear Plant Operations Nuclear Plant Maintenance Q Yes 0 NIA NInfAn~ Nuclear Ucensed Operator Training 0 Yes [ NIA Manager. Site Nuclear Services 0 Yes [ N/A Sr. Radiation Protection Engineer NIA [] Yes ] NIA ftrMuffWWO Nuclear Plant EOP Group

                               'Yes              [   NIA

>5 OTHERS: N/A

                                                                  -V~rwa' ftv. 12M7

CALCULATION REVIEW Page 2 of 2 2CALCAATIO MAW.11 S 95-0082 Revision 3 PART III - CONFIGURATION CONTROL: APPUCABLE [3 Yes 0 No The following Is a list of Plant proceduresflesson plans/other documents and Nuclear Engineering calculations which require updating based on calculation results review: Document Date Reaulred Responsible Oreanizatlon i Upon completion, forward a copy to the Manager, Nuclear Regulatory Assurance Group for tracking of actions If \. any Items are Identified in Part III. If calculations are listed, a copy shall be sent to the original file and the calculation log updated to reflect this Impact. PART IV - NUCLEAR ENGINEERING DOCUMENTATION REVIEW The responsible Design Engineer must thoroughly review the below listed documents to assess It the calculation requires revision to these documents. If "Yes." the change authorzatlons must be listed below and Issued concurrently with the calculation. Enhanced Design Basis Document 0 Yest No CIrc) Vendor Qualification Packagea[ Yes 0 NoIVOPJI FSAR 0 Yes 0 No ce"Kh Topical Design Basis Doc. 03 Yes 0 No Ifcm Improved Tech. Specification Q3 Yes 0 No 9--8) EISOPM 03 Yes 0 No ,fTca Improved Tech. Spec. Bases r3 Yes 0 No !In) Other Documents reviewed: Config. Mgmt. Info. System r Yes 0 No C,1) ____yest U3 No eea ia& ooc. .,g.cl 'J) Analysis Basis Document (3 Yes 0 No ITch .0 Yes 03 No., _ ___ 1CNAMGI DOC. IJMN"CEI Design Basis Document 03 Yes 0 No TCO) 0 Yes 03 No (OCHAWWOC. rMMMNC Appenix R Fire Study [] Yes 0 No 0CA 0 Yes 0 No Fire Hazardous Analysis [3 Yes 0 No IlT) -0 Yes [3 No 4£NM4GISOC mENC MNPA Code Ccewvmwce Docuenat [3 Yes 0 No ITch 0E3Yes E3 No_______________ PART V - PLANT REVIEWSIAPPROVALS FOR INSTRUMENT SETPOINT CHANGE PRCIDNPO approval Is required If a setpoint Is to be physically changed In the plant through the NEP 213 process. PRC Review Required [j Yes 0 No tI/A PRC Chairman /Data

  /   DNPO Review Required             0   Yes             ONo                    NIA ONPO                                              /Date DES" INESUtATW1 Z-v-1r DO"EWiN NER .A-I-NTED IJohn D. Shubert. Jr.

NAME I

CALCULATION VERIFICATION REPORT Crystal River Unit 3

                                              ~~CA.LWRPJFRM Page 1 of 1 YES   NO    N/A
1. rX Are Inputs, Including codes, standards, regulatory requirements, procedures, data. and Engineering methodology correctly selected and applied?
2. 0[ E3 Have assumptions been Identified? Are they reasonable and justified? (See NEP 101, V.c, for discussion on references).
3. [3 [ Are references properly Identified, correct, and complete? (See NEP 101, V.c., for discussion on assumptions and justification.)
4. [3 [ Have applicable construction and operating experiences been considered?
6. 0 .[3 Was an appropriate Design AnalysislCalculation method used?
6. r [1 In cases where computer software was used, has the program been verified or reverified In accordance with NEP 136 for safety related design applications and/or are Inputs, formulas, and outputs associated with spreadsheets accurate?
7. [3 7_ [3 Is the output reasonable compared to Inputs?
8. D EQ Has technical design Information provided via letter, REA, IOC or telecon by other disciplines or programs been verified by that.discipline or program?
9. [3 "* Has technical design Information provided via letter or telecon from an external Engineering Organization or vendor been confirmed and accepted by FPC?
10. [3 0 Do the calculation results indicate a non-conforming condition exists? If *Yes," Immediately notify the responsible Supervisor.
11. I][ 3 Do the results require a change to other Engineering documents? If 'Yes," have these documents been Identified for revision on the Calculation Review Form?

I have performed a verification on the subject calculation package and find the results acceptable. IMATONMR DATI ,TI K) k /

Florida INTEROFFICE CORRESPONDENCE Power Cgo 9-0 i &$10 A"-X.IO J Nuclear Engineering NT6D 240-1511 Office MAC Telephone SUBJRCT- Crystal River Unit 3 Quality Document Transmittal - Analysis/Calculation TO: Records Management - NR2A The following analysislcalculation package is submitted as the QA Record copy: DOCNO 0PC OCCUMENT I fiVj,

                                                     ,TICATIONUMES
                                                       .                                                  TOTMMPAMtS          41D S95-0082                                   2                           MX          _   TOTALPAoEs     153 TITLE 6th Tendon Surveillance - Generation of Tendon Force Curves WWS       W     %ft W"M      ORLATERWIMJ Tendon, Surveillance D)m*rer             OR PUS - LIST PRIAMARY CESetm                    PILE3.

FsT vC~o iVINMOR NAME) V1N0W DOCUM.NT =tAER CDXRLr SUPMEsED DOCJMTNTS IDXlI.. FPC (from Parsons Power) N/A N/A TAG

                       -                                              PAT       NO. 7 cOMMENTS     ISMA;E RKsCTION3. PRORIKETARY. WTCJ Revision by FPC to Parsons Power calculation (using FPC format)

NOTE. Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34, DCH-99), otherwise; use Part number field (i.e.. CSC14599, AC1459). if more space is required, write "See Attachment" and list on separate sheet. ,-- 'A 9, DATE 6.2-W DATE jr4 41-1541 tc~*WJI QA.A~ DATE Calculation Review form Par tI M CfLN nxY WPP¶ %ýiRE$ WALA~ 0Yes 0 No B 22z97 F

  • j cc: Nucloar Pro)ects (if MARICOWR/PEERE in.,.

Saturn to Service Related) r0 Yes ] No pf Yes. send copy of the form to Nuclear egulatory Assurance and a Supervisor. Config. Mgt. info. copy of the Calctiation to the Responsible Orgunization(s) Identified In Mgt., Nucl. Operations Eng. lOrigInati wlattach Port IIl on the Calculation Review form.) Nov. W,

UE..liork ANALYSIS/CALCULATIONA.C~U4JUIR

SUMMARY

K )OCUMEN" ._ IEEIFICATION NUMBER I-LN, coIT*.- mV ug

                                                                                                        ,*O S                    95-0082                       2 Tw                                                                                            LASSM1AO IOCW     ONO 6th Tendon Surveillance. Generation of Tendon Force Curves                          ED   Safety Relted o    Non Safety Related MA~SPMJCGWR*ERE NUER Wle V9moonR OOCMEr NUMBER n/a APPROVAL                                     PRINTED SIGNATURES                                     NAME Design Engineer                     -s_
  • John D. Shubert, Jr.

Date (.2 1 -l Verification Engineer X)& wt___'_____ _0_ ___ _ k Date Supervisor_____________________ Date ITEMS M*V15EO (see 'Revislon Description Sheet' for revision 2)

 'PUPOSE 

SUMMARY

Determine Tendon Force losses and prepare Tendon Force Curves for Tendons for 6th Surveillance Inspection. RESUTS

SUMMARY

Force Curves are plotted and attached.

.)
           ...........                    CALCULATION   C, ACJ*EVJWJ REVIEW Page 1 of 2 CAICt"'"M NOAM.

) S 95-0082 Revision 2 i 1 PART I - DESIGN ASSUMPTION/INPUT REVIEW: APPUCABLE [Q Yes ED No The following organizations have reviewed and concur with the design assumptions and inputs Identified for this calculation: Nuclear Plant Technical Support System Engr Nuclear Plant Operations OTno"m

                                                               ~0~

PART II - RESULTS REVIEW: APPLICABLE [] Yes [a No The following organizations have reviewed and concur with the results of this calculation and understand the actions which the organizations must take to Implement the results. Nuclear Plant Technical Support Sogtutumse System Engr Nuclear Plant Operations SVn--*- Nuclear Plant Maintenance o3 Yes [1 N/A ftww"Me Nuclear Licensed Operator Training "ftwOes. 0 Yes 0 N/A Manager, Site Nuclear Services 0 Yes [] NIA Sr. Radiation Protection Engineer SWnW-09 0 Yes O N/A OTHERS: ) PAW."?

_&0660ý.S CALCULATION REVIEW 1AM rki Page 2 of 2 S 95-0082 Revision 2 PART IIl - CONFIGURATION CONTROL APPUCABLE M Yes [3 No The following Is a list of Plant procedures/lesson plans/other documents and Nuclear Engineering calculations which require updating based on calculation results review: Document Date Reaufred Responsible Organization SP-182 11-1-97 Nuclear Engineering Programs Upon completion, forward a copy to the Manager, Nuclear Regulatory Assurance Group for tracking of actions If any items are Identified In Part III. If calculations are Bated, a copy shall be sent to the original file and the calculation log updated to reflect this Impact.

. PART IV - NUCLEAR ENGINEERING DOCUMENTATION REVIEW The responsible Design Engineer must thoroughly review the below Ulsted documents to assess if the calculation requires revision to these documents. If "Yes," the change authorizations must be listed below and Issued concurrently with the calculation.

Enhanced Design Basi Document 03 Yes 0 No ITUI Vendor Ouaflfcation Package 000") FSAR 03 Yes 0 No L-0) Topical Design Basle Doe. [3 Yes 0 No (coel improved Tech. Specification Q3 Yes W No "Rer,) E1SOPM 0 Yes 10 No IYcD) Improved Tech. Spec. Bases [0 Yes 0 No ILA-# Other Documents reviewed: Conflg. Mgmt. Info. System 03 Yes 0 No iA r_ _ _ _ Yes 0 No IXWADOC.PtBWt:K Analysis Bosis Document 13 Yes M No (rcTn __ Yes "1No

                                                                                                                      *WGDCC.Ppm~m;c)

Design Basis Document 0 Yes 0[ No ITC2 .. Yes [] No ICANGA DWO.MEOU6IJ Appendix R Fire Study D3 Yes M No ITC __ Yes 0 No IOAiIDeC. ANOWlMU*I Fire Hazardous Analysis E Yes [ No IT' __ Yes [] No KWG OC . HWEJA W5PA Code Conformane Doctrnent [] Yes 10 No IrChl __ _ Yes [3 No I4UO5 00c. WErxiCI PART V - PLANT REVIEWSIAPPROVALS FOR INSTRUMENT SETPOINT CHANGE PRCIDNPO approval Is required If a setpoint Is to be physically changed In the plant through the NEP 213 process. PRC Review Required ] Yes 0 No PRC Chhairman /Date DNPO Review Required 0 Yes ~No ONPO M~ate Of")GIEMT OEMSa. ENGM - PrMTEO NAME IT-15-"917 IJohn D. Shubert. Jr.

                                                                                                                                    -1 Rv, "1?

CALCULATION VERIFICATION REPORT uea se

              **sx                                              Crystal River Unit 3 CAMW.MPJPM Page 1 of 1 CA&CULATION  UMu    S 95-0082 IRe'                  Revision 2
                      ' h T'e '                 cef                     ocTaTrI'*

6 th Tendon Surveillance - Generation of Tendon Force Curves YES NO NIA

1. C t3 Q Are Inputs, Including codes, standards, regulatory requirements, procedures, data, and Engineering methodology correctly selected and applied?
2. 1 0 Q Have assumptions been identified? Are they reasonable and justified? (See NEP 101, V.c, for discussion on references).
3. M* 0 Q Are references properly Identified, correct, and complete? (See NEP 101, V.c., for discussion on assumptions end justification.)
4. 1 Q [ Have applicable construction and operating experiences been considered?

5.0. 0 0 Was an appropriate Design AnalysislCalculetion method used?

6. 0 " 9 In cases where computer software was used, has the program been verified or reverified in accordance with NEP 135 for safety related design applications and/or are Inputs, formulas, and outputs associated with spreadshoots accurate?
7. 0 0 Q Is the output reasonable compared to inputs?
8. 0 0 0 Has technical design information provided via letter. REA, 10C or telecon by other disciplines or programs been verified by that discipline or program?
9. 1 0 0 Has technical design Information provided via letter or telecon from an external Engineering Organization or vendor been confirmed and accepted by FPC?
10. Q 1 Q Do the calculation results Indicate a non-conforming condition exists? If "Yes,"

immediately notify the responsible Supervisor. 11.0 - ' 0 Do the results require a change to other Engineering documents? If *Yes,' have these documents been Identified for revision on the Calculation Review Form? I have performed a verification on the subject calculation package and find the results acceptable. SVMILA1 Ii I NU DAT RI SOR$ fUC*.AR ENGWNUtwc , *ATE ) Pkv."7 NET.- 0~ NSA NcEftWuI, 912247 MP&SI*

W 19 w Florida INTEROFFICE CORRESPONDENCE Power GO 1kP O0A ISON Nuclear Engfneering Design Office NA1E 240-3568 MAC Telephono SUB.C1": Crystal River Unit 3 Quality Document Transmittal - Analysis/Calculation To: Records Management - NR2A The following analysis/calculatlon package Is submitted as the QA Record copy: 000FMC DOCLNAME W iPCAINFIMMMM NME F. OA M ASfiTTEO "hES n-95-0082 I MX A4T__.15/ 6th Tendon Surveillance - Generation of Tendon Force Curves PEWaSSOMYSEYWOPOS FOA LAM AVElnMA Tendon Surveillance "mm!P SiPN OnRFl s *W m P IEmFRE m SP-182 I) -tW (f*N Mo*N q - FPC (from Parsons Power) vENoOooIJME4 NIA tb En SWUM=,E DO0MENS 4Dft*) N/A TAG PART NO. m#AkhTS 5JSAME RMCT iO4 PAOPPRIETAMY. Ell Parmons Power calc revision using FPC format. NOTE: Use Tag number only for valid tag numbers (i.e., RCV-, SWV-34. DCII-99), otherwise; use Part number field (i.e..CSC14599, SAC1459). If more space Is required, write *See Attachment" and list on separate sheet. MOM MR "IP'" DATE IWRIFICATIM&GNEER t DATlEM[i" OI4N'.Ar DAME K) cc(jAR office OfIMAM Palatal1)e

          '"Ugr. Nuc. Config. Mgt.

D. ENO Plant Document Updates Required 13 Yes OYA O oYea.jmnd copy of the, CaicufatoTn Review form to Nuclear Uceneing Md a coy of the Calcuistion to Mgr., NucL Eng. Deslgn twe PRontcni Orgatdon(OIde, d InPart an twe C ulcubmon Review Imn) (OIgInalo walltach NE_ y-_, T_ _wYtt MNo (ifyes. Transmit wlattach) AM am ET I. of Plorit FIG Asvl Nuclou E 9' -In@

Af Flodda Powa,,er otw li.~en ANALYSIS/CALCULATION

SUMMARY

DOCUMENT IDENTIFICATION NUMBER 1 STRUCTURAL - -0821 "-- PREPARATION OF TENDON FORCE CURVES FOR 6TH TENDON Rono Safety Ram SURVEILLANCE INSPECTION VD9=l 0O0AiEMT "UUUR REVISION rTEMS REVISED APPROVALS

    .Design Engineer               444                          "..                      k A                ftýL Date./                                    /IXDAply7            0 Verification Engineer                                               _     __-____._               _   _     __          _    __       _

Date/Method'* /5/61 ..... . Supervisor &4________"a_____________________ Dat* 10 W1-. 1-1

   'VERIFICATION METHODS:,0. Design Review. A                               -  Alterate Calculation: T - Oualiflcatlon Testing K ,

06CARIUI BELOW iF METHOO OF VERIFICATION WAS OTHER 1THAN DEIMON REVIEW DETERMINE TENDON FORCE LOSSES AND PREPARE TENDON FORCE CURVES FOR TENDOMIFOR 6TH SURVEILLANCE INSPECTION REALTS SEIMARf FORCE CURVES ARE PLOTTED AND ATTACHED Swaim ~~-.W IjM . of~P~mdVNSP.NSw &tiiln

PARSON5 POWER GROUP INC.,,4:3.Vna'on c Gbe-tCornmon.-.,a, ano PPlrSon3, Main ,-.:.v' '.J,,ntod' R0a'

                     -   *eao.n9 P- I'C7-*
                                       .*610;6 35-2000
  • FRA. 16101855.2001 February 11, 1997 FCS-14171 Contract N00821AD, WA048 Mr. W. W. Nisula Contract Manager Florida Power Corporation (NAIB) 15760 West Power Line Street Crystal River, FL 34428-6708 Attention: Mr. J. L ese Re: Crystal River Unit 3 6th Tendon Surveillance Force Curve Calculation

Dear Mr. Nisula:

Please find attached calculation S-95-0082 Revision 1, which documents the generation of the tendon torce curves io accounumudtc 0he prt)ptI,*ed inspection date of early March 1997. Included are disks with related electronic files used in the preparation of the data and force curves. Should there be any questions please feel free to contact Dr. Samir Serhan at (610) 855-3209. Very truly yours, Samir J. Serhan, Ph.D., P.E. Supervising Engineer Roy W. Adler RWAISISIbmb Project Manager Attachment cc: W. W. Nisula (NAIB) D. L Jopling (NA IE)MI J. A. Lese (NAIE) Dc' R. E. Vaughn FPC Records Management (CL Only) R. W. Adler(2) P. 1. Hamiltonto S. 3. Serh:m

  • PARSONS

Florida INTEROFFICE CORRESPONDENCE Power cORPpOIAT ION Nuclear Engineering Offic NAIE 240-3568 MAC Telephone SMET.*E* Crystal River Unit 3 Quality Document Transmittal - AnalysislCalculation To: Records Management - NR2A The following analysis/calculslon package Is submitted as the QA Record copy: f

          ?pc  DONAEMT MEWME       N                REVn0                           I SYID0                               ThGMaa TPASO S-95-0082                                       0                           MX                            383 6th Tendon Surveillance       - Generation of Tendon Force Curves itDB WC1PY iMW*qWOR LAMERIMMEVAL)

Tendon Surveillance IPFu OR PUS -USTMOAWFY FU 'Fl V"Di IVENDOR "AMPE VE"hI~w WEIEO DOGMEHIS0X3 F ) FRC (from Parlons Power) N/A NIA TAG PART NO. COMMOr3 OpBAWIEMUC11ONS, 0#V(JPt,0R. FE1C4* Force Curves for 6th Tendon Surveuillance NOTE: Use Tag number only for valid tag numbers (i.e., RCV-8, SWV-34, DCH-99), otherwise; use Part number field (i.e., CSC14599. AC1459). If more space is required, write "See Attachmento andAIist_9i9 8arat0,4 sheet. Mamr MW W .-. ,.r.e .W.%,r..,,r .r ... n.wH.~.Im~

         -L                      &    -ýF9ý0                                dA                                                        9411-i;ik4 cumA Office (NfMAR Related)       13Yoe         M  No              Plant Document Updates Required 13 Yea 01 No Vf Ye eend coPy of the Mgr. NucL Cotdig. Mgt.                                      Calculation Review Iofm to Nuclear Licensing and a copy-of the Calculation to Mgr., NucL Eng. Design                                      t, Flespon~le Orgw(o
                                                                                     *a           diFd in  hP Nan toeCaleLudon PAwfw lim)

(Odginal) w/atach AE DYes I1No (Ifyes. Transmlt w/ntach)

CALCULATION REVIEW Page I of 2 c~aw NWV. S-95-082IRevlsion 10 PART I - DESIGN ASSUMPInON/INPUTREVIEW The following organizations have reviewed and concur with the design assumptions and inputs idcntfied for this calculation: Nuclear Plant Technical Support System , Engr Nuclear Plant Operations w -m Ono"mm PART II - RESULTS REVIEW The following organizations have reviewed and concur with the results of this calculation and understand the actions which the organizations must take to implement the results. Nuclear Plant Technical Support System 2 /A, Engr II-Nuclear Plant Operations s-IA. 0/A Nuclear Plant Maintenance o1 yes IK] NIA Nuclear i.ccnscd Operator Training 1 yes [i] N/A Manager, Site Nuclear Services

                                                                 *flftIinDIA*

1o Yes [K N/A St. Radiation Protection Engineer o Yes KJ N/A OTHERS: g)p.aus~Oaa. K;

  -d S~gft~

m,..i WEELie of fmt FKM *Jgaiku CROM90"tn

CALCULATION REVIEW C A GPage 2 of 2 S-950082/Revlslon #0 PART M - CONFIGURATIONCONTROL The following is a list of Nuclear Engineering and Plant procedures/lesson planslother documents which require updating based on calculation results review: Document Date Rguired Resmzonsible Orianization SP-182 3/1/98 Nuclear Engineering Design (A. Petrowsky)

)

) Upon amplction, forward a apy to the Manager. Nuclear UeCeiug for traking of ations ifany items are IdMutified In Par UL PART IV - PLANTREVIEWSIAPPROVALS FOR FIELDSEMPOINT CHANCE PRC review Is required If a full IOCF-R0.59 Safety Evaluation is performed. DNPO approval is required if a setpoint is to be physically changed In the plant. PRC Review Required 0 Yes F] NoaPRO n i DNPO Review Required Yes No ) DNPO /Dot* 9E A-I aDate

  • RET: w.h d Piwd swl* Nldain Enahlmi* 'a

Agralk Elodds Lo= ANALYSIS/CALCULATION

SUMMARY

                                              -  E---                     ICOK°   m                      --isI     --
   .oa,.                            Y         1*o            -a         o                                        0

_ _ 4 4 _ 6 _ 1M ~WM _ _ _ _ _ _ _ _Mm__ _ _ _ _

               ~dg E~guM£                 M        L        1J77                        ffm   MOM v.if.t                       .fu,.e~z51     .*
 )     VErFATION IE*TI10(*'(         Ign "w* w A
  • Mismate Culculson; T - Quawflatton T*stno CEM WW *V IiEn=O0F V ErAflnMWA5V1)RW4 OEGNWVW

(~UL~t A4A l'hej AA, Af~ari 7 /a4-kimAun~ -A4d A&PAe.n,

                 &&.fdPM.r7~Aq         C!*.CJLJ477hd        6fAL        b2"-Afet -90=6MCe~             .'o c ..... Awte-/g.. ....                                777 fO              LW.4...

K

 )

i! raw. 8/0 N~Mt 5xv of mom "am- hufto choob"

                      = rDESIGN ANALYSIS/CALCULATION
                   *"£'a°e't""                                   Crystal River Unit 3 K,
)                                                                                                                  Page       1 S-95"O82 Revision No.:                3                                                           This page followed by page 1A The followino items have been revised in the current revision:

Revised Pae Affected Sections _____Add Replace _____I............ I Remove Description/Purpose of Revision 1 X add "Revision Description Sheet" for revision 3 change page number on revision 2 "Revision 1A x Description Sheet" from page 1 to page JA and state that "page 19 follows" change page number on revision 1 "Revision 18 Description Sheet" from page JA to page 18 and state that "page IC follows" change page number of Table of Contents from page iC X 18 to page IC and add item for Revision 3 _ ____ _ Descri ption Sheet change data Input tile names to correspond to 11 X- current names (i.e. DOMER3.XLW. etc) and add note change data input file name to correspond to 20 X current name (DOKR3.XLO), add data for Tendons _____Dill. 0D302, 0306 and state that "page 20A follows" 20A-208 X add spreadsheet and curve for Tendon Dill 49 x state that "page 49A follows" 49A-498 X add spreadsheet and curve for Tendon. D302 S5 x state that "page SSA follows" 5SA-SSB X add spreadsheet and curve for Tendon 0306 change data input file name to correspond to 63-64 X current name (HOOPER3.XLW) and add data for Tendons 42H29. 42130, 42M34 thru 42H37, SIH28, 52129, 62H39, 62H43 and 62H444 70 x state that "page 70A follows" 70A-700 add spreadsheets and curves for Tendons 42HZ9 and 42H30 76 X state that "page 76A follows" 76A-76H X add spreadsheets and curves for Tendons 42H34 thru 42N37 94 x state that "page 94A follows" 94A-94D X add spreadsheets and curves for Tendons 51H28 and 5129 112 X state that 'page 112A follows" 1IZA-112B X add spreadsheet and curve for Tendon 62H39 118 X state that "page 118A follows" 118A-218D X add spreadsheets and curves for Tendons 621H43 and 62H44 159 X Include "Original Stresses data" for Tendons D111, D302 and D306 and change data Input file name to correspond to current name (DOMER3.XLW) 160 x include "Original Stresses data" for Tendons 42HZ9. 42830, 42H34 thru 42H37. SH28, S2H29. 62H39. 62H43 and 62H44 and change data input file name to correspond to current name (It0OPER3.XL) 894-BlI0 X add Tendon History Sheets for Tendons Dli, D302, D306, 421129o 4ZH30. 42H34 thru 42H37, S1H28, 52129,

           .......                                                             62H39, 6          621143 and 621144 K'       K2                                         X                            change data Input names to correspond to current names (i.e. OOWER3.XLW, etc...) and add note REVISION TYPE:               0 Superseded by Calculation Number (check one)                  b runI Revision                          0 Page for Page 8126                                                                                                                   d AIM":U e" '  msr. M W Inghewe

Power~ DESIGN ANALYSIS/CALCULATION Crystal*5ACJ*e

  • J Iw
   /

River Unit 3 Page 1A 1 S-95-082

                                              -                                                 -          - 1 ,. -                        3                    I Revision No.:                  2 The following Items have been revised in                                                        This page followed by page 16 Revised                                                              the current revision:

Affected Add Replace Remove Page Sections  ! Descriptloa/purpose of Revision ix add "Revision Description Sheet' for revision 2

      .                        .change page number on revision 1I Revislon x                      Description Sheet" from page I to page 1A and state I that Change:Roe  PageIsnumber fallows" of Table" -of-Cont~ents from page 18                                                    x I,_         _                         __

IA to page 1I and add item for Revision 2 SDoscrition 3! . .. Change start Sheet date fro* Spring 1997 to Fall 1997 x change start aate from Spring 1997 t; Fall 1997 change reference to Enclosure 30.to 9 3usz state x 'Original Stressing Data" change. Start date froa March 1997 10 to November 1997 ___I Xand change numerical values to correspond to November 1997 change data Input file names to 11, correspond to x current OaWs (i.e. OO'ER2.XLW. etc...) revise the discussion about the interpolation sX between data on the spreadsheets 0 -change x" _ current data inpuC file name C(OcERZ.XL.0name to correspond to 21 X revise spreadsheet for November 1997 start date revise soreadsheetsand curves for 23-61 x November 1997 start date 64 X change data input file name to correspond

                                                                              -        current name (OPERp.2.xu*)                                  to I

G5-124 revise spreadsheets and Curves for Novetmbr X 1997 start date 1z6 x change data Input file name to correspond to current nare _VERTRZ.Xt.O revise spreadsheets and curves for N~ovember 127-156 1997 X start date I -change reference'to Enclosur'e 30 to 3ust state 151 _ .. _. .... x 'Original Stressing Data" and Enclosure

                                    -ichange                                            stato *data sheets"                                      29 to just reference to Enclosure 30-lea 3ust state 159-161 "Original Stressing Data" and change file names to correspond to current data Input names (i.e.
                                                                                   --    _DER2.XLW,      etc...)

x62 change reference to Enclosure 30 to just x 'Original Stressing Data" and state

                                                                                    !_state 'data         sheets"               Enclosure 29 to just
                                                                                    *~Change data Input file names to correspond to x                     Current names (i.e. OCERZ.XLW. etc...)

REVISION TYPE: (check one) o Superseded by Calculation Number o Full Revision 0 Page for Page 445

                                                                                                                          "'S sriOn.

Ulf of P s I5P 5, 194-0."~

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3

              ,tOn CoM                                                                                                       Page   J.%

Calculation S-95-0082 3 Revision No.: I This page followed by page IC A3 This fbrm shall be used to mcord &.a purpose or reason for the revision. indicata the rcvision pages and/or aff'ectd sections and give' a short description of the ravision. Check (X) the appropriate function to add. re-placc or remove the affc.tc-d pages. Revised Affected Add Replace Remove Description/Purpose of Rcvision Pages Sections - 1 X Add revision description sheet. LA x Change pane number from t to LA. Add item for revision description sheet. 3 X To ch.nge start date for the 6th surveillace inspection from March 1993 to March 1997 10 X To change start date for the 6th surveillance

                                                                 -... inspection from March 1993 to March 1997 Is                                             X                  To change start date for the 6th surveillance
                                 .... __               _inspcction                  from March 1993 to March 1997 21                                             X                   To change start date for the 6ft surveillance inspection from March 1993 to March 1997 23-61                                            X                   To change start date for the 6th surveillance

___ _ _ Iinspection from Mvarch 1993 to March 1997 6 To change start

                                                                                          ,ftromdate for1998 March   the 6th to M surveillance a tch 1997       ,
                                               .......                     insp.',-cuon 127-136                                                               To chang estart date for the 6 thsurveillan ce inspection from Miarch 1993 to March 1997                  :" A1 I)

REVISION TYPE: I I SUPEUSEDED BY CALCULATION NUMBER I check ow*l I I FULL REVISION I X I PAGE FOR PAGE a a? . eq 0 ixAM wtsp, r - a"

 =

I a DOCLuMEM IDEN7 Florida Power CO8PORAION fUIC.1ION NO. DESIGN ANALYSISICALCULATION Calculation S-95-0082 Crystal River Unit 3 Page IC R~ISOKN 3 9E(CTION TITLE CALCULATION COVER SHEET REVISION #3 DESCRIPTION SHEET 1 REVISION #2 DESCRIPTION SHEET IA REVISION #1 DESCRIPTION SHEET lB TABLE OF CONTENTS IC R3 1.0 PURPOSE 3 2.0 DESIGN INPUT 3 3.0 COMPUTER CODES 4 K

   )             4.0 5.0 ASSUMPTIONS SCOPE AND TENDON SELECTION 4

4 6.0 CALCULATIONS 9 6.1 GENERAL BACKGROUND & SCHEDULE 9 6.2 FORCE CURVE GENERATION PROCEDURE 11 6.2.1 PREPARATION OF INPUT DATA 11 6.2.2 PROCEDURE FOR DETERMINATION OF TENDON LOSSES 11 6.3 DOME TENDONS 19 TENDONS LISTING & DATA INPUT TABULATION 20 INDIVIDUAL TENDON LOSSES WORKSHEET & CURVES 21 6.4 HOOP TENDONS 62 TENDONS LISTING & DATA INPUT TABULATION 63 INDIVIDUAL TENDON LOSSES WORKSHEETS & CURVES 64 6.5 VERTICAL TENDONS 125 TENDONS LISTING & DATA INPUT TABULATION 126 INDIVIDUAL TENDON LOSSES WORKSHEETS & CURVES 127 6.6 CALCULATIONS SUPPORTING SP-182 157 RET: uLe o Plant R93P. N. Almlr Emgln"mat

Aft Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 2 Calculation S-95-0082 o 5ECTION TITLE

7.0 CONCLUSION

S 162

8.0 REFERENCES

162 to 163 9.0 ATTACHMENTS A. DESIGN INPUT FOR 6TH SURVEILLANCE At TO AIS B. TENDON DATA HISTORY SHEETS FOR 6TH SURVEILLANCE BI TO B92 C. TENDON STRESSING SEQUENCES CI TO C24 D. EFFECTIVE WIRE SUMMARIES AND TENDON WIRE DATA DI TO DI0 E. ELASTIC SHORTENING REFERENCES DATA El TO E9 K~j F. WIRE STRESS RELAXATION REFERENCE DATA FI TO F8

 )            G. CONCRETE CREEP REFERENCE DATA.                    GI TO GI4 H. CONCRETE SHRINKAGE REFERENCE DATA                 HI TO H8
1. NORMALIZING FACTOR REFERENCE DATA It TO 123 J. HOOP GROUP PLOT OF TENDONS Ji TO Js K. ELECTRONIC FILES INFORMATION & DISKETTES EI TO K2
 )

I WfT:Lt d NF% RZ2. 0bclew Ef£ieuqg

SFlorida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3

                   ~Page DcdVM1A 3

Calculation 8-95-0082 2 1.0 PURPOSE AND OBJECTIVE Me CR3CsP.DOC (Word 4.0) Th1 purpose of this calculation is to provide tendon force curves for Florida Power Corporation for the Crystal River Unit 3 facility in support of the upcoming 6th tendon surveillance period scheduled for the Fall of 1997. Specific tasks to be performed as part of this scope include the following: A.) Determine the predicted tendon losses and develop forcedime curves for each of the selected tendons for the upcoming sixth surveillance period. Generate the tendon force curves for the selected tendons, the tendons adjacent to the selected tendons, and alternate tendons. Alternate tendons are tendons not specifically scheduled for this surveillance but force curves are prepared to be available in case a substitute tendon should be required during the surveillance. In addition, force curves for a group of tendons deferred/exempted from the previous surveillance will also be prepared. These are discussed in detail in Section 5.0. B.) In addition to the force curve development, other calculations which are required to support Enclosures included within Surveillance Procedure SP-182 will also be prepared within this same calculation. 2.0 DESIGN INPUT Design input information has been reviewed and is included as Attachmnct A to this calculation. Note that there arc no significant changes to the basic criteria and related documentation which address the licensing of the CR3 plant with respect to the tendon surveillance program. The previous surveillance efforts completed various studies and addressed the CR3 tendon program and its' compliance with U.S. Regulatory Guide 1.35, Revision 3, since it was formally issued in July 1990. Based on FPC licensing efforts and Technical Specification revisions performed at the time of the last surveillance period, as well as recent discussions with the NRC, FPC has now committed the CR3 tendon surveillance program to be performed in accordance with U.S. NRC Regulatory Guide 1.35, Revision 3 (Reference 3). U.S. Regulatory Guide 1.35.1, Revision 0 (Reference 4) is a daughter document referred to by the above Reg. Guide and deals specifically with the calculation of individual tendon losses and the generation of tendon force curves. While calculation efforts for the CR3 tendon force curves have followed closely with both of these Regulatory Guides as they evolved through the 1970's and 1980's, the format and current procedure for the preparation of the force curoes is not in exact compiance with Regulatory Guide 1.35.1 Revision 0 as issued in 1990. The method and approach used in the generation of the CR3 force curves is superior to that of the Reg. Guide in that a specific curve is generated for each individual tendon. Based on the discussions held with the NRC and the results of their review, the method and approach used for these calculations shall be the same as used for previous surveillances. Sec the Attachment A information for further discussion and references to recent correspondence and documentation with the NRC on various issues related to the tendon surveillance program. Applicable Technical Specification sections, as well as FSAR sections were also reviewed for this cffort. They support the position noted above on the FPC commitment to R.G. 1.35, Rev. 3 and are discussed and

 )      referenced within the Attachment A information.

I

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 CORPOMAO Page 4 Calculation S-95-0082 7 3.0 COMPUTER CODES This calculation package is being prepared using Microsoft Word, Version 6.0 and Microsoft Excel, Version 5.0. Spreadsheets from earlier surveillance efforts were prepared using Lotus 123, Release'2.01 and 3.0 and were convened to Excel format for this calculation. All input and calculations are manually checked and verified, therefbrc, verification of computer programs is not applicable or necessary. I 4.0 ASSUMPTIONS Any assumptions made arc noted and contained within the calculation package. None requi e future confirmaton. 5.0 SCOPE AND TENDON SELECTION Tendons were selected for the sixth surveillance period in accordance with the requirements of Reg. Guide 135, Revision 3 and using the same methodology as was used in the past surveillance. Basically. a random but representative sample was selected and checked at the site for accessibility. Specific citeria used for this selection process is summarized as follows: Tendon Selection Process The tendon selection process has remained the same as that completed for the last several surveillances where a random but representative sample is selected for inspection and testing. The intent is to get as many new and never tested tendons in the sample population, but still keeping one control tendon from each major tendon group to be investigated in each surveillance. Note that this current method differs from methods used during the early life of the plant where some tendons were repeated for inspection every third surveillance. Basically, the selection criteria and process used considers the following: 1.) Select tendons based n Reg. Guide 1.35 Revision 3 Based on the good reults of prior surveillances, the Reg. Guide requires a minimum of I I tendons to be inspected, including 5 hoop, 3 vertical and 3 dome. Tendons should be selected which were never previously inspected or tested. Previously detensioned and retensioned tendons should not be included (unless there is a specific need to investigate the tendon per item 3 below). In addition to being selected at random, tendon selection should be representative of various areas and conditions. For example, the hoop tendons selection was based on random selection but also considered what tendons were inspected in the past and in what hoop area. A plot of previously inspected hoop tendons was prepared to track tendons inspected by grouping (i.e. 13's, 42's, 35's, 46"s. 5 1's, and 62's). Therefore, the selection process considered those sections not equally represented by as many tendons as completed within other sections from prior surveillances. See Attachment J for various plots and information of the hoqp group. The same procedure was applied to the dome group (i.e. 100's, 200's & 300's groups) and to the vertical group (i.e. 12's, 23's, 34's, 45's, 56's & 61's & quadrants). See Attachment D for groups information. METI. Uk dP REup:,Ndoat Emgn~M

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 COAPORAICP __ __ _ _ _ _ _ _ _ _Page65 o Calculation S-9S-0082 2.) Maintain Control Tendons to be completed each surv.llance. The Reg. Guide also requires a control tendon from each group to be inspected erfy survcillane for comparative purposes. CR3 W not had control tendons since the first surveillance. The concept was introduced probably in the fourth surveillance. Tendons D212, 12VI and 5 1H26 were probably the original control tendons since about the time of the fourth surveillance. They were intended to be inspected during the fifth survllance but the group of tendons selected was based on the surveillance being performed during an outage. FPC decided to complete the Sth sunrvillance during normal plant operation and the original tendons selected wcre affected because many tendons were located within the area of the plant steam vent zone. This included the above three control tendons, and three new control tendons, D215, 34V6 and 46H29 were selected for completion of that surveillance. A problem with 46H29 during the 5th surveillance forced the selection of another control tendon, 46112 1, for the hoop group. New control tendons may need to be selected periodically if the tendon has a problem and is ever detensioned and/or retensioned. As earlier surveillances on CR3 did repeat some tendons, the selection of these other control tendons was easily done from several good candidates. New control tendons should be selected from those previously inspected as far back as possible and cannot be one previously detensioned and/or retensioned. A tendon inspected in more than one prior surveillance is preferred. Based on the above, it is recommended that both of the above two sets of control tendons be used by FPC as control tendons, with one set of three to be utilized in the 6th surveillance during a plant outage, and for

 )      the other three to be used in any future inspections scheduled to be performed on-line.

3.) Consider any tendons with problems or abnormal conditions as reported by plant personnel. Any leaking tendons or tendons with any reported problems should be considered within the scope of the surveillance. Also, past inspection reports and records should be checked for open items, recommndations, or noted problem tendons. 4.) In the selection of tendons for detcsioning, (one per group is required per R.G.) consider the number of effective wires as recorded in the tendon history sheets and summarized in the effective wire summary in Attachment D to thi calculation. As any tendon is to be considered ineffective if it has less than 155 effective wires per the FSAR, it is therfore notddesirable to select a tendon with many missing, cut or ineffective wires. Unless there was a specific need to detension that particular tendon, doing so could therefore render the entire tendon as out of service. Only a maximum of 3 tendons are allowed out of service at one time per criteria in the FSAR. 5.) The reduced force dome tendons are not normal candidates for normal liftoff testing per SP-i 82, Enclosure 8. 6.) Tendons adjacent to the selected tendon may require testing and should also be feasible to inspect and test. Adjacent tendons in the dome should not include any reduced force dome tendons. Jump to the next regular dome tendon for the required adjacent tendon. Also, adjacent tendons of the lowest hoop tendons (#I) shall be considered as the two'diretly above the selected tendon. Adjacent tendons of the highest U hoop tendons (#47) shall be considered as the two directly below the selected tendon.

 )  7.) One alternate tendon should bc selected from each group, and the two adjacent tendons of these alterates 4         at least considered for possible inclusion.

WE:Lft P0'R"o W NO~ mawp gbiLate

I

  • Florida DESIGN ANALYSISICALCULATION k) Power Crystal River Unit 3
                -c  oricI.

Page 6 Calculation S-95-0082 In addition to the above selection criteria, there arc several other factors which have influenced the scheduling of actual field inspection and testing. These include: A.) Steam Vent Zone - Plant steam venting can impose a safety hazard to personnel during plant operation and early modes of shutdown. Tendon work in the range between 0 and 120 degrees is affected during plant operation by the potential steam venting of the plant. Tendon work in this area must be held off until the potential hazard is eliminated or other approval is obtained fiom plant operations. Note that for the fifth surveillance per FPC operations, this even includes the outside tendon caps of the affected butresses at 0 and at 120 degrees. B.) Fuel Pool Area - Work over the fuel pool can only be performed while missile shields are in place. (Nureg 0612 reqint.) C.) Plant Interior Work - Work inside some plant areas is difficult due to access problems, high radiation areas, interferences, ram accessibility, etc. Deferred/Exempted Tendons After the tendons were selected for the fifth surveillance for an outage surveillance, it was decided that the 5th survcillance would be completed during normal plant operation. A group of tendons originally selected for inspection during that surveillance had to be exempted f(rm that surveillance due to their proximity to the main steam vent zone and the associated hazards with woffing in that area. FPC discussed this issue with the NRC and has documented the following 8 tendons as deferred tendons: W*, Lth d Rant Rer.Ma.Nclow eq 0

lorida DESIGN ANALYSISICALCULATION y Power Crystal River Unit 3 Page 7 C.lI.

     .. 0RIE.V9*..8   NO.

I Calculation S-95-0082 rou D1 15 Never inspected in any surveillance. D212 Inspected in Surveillance 3 and 4. Considered as Control Tendon for outage condition. D3 11 Never inspected in any surveiance. 12VI Previously included for liiftoff testing in the 3rd and 4th surveillances. Considered as Control Tendon for outage condition. 42H44Never inspected in any surve illnce. 511126 Previously included for liftoff testing in the 3rd and 4th surveillances. K-I Considered as Control Tendon for outage condition.

 -J 53H46                   Never inspected in any surveillance.

621146 Never inspected in any surveillance. As FPC has mnmittod to t"e NRC to addrcss the above tundon within the upcoming 6th surveliancc these tendons were considered in the scope of this calculation. The 6th surveillance is scheduled to be completed during an outage. Since three of the above exempted tendons were also previous control tendons, it was onidered ta thee tendons can again be used as control tendons for this surveillance instead of the 3 control tendons used in last surveillance (when the surveilance was done on-line). Therefore, the three exempted control tendons can be considered as three of the 11 tendons required per Reg. Guide. A total of 16 tendons should be inspected during the surveillance with three additional alternates selected. Note however that the scope of this calculation will include force curves to be regenerated for the other control tendons, D215, 34V6 and 46-21. A complete historical record of all tendons included in all prior surveillances, along with the list of selected adjacent, exempted and alternate tendons which are planned for in the 6th surveillance is provided on the following Table.

 )

{ 8 ET. Life of PW*i ft6P. MA* Enpame"

9p-3LML.14NCZ, PO lT SXU"VERI 3W31RM, 3 =wLA**m o L 4TM U.LM= .. S ETISUQA= qmxE*TJ. o flT7TIIt I33,MM1TP"m 3'ifl 2'1TOS1 Y $OWN1 TO*11111 MW03143" OIT Imunioianiu l/O I177 inmoOIJN. l,* um* PALL19

                                                                                                                                                                             .. 34?"kP3 Sr
  • SI'I'wV76 IvZAR YEARS MARS IIYEARS 7Y..AERS . YIEARS . SUOAyDATA RInEQV3TO Davd0 21 TOT-101t VO 23T.101.M V.SD 21 "wr.IwcWV.so II 0741U.LIVO I I OT-..VPr. it TOT-=.."" . ns WT7m. Y.2.11 AiAZ.L*INSPECTED 2$ 1TOl'T.IV0irVD Z3104TV*IUrSD 21iT*ri01UW.s IIITOT-54UV.J.* 1lT410,..D * *Da P IOT.4I3K[.220 T

3?BASIS Sp-*13.P4"IP-63 S-2 M1-83 sP*Ill TOTAL- 16 81P*Sfl.31.4454 PJlY- PLEYG RErV? PSISIlII

  • cc Rzm DATE 3.27.10 a 4IO v" 5'11r2, vim 4 0 Dcm12TOtu DiI3n Din2 D123 Dios V DI$M P.C 0212 I.Z , 22. 3 TENDONS IDQTAL D225 0140 i215 R W212 PLC 0231 9
  • 0204 D . I*sucrm SGR.OWSSOF41 v2ni D 4 D =212 2 !2 A , O1is
  • TODATE .n IDiImDM. D2iS 2 .21PI 0'22 P , D .

1340 V.031 A . lW~tEAL2TPv9 W19 M2V2 l~vo lUvi I.e 1414S P.C

  • uvo P.CX *2VET.MMONS 144 TOTAL 12V20 2120 fR SV t v4 EI$ D , IV2311 DD
  • PEC 0 GRNMIPF 24 t"V 2m 14V19 D V sm*

Ii D ,1 232 , TODATh C, 12.34.545. 413 2MI 3m1 4s136 .62116 A MV4, 441' Ml . Ce

                                                                                                                                                                                                                                   .9 0) 3P0AWNTAL1r,D,*100            131110                    12                             1         a        3110 1Mat                  *11to14                                          P.CIw M              as5K1097mm 20 TOTAL                         )I1.i9                131031          0           131444                 1M140            D          M1*41                              Mae 1b]s1                                m                     S 6(,OROM04110*30               1.3113)?                 MW*1                        423                    s11136           9          ea09           c2iwI)         . law                           T*

ODATU .5 I,33344. 4, 13111 911110 423144 53313 Ga1in ADL.1 , 421144 E C

$TENDNS PE11     R I          5313311n               sl1msI                       51112                  4Mt                         4m   E          L .IDw             62032 64i0                    5111131                     51311                                              d41100          AML            ,   014I          0                                            .9 40w1                    ISW?'                        53105                                             4al1            D              . I42,6         E          .

U 481137 D 5314" 42134 =12 A TOTALTDOS ... a So4

                         .... 4d34s S                  411142
                                                     ,,.,=.-            . *=.=.=...44n10 ..      D ... *  ,.a      .-.       -- , .. n       ..    ,     .. n.=.,
                                                                                                                                                               .._ ..                    .. 8 a.... U*    *n...

7UTALDtS*gCTW 23 22 21 I1 14 . 16IALT. , T10AL4 1.30214- &.ALTERNATE ADL.ADhACENT ac.C%7RTE A DEEN1014ToV a METNaIONIM L.EXE&Gq730PJ!Rzm r10*42M1 Sill. R. RMPATWD 1.31704234v _______ NJ

                                                                                                                                                                                                                               'a 0m I-I-

a I Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 9 Calculatlon S-95-0082I 2 6.0 CALCULATIONS 6.1 Gcncral Background and Schcdulc Information General Background Tendon forces curves are to be prepared for the upcoming 6th tendon surveillance period at CR3. From the basic criteria as presented in the Design Input Section, as well as from several discussions with Mr. Joe Lose of Florida Power & Light, it was determined that the criteria for this surveillance period has not changed since the last surveillance efforts. A review of Tech Spec and FSAR criteria confirms the FPC positions with respect to the tendon program. Supporting work for this surveillance period will be based on the same criteria that was used and accepted in the previous surveillance periods. Tendon losses have been calculated in the past per the Rcfcrcm= 8, 9, 10 and I Idocumcntation. Individual tendon losses include the following.

       " Force loss due to elastic shortening of the containment as a result of the prestressing process and the particular sequence of tendon stressing.
       " Force loss due to the stress relaxation of the tendon wires.
       " Loss of prestress force due to the creep characteristics of the concrete structure.
        " Loss of prestress force due to the shrinkage of the concrete structure.

Based on some earlier calculations made for tendon losses per the Reference 1 document, Lotus spread sheet templates were prepared for tendon losses calculations for the 4th tendon surveillance calculations. See References 9 & 10. These templates were reran and tested for their accuracy and validity for the fifth surveillance. In addition, the procedure for the gatering of all input data was automated in the fifth surveillance to the format presented herein. Numerous test cases were ran to duplicate forcm curves prepared in the past There were four master templates prepared for the fourth surveillance; one for the hoop tendons, one for the vertical tendons, and two for the dome tendons. The dome tendons are divided into two groups; one for tendons with an original stressing sequence below 27, and the other for tendons with stressing sequences above 27. Based on the work previously accomplished in the prior surveillances, new spreadsheets were prepared this surveillance using Microsoft Excel for the collection of input data and for the calculation of tendon losses ncedcd for generation of force curves. The generation of the force curves was also automated this surveillance by using Excel to plot the graphs. The organization of most data used for this calculation was setup into Excel workbooks with subfiles built and included in each workbook. There is a separate workbook for each of the three tendon groups and each one contains the following:

        #    Tabulated input data
  • Original tendon stressing sequences.
  • Eff*ctive wire summaries.
 )           "Original Stressing Data" calculations for SP-182.

e Separate fils including each tendon loss spreadshect, plot data and an individual force curve. Ig Additional information on electronic file names etc. used in this calculation is provided in Attachment K.

r IAFlorida DESIGN ANALYSISICALCULATION K Power Crystal River Unit 3 DOLUN W*

                  )

CCAPui1oH nToN NO.

                                     ..                                   ,Page                                        10 RE~*IQN Calculation S-95-0082                                                                  2 Schedule Information The expected timing for the sixth surveillance is Fall 1997. A date of Novembcr 1, 1997 will be used as a bases for determining the predicted values of base, 95% base and 90% base and labeling this information on the force curves. This allows for ficld usC and decisions to be made based on the requircmcnts of Surveillance Procedure, SP-182.

The scales of the force curves are based upon previous surveillance efforts. Thc x axis is a log scale in time representing the time after average date of dome or wall concrete placement, in years. This scale is labeled at the top of each curve. Force curves are plotted using the actual log scale points for the x axis (not the scheduled surveillance years after SrI) versus the calculated tendon forces in ldps on the y axis. The scale at the bottom of the curve for scheduled surveillance periods afte SIT are for ease and readability relative to rcgular scheduled surveillances per Reg. Guide 1.35, Revision 3. Most of the CR3 surveillances were performed on the regularly scheduled years, however, the 5th surveillance was actually performed in the 17th year after SIT. Note that the containment Structural Integrity Test (SIT) was performed in November 1976. For the domc tndons force curves, the point on the bottom scale at SIT corresponds to the log sce at the top of 2.5 years. Therefore, a corresponding log scale data point must be determined for curve plotting for the period of the 6th surveillance. Based on a date of November 1, 1997 for the Fall 1997 surveillance, the length of time between November 1976 (@ SIT) and November 1, 1997 is 21 years. Since the dome group at SIT is at year 2.5 on the log scale, thc 6th surveillance will correspond to (21.0 + 2.5) or 23.5 years on the log scale. The same procedure must be performed for the hoop and vertical groups as they have different reference L points on the log scale for time after concrete wall placement. Both hoop and vcrtical groups are the same with SIT corresponding to year 4.4 on the log scale. Therefore, the 6th surveillance period will correspond to (21.0+ 4.4) or 25.4 years on the log scale.1 l2 A vertical line will be shown on the force curves at the point of the next surveillance and the calculated values of base, 95% base and 90% base representing points on the curves at that time will be included on each of the curves. RETZ. Eagveaw WeW Plan RESP: Mkacem

AR& Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 DO W Page 11 Calculation S-95-0082 3 6.2 General Procedure for Force Curve Generation The same procedure within the calculation for the preparation of the force curves for the fourth and fifth surveillance periods will be followed. 6.2.1 Preparation of Data Input Spreadsheets In each of the Excel workbooks is a data input file where data from source calculations and current tendon history sheets has been tabulated. See DOMER3.XLW (DOMEINP), HOOPR3.XLW (HOOPINP) & VERTR2.XLW (VERTInP). The compiled books of tendon surveillance historical information, as updated to include the results of the fifth surveillance, provide key input data for the development of force curves. See References 12, 13 & 14. The selected tendon history sheets related to this surveillance have been included herein as Attachment B of this calculation. The Reflrce 11 calculation is essentially a source calculation for this procedure with the Rcfcrence 8 & 10 calculations also providing information.

~sheet. Notes and      data inputrelated Ilerefcrences          to the ame tabulations   tabulation of the presented      datafirst as the    on these  spreadsheets sheet within        arc shown the following      on the6.3, Secdons      individual 6.4 & 6.5.

6.2.2 Procedure for Determination of ndividual Tendon Losses The procedure for the tendon loss calculations, as derived from the reference documentation, is as follows: 1.) Calculate original force in the tendons The original force in the tendons is detcrmined as follows: rActual~lfiqff Pressure1 ORIG.FORCE= 0.7 *Pressure x WireFactor PredictedLfloff Pressej Where: fa - 240 Ksi, typical for all CR3 wires. Wire area = 0.07685 in2 per Appendix F of the Rcfcrcnec I I calculation. Fk (Kip Force)= Tendon Area (in2) x f&, (Ksi) - 0.05985

  • 240 Tendon Area (in2) = Arca/Wire (in2) x No. of Wires. (Considered by wire factor.)

Actual and predicted original liftoff prcssures are obtained from Tendon History Sheets References 12, 13, Kj 14, with those within the scope of this calculation attached in Attachment B. Refer to the Appendix F part of the Reference I I calculation, for source data of above formula. The above expression was used as the basis for the calculations for all the shop and field end forces calculated on the Data Input Spreadsheets. This procedure does not apply to rctensioned tendons. I iTr Lac.e PlUWAEeSPNM.M Enok

I, Florida Power DESIGN ANALYSISICALCULATION Crystal River Unit 3 CMPMTMPage 12 Calculation S-95-0082 Note that the wire factor as shown in the various spreadsheets is avalue representing the tabulated number of effective wires over a total of 163. The number of wires is usually 163 uniless cut, loose or considered ineffective. The number of effective wires as recorded from the original installation is documented on the tendon history shoets. The number of effective wires for each tendon has been updated, tabulated and presented in the Effective Wires Summary for each individual group within Attachment D. This tabulation was updated to include the results of all previous surveillances. It does not imply each of the tendons was specifically checked for the numbers ofeffective wires as presented in the table. It reprmsents only data from the original records and as made available from survcillance records and subsequent Inspections. - Note that the wire factor used is based on current information and is not based on the number of wires at the time of original installation, therefore the original Force calculated may not be the "original force" in the tendon back at that time. The effet of less eflfctve wires lowers the curve vrtically. This is insignificant at the current time as the curve of interest will be cos c for use at this time. Another method would have been to plot the original value using the wire factor then and then to show a step down on the curve should a lower wire factor occur at some point later on the graph. 2.) Calculate Elastic Shortening Losses The elastic shortening losses are afunction of th stressing scquence number for the individual tendon. In addition, the tendon wire factors an also considered and used. The base expression used to calculate these forces is the same as used in previous calmlations and is already built into the basic spreadsheet templates. All the equations for elastic shortening were confrmed as being the same as established in prior calculations. Based on the review of the procedure for calculating these losses, it is concluded that the existing templates are still appropriate and omect with the additional input of stressing sequence data and wire factors to be input for the current group of tendons for this surveillance. Refcrence 10 & Reference i I data and informatiom on elastic shortening was inchided in Attachment E to these calculations. See Attachmet C for original stressing sequences for all tendons and see the Data Input Workshet*s & Attachment D information for tendonfwir factors and source data. Elastic Shortening Losses for Dome Tendons Note there are two expressions used for elastic shortening for the dome tendons depending on the stress sequence numbers. For dome tendons in sequences I through 27, the Domelow template is used. For dome tendons in sequences 28 through 32, the Domehigh template Isto be used. This is because of the two separate expressions used for the calculation. Elastic Shortening Losses-For Dome Tendons in Sequences I through 27-N - 27 Total Sequences n - Sequence of particular tendon. M~ f lPMutRES PJNucbwem~

      *FFlrid~a                   DESIGN ANALYSISICALCULATION K)                Power                                 Crystal River Unit 3 C RMAoM Page 13 Calculation 8-95.0082 Force Loss due to elastic shortening - Fa.

A, N-n x 827 + 75] x reFaddr Elastic Shortening Losses. For Dome Tendons in Sequences 28 through 32-N ,5 S (Sequences 28 through 32) n - Sequence m-nber less 27 i.e. for sequence 28, n - I for sequence 29, n - 2 for sequence 30. n , 3 for sequence 31, n - 4 for sequence 32, n - 5 Fie$=[Lj,-- x 47A4- 13.7] xc e~co The value for elastic shortening in kips declines as the stressing sequence increases. A review of the data for the dome group shows that values for the dome group go from 154.6 kips for sequence I tendons down to 75 kips for sequence 27 tendons, and furtie going down to -13.7 kips for the last sequence, sequence 32. Note that wire factor differences between individual tendons will cause the calculated result to vary slightly for two tendons within the same stressing sequence. Elastic Shortening Losses for Hoop Tendons-N -60 Total Sequences n - Sequence of particular tendon. Force Loss due to elastic shortening - Fles = nx 134.0] fieaco A review of the data for the hoop tendon group shows that the range ofvalues for the calculated elastic shortening go frion 127.3 kips for sequence 3 tendons down to 0 kips for the last tendon sequence, sequence 60. Emgmawuwrn RE1.U.wP~,i RESP~ Ie.acba, oft

  *91

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 oo fn RP*oR Page 14 Calculation S-95-0082 Elastic Shortening Losses for Vertical Tendons - N -3 Total Sequences n - Sequence of particular tendon. Force Lois due to elastic shortening - F =sn x 73.5] x fracr A review of the data for the vertical tendon group shows that the range of values calculated for elastic shortening go from 71.1 kips for sequence I tendons down to 4.7 kips for sequence 29 tendons. There are a total of 31 stressing sequences for the vertical tendons. 3.) Calculate Wire Stress Relaxation Losses Wire strcss relaxation losses and the procedure for the determination of thes losses for the 4th and 5th )surveil ances are addressed In the Reference 10 and I1 calculations. The original wire relaxation curve, as provided by test data from the wire vendor forms the bases for wire relaxation loss values (See also FSAR Figure 5-23). It was determined that tie same procedures and figures as calculated in those prior calculations are still applicable for this surveillance. Applicable data fioro the reference sources was attached and included within this calculation as Attachmntd F. Note that there were adjustments made to the original stress relaxatio values from the vendor relaxation curve to allow for some conservatism and for temperature consideration of 100 degrees vs. 68 degrees F. Also, per the original design the wire factor or actual number of effective wires was considered as negligible for these losses and was not included. Note that values for stress relaxation nmgc between 40 and 50 kips for the surveillance period for all three tendon groups. 4.) Calculate Creep Losses Concrete creep calculations in the Rcfcrence I I document are attached in Attachment G. The losses are based on the curve contained in the reference calculation. Creep values are different for each of the three groups of tendons. For the dome tendons in the coming surveillance period, creep values are the same and are about 152 to 158 kips, hoop values are between 79 and 83 kips, verticals are 36 to 38 kips. 5.) Calculate Shrinkage Losses Attachnmnt H contains source infonnation for concrete shrinkage from Reference 10, pg. I I and Reference 11, cover page & Pages 13 & 14. The straight line shrinkage losses in micro inches per inch as calculated in the above two references are still applicable for this surveillance period. Tabulated values from these referenccs were input into the dome, hoop and vertical spreadsheets. There are no additional variables or considerations and the samc values are to be used for this calculation. From a review of the output information, the dome values are constant at 8 to 9 kips, hoop values are above 5 kips, vcrticals are also slightly above 5 kips. LI. MET. Pft RESP. MA~ceE-hpow.N

y ePower

  / OC~lrI*.~fnN1FAI~

Florida COM10 . ft #~o DESIGN ANALYSISICALCULATION Crystal River Unit 3 Page 15 1 Aro t Calculation S-95-0082 6.) Total Losses Calculated force losses for elastic shortening, wire stress relaxatiom, creep and shrinkage are added for a total of all losses. Also, a percent of this total of all losses is calculated based on the original average force in the tendon. 7.) Determin Predicted Forces for Base, 95% Base and 90% Base values The original force less the total of losses calculated yields the base predicted value for the subject period of surveillance inspection. The 95% and 90% values are then calculated based on the calculated predicted base value. 8.) Normalizaion Factors Normalization factors arm calculated based on the expressions and the source article contained in Attachment I of this calculation. This fhctor usually does not change much over the forty year time span of the calculation. The base expression for the dome normalization factor value is presented as follows:

)                (A -B) x(-C)+(D-97.7)

Where: A - Averag of all Domes group B - Original average tendon force C = Wire Stress laxation Percentag D - Elastic Shortening As an example, Dome tendon D 112 calculates as follows: NanmaozahlonFoator= (1639 - 1676) x (I - 0.0257) + (D - 97.7) or

                       =--(-3 7)  x (0.9743)+(-1*1.9) or NF - -138 which matches the spreadsheet calculation.

Similar expressions arc shown for the hoop and vertical tendons in the information in Attachment I.

.)

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3

            .,oo.T4"                                                                                         Page 16 Calculation S-95-0082                                                     x 9.) Plotting of Data Only the data from Column B, L, M, & N are tabulated on a separate area on the side of ft spread*hect. See Columns R, S, T & U; Rows 40 through 50. Only these values arc selected for plotting on the force curves.

This is for ease of plotting and has no affl o the quality or accuracy of the plots. An example copy of this data immediately follows the first dome tendon. The plots of all dome curves with all the data points showed the force curve plot line as slightly crooked from a true linear plot. The large scale used showed some inflection points slightly off of linear. After investigation, the condition was avoided by omitting data points at year 10 and 15 after SIT for the final plotted figures. UTis was done only for presentation purposes and there is no affect on the accuracy of the plot or the base values calculated and presented on each cune. A column by column explanation ofthe losses calculation worksheet follows: L IA6 ft". eof PMI tESI' N.vif Engoakip

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 oomfo.M IPage 17 7 WkMTWCAWMO NO- mo Calculation r-95-0082 INDIVIDUALTENDON LOSSES LOSSES CALCULATION WORKSHEET NOTES AND LEGEND Individual tendon losses arc calculated based on the procedure presented in the preceding section. The following notes explain the spreadsheet process, input and calculations performed for each of the columns presented. The shaded values on the losses worksheet are extracted from the data input worksheet. Column Racdilign A. Inspection Period after SIT Scale based on years after SIT which is shown on the bottom scale of each individual plot. Noie that this information is provided for easier readability with respect to SIT but is not the actual log scale used to construct the x axis of the plots. B. Years after Concrete Placement Scale of years after concrete placement as used for the x axis for plotting of the force curves and shown as the upper log scale at the top of each plot.. Note that one year after SIT for the dome tendon is 3.5 years on the log scale and for the hoop and vertical tendons is 5.4 years. See Section 6.1 of this calculation for further information. C. Elastic Shortening Calculated based on formulas presented in Section 6.22 and Attachment E information. D. Stress Relaxation Percent Calculated based on original wire loss curve percentages modified per the information presented in Attachrent F of this calculation. F. Stress Relaxation Forces Data input from the Reference I1 calculation page 12. See Attachment F. F. Creep Stran Strain value (x 0.000 IData input from the Reference 11 calculation. See Attachment G of this calculation for data. G. Creep Strain Force Data input from the Reference 1 calculation. See Attachment G ofths calculation for data. H. Shrinkage Values Data input from the Reference II calculation based on the shrinkage curve. See Attachment 1H of this calculation for data.

1. Shrinkage Force Data input from the Reference 1 calculation. See Attachment H of this calculation for data.

l Peru% of Pam "Sr. toidw Eho~We

I Florida DESIGN ANALYSISICALCULATION S t, Power CORPORATlON EWW.CA7"ON NO. MEWJIIf Crystal River Unit 3 Page 18 REV'SW Calculation S-95-0082 2

3. Total Force Loss Calculated valuc, Sum of columns C, E, G& 1.

K Total Percent Loss Total loss in percentage, Column I / Average of original forces for shop & field ends calculated and shown above on the spreadsheet. L. Base The average original force for the tendon noted above on the sprcadsheet, less the total losses calculated in Column J. Note that total losses were not calculated on the row for the 17 year period, the 21 year 3 month period, as well as the 21 year period after SIT. Thcse rows represent the fifth, the originally planned sixth and thc current sixth surveillance periods and the values of Base were derived through linear interpolation of above and below data presented on the spreadsheet. The quality and accuracy is not affected by this procedure. M. 95% Base 0.95 x Column L for the same row. N. 90% Base 0.90 x Column L for the same row.

0. Normalization Factor -

Calculated based on formula presented in this calculation and in the information presented in Attachment . IqE L~IRE ru NUW~ 7WCIW ~IIgWWWW~ MWP &ft40 Phwd RM3P-. MCWW Engm"ma

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3

                             ,l[Tmm~l    Jt    usqPage                                                       158 Calculation S-95,M82                                                               ...       ý Column H & I          Calculated force values in Kips which represent ram pressure @ 1500 psi. These forces represent a zero slac starting point for both shop and field ends of each tendon and provide a basis for the cat of any retensloning effort. The following expression is used to calculate these values:

0.7

  • Tendon Ultimate Strength ' 1500 1 Predicted Lift-Off Pressure at 0.7 Tendon Ultimate Strenrgh. See Reference 10 Calculation, page 34.

Column J & K Calculated force values in Kips which represent forces at 80% ultimate based on the following expression: (Actual prssure @ 80% ultimate strength (Columns F or ()

  • 0.7 Tendon Ultimate Strength) / Predicted pressure @ 70% Ultimate Strength.

Column L & M Actual elongation data, repeated from columns B and C. In addition, the following calculations support the ultimate strength values provided on these spreadsheets: Tendon winr ultimate strength- Ca for wire - 240 ksi ) Tendon Ultimat Strength - F, - [fa for wire 0 Tendon wire area] =

                                      - 240 ksi (0.05985
  • 63 wires) "2341.3 Kips 0.7
  • JRh - 0.7 '2341.3 = 1638.9 Kips 0.8
  • F,h 0.8 02341.3 - 1873 Kips

)

   . , LORIDA POWER CORPORATION - c*YSTAL RIVER UNIT 3                                                                     DOC 1T:S-95-0082 MUi 1 REACIOR BUILDING PR*STRESSING SYSTEM                                                                                 RMiSION 3 IN ST 6th TENDON SURVEILIANCE                                                                                               PAGE M9 CALCILATIONS SUPPOINDOG SP-182 O'RIMALS,                SS'HO DATA FOR THE DOME TENDONS GROUP 0.7 Tendon Ultimate Strength -

0.9 Tendon Uilmae Sfrenot . File DOME3.X.LW Aduzi d Ift-Of 30% UAad= So%1 Fow51-182 Sruu DIa"_Dta I1j Tada M-updm oin.) PIM j PfuMzu4d) Raw I (Kip0 Raw 2 (K~ps) Raw)3 ML.)

                 -C                               ()      -- ()        1--         W-                     UL                  m~l)                    (K Dili          3          S           6810       6810       7780       7780        361        361       1272        1872        3           3 0D112       4-3/4        5           6810       644         777       779         3so        359       1873        1367      4-3/4         S D113        dt-7/8      4-3/4        68033      Q140        7m7       7790        3a3        39        1,973       1867      4-7/5       4-314 D114        3-111       4-/8         S IM       6440        7770        790       362        3J9       187)        1867      5-118       4-3/3 1)15          A          S           6840       6800        7790  1 7770          359        362       1867        8873        S M16        4-3/4       J-1/         6760       60          77M       "7          364        343       3672        1s"       43 D1o           S                      6870
                                                    ,   I   681o        7810      7780        38         361       is"         187         5        3 D131        4-1/2       4-7/1        6110       6740        7660      77M         366        365       1871        t87n      4-1/2       4-7/8 Din.        4-14        4-7/8        67M0       680         77m                   3H4 375        362       187          1808     4-1/2       4-7/3 D21                                  610        68701 012         4-54        4-7/8        6770       6770        7730        70         363       363       1871      1           4531        4-7/1 83233       4-.V4       4-3V4        &M4        "W0         7790      7770        33         349       J867         1873     4-3/4       4-304 0214        4-3/4       4-718        6670       4740        700       7610        369        36        Is"         186       4414        47/8 0213        44          S-413        68CO       6870        788       7810         361        358      138         1863       44312      5-1/11 D216          S           5          68M         "8         70        7M                      361      1373         3373       3            3 D=0          3-38       $47/3        6530       65:0        7450      1430         376   1    373      1870         1871     3-5/8       r3-7/8 D303        44          1-3/4        6760       6770        77o       7730         364       363       17           1371     4-1/        3-3/4
         .D304          44-/1        4            440       4600o        790      77           359       362       1967         183       4-1/8        4
       .4 D"            .4-311   1 4-3116    1   67"0  1    "M8         763   1   71620 1      M?         36    I   1967   I    IM        4-3/a I   4"316 1R3 dr, D30    3         4-1/4        6770       6m3         718        7730        361        363       1873        3872      4-/        4-1/4 V311       431/116      4-5/8        6800       6840        777       7790         362        359       1373        1867    4-11f16      4-5/5 I               *      -7/3-,     4840I      6880        77190      7770I       339.S      3.,,1 I    86         3873     47/5
                                                                                                                                        *,,l         4-7 770       6770 3 the wwm       ~dlkall mxnyletd t  dll mdcl uipe11 u*am#t s0plusdla. .Ih4aI la                                          smallauom and bCdlwma  A SmuO M.

283J6-4M 3:54 PM

kY.J FLORIDA POWER CORPORATION - CRYSTAL RIVER UNIT 3 DOC 30:S-95-062 REACTOR BUILDING PRESTRESSING SYSTEM REVISION 3 6th TENDON SURVEILLANCE PAGE 160 CALCULATION SUPPORIG SP-182 "OIUGINAL STRMSSING DATAO FOR THK nOOP TIEDONS GaOUP 0.7 Tendon UImate Surngth - O.S Tendon Ulbinne Strengdt - r'. WeHOOPP.XLW Aclual P-J4. eded litM-Off 8051 1et Noimre Klps SP-182 =Orligfd &r now$ Data I m 4-Tendon 1louglom Ou. ao Fid - presurp) Rp ilI -ap Press0r ( P-Raow I (Kips) So I Fil_ IRw 2 (iops) Sbp Fed Mp Rowi (In.) bd M3 4-8 6871) 6810 7(i 7780 33 361 1263 i-5/ 4-5/8 42HI34s8 33/8 68410 6799 7810 7750 359 362 3873 1868 3 5-3/8 421119 534 5 67 680 7810 71 5 6 53 17 ./ 421129 5112 5-1/ 6870 6810 7810 77s0 35 361 186 1872 5-1/2 5-1/8 42H30 421131 4-7/8 5-1/4 5-3/4 4-7J3 1 1 680 6170 6790 6810 7810 7310 7750 7730 358 358 363 363 1563 1363 1871 1872 4.71

                                                                                                                                         $-114
                                                                                                                                                    $-3/4 4-7/8 Ip,,

42H432 S ' 518 16 70 7111 770"tO o 87 -/ -/ 42H32 5-1/4 3 6870 6790 7810 77 353 362 1863 1373 3.1)4 4121433 slu/t 5-1/4 6370 6830 7810 7780 3538 361 3863 1373 5.3/8 5-1/4 42H34 5.1/ $Iva 675 6660 7680 7600 344 369 15w 38m 5-1/2 5-3/8 421135 5 5-1/4 130 6770 17760 7720 360 363 3362 3869 - 421136 5.14 5-1/3 6170 6790 7610 7750 358 362 1863 3673 5-L1 3/m 421137 5-3116 4.7/3 6870 6130o 7310 7780 358 361 1363 13872 5-s/36 4.748 42H43 5-1/2 "/a 4870 6110 7810 7730 358 361 186 1373 "12 5-1/8 421144 5T111 5 6790 6140 750 7M 362 359 1871 3367 5.1/8 5 421143 3-7/16 3 670 "40 7810 7780 358 361 1863 1372 3-7/16 5 461120 114 5314 6640 6600 7700 7630 370 373 1901 1890 3-1/4 3-11

    -146I1)2      3-118        --5-1/4         6720         6730     7700o       7640      366        365            --

3873 1361 5-1/3 5-1/4 46H=f 5.5/8 a-1/4 6720D 6730 7700 7640 366 365 5873 1861 5-5/3 5-1/4 511S2m S 5-1/8 677 69 7720 7750 363 362 1369 1368 1 3 5.18 331426 5-1/2 5-114 6760 4760 7750 7700 364 364 I179 1867 3-M/ 54/14 531H27 3-1/3 4-718 6740 6670 7630 7600 365 369 Is"8 1368 5.3/3 4-7/8 51H231 5.1/3 5 6760 6750 7750 77W0 364 364 1879 1870 "IN 5 51129 31In 4-3/4 6810 6750 7780 7700 361 364 872 1370 5-1/2 4-3/4 533111 5-3/4 3-118 6700 6760 7650 772 367 364 2871 13872 5-3/4 3-1/8 1K 53112 "-34 4-M/ 6800 777 7760 7720 362 316 5170 3628 5-3/4 4-5/8 531143 5.3/8 4-3/ 6670 6710 7400 7770 369 3462 1368 3373 53-/8 4-1/8 33143A 4-714 1-5/4 1 6740 68030 77590 7770 359 362 3 586 1868 1587) 86747/5-5/4 5-3/34-/ 5-3t& 369 36 531447 4-3/4 5.3/ 1 6340 6800 7600 779 7660 7770 359 362 1367 1873 4-3J4 5.312 6670 67130 421121 5-34 -/ 5-3/3 4-314 6760 6700 7720 7650 364 367 1372 1873 5-1/3 4-3/4 3 5 214,173 62152 3-5/16 11 6800 6750 7773) 7700 362 364 3873 3870 "-5/6 S 62H423 53-Ail 5-3/4 680 6750 7770) 77W1 362 34 1373 387 5.3/S 3-1/4 62139 621,140 5-7/16 5-3/8 5-114 4-718 6800 6100 6750 6750 7770 7770 7700 770 361 362 36 364 3873 3873 1370 3870 5-7/36 5-3/3 5-3/4 4-7/8 193 4231143 5-34 5 6m 6750 70 77 362 364 3873 1870 5-3/4 5 62M142 3-3/9 51116 6800 4750 77 770 362 1 364 1373 170 5-318 5-3116 421,14) 5-3/8 4-7/8 6710 6670 7660 7600 366 369 1871 3868 5.3/3 4-7/8 6=44 621145 5.12 53316 4-7/8 5.118 6800 6760 670 6700 7770 77M0 7700 362 364 3" 367 1873 1884 1870 5-1/2 5-3/16 1 -7/8 311 IR. 621146 5-3/8 5-319 6800 7770 77W 362 364 1873 2570 5-1/3 5.318 2,1147 5"/s 4-3/2 6680 6640 7620 7550 368 370 1870 3864 1-. 1/2 bo. -sgcuw sO w~dppt w dw3wd~ti&ayaiumd~~~ uh 28-Janr98 3:24 PM

   )
   *.,jFLORIDA POWER CORPORATION - CRYSTMAL RIVER UNIT 3                                                                  DtI)1S 95*0a2 REACTOR BUILDING PRESTRESSING SYSrEM                                                                              PEVI      2

-.- 6th TENDON SURVEILLANCE PAGE3 161 CALCULATIONS SUPPORTING SP-182 "ORIGINAL STRESSING DATA* FOR THE VERTICAL TENDONS GROUP I ?,' 0.7 Tendon Ultimate Strength P32KYps 0.8 Tcndon Ultimate Strength IL83"Kips File: VERTR2.NLW Actual Predicted Llft-Of 80% Uhimate For SP-182 "Original Streuing Data" Tendon Elongation (in.) Pressure (p) IPresme Row 1 (Kips Row 2 (Kips) Row 3 (In.) 9?- I,5top F ikeT,IShop Fid Jip Field I so ~- Field ShpFedhp il 23V24 12-7/8 H 6870 NIA 71T WA 38 WA 1563 N/A 12-7118 IVA 12Vl 12-1/2 NIA 60 NIA 70 NA 362 N/A 1873 N/A 12-1/2 NIA 12V2 12-312 NIA 6800 N/A 777 NIA 362 NIA 13 NIA 12-1/2 N/A 23VI 12-1/4 N/A 6800 NA 7770 NA 362 NA 1873 N/A 12-114 N/A 23V2 13-1/9 NA 6870 NIA 1710 N/A 353 N/A 1863 N/A 13-1/3 N/A 23V3 13 N/A 67W N/A 7750 NfA 364 N/A 1179 N/A 13 WA 34V5 12-5/8 N/A 6800 N/A 7770 NWA 362 NIA 1873 N/A 12-S/8 N/A 34V6 13 NIA 6810 N/A 7730 H/A 361 N/A 1872 N/A 13 N/A 34V7 12-3/4 NA 6970 NIA 7510 N/A 358 NIA 1863 N/A 12-3/4 N/A 61V9 12-5116 N/A 6860 N/A 7840 N/A 355 N/A 1873 N/A 12-3/16 N/A 61VIO 12-3/4 N/A 6870 N/A 7810 N/A 358 N/A 1863 N/A 12-3/4 NIA 61 VII 12-5/8 NIA 6710 N/A 7660 N/A 366 NIA 1871 N/A 12-S/S N/A 661 V20 12-3/2

                         -       N/A      6870        N/A       7410       N/A       358        N/A       1863      N/A      12-1/2     NIA 12-I/8     N/A      6810        N/A       7810       N/A       358        W/A       1863      N/A      12-1/8      NIA U       OIiV21 61V22      12-7/S1    N/A      0870        N/A       7810       NIA       358        N/A       3863      N/A      12-7/8      N/A Columns A ltrough G ire data Input extracted from ite tendon history books (applicable shes contained In Attachment B).

Columns H through M are calculated using she expressions noted below. Column Tendons withn the scope oflls survellabnce. Co.l&C Actual elongation dam taken horn tendon histry sheem for shop and field ends respectively. For the verical tendons, only fthshop cnd applies. Col.D&E Predicted Liftoff Pressures taken from tendon history sheets for shop and field ends respectively. Col.r&O sOS Uldmam pressures taken from tendon history sheem for shop and fld ends respectIvely. CoI.H&1 Columns H & I - Calculated force values in Kips for "Original Stressing Daa' Row I which epresent ram pressure @ 1500 psi. These forces represent a zero slack starting point for both shop mnd field ends of each tendon and provide a basis for retensloning effors. The following expression is used to calculate the values for Row I data: 0.7

  • Tendon Uldtmate Strength 0 1500 I Predicted Lift off Plete at 0.7 esudon Ultimate Strength.

le. for23V24: 1639* 130016870 - 358 ColJ&K Calculated force values in Kips for Original S "ess Dam" Row 2 data which rprsem forces at 80% Ultimate based on the foUowing expression: I Actual pressure @ $0% Ultimate Stregth (Cols. F or G)

  • 0.7 Ultimate Strength I Predicted pressure 4 70% UIL. from Cols. D or E.

ie.for 23V24: 7810 " 1639167M - 1863I Col.L& Actual eloatiin values repeated from Columns B & C for Row 3 of Original Stressing Data'. 12-Sep.97 9:49 AM

Florida DESIGN ANALYSISICALCULATION Power COSUoRA Crystal River Unit 3 Page 162 Calculation S-95-0082 2

7.0 CONCLUSION

S Tendon Forcedfne Curves have been gcnerated from the results of this calculation. Final force curves arc presented and attached in Section 6.0 of this calculation. Force curves for the three control tendons were also generated by this calculation and were used for comparison and verification of data and spread shects with the same curves generated previously for the same tendons. The comparison was completed and the data sheets and force curves were found to be the same as that previously gcncratcd. Other calculations supporting the "Original Stressing Data" and "Data Sheets" in SP-1 82 were completed I and arc presentcd in Section 6.6 of this calculation.I

8.0 REFERENCES

The following references are used in the preparation of this calculation:

1. G/C Lettcrto FPC, FCS-14594, Scope Document, Novcmbcr 24, 1995, for Preparation of Tendon Force Curves for the 6th Surveillance and site trip to CR3.
2. G/C Letter to FPC, FCS-12439, August 13, 1991, Tendon Selection and Recommendations for the Fifth Surveillance.
3. Reg. Guide 1.35,Revision3
4. Reg. Guide 1.35.1, Revision 0
5. CR3 FSAR, Section 5.2
6. Technical Specification, Section 3.6.1.6 & Section4.6.1.6.
7. Design Input for the 5th Surveillance, DI-55220-152.0 SE, Revision 2.
8. G/C Calculation of Force curves for the 5th Surveillance for SP-1 82, Revision 11.
9. Design Input 5500-528-1, Revision to SP-182 Procedure for Tendons and Calculations for Force-Tune Curves for Surveillance 4, Revisions 0 and 1, Jan.87 and Sept.87.
10. G/C Calculation 5500-528-1, Tendon Loss Calculations for Surveillance 4, Revisions 0 and 1, Jan.87 and Sept.87.
11. G/C Calculation 04-4762-099, Tendon Loss Calculations and Appendices for CR3 Tendons, J.Fulton and G.T.DcMoss, 3/6/87 and 1980 calculations.
12. Dome Tendon History Sheets updated to the 5th surveillance.
13. Hoop Tendon History Sheets updated to the 5th surveillance.

RET. L. COPmut R!SP N!3P f EW~bFeVu

Florida DESIGN ANALYSISICALCULATION Power Crystal River Unit 3 Page 163 bCCVMWb4T'CA1W0 NO.1 REWW4

       . ...            +/-   _,~~Calculation
                               ...          S-95-0082                       _o
14. Vertical Tendon 1-istory Sheets updated to the 5th surveillance.
15. Effective Wure Summary information, letter to FPC
16. Prcscon Vendor Dravwgs
17. SP-182,Rzv 11.

IS. Surveillance Report for the Fifth lnspection Period, VSL

19. Engineering Report for the Fifth Tendon Surveillance, GIC Letter to FPC, FCS 14401, 6120/94.

)

                        ~Rft.                                                                  UJ,dP~ R 3I~A .uc*. E~knm*gl

4,I) Florida Power

        ~~N1IC~fON VOGMIM fORAcm1mOK dO DESIGN Catcufetion S-95-0082 ANALYSISICALCULATION Crystal River Unit 3 Page Al ATTACHMENT A DESIGN INPUT DATA FOR 6TH SURVEILLANCE K-,,

U

    )

m'.Vie d "am~ RES$: WOWsl&4amnsW

a DESIGN ANALYSISICALCULATION Crystal River Unit 3

) .-                                                                                                           Page A2 "non  Na,.E08 I                     Calculation S-95-=02 Design Input Information for the 6th Surveillance The Gilbcn/Commonwealth Design Input document prepared for the 5th survillance is still applicable sirne it was prepartd at the ime FPC adresse new licensing and Tech Spec revisions concerning the CR3 Tendon Survillance Program. The document and some of W's attachments are attacbed herein. Also. correspondence frm the NRC resulting from It's review of CR3 tendon program issues is attached for reference.

The following Tech Spec sections were rviewed and are applicable to the tendon suroveillance program. Section 3.6.1.2. Amemdment 149 Section 5.6.2.7. Amendment 149 FSAR Sections applicable include. Sections 5.2 & 14.2.2 Figures 5-24 and 5-25 N WI: L4 at Pt" RESP. Modow Engims*'

POPiA3

   *   %U;09 *095-3:06Pt1   HLIC ADI -R VI K~)
                                                                                       *4000ft   IAK
                                                *ITED ITATIS
     .                          N*NUCLEAR REO ULATORY COM IMISSION                     sno WILINI14elf a. D.C. "NmOa@4 July 26, 199
r. Nery M4.Beard, 4r.

ltnior Vice President, Nucliar Operations (IAZI) OUBJECT:.8Jgutdqf~bLAt Florida Power Corporation ATTN:. Kanaptr,, lclear FIEN.*1~.L... Licensing 15750 V Power Line Street F2~C AaED. IL Crystal River, Florida 344Z8.4708

SUBJECT:

REVIEI OF IhE FIFTH TENION SURVEILLANCI REPOXT - CRYSTAL RIVER IUCLEAR GENERATIG PLANT UNIT 3 (TAC NO. K90126)

Dear Mr. Beard:

By letter dated August 12, 1993, as supplemented Deceaber 11, 1991 and May 15, 1991, you submitted for staff review a report 6n the results for the fifth (seventeenth year after structural Integrity test (SIT) ghysical surveillance of the C0stal liver 3 (CR3) Plant cont&inent bulldIng post-tensioning system. Vou performed the surveillance in accordance vith the requireunts of the orl Intl pl&At technical specitfcatlons (tS) for tendon surveillance and Regulatory auidb (R) 1.35 Revision 3. On the baist of your sureilllance end inspection of the various alwants of the post tlnlionift system, you .onclWded that the surveillance results demonstrate #*e integrity of the containment tendon system. We have completed our review of your submittal and we concur Vith your conclusloi with certain exceptions. Your surveillance revealed great@ leakage, corrosion of uichorheaid and bearing plates and ps.1ling aand crcking of concrete, all of which could be detrimental to the containmt terodon

         .System$ Please submit in action plan to rectify the umdesirable conditions as idetified and to iplement appropriate actions to rectify thes befor. the next.scheduled inspection. Our evaluation Is-          enclosed.

This completes our review under the TAC No. 020196 and, therefore, the TAC is c1osed, This requirement effects nine or fewr respondents, and therefore It is not subject to Office of asntoement and Budget review under P.A. H-is. a.Rghavan*,Vreect Namager " ProJect Directorate 11-1 Division of Reactor Proests o Litt Office of Nuclear Reactor Regulation Y I Docket No. 50-302

Enclosure:

As stated cc w/enclosurm: See next page

     "9 90 0310?PI¶ tLJc ArA¶It BLD                                     Anfhmot~A Isr A4 Mr. Percy N. leard                        Crystal liver Unit No,. 3 Florida Power Corporation                 loefirating Plant cc:*

Nr. Gerold A. Villiaas Kr. Joe yers Director Corporate Counsel civilian of t roee preparedness Florida Power Corporation separtasat oCCo nty Affairs t749 Centsemve Drive P.O. tax 1444t T.3litasssas florifa SS#tMlOG St. Petersburg, ?lorida 33711 Mr. truce a. Vlickie Director Nluclear Pliat Optiraions, (MCI board of County Comissiouers Florida Imoer Co'orhtIon titru~s County Crsa iver Energy, Coolex orth opkaAvenue 110 156.Pooer Line Street Crystal River, Florida 34428-6708 Mr. Robert 5. loirsum Mr. larry C. K~elley, Director Ulf Nuclear Technologies Nuclear Operations Site Support 3100 Rockville Pike,, Suits 1225 Rockville, Maryland 20852 a~ridIa Power Corporation Crys tal River Dueny Complex 170V Power Line Street crystal lisere florida, 34&2t.6Th6 National Aftiulstrator, Region It Seair Resident losprctir 101 Narietts, Stvt N. #I Suits IS04 Nuc ear latovy comissiowi U.S. Atlanta,, georia 30)1n $741 ll11hassee Road trystal River, florids 34415 yr. sll pas"atti Wr. 924r~y Bolatp Vice Prsident - Office of Radiation Control ftlear Productlou 1S142) pop~%~aof Health and florida, Fewer torwratios crystal River te' EwCo~lex 1317 Ulnawood . TallAhuses Florida 32319-07*@ crystal River, florids 34425-708 Attorney General Deportment of Legal Affairs The Capitol

         'Tallahassee, florida,31304 K)

(.

The Crystal River 3 (C3) plant tehnical specifications (IS) r etme performing periodic Utndor surveillance consisting of sheathing filler material inspection, tendon l ift-off force measurement, anchorap compopent inspectiong, ndon wire Inspection and tensile tasting, grease leakage check, and tendon datenslonlng and rtenstioning and resealig for a number of selected tendons. for the fifth saurvallance In add tion to the three control tendoes (bat for each group), you ranaomly selected tw dome, to vertical and four boopteNc and subs4Ctd them to lift-offs with one tendo" In each group Ling detensioned and retension*d. You performed the surveillance In accordance with the requireenta of the original plant 7S for tendon surveillance and Regulatory Guide (Ii)1.35 Revision S. On the basis of your surveillance and Inspection of the various elements of the post-tensioning systems, yoU cocluded that the surveillance results dombostrute the integrity of the Coatakimt tendon system. On the basis of our review of your submittal, ie concur with your conclusion with certain exteptitns. lour seurveillance revealed grease leakage, corrosion of anthorboads and bearing plates and spelling and cracking of cbncrete, all of which could be detrimental to the contat neont tendon system. These conditions are evaluated below.

1. Grease Voids From the data en grease removed from and groese replaced Into the tendon
          .hsathings theme appermd to be an untually high amount of freass voids or leSage, aho asount of grease added ramued from 9.5% to as high as 30.4%. In U

letter Watd Septeubero S11146,us ! dicated that the loss of grease appears to be nusually high in comparison to other plants with similar ireatress"d concrete containtente aid post-tensioning syates. Your response indicated that the losses elosely matchrthosn of previous surveillantces & a tthorough investtiWon had not detemined a toot cause for the abnrmality. Homver, frs the pYSiCal teast of individual tendon wires, the chmical tests of tM grease Itself. and the lift-off tests, the tendon systo is Miateaining its Intigrity. Furthevso I, there has been no gresse leakage observed. .t the out*ide surf$ace of the contaim*ent. On the basis of these observations, y"m reiterated that, Is spite of the abnormally hkgh amunt of grease voids, the structural Integrity of the tendons has not bean affected. We find your response 'to be reasonable. However, in view of the detrimental effects of potential greass leakage, you should sonitor more closely the greast injection.procedure in future survillancs tod ptrfom a thorough root cause investigation fot grease loss.

2. Anchorage Assembly end Tendon Wire Your surveillance revealed high levels of corrosion on the anchor heads on five of the tendons (three an. the fitld and and two o4 both ends) uander surveillance. A pitting condition existed on localted areas of these anchor

) heads, with. no signs of active oxtdaticn er bjldup of crust or rust. No free SaMoisture wIs obstu*A. within t*e s$Wi. cap, ,f arY t tr,!a. Tbe bulk filler grease covered all tendon stressing anchor beids except for the top end of one

CMCkA1". 3-93-CM P~ar~~ Ad vertical tendon. You believe that this condition has existed since original installation. You conclude4 that the observed conditions do not Indicate abrnioal degradation and will riot affect Ithe function Of the anchor heads. Your surveillance also discovered high levels of corrosion on bearing plates outside the seed area of the tendot end caps of six tendons (on ones end Of three ttndons and ont both ends of another three). The torrosioa ocuttred - exterior to the O-ring seal ad has not progressed to the point of breaching the Integrity oa te 0-rin and aeffecti o the tendon achorage c.mpoanets. RWpairs were made to the bearing plates to stop further degradation. The protection of the anchorage components Is assured and the function and integrity of the bearing plates Is maintained. However$ based on our review of tendon surveillance reports of a number of pliants we find that the types of corrosion of arnhorage components have not betn observed 14 other facilities and are unique to CR3. therefore; ue believe that it is necessary for you to expand the inspection to anchorage assemblies, especially the bearing plates, of other tendons not under surveillance to ensure timely repair of tay adverse conditions.

 -     You Indicated that the cracking and spalliag of concrete are Insignificant.

HoRwver, this requires repair before causing a further deteriorative of concrete and eaiforcement. It should also be lsoe aoted that your report provided only general stitiftats, regarding moisture content and the detrimental hemIical contents and does wO, giVldetails of water Content for each of the grease samples taken from the specific tendons and free water discovered at ed W nchorages and reuse cans. RG 1.35 requires such detailed Information and should be provided n future surveillance reports. One wire from each of thO detensioned dam, hoop and vertical tendons was tested. Inaddition, Ineffective wires and broken wires were removed for saple selection and testiol. All of the tested samples exceeded the required mtsibmu values for yield strength and elongation. A1 but on# exceeded the required tintm ultimate strength. -Tht caust for the broken wires was determined to b oft a mecha*ical nature rot dwt to stress corrosion. The buttonheads urae inspected for their physical condition and Were found to be effective and acceptable.

3. Tendon Lift.o-f Forces We have reviewed the lift-off forces of three dome, three vertical and five hoop tendons and also the Information on the correlation of force and elongation of the three detentioned and retensioned tendons. With the txcsptionf of vne hoop tendoo (46M29) which had only 68.1% of the base value (less thin the 90%of the base value as requirsd), the lift-off forces of other tendons were above the lower bound valuts established for these tandoge.

Additional %oop tendons were lifted off to net thu requirements in RG 1.35 under such a situation. The forces kvid the Corresponding elongations for the

  • three dotensioned sr.d ratonsion!'d tendons wars reviewed, and for each tUndon n sto 1r
                   ;      aer.tuyaoflsalmn b        Lln hie v    it ppoears to us ttl$t more I

ft4.MMA? 3-3 careful elongation muasuruments could have provided the required correct information and assurance of the quality of the overall tendon surveillance performed. The purpose of tendon surveillance is to dteromine If the ties dependent testross losses such as creep and shrinkage of concrete and eltxltion of tlndon wires are within the predicted range. The trend of such losses can be obtained by ferforming a regression analysis of the tendon lift-off forces for the tendons l0a group from all the surveillances conducted to date after the SIT. Before perfoming the analysis it is necssary to correct the teno seating force. This it because during.tendon Inst*llation and tWntionl it Is not possible to anchor all the tendons in a group at the sam force level and at the same time. The tendons are instaVlx sequentially. Anen the containment is subacted to the tendon force there will be elastic deformation. The'tendon tensioned first wit1 have lowver force at copletion of tensioning for the group than those tensioned list. lhertfore, the settitq force oust be corrected to reflect the tendon ho,r force for the elastic shortening taking into consideration the tendon tensioning sequence. On the theory that the containmmnt design isbased on the Average tendon force of the group, an average of the corrected tendon anchor force* is determined. By. )v iding this average force by each individual corrected tendon force. a so-called nomalizing f )or obtained. Ihis NF is used to modify the I lQIFI lift-off force of the tenm don obtain the average farce Which should be compared with the rq'uired tendon force. The KF for each tendon Isa ca stant and will be used throughout all the survetllances. This appers to be the procedure used by a niger of utilities. Theoretically, ater mralliZation, all tendons in a group-should have the sam average value. Due to the mothod used In establishingUs KF and In obtainlng the lift-off forces the normalized tendon force It at best approxtuate but it should not vary appreciably from the average valve 1`r thk 9g;up. n *contrast to the KF approach, the RS 1.1 tiprsch to consider the prestress losi: isthrough the use of upper bound and loaer bound of tandoa forces as discussed InAG 1.15.1 and shoum inFi.2 therein. The mverage Of the endon anchor forces which are the tendon setting forces corrected for 6t1itic losses can be used as the initial prestressing force. A graph similar to that Shown in Fig.t of PA 1.35.1 should be first constructed. The lift-off tom obftined for the group 0f Utndons represetted by the graph should be plotted on the graph without any correction. By plotting the lift-off forces from consecutive tendon surveillance of the group of tendons, It becomes possible to perfoam a trending analysis of the tendon forces. In response our request for additional information on normalization, you rovidod a formula for the OF, which Is actually a tendon force correction and ecludes not only prestress loss due to elastic deformaton, but also the relaxation of the tendon wire. In view of thes, the NF will be differet for each surveillance since ItInvolves the time factor. This only complicates the normalization procedure and does not improve the ascurity. If the hF involve- relaxstion of tendon wire, it appears the other time-dependent ir-sLr~s: ";s 6^0 to cret; W: .*ri*.*te should s'.io be includGd. It Is to

.LJ e9 S5 ez:s'ft MC PZXI&K BLDG caggkAf A.4 FAS

                                                -4.

be roted that correction Is mide to the setting force only for the elastic loss 0Ich Is not tim dependent and the normalization factor Ahich Is based on the corrected tondon anchor forcte As used to todify the lift-off force to the averige tendon force of the group. The NF procedure 11 based on the fact that after correction for elastic shortening loss each of the tendon forces and the avenrage of these tendoan forces for the group of tendons ire larSe To#red to the tie-dependent prestress losses. Therefore, the ratio, ei. the 0F, betwen each tendon force and the average tendon force for the group after correction for elastic shortening loss will not vary signifileily from that after correction for the tmes-dependsrtt lv The U F procedure it based on this proviso. in response to our concerns regardig 'bur normalization procedure a nesd of the average of lift-off forces for the trot! analysis, you porf4rmrd analyses for each of the following cases for each group of tendons: II Using Us no lift-off all data averages, normalized points, normalized 3 Using lift-off averages, uocroalized 4 using all data points, umormmlied TMe ifonJtOn f1r each caste was plotted on I graph the sUm Us that shown In fig. I of is l.39.1 and a tgretssion analysis was performed for each caste In each group. From the results of these analseat we obiserved Isstlificant differences between the nomalized cases (1) a 4 (2) or the unnomllzeo cases (5)and (4), and apprecible differences between the nomalized Wd the VtnorMallze4 cases. However, based oan the trend of all groups of tendons, no roup of tendons womld be expected to go below its minimm required during the a.0rs plant life. 1i spite of the favorable outcome of the results is sumtrlzed above, we believe that for future surveillances, the lift-off forces should be used for the trend analysis without averaging and normalization. Each tendon lift-Off force should be compared with the predetermined values of bats, 955 bste, and 501 base as required by R4 1.33. to tontlosion, we concur with your conclusion that the results of the surveillance demonstrated the Integrity of the containaent tendon system. Hoever, before the next Surveillance you should resolve the problem of missing greaise and should undorta'Me &program of inspection of the anchorage systeI which consists of the anchor heads and the bWing plates to assure tJath the pitting of the anchor heads and the-corrosion of the bearing plates uncovered in the surveillance are not widespread and would not Jeopardize the Integrity of the tendon anchorage systa. You should repair the cracJ*ing 4nd spelling of concrete so that there will be no further deterioration of concrete or reifforcement. for future surveillances, the trend study.ýaf tha

       .tender. forces should be based on the lift-off forces witboavt avervint-and noY I Szllion. In retcnsionir! tendons, the elopgatifis-orroesponddi4 to-.e ro-rcez-snugJ.U ca&ul ly-rneasyced so ?1m2rM4,,7h,rII'eWI                      twohs, 01 Preserved. 'Mia cs'iiserve asiaftaditlonal choe-on the accuracy of the measurements performed.

(84. ( _NJ (a4 Mr. Percy N. Beard, Jr.,r zi Senior Vice President, Nuclear Operations (SAA) Florida Paver Corporation ATTN: Manager, Nclear Licenslog 15760 V Power Line Street Crystal River, Florida 34428-6708 SVBIECT: CRYSTAL RIVER NUCLEAA GfIERAIMTG PLANT 1I01T 3 - POSTPONEMENT OF SURVEILLANCE OF E101T TENOIIS EXEMPT0E FROM THE FIFTH TEN1ON SURVEILLANCE (TAC NO. NON)055

Dear Hr. 8erd:

ly letter dated October 23, IS1, rou requested staff approval for postponing surveillance of eight tendons whic were exempted from the fifth tendon surveillance performed in 1"3 to the Sixth tendon sureillance. You bad ,) committed to include the eight tendons In your sixth tewdon surveillance which was originally scheduled to be performd in It". You now propose to perform

  -the sixth tendon surveillance is 1998 Which Is less thin S ye ars from the fifth tendon surveillance which was performed is Noveber 193. Accordingly, you are requestin staff approval to postpone the surveillance of the eight tendons to the 1?S8 sixth tendon surveillance.
    $y letter dated Hay 159 1"5, you submitted results of your fifth tendon surveillance to demonstrate integrity of the containment Undon system.

in a letter dated July 21, 1995, we forwarded our evaluation of the Fifth Tendon Surveillance Report, and concluded that the trend of all groups of tendons Is such that no group of tendons will go below Its minimam re"uired lift-off forctes before the 40-year plant life. Our July 28, 115 letter also identified certain undesirable conditions such as greast leakage, ancorasge bearing plate corrosion, cracking and spallinl of concrete. In response to these concerns, you committed to perform, during Refuel 10 (ti 111), a complete valkdowm of 549 tendons comprising the containment post-tensioning system. You also committed to perform visual Inspection to monitor external corrosion, grease leakage, and monitor for spelling of concrete and take appropriate corrective actions where warranted. On the basis of the fifth tendon surveillance results and your commitment to perform visual inspection during the Refuel 10, we find It accee table to perform the surveillance of the eight tendons durinolg-nosixinIthenon surveillance scheduled for Resfuel 11 In 118, which is within the 5 year surveillance frequency. In this matter we also would like to draw your attention to the following. In November 1176, you perforved the structural Integrity test (S1T) on the Crystal River 3 (CR3) prestressed concrete containmnt. Per Regulatory Guide

t"? 27 ,.% 09a:4i t1C ailr* B= Cbkekd.n S-9s PAuerm A Mr. Percy N. Isard, Jr. - z (RG) 1.35. the tndon surveillances are to be performed 1, 3. and S years after SIT and every 5 years thereafter. You have comitted to follow the RtG 1.35 criteria. owver, a review 6f the history of your tendon surveillance Isdicates that your 3rd, 4th and Sth tendon surveillances have been performead on anl Inroxzittely 6-yetr interval, Whlle plnt technical specifications allow schedule flextblltty (aZ5% tnspctton Interval extension for conducting surveillanceus, such a schedule extenslon should imot be continued on a IO-term basis. Also, the general industry practice has been a plus or minus 6

   =nuthS scheule variants.

This camletas our effort under TAC No. K94036 and the IAC Is close. if you have any questions, please call mu at (302) 4)5.1473. Sincerely, L. Raghauan, Project Manager Project Dlrectorate 11-i Division of Reactor Projects */Ut Office of Nuclear Reactor Regulation Docket No.. 50-302 cc: See Het p1g9

CA Al~em 5wks4* A

                                                 !nghv.wring hautosd" NO.

monc r w.o. 100m"F "al River Unit 3 04-5520-12 DI-6520-152.O SE K~) DESIGN INPUT RECORD SUBJECT Tendon Sumiiance Proam . Preparation of Misc. Calculatious and Survillance Podurc SP-182 CiSCiPuNE I Structual 2241 PAE 0I REVISION 0 1 2 3 ITEM(S) REVISED ORIGINATOR M. mar_ _ _ DATE a0--3 Oc s-7-cr?.*V */ q _____ MROIEW DATE Sef APPROVALP "CE)_______ DATE 7069?64t1Z~b v FtUTURE CONFVIRMATION REOUI RED? NO A4 _____ 0ACROPILMED / DATE ITRUCTIONS: USE'NIK FOR IM S NOT APP CAMIL wT1y ITEMS KOUANG FUTURE CONPMTIOM BY CIRLE OR CLOU* WTFY IEVISED ?OPKOIMAON BYVERCAL LNE INA-HT MARON AND E' ION N"VL USE ADOITIA-SHEETS AS NECESSWA'. I vReim awi -4 &v(i aZ 7-. xi~ Aft av,) AwED -4rrw/4/Ar-z A 7MI/2~T~r4.1 At M;J A-WISED *4rroted4K'ILr7.

                                                                                                ,f     w A          "-IV=7
                       *141' "                          OGebCommAnweaNh aft.=23 2*2I

CdOfltm 5-954NO AUN~md A Engtin.v Instmion No.1 f Ai2

                           *'    *DI-52DESIGN INPUT RECORD                         toimn.ER       Z0-M SE DESIGN INPUT FOR:       CR3                                     P1--     2   e I[I                     STH TENDON SURVEILLANCE PERIOD                            REMlSiON:    2 DATM     17NOV93
1. SCOPE OF THIS DIR; BASIC FUNCTIONS OF SYSTEM, STRUCTURE, OR COMPONENT:

This DIR presents Design Input documentation related to the 5th Tendon Surveillance Program for Crystal River Unit 3. The scope of this DIR is for the preparation of Force/Time Curves for individual tendons, misc. calculations supporting surveillance activities, as well as for the revision of Surveillance Procedure, SP-182, tor the performance of site inspection activities. Revision I of this DIR wpill address the change in Inputs required as a result of the NRC not accepting the FPC proposed Tech Spec revision for the CR3 Tendon Surveillance Program to corply with the requirements of ASME Section XI, Subsection IWL FPCs discussions with the NRC concluded that the FPC program requirements should be based on Reg Guide 1.35, Revision 3. issued July 1990. Revision 2 of this DIR will address the change In Inputs required as a result of several meetings at the CR3 site. FPC's discussions with the NRC concluded that the new FPCTech ) Spec Program may not be Implemented as soon as expected and that the current Tech Spec requirements are to be be addressed for this surveillance within the acceptance criteria of SP-182, Revision I).

2. CLASSIFICATION; DESIGN CODE(S) AND STANDARDS:

Nuclear Safety Related Classification Existing FSAR I.Tech Spec 3.6.1.6 and 4.6.1.6, Amendment 29 & 31. Re; Guide 135, Revision 3, July 1990.

3. PERFORMANCE REQUIREMENTS AND SOURCE:

The Tendon Surveillance Program is controlled by Tech Spec Sections 3.6.1.6 and 4.6.1.6. However, FPC is currently going through a Tech Spec Improvement Program and will possibly be implementing this Program Inmid November in the middle of the surveillance. The new Tech Spec (See Attachment 1)will commit the Surveillance Program to Regulatory Guide 1.35, Revision 3 criteria. FPC has discussed this with the NRC, and it was agreed that the new acceptance criteria is acceptable for use for this entire surveillance period. Therefore, the Reg. Guide criteria will be the basis for a revision to the existing Revision 10 of Surveillance Procedure SP-182. P-e- det he-ie.eme ,o( he.¢irren,.Ttnh-.Teeh-wR t-be*ncluded .-the-re~sio4o.SP42.(Se.-Attaehffe1;): It was determined in mid November that the existing current Tech Spec requirements will have to be addressed in SP-182, Revision I1 until the actual implementation of the new Tech Spec program takesplace. Ws acceptance criteria is to be worked into SP-182 in addition to the Reg. Guide 135 acceptance criteria already built into the draft version. ) THI 'S AT -fA - CREbsCommonwRaNlOT ... - 7HI I A E/MA£NTDE(G! RCOID O OTDEST/ROY

Au, odmsA 5"Inewln" Iftowwoon No. I PWA". DESIGN INPUT RECORO ____ ____ ___ ____ ___ DI-5S20-1S2.O SE "PAOE 3 .t 6 DESIGN INPUT FOR: CR3 5TH TENDON SURVEILLANCE PERIOD nEVWSSON: 2 _DAM 17NOV93

4. DESIGN MARGINS OR SAFETY FACTORS:

Design margins and safety factors are as included in the above Codes and Standards.

5. DESIGN CONDITIONS AND SOURCE:

There are no design activities.

6. OPERATING CONDITIONS AND SOURCE:

This surveillance will be performed during normal plant operation. Tendons in the area between Buttresses I and 3, (00 to 1200) must be avoided due to the safety hazard of the main steam vents in that area. After numerous discussions with the site, it was determined that outside tendons with the following group/buttress numbers are to be considered inaccessible due to the steam venting problem- 13HXX, 42HXX, 51HXX. 53HXX, 62HXX. Inside tendons accessiblity must be individually confirmed through an FPC walkdown/concurrance. Radiological conditions, safety, and Interference with safety related systems and components may affect the selection of tendons inside the plant. Adequate consideration must be given to the potential effects on safety related systems from any surveillance activity. FPC has been Informed by G/C that the tendon selection process can be sucessfully completed for this surveillance using the limitations on the tendon population as noted above, however, the next several surveillances cannot be performed during plant operation because of these effects on the random tendon selection process. In addition, the exempted tendons from the selection process of this surveillance must be reviewed and considered for inclusion in the next surveillance. The exact position for the resolution of many exempted tendons will depend on the final accepted position taken by the NRC on the proposed Tech Spec position taken by FPC See the Attachment 3 letter, Attachment 1. This position will not affect remaining work for this surveillance but will need to be considered In future work.

7. AMBIENT CONDITIONS AND SOURCE:*

Ambient temperatures and pressures of the Reactor Building during normal operation of the plant are to be considered. Elevated temperature effects on the tendons may need to be considered.

5. MATERIAL(S):

Most tendon materials are replacement of original materials. A summary of tendon related materials can be found in FSAR Section 52233 and In the CR3 Reactor Building Design Basis Document. SGbeWCommanwoalh-Cf1-QfGAI-SUfrC~fM AAW~f 24teC

EMghw..Ingbstucion No. I PoVA14 DESIGN INPUT RECORD IDENTMIER DI-5520-M12. SE PAGMs 4 of 6 DESIGN INPUT FOR: CR3 STH TENDON SURVEILLANCE PERIOD R*iVsIOm: 2 VATC: 17NOV93

9. OTHER REQUIREMENTS:

The requirements of Reg Guide 135, Revision 3, are essentially the same as the requirements of ASME Section XI, Subsection IWL. In many places, the ASME Code provides a greater level of detail than the requirements of the Reg Guide. The ASME Code document will be utilized as a reference In the interpretation of some Reg. Guide requirements and criteria. FPC administrative procedures noted In References 16, 17, and 18 are to be followed for the revision of SP-182. The normal 40 year plant life is to be considered. As yet, no consideration for plant life extension has been requested from FPC. Future retensioning or other tendons work may need to consider any FPC plant lire extension plans or considerations.

10.

REFERENCES:

1. Design Input 5500-528-1, Revision to SP-182 Procedure for Tendons and Calculations for force-Time Curves for Surveillance 4, Revisions 0 and 1.Jan. 87 and Sept. 87.

K~) 2. Calculation 5500-528.l, Tendon Loss Calculations for Surveillance 4, Revisions 0 and I Jan. 87 and Sept. 87.

3. J. Fulton and G. T. DeMoss Calculation 04-4762-099, Tendon Loss Calculations and Appendices for CR3 Tendons, 3/6/87 and 1980 calculations.
4. Vertical Tendon History Sheets
5. Hoop Tendon History Sheets
6. Dome Tendon History Sheets
7. SP-182, Revision 10.
8. SP-182. Revision 7. (Last surveillance proven revision)
9. ASME B & PV Code, Section XI, Subsection IWL
10. Regulatory Guide 1.35, Revision 3, Issued July 1990.
11. Regulatory Guide 1.35.1, Revision 0, Issued July 1990.
12. G/C Engineering Study on the CR3 Tendon Surveillance Program, FCS-13670, Marcb 5, 1993.
                                  -                b ,¶/CommonweaIth

.1I G .52N 2I2OC THI I &ERMW 1ESGNREOD ON17ESB

Afamam A EaginewhIn,ktuacln No0.I Prag A13 DESIGN INPUT RECORD sMrl1ER D1-5S2OT4LD SE DESIGN INPUT FOR: CR3 5 I SIM TENDON SURVEILLAINCE PERIOD REMMvS: 2 OAM" 17NOV93

13. G/C Study of ASME Section X), Subsection IWL for the CR3 tendon Surveillance Program, FCS- 389Z June 2, 1993.
14. G/C Letter to FPC, FCS-12439, August 13, 1992, for Task I deliverables, Tendon Selection, General Report and recommendations for the 5th Surveillance.
15. Prescon Vendor Drawings - (GC Vendor Code 4680, Drawing Numbers 52-W26-000MA through 52-0026-0043P.
16. FPC Administrative Instructions, AI-402B, Procedure Writing (Except for EP/AP/VP), Revision 8, 10/25/91.
17. FPC Administrative Instructions, AI-400-C, Permanent Procedures Revisions, Revision 10, 11/19/92.
18. FPC Administrative Instructions, AI-701, Conduct of Inservice Inspection, Revision 9, 7/11/91.
19. G/C Memo, 10/27/93, D.L. Keiser to M. Marcellus, Calculation references for minimum required prestress forces.

20 Crystal River 3 Reactor Building Design Basis Document.

21. G/C Engineering Report for the 3rd Surveillance, By T.H. Noble, May 19,1982.
22. 3/C Engineering Report for the 4th Surveillance, By J. Herr, March 10,1988.
23. G/C Scope Document Letter to FPC, FCS-13766, 4/2/93.

ATTACHMENTS

1. Proposed and submitted FPC Tech Spec showing compliance to ASME Section XI, Subsection IWL, fax received from FPC on 9/24/93.
2. W/C Letter to FPC, 10/8/93. FCS-14114.

M. Marcellus to J. Mascoll/B.Crane/B. Gutherman, Summary of G/C Design Input positions.

3. FPC Letter to the NRC, October 25, 1993, Withdrawal of Tech Spec Change 197 with attached revised Tech Spec, Changing from ASME IWL compliance to Reg Guide 1.35, Rev 3 compliance.

I often/Commmoawft3 92MLQESTRQY GXA5=2 242qc

EnIMMOWW9 Inovvcon me9.I PAup ASA DESIGN INPUT RECORD I*N.E DI-5520-2.0 SE

)                                                              eFCV. 5 of 6 "

IDESIGN INPUT FOR: C" P - 5TH TENDON SURVEILLANCE PERIOD RElIION 2 DAT.M 17NO93 0/C Letter to FPC, 10/12/93, FCS-14119, M. Marcellus to J. Mascoll/B.Crane/B. Gutherman, Revised summary of G/C Design Input positions.

5. G/C Letter to FPC, 10/12793, FCS-14158, M. Marcellus to J.Mascoli/B.Crane, with G/C comments on the proposed Tech Spec.
)
  • 1 oww" /c DO ,I ,QM WAJ523 2 4 Z'o

cdi tmS-4So AdMOW A 7Ta A17 DW4O20-15L.0 SE ATTACHIMENT 4 b ~IP OilbartC@MMonMWkahVW"%WW"WM 0 O',pCwumuCame. R.*lVMuwft. RNiul. PA IN07' ROY W.A)L!A October 12. 1993 tNtcjgr S4Incr FCS-14119 Work Order #04-5520-152 Contract NPM00.D. WA 152 Mr. . T. Bowles Nudear Pprqec Management Engineer Floda Power Corporation 4, e7/ 7 t4JisC1-P. . BDc 1404211/l nA*Ar Ma a 1&. St. PCtasbur Fgfloid 33733 Auention: L 0. MascoUl. Crane, B. Outirman "1 ya River 3 Tendon SurveMance Program Re FCS14114 Dated October 7,1993 Action By: FPC - October 13, 1993 Review and Comments, Unless N/A Deur Mr. Bowles: y isses and criteria for the tendon surveillance program were reviewed with you i. the above refenced letter. Since then. the direction for implementation of our work has 4ipiiflcady changed based upon the NRC rejection of the Tech Spec for the Tendon Surveiance Program. Based on discussions with Bnice Crane, we will now perform all related tendon surveillance tasks based oan the followin.

t. Revision 11 of SP.182 will now be perfamed to comply with Reg. Guide -135 Revisdo 3, SnotASME Section Xl, Subsectim IWL An earlier review of the Reg. Guide veathe CR3 propmt concluded there were no sipfficant issues or disadvantages to commidi to teg. Guide, Revision 3. Howem, until our review and revision is complete, 0/C Is recommending that FPC consider that there are some exceptions likely to be taken against the full compiance to the Reg. Guide by FPC. G/C will notify FPC as tay *iftificant
                     =eptlon Isidentified.
2. The documentation of the above position, acceptance Items and specific interpretations of the Ref, Guide acceptance criteria has not been decided at this time. It may be within CP-145. However, an Interim place is to include these positions within SP-182. 0/C wl now include some of the general positions in the SP.182 document, but is uncertain whether all engfncermn/licensing positions and acceptance criteria can be properly placed In SP-181.

SP-182 has basically addressed site inspection activities in the past and has not addressed engineerin/Licensing Issues to any level of detail. IiD An= Sa:lPA

                                           *O49&P
  • 0A loamt 690OI
                                              %Wt11                     .1 r¶snc
  • far 2137M2.", bl1: )7in -
                     $k*MVs'xI           iWCc'mMF AWbuuSA20A*
                                       -~u                                  Mhd~
                                                                               *~U T*avae;6 413142-I
  • Pax: 5S4S17-1

PQ A 4sm-1 S2.0 SE

  >5 OUCh.                                                                                         ATTACHMENT 4 pOPi Psge 2
3. It Is assumed that the Tech Spec Improvement Propam wfl be in place and accepted by the NRC by November Ztn With the surveillance rapidly approacIng, aTech Sp" ision prior to that date Is imprctical TMw accptance craie foe the interim period up to November 22 was discussed. Bused on the established CIO Tendon Surveillwace Proram as dened by SP.182 and other documents, it h amumed that this entire tendon surydlance can be performed apinst the new criteria. Therefore, the acceptance crheria,within SP.182 which Is related to the eisting Tech Spec positions wil1 be removed and repla by the Reg. Quid. 135, Revision 3 positions. This will invove. new enclosures and calcladons within SP-182.

Note that the above direction sIicantly changes most position noted i the reference letter. However. Items 4, S, 6 and 7 of that letter an umchanged for Q/C to Implement the requied scope of work. kpc concurrence wit the above positions by October 13Is required for o/C to complete ow tasks In support of the surveW*an. Any revsilon to the above will Impact out completion of S1.182. Additional rewofk enclosures and verilation result S ftom t dhaSe in criterIa, as cianmed above, has impacted the shedue. Assuming no further change in basic criteria, SP182 Revision it will be electrancafly transmitted to FPC on October 26 for review and comments. Tn addition, a copy of the document wM be Fedea Njpressed at the same tfMe. Should there be questions or dicusson on any of the above Items%please feet hee to eontact us at your conveniencL Vestruy W yours I PL . Marcehau

                                                             -StrucnsnlTask         Engieer R. T. owdes
3. Outherman R.W. Adte R. Crne roetMAnage FM Records Management (CL Only)

R. W. Adler (2) C. N.Rentc=hler D. D. Kraume I! A

DESIGN ANALYSiSICALCULATION ft Florida Power mpaUOt4 Crystal River Unit 3 Page BI 0OGUMWf "NnMA1T "a REVOC ICalculation S-95-0082I ATTACHMENT B TENDON HISTORY SHEETS FOR 6TH SURVEILLANCE K) 4 em RKT Lb~ PhE ~P pA~w ~q,~wuq ou otm W# of ftme f4mp, mxQW fj q &

                                                                                           ýý

e6-eeO , mS S-,S4 aFloida CRYSTAL RIVER MflIT NO. 3 re 02 Power REACTOR BUILDING PRE-:rRESSlNC SYSTEH o"u.I'"= imm*-* .. .... TENDO !rIISTORY T... TENDON IDENTIFICATION NUHBER I la CUQT LENGTH _ _ _ _ _ SHIOP WASHER ID: PC1 I CR J J~ ,iL@AhRZ:PCR

1. CAIIQA vendor Inspection cover letter number-FPC I /O/VD DATE _4,f/i/V
2. Date tendon received on-site __________ XR Number . 7 c~/

3, Date Installed in conduit __ Ins'tallation 4CR'_ Wires removed 0 Wires teplaced 0 Total Ineffective wires

4. Date buttonheaded ./01 71, Buttonheading NCR's ___

Sad wires _0 Accept. Reheads 0 Total Ineffective wires 0

5. Date stressed ia " 7j Stressing 1CRts rDate restressed Restreseing NCR'se SiOP?END FIELD END TOTAL
   ..)Elongation     (150O-psi to 80% ult.)-wPred./Act.                     tihfJ  ii     4k   $A-                       q4          9i4 Lift-Off Pressure - PtedictedfMtual                                  (PO            ED  (2NC'F21_I 0tlA Shim Thickness/80X Ultimate Pressure                                  :.Z.-J-227             _11       0               /

Unseated/Broken Wires -Total effective wires after stressing "

6. Date Bulk-filled --.

w ,75 .. alk-Filling IICR#'s Time since instAllation Inlet Pressure JS'Q..p5Z.. Outlet Temp. Date end caps refilled: Shop _ ._ _ Field .... .

7. Data compiled by &.? ~Organi zation_______________

Date _1- _ _ __77

8. Additional Cotments; 11K

Florida CRYSTAL RIVER UNIT NO. 3 Pr" Power REACTOR BUILDIG PRE: fRESSIRC SYSTEH

 )                                                 TENDON fiSTORY TENDON4 IDENTIFICATION NIUMBER_____________ CUT____LENGTH___

SHOP WASHER ID: PC It tI , CR i FIELD WASIER, ID: PC__I JI CR 10-7-_5

1. CAI/QA vendor inspection cover letter number-FPC I /0.'O DAZE W__,__,711
2. Date tendon received on-site* *'3 Jg,-1.=7 R4R Number "j__ _ _ _ _
3. Date installed in conduit _ ___ '__ Ins'tallation NCR's Wires removed 0 Wires replaced 0 Total Ineffective wires 0
4. Date buttonheaded _ .,_-_7_ - .-Buttonheading NCR's Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0
5. Date stressed /-_*./-i4 Stressing NCR's -] 7 bate restressed _____ _ _ _ estressing NCR's SHlOP END FIELD E1ND TOTAL KY Ilongation (1500 psi to BOX uit.)-Pred./Act. 4n147-g A'94 ;A Lift-Off Pressure. - Predicted/Actual CS/1 (jc.L~s&%I MIA Shia Thickness/80% Ultimate Pressure 7-77n
                                                                              -~I       .L       ?.D              N/A Unaeated/Broken Wires                               Total effective wires after stressing                 Ma ?
6. Date Bulk-filled ,,,3-.Z5-7-- Bulk-Filling NCR's Time since installation LQ L..inlet Pressure jcý)Outlet Temp. 1 Date end caps refilled: Shop._-_ Field _ _._ _ _ , _,
7. Data compiled by .? Organization_______________

Date8._d__o a___ens_..._.___,___....

8. Additional Comments:___________________________________

Cokmbm S.9160o Attm" Florida. hit 1.4 KA..Power

     )

CRYSTAL RIVER 1111T NO. 3 REACrOR BUILDIhC PLTRESSINC SYSTEM

     *g¶4*180 TENDO* HIsToRY SAW TENDON IDENTIFICATION NUNDER__.             __            3_.._               aJT   u:'r         __

SHOP WASHER ID: PC_ CR FIELD WAS*ER ID: PC,. CR .... 1% CAI/QA vendor inspection cover letter number-FPC I DATE

2. Date tendon received on-size )R4,Number
3. Date Installed In conlduit Installation NCR.'s Wires removed Wires replaced 'Total Ineffective wires
4. Date buttonheaded Buttonheading NCR**__

Bad vires Accept. Reheads .. Total Ineffective wires

5. Date stressed .__ __Stressing NC1os_

Date restressed Restressing NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. L I I Lift-Off Pressure - PredictedlActual XIA

                                                                                                                       /

Shim Thickness/80Z Ultimate Pressure t/A N.. UnsestedlBroken Wires Total effective vires after stressing 6, Date Bulk-filled Bulk-Filling NCRs_ Time since installation . .Inlet Pressure .... _Outlet Temp. Date end caps refi1led: Shop . Field

7. Data compiled by /2Organization ______________

Date__

8. Additional Comments: a",e 4 4A 4 -"
                                                  ~f
                         -      p                 '1  (f~

Florida CRYSTAL RIVER uNItr NO. 3 AN -,-

     - ..-      Poaw*
                **,t      r            REACTOR BUILDINGC RPs' R.SSIG SYSTSEMK ENDO        IDENTIFICATION           ER                                 1     ..          CUT1  LENGTH         /,                rP HOP.ASHEIR        ID: PC                    CR                          FIELD WASHELR ID: PC         /,2                    CR      4706,.

CAIIQA vendor inspection cover letter number-FPC I - C /9p DATE

. Date tendon r-celved on-site d3 /' 74 . R Number o,7F il
3. Date Installed in conduit _ _ _-.2_-_74 installation Na's _
   . Wires removed                      -     Wires replaced                  0           Total Tneffective wires                      0
i. Date buttonheaded 0/4- Buttonheading N4CR's Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0
 . Date stressed              //                                   Stressing     CRs       1               I            '7 Date restressed            /42-//"7,                                Restresslni INCR's SHOP END            FIELD END                      TOTAL ongationa (1500. psi. to 80% talt.)-Pred./Act.                                yI/~           /

K)Lif t-Oif Pressure - PredittedlActual ~ .6,ZLZ o 6 0 MI/A Shim Thickness/WI 1

                          *7- Ultimate             Pressure                           Z*70          6                                      "/77..A Unseated/Broken Wires                      j.       _         Total effective vires after stressing                            /*.,
6. Date Bulk-filled %3-P?5:-15
                                        ..                           Bulk-Filling      NCR' a Time since Installation             6              eA
  • Inlet Pressure 46i Outlet Temp. i Date end caps refilled: Shop /"-2&07.o Field &-2,0-76
7. Data compiled by _______________Organization J1______9540_______

S. Add"itional Coents:t lt 1 1L~r L 'L ~g

Florida CRYSTAL RIVER Utli NIO. 3 arfl6 Power 460P666900 REACTOR BUILDINt G PRETRESSI?4G SYSTE) TENtDON H1ISTORY TENDON IDENTIFICATION IUMEK /j2 CUT LNIcn_ SHOP WASHER ID: PC ____ CR FIELD IASUER ID: PC CR

1. CAMIQA vendor inspection cover letter number-FPC f . DATE 2, Date tendon recelved on-site NIR Number .
3. Date installed In conduit Installation NCR's Wires removed __ Wires replaced _ Total Ineffective wires
4. Date buttonheaded __ Buttonheading HCR's _

Bad vires Accept. Reheads _ Total Ineffective wires __

5. Date stressed Stressing NCR's Date restressed Restressing NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 80Z ult.)-Pred./Act. -...

Lift-Off Pressure - Predicted/Actusal I, tI/A N Shim Thickness/80Z Ultimate Pressure . L - IA, Unsested/Broken Wires Total effective wires after stressing_

6. Date Bulk-filled Bul____Sulk-Filling NCR's Time since installation Inlet Pressure Outlet Temp.

Date end caps refilled: Shop Field___

7. Data compiled by Orga;.zation ..

Date _____ 1______________

8. Additional Coments: A042f I
                                 -.--    6..       .    ....                       -21             -7              -
       -20                                1                         l /iPOi*     i         _                       i

Florida CRYSTAL RIVER WIT NO. 3 Par 87 Power REACrOR BUILDING P*.':4RESSINC SYSTE M

                   ~SBFOAUS@MTENDON AISTORY TENDON IDENTIFICATION NIIMER                   .1.       /5.CUT                         LENGTH   /0.7     -7:k SHOP WASHER ID: PC____                CR        :      )     FIELD WASHIER ID: PC                           CR _         I
1. CAX/QA vendor Inspection cover letter number-FPC I ,______,,. DATE ________"
2. Date tendon received on-sits _________IH ubr 3:7 qgg4
3. Date Installed In conduit f-,?- / Ins'tallation NCR's Wtres removed 0 Wires replaced . 0 Total Ineffective wires 0
4. Date buttonheaded .. _ J'o7/ Buttonheading NCR's _... ._

Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0

5. Date stressed /f-//"7v Stressing NCR's,_ _

Date restressed Restressing NCR's SHOP END FIELD END TOTAL

     *Iongation (1500 pat to 80 ult.)-Pred./Act.                   .... ,5 5..                                    I ) 1 10 Lift-Off Pressure - Predicted/Actual                                                                                 H/   -

Shim Thickness/8OZ hiltimate Pressure Pjg:12~jL qa J 7- i /A tI7 Unseated/Broken Wires ,

  • Total effective wires after stressing _
6. Data Bulk-filled , 3 Z57* Bulk-Filling NCR's Time since 'installation _* Inlet Pressure _a4 Outlet Temp.

Date end caps refilled: Shop . Field

7. Data compiled by 49221 0. 'Organization..."_

Date _241. /7 7

8. Additional Coments:
    *    " '* Florida                        CRYSTAL RIVER I-II1T             NO. 3                                   Afl     .i Power              MAcroR BUILDINC                  LTRESSIG SYS=                                   Pr
                  *                                        /TE1DOM   HISTORY TENCOM IDENTIFIC&TION NUMR                        p--11                    __          CUT   wNcT              _

SHOP WASHER ID: PC_ CR _ _ _ FIELD WASHER ID: PC CR . ......

1. GAI/Q& vendor Inspection cover letter number-FPC I 7W4" DATE _Z '___,_
2. Date tendon received on-site _MR Number _
3. Date installed In conduit InstallatIon NCR`_*

Viares removed _ Wires replaced. _ Total Ineffective wires

4. Date buttonheaded ._Buttonheading HCRPs bad wires Accept. Reheads Total Ineffective vires
5. Date sttessed Stressing NCR'.s.

Date restressed Restressln NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 80% ult.)-Pred.lAct. " __ _. Lift-Off Pressure - PredictedlActual . t HLA Shim Thickness/80X Ultimate Pressure j _ " lA Unseated/Broken Wires _-_ Total effective vires after stressing _ _.

6. Date bulk-filled ... .. B*uk-Fil1ing NCIVs .__

Time since installation Inlet Pressure Outlet Temp. Date end caps refilled: Shop _ Field .

7. Data compiled by Organization Date_ __ _ __ _ __ _

8.Additional Covuenta: £?,Ame,e e - Z90-rd"&r_.-AV SA-ap - "ft,

          - -/

06-. - ... ... Air X .. . K iN - -- ml -- - I

Elorida CRYSTAL RIVER 1'tIT NO. 3 REACTOR BUILDItNG PIRrTRrSSING SYSTEMt TENDON 11L' fORy

                                                                                                       *="ftVS.M4tf Aaa.o 3 ft".so
  *iDOtE IDENII~FICATION NUtIMER                          11LE              CUT N GTHn____________

SHOP VASHER ID: PCJ/",.. cR _ _ _.I VASHER-ID: PC C__ ,

1. CAI/QA vendor Inspection cover letter number-FPC I DATE
2. Date tendon received on-site __R Number
3. Date Installed In conduit Installation NCR's Wires removed Wires replaced ._._Total lneffective wires
4. Date buttonheaded Buttonheeding NCR's bad wires .... _Accept. Reheads Total Ineffective wires
3. Date stressed " Stressing NCR's Date restressed Restressing, NCR's SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. / /

Lift-Off Pressure - PredictedlActual *  ! N/A Shim Thickness/80 Ultimate Pressure / N/A Unseated/Broken Wires Total effective vires after stressing __

6. Date Bulk-filled Bulk-Filling NC_*_s Time since Installation .I,_.._____._ Inlet Pressure Outlet Temp.

Date end caps rdfilled: Shop Field ____

7. Data compiled by 4.0 Organization FPC.

QDate 1 0 - 72

8. Additional'Comentse.PJ ftPLAA-rrWJ Wa. Jf* SHMrC I 907 716
  • Florida CRYSTAL RIVER V'-IT NO. 3 A Power RECOR BUILDtIC PitlVFRESsl4G SYSTEH TENDON IDENTIFICATION NUMER D/2)o CUT LENGTH //0  !-P SHIOP WASHIER ID: PC a CR 2 FIELD WJASHER ID: PC J CR
1. CAI/QA vendor inspection cover letter number-FPC I /o/9D DATE _,//_ _ _ _
2. Date tendon received on-situ __________ IR wNuber .079__________4_
3. Date InstllaIed in conduit _ "F.e- -2 Installation NCR's Wires removed. WIres replaced 0 Total Ineffective wires 0
4. Date buttonheaded _ " _0- 7S9 Buttonheading NCR'_s Bad wires . Accept. Reheads 0 Total Ineffective wires
5. Date stressed /.2. 7V Stressing NCR's Date restressed _,__ ..... ___ Restressing NCR's SHOP END FIELD END TOTAL K.., Elongation .(1500 psi to 80% ult.)-.r.d./Act. .5",LfI j." "

Lift-Off Pressure - Prediceed/Actual 6760 NIA Shim Thickness/SOZ Ultimate Pressure -7*'/77ZDo 7 AL..TL26O tIA Unseated/Broken Wires ....- Q Total effective wires after stressing j(_

6. Date Bulk-filled SE- 7 " Bulk-Filling NCR's Time since installation 16 t*Mx1I4 Inlet Pressure& p0o Outlet Temp. 64 Date end caps refilled: Shop _ _. Field
7. Data compiled by Jt. Organization __ _ __"__.

d70. Date n/t

8. Addi~tional. Comments:

I

Florida CRYSTAL RIVER U1IIT NO. 3 A-,m, B IPower Co,0,I0l 1"1STO_ REACrOR BUILDIG TCOII04 PE:..F*EsSING SYSTEH he,,,, TENDON~ IDENTIFICATIONI NUMBER .1/0 CUT LENGTHI /92 SHOP WASHER ID: PC " L CR P11 FIELD 'WASHER ID: PC IC'R) ci -2. .2

1. CAI/QA vendor inspection cover letter nmbar-FFPC i /oZOL. DAlE v/,,h Y
2. Date tendon received on-site ,3 -ar HNumber .3 'O9-O
3. Date Installed in conduit M_2__"-

___- __ .CR's Installation Wires removed 0 Wires :eplaced 0 Total Ineffective Wires (

4. Date buttonheaded 9 2 -7/ Buttonhe&dntn NC,4's Bad wires $ Accept. Reheads _ Total Ineffective Wires .
5. Date stressed L/0-3
                                              -74/                 Stressing     NCR's            ____.

Date restressed _Restressing NCR's SHOP END FIELD END TOTAL Eo.ngation (1500 psi to 80Z ult.)-Pred./Act. 14 /; Lft-O~ff Pressure - Predicted /Actual N/A.~fi! Shim Ihickness/801 Ultimate Prcssure ý5 17p n - N7IA Unseated/Broken Wires _0 Total effective wires after stressing .

6. Date Bulk-filled 4 75Bulk-Filliog NCR's ______________

TIme since Installation 10901Aj11 Inlet Pressure j)55...p5z Outlet Temp. Date end caps refilled: Shop _ ,_ _ld . .. . .

7. Data compiled by-2 e Organization _______________

Date____________ _

8. Additional Coanents: _-.__

A

4 Power Florida co-*o",l~oTENDONIEAC"ORCRYSTAL RIVER BUILDING UNITESSING Titt'*r'T 6l1STORY. NO. 3 SYSTEH cmk*,,$-.4012 l'*oi 4DOI4 IDENTIFICATION UMB ER. . . CUT LENGTH //0- 9/,' SHOP WASHER ID: PC J) j CR -/002 FIELD WASHER ID: PC__ I '- CR _ * ....

1. CAI/QA vendor Inspection cover letter number-FPC  % DOE_ ./'/:i
2. Date tendon received on-site _%_3r= _21 WIR Number _ _ _ _ _ _
3. Date Installed In conduit -n Intallation
                                                                             -L/..              tcN,.'                           .

Wires removed 0 Wires replaced 0 Total Ineffective wires._

4. Data buttonheaded -.. Bb-'7 JuttonheadinS NCR's 1/41 Bad wires / _ Accept. Reheads 9 Total Ineffective wires
5. Date stressed /, "67/ Stressing VCR's Date restressed ._.. Restressing NCR's _

SHOP END FIELD FND TOTAL Elongation (1500 psi to 80% uit.)-Pred./Act. ja44 -4 j 2JýZ/i9

  ~5 Lift-Off Pressure     -   Predicted/Actual                       (:10'7/bf                   6,7o4 Of (aW Shin Thickness/BOX Ultimate Pressure                                       /-14                     A         20.             NIA Unseated/Broken Wires                              Total effective -ires                     after stressing            J.j_
6. Date bulk-filled _________ ulk-FIlling NCR's ______________

TIme since Installation /g Inlet Pressure D5M~... -Outlet Temp. Date end caps refilled: Shop Field__

  • 7, Data compiled by V 40<1&Organization J4,4_ _ __

Date _____________

8. Additional Comments:
 )

Rp 11

Florida CRYSTAL RIVER WIlT NO. 3 ANkmm hg*Sl$ I ' Power rompsa~tso~m REACTOR BUI1LDIIG PREaIRESSIHG SYSTEM "tHDO HISTORY iNDON IDENTIFICAT ION NUMBER 9 , /3/ I -. CU w M SHOP WASHER ID: PC CA. FIELDWASHER 1D: PC CR ___

1. CAI/QA vendor inspection cover letter number-FPC U __DATE._ _
2. Date tendon received on-site _ _ _ _ _ IXR Number _
3. Date installed In conduit .. ...... _Installation NCR's ,,

Wires removed _Wi_ lires replaced Total Ineffective wires

4. Date buttonheaded __ _ ButtonheadibZg NCR9s Bad wires Accept. Reheads -_--Total Ineffective wires _.
5. Date stressed __Stressing NCR's ___-_

Date restressed Restresaing NRs_ SHOP ENID FIELD END TOTAL Elongatlon (1500 psi to 802 ult.)-Pred./Act. . - ~1~~~~- Lift-Off Pressure - PredLetedlActual I ~1~~ NIA Shim Thtckness/80Z Ultimate Pressure I Unseated/Broken Wires Total effective wires aftelr stressing_

6. Date Bulk-filled __Bulk-FIlling SCR' -

Time since Installation Inlet Pressure Outlet Temp. _ Date end caps refilled: Shop __. __ Field

7. Data compiled by _ . Organization.____

Date S. Additional Comentsi Vgwo dor/ AZ/vjijA).>/Ao) 00-1 Prt-e -22 4C 7~t 80 AC &p I

                                  -                               -      --    ~~~~.w~--------.                               -- s             -

1 pý

ti Florida CRYSTAL RIVER UNIT HO. 3 t..o...jot v er REACTOR BUILDI::C Pt:SIRLSSItN SY£H 1 il TEND03 IllS ORY x)vO z4 IDEUtIFICATON NUKIER 137.V or LENGG /3'- //' '.oP WASHER ID: PC 4/ ,. CR 1d FIELD WASHER ID: PC /1 CR CAlqA vendor inspection cover letter nuober-FPC I AP - 0 2- _ __ _ DATE ___/__, _"

. Date tendon received on-site               3'*    2-       7        .      R Number              ....
5. Date installed in conduit , J.7-,/' Installation NCR's Wires rcoved 0* ires replaced 4c Total Ineffective wires C)
,. Date buttonheaded                                         BitonheadLng NCR's Bu-.*O.7LI                        __

bad wires / Accept. Reheads 0 Total Ineffective wires

  . Date stressed           1.,-3-7q                             Stressing NCR$'s.

Date restressed ...... Restressing NCR's$ SHOP END FIELD EIND TOTAL O'Nloniation (I.500.psi to 6D% ult.)-Pred./Act. JL,ýL -4 d.j/ 9

        .t-Off    Pressure - Predicted/Actual                            674a4700                   69",/OO                          N/A sim. Thickness,/oZ Ultimatce Pressure                                  "i 7Z,7,o                     777,6                    N/A Unseated/hroken Wires                0               Total effective wires after stressing Date Bulk-filled                                     1Bulk-Filling B/""/".              NCRP,'s Time since Installation /__,__,._:_ Inlet Pressure                           _,_o         __;       Outlet Temp.

Date end caps refilled: Shop Field

    '.Data    compiled by       e.________________                         Organization_______________

Date ______ _ _ _ _ _ _ I., Additional Co-entsz

       ),                                                                            l-                        ii ,
  .*     ,,;-  F~or.ia                             CRYSTAL RIVER U31T 110. 3                                                  cdl       35m
  • _,.0. k"*,.0.; J EAcrox r*-*s TIFIM_ON ?1' 11tSW rqsst:::

R,, . sysTuL rat 1D.b IDENTIFICATI0: ?UMIMER_____________________ 0 .. 1 LE4_CD; /'Z 07, 3P WJASHER 10 C /:l. CR 7,2 FIELD WASHIER ID: PC _j ; ca CAI/QcA vendor Inspection cover letter n=.ber-?PC 1 /0ZA'_' DATE 4'//o74... Date tendon received on,-site £ 7R Number ______. . .. Date instal.le! In ccn.uit Z,-J-374 installation tNCR's __ Wires rc=oved 0 Wires ra;lzzed 0 Total Ineffective vires 0 Date butc..eeaded 1 1)" ' Buttonheading NCR's Bad vwres _ Accept. R.cthcas " Total Ineffective wires Date stressed _/ 3_ -7_ Stressin; NCR's &tRi

                                                                                                        *          &M/,"

Date.restressal _ PRastress~ns tiMR's .... SHOP WD 'FIELD END TOTAL 9n-n.o*ti,0n (1500 psi to 60% ult.)-?:ed./Act. * ','$.- - "" 964',/oe

        +li.-Of     ?'ressure - Predicted/Actual                                    /    '          " 4 1*.              e&,(             T Ii/A Shia Thickness/8o%.Ultimate Pressure
                          *                              ,+                                                      174' Y/",7&'-O             NIA Unseated/Broken Wires                                         Total effective wires after stressing ..                           L         * '

. Date Bulk-filled -2(-7g" Bulk-FlllLnZ NCR's Ilme since Installation Inlet Pressure UT Outlet Temp. Date end caps ref illed: Sho . .... . Fleld ____

  *Data      compiled        _______________Organization                                             _         0__o_______________
                                                                *                ~~Date  A__________________

.. Additional Coiencs: 1V&,tA4gD0

C. , 4S.C-u Florida CRYSTAL RIVER UNIT NO' 3 Aftfaebmm PAf oS 8 Power ar 06 gompea REACTOR BUILDU4C PRLS,-'ESSINC SYSTE1 TENDON IISTOmy TENDON IDENTIFICATION ?IL D Z/1. r CU LENGTH-_ SHOP WASHER ID: PC_____ CR ______FIELD WASHER ID: PC______ CR ______

1. CAI/QA vendor inspection cover letter number-FPC I __ _ DATrE
2. Date tendon received on-site 4P. Number _
3. Date Installed In conduit Installation NCR's Wires removed ,,, Wires replaced Total Ineffective wires ,,_.....

A. Date butionheaded ___ButtonheadLng NCR's Bad vires _ Accept. Reheads Total Ineffective vires

5. Date stressed Stressing HCR'sa Date restressed Restressiug NCR'.s SHOP END FIELD END 7OTAL Elongation (1500 psi to 80X ult,)-?red./Act. -I-LIft-Off Pressure - Predicted/Actual, N/A.

Shim Thickness/8OX Ultimate Pressure inseated/Broken Wires -_ ._ .. Total effective vlres after stressing

6. Date Bulk-filled _ Bulk-Filling NCR' s Time since Installation Inlet Pressure Outlet Temp.

Date end cups refilled: Shop .. _-. __ Field

7. Data compiled by .22 - Organization Date
8. Additional Coments: ArPoi7?
                                                  '      A "    -'""

P A, - f ( 74I II J-I I

F'.or~da CRYSTAL RIVER WIlT NO. 3A 3

6 6~.#o -bo IEACMOI I:LuLD::G Pr!:rFTSr~Sl:: SYSTEM  ? $1
  =4OO  IDENTIFICATXM1 NMMER__________                                                       _     aLIr LEIGTH               /'V-OP 1WAS11ZR, 10% PCJJ                          CR                          'FIELD WIASHIER ID.- PC_                                CR GAl IQA%vendor Inspecticri co*.-r lette~r number-FPC                                        /O

___________ DATE '/ ' Date tendon receivad on-sita %3___89-7___- P.IM. Number 53 1? a Date Installed in conduit __________Installation NCtfs i'Ii Wires rczoved 0 wires replaced ý0 Total Ineffective wires 0C: Date buttonheaded 10 ?l Buttonheadin; tC.M's _____________ Bad wicrer Accept. Rehe.ids 0Total Ineffective wires / Date stressed _____ ______Stressin; ".CR's_____________ Date. restressed ______________Restressing 1:CRs________________ SHOP L'D FIELD ENID TOTAL ag'oation (1500 psi to 60Z ult.)-rred.IAct. d~go 179019/*~~ 1i~c-*O&ff Pressure - Predicced/Actual 477o, WA~4 Shia Thickness/BOX8 Ultim~ate Pressure N/i,#~~HA

               * *Unseaed/SrokeWires                    0Total                    effective wires after stressing,..2.J..
  *Date Bulk-filled                       S..7                            Bulk-Filling liC91              ________________

TIme since installation ltet Pressure In~~d~

  • Outlet Temp._____

Date end caps refilled: Shop _________ Ireld___________________

   *Data    CDrCPIled      by       2?~Organization                                                           ______________
                                                                                     'Date      ___9&               ______177___
   *Additional Co~ents.:

0 9 I aJ _ -]

C C I eISTaL l UilNTl i. 3 I3ACMOTllSI* PItIIlUUI 6111MM wuamm 3UIVUI.U5 ImsC 1fIDUOne D212

                                              , Itl     Of ¢ociff1Oi.                                   .               ?tICIIIaI Irnpectle.                           Avg.                 8in      Lat"-         Total                   Avg.       M         "10 il00-            TOMal    stor           alas.

lPalr sad lotre Io*e I*ktllmieog ,sim 91060"w forev Ifinos TlIeiee.o atios tllotiwe ow *atlvCu of

        !se     Wae     AY2            fbia)              _(V            It)        WIvo       (RIP)       (%IN#)         (Q              (it)            e  l             a 2                     4                                                                                 1               1         WO                                      35e-
   *lgl lM                      I31wi                     6          4 _Si                  &                             .9L            _iLL 1213174            I      1612 6                           6/         471r           162                                                     L           l K   &      .9L   i       X  &,               ll lm I    M        *X   &"    Ji U L   "

3 Ir .. _..92 6 31._" VIA VIA ulA Uva 1. Lift-off goly V 128S 1336 6 31_. VIA 162 piA VIA TIA VIA 162 82 53

                                                                                                  .L                                     MIA
    .YY&W                                                                                                                                                                                     144R1-COA"S OFxc
                 £.n3    p2um           ai's                         .d                        AM           A&            Alm           MIA                                                             /e
-                -        -           -                    -        -             -           ~n                        -                           -           --

5ff - - - - - - - - a - - - - - WI

Florida CRYSTAL RIVER UNIr NO. 3 t. B,, TEHNON HISTORY TENDON IDENTIFICATION4 NUMBER 71M)in CUT LENGTHI ____________ SHOP WASHER ID:- PC L2 .CR ~ ,FIELD VASHER ID: PC L..... CR 2...... I. CAI/QA vendor Lnspection cover letter wumber-FC I /0Z,_r'" DATE _/Ao/ "

2. Date tendon received on-site _ 3_A______9_____ RHR Number __________________
3. Date installed in conduit _-__ -_. _ Installation NCR. __s Wires removed
  • WWires replaced 0 Total Ineffective wires 0
4. Date buttonheaded ICo -Ito - 7(1 Duttonheading NCR's _____________

Bad wires 0 Accept. Reheads 0 'Total Ineffective wires 0 S. Date stressed i11894 Stressing NCR's Date restressed Restressing NR'1s SHOP END FIELD END TOTAL

        .oongation (1500 pos   to 80% ult.)-Pred.Act.                          _     _  7_7;E_,                  _7__v Lift-Off Pressure - PredictedlActual                                /g'.o                  0,VOrSt 1                      N/A Shia Thickness/80% Vitimate Pressure                        &6 'iLlO 7      ~             s   7770                 NI/A Unseated/Broken Wires.             0          Total effective wires after stressing                                   ,
6. Date Bulk-fllled_ *-.26- 25_ bulk-FtllIng NCR's Time since Installation C~n Inlet Pressure L p. Outlet Temp.

Date end caps ref'iled: Shop Field

7. Data compiled by  : Organization J"_44, Date V 7-
8. Additional Comments:t ._* cL ,ID*4,)

K;-

         -&        Florida                          CRYSTAL RIVER UNIT .N. 3                                             Athm..M rw Power                    AcrOR BUILDINGCAIlTRESSING ST TNDON IDErNrIFCATION NUMBER                                      2./       .               . CU t LENGTH        _       __

SHOP WASHER ID: PC_ __ CR __-__ FIELD WASHER ID: PC CR _

1. GAIIQA vendor inspection cover letter number-FPC D D&TE
2. Data tendon received on-site , _ HR Number _ _ .. _.
3. Date Installed In conduit InsZtallation NCR's Wires removed .... Waires replaced 'Total ineffective wires
4. Date buttonheaded _uttonheading, NCR's Bad vires _ Accept. Reheads -_ __ ,,, Total Ineffective vires ___.
5. Date stressed Stressing NCR's Date restressed _Restressing NCR's Sol*O END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. __._________7 Lift-Off Pressure - PredLcted/Actusl N.liA Shim Thitkness/801 Ultimate Pressure hIA M

Unseatedl/roken Wires __ ____ Total effective wires after stressing

 '6. Date Bulk-filled                       ........                Bulk-Filling MCRs' Time since Installation                                        Inlet      Pressure                      Outlet Temp.

Date and caps refilled: Shop . ... Field

7. Data compiled by 0017?Z4S , Organization
                                             ---             *                    ..                                                        .Date
8. Additional CoumentB: _&p /ý,!rw
             ,0aA-,0 06  " "V   W.

K Tq nAl. 71

I11o

     ,.                                           CRYSTAL RIVER U4ur ZO. 3                                                   All'*'SM
        .. m ...,jzT
               *:,                      ICrO BUIL[DI::G ?r.sgr.::S: SYSu
               , aO*PO-I#O TEUWO. HItST')RY MMI IDEN71FICATI03 NUMER                                                ~T                CU~i/  LEC~TIM'            /7'/

WASHER ID: PC_ Ci FIELD ID: -ASIIL - C g GAIIQ,/ vendor inspection cover letter number-FPC i /62 -5. DATE _______y_. Date t endon received on-sfte ,.,,A9__-_ RXMR RKuber R2_'__.6._. Date Installed in cendui.t t -e1-4 Installtion NWCR'S Wires rceoved / Wires replaced 0 Total Ineffective wires Date bucto.headed L1- IJ. L4. Buttorhedin.; ?sCR*s Bad wires

  • Accec. ulloads 0 Total Ineffective vwres /

Date stressed Ia "(o" 4 Stressin; r.Cu _s Date restrcss4 _ lestressir. ICnK's SHOP *IND FIELD END TOTAL pgation (1500 psi to 609 uit.)-Pred.fjAcc. -a '/ 4-0g 4Af t 41,~j 9 51fg% LIft-Off Pressure - Predicted/Actual q L70A _904 5LA292A1; f6~q tiN/A Shim Thickness/80% Ultiiate Pressure ..2..Q d NIA Unseated/Broken Wires tToial effective vires after stressing _

  • Date Bulk-filled  ! 3-*24,-7. . Bulk-Tilling NCR's .....

Date end caps refilled: Shop

  • Yield ....
*Data compiled by                                                               Organization         ______________

Date L77 Adiina c ens - -t II-& A IIIft " tl;-m WAAL&-

Flrida Crkatre SB2 CRYSTAL RIVER UNIT NO. 3 Power 90164459 RZACTOR NUILDINC PRMC:RESSING SYSW( Fa. 322 TENDON HISTORY TENDON IDENTIFICATIO14 NUMBER 2/jA ' nLM SHOP WASHER ID: PC CR FIELD WASHIER ID: PC CR _. I. CAL/QA vendor inspection cover letter nuber-FPC I . ... DATE__

2. Date tendon received on-site M Numbet
3. Date installed in conduit Installation HCR's Wires removed Vicres replaced Total Ineffective T vires
4. Date buttonheaded _Ba_-__ _ Dttonheading NCR's Bad wires _ _ . Accept. Reheade. 'Total Ineffective wires
5. Date stressed ..... Stressming MCR1 Date restressed .... _ Restresolng NCR's SHOP MNl FIELD END TOTAL Q,) Elongation (1500 psi to 60? ult.)-Pred./:t. . I Lit t-Off. Pressure - Predicted/Actual " , TAIA Shim Thickness/802 Ultimate Pressure _ N/A Unseated/Broken Wires __Total effective vires after stressing __-_____"
6. Date Bulk-filled ___-_._ Bulk-FIrllug NC'_s live since installation Inlet Pressure Outlet Temp.

Date end caps reftlledt Shop Field

7. Data compiled by DOrganizatio Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

a.- Additioanal. Comments: _&VP&,e efe, #.,r o X

                                                 .1                _,' ,;/      .,/.                                 .

Florida CRYSIAL RIVER UNI r HO. 3 &-"4M q*4 tooTto Power REACOR UILDING PRESTRESSING SYSTVI par W) TENDONI HISIOWY

~Tirot    iDEincinCt;O      muK314at                  21                       CU   LENGWTH___________

SHOP WASUER ID PC 2. I c& TELDWASHER ID: PC __ _ C&_

1. CA*lqA vendor inspection cover letter ~umber-MPC 0 ,_ DMTE
2. Date tendon received on-Bite R $umber M__
3. Date Installed In conduit Installation NCR's Wires removed ____ _ Wires replaced __Total Ineffective wires ,,,_ ,
4. Date buttonheaded __ )uttooheading NCR's Bad wires .... _Accept. Reheads _ Total Ineffective wires _
5. Datae stressed Stressing NCR's S__

Date restreused ._ Restressing 14CI's __ SHOP END FIELD END TOTAL Elongation (1500 psi to 80 ult.)-=red./Act. I z - Lift-Off Pressure - Predictedl/ctual L NIA Shim Thitckness/80O Ultimate Pressure I . NIA UnseatedlBroken Wires Total effective vwies after stressing ._._

6. Date Bulk-filled _ulk-Filling NCR's "_

Time since installation Inlet Presshlae _ Outlet Temp. _ Date end caps ief illed: Shop Field _ _-_ _-_____.. _

7. Data compiled by 7
                                                              ~      --Or~: ization gan                    FPC-Date  _    _       _    _    _       _      _      _    _  _
8. Additional Couwents: Th' ?,tCA41?A 1TOI) Pie -5.4 r~9JL4JCC 907 716
           *1Florida Power t

CRYS7AL RIVER UNIT NO. 3 REACrOa BUILDINGC PRS, 'ESSlIG SYSTEM TENDON IILSTORY Aa"b W4DON IDENTIFICATION NdUMBER 5OT CU-?LENGTH .~3~d SHOP WlASHER ID: PC ,/Z ca lEL WASHER ID: PC FI_ /X/ cR

1. CAI/QA vendor inspection cover letter number-YPC I 0 2Y!r DATE _.'./ ,
2. Date tendon received.on-site. _%3ng- 74 Pat Number ________________
3. Date Installed in conduit (-JO)'7 4 Installation NCR's Wires removed 0 . ires replaced 0 Total Ineffective Vires 0
4. Date buttonheaded /1-/ Q42 d Buttonheadins NCR's _

Bad wires 0 Accept. Reheads 0 Total Ineffective wires

  • 5, Date stressed _ /.. -'74 Stressing NCR'* ,_,

Daie restressed Restressing NCR's SHOPet D FIELD END TOTAL

        -ongation (1500 psi to 80% ult.)-Pred./Act. .~Li..                        ~         i:

LIft-Off Pressure - Predicted/Actual 1,0? v 7 OI KAA Shim 7hickness/8O% 'Ultimate Pressure I-4A ,7110 1 "/A Unsested/Broken Vitres- 0 Total effective waires after stressing

6. Date Bulk-filled . .. L-7*-Bulk-Filling NCR's .___._ __ _.

Time since installation Z~ L.Inlet Pressure f~!Outlet Temp. ZI Date end caps refifleds Shop ... ____ Field 7, Data compiled by ...... ..... .. Organization Date -7/"Z _7Z

8. Additional Coments:

C. I

Caksu~hg 5-95.006 AftwMhmm U Florida CRYSTAL RIVER UIIT MD. 3 irl"325 rW Power 4g-A6AIxv REACTOR BUILINGu PREJREssINC SYSTEMj TENDON HISTORY TENDON IDENTIFICATION NUMBER - 42 CUT_ wlr _ __CT_ SHOP WJASIIER ID: PC CR __ _ FIELD WASHER ID: PC__. CR _

t. CAIIQA vendor inspection cover letter number-FPC I ,_DATE
2. Date tendon received on-site _IR Humber
3. Date Installed In conkuit _ InstallatiounC*s _NCs Wires removed ... _ . Wires replaced ...... Total Ineffective wires
4. Date buttonheaded _Buttonheading VCR's Bad wires Accept. Reheads Total Ineffective vires
5. Date stressed Stressing NCR'__

Date restressed ,.,_ __ _ Restressing _CR SHOP END YIELD END \ TOTAL -9 Elongation (1500 psi to 802 ult.)-Pred./4ct. , Liftt-Off Pressure - Predicted/Actual L . 1 14/A Shim Thicknesu/80Z Ultimate Pressure " / N/A Unseaced/Broken wires Total effective wires after stressing

6. Date Bulk-tilled Bulk-Filling, ?CR's Time since installation I____nlet.Pressuve Outlet Teanp.

Date end caps refilled: Shop "___Feld ld ... 7., Data compiled by Organization m Date2 k Be Additional Comments: .. -- t

            //.... .. ;o-      1?*o             (z/,r/,e)"

At .,eMm3 qsusFlodda CRYSTAL RIVER UNIT NO. 3 faor S2 Power REACr0l BUILDI*fG PRESTRSSIN SYSTEM TENONt HISTORY

 !DIDM IDNTIFICA-TION         UMBER        C)2SanT                                     LUNGnI___________

SHOP WASHER ID: PC__ _ CR _ FIELD WASHER IDs PCCR __

1. CAI/QA vendor inspection cover letter number-FlC I I DATE_ ____.....
2. Date tendon received on-site MR Number
3. Date Installed In coudduit _Installation NCR's Wires removed " _ Wires replaced . _ Total Ineffective *ires
4. Date buttonheaded Buttocheading NCR's_

Bad wires __Accept. Reheada .... Total Ideffective wires __

5. Date stressed Stressing NCIL8s Date restresee, ___ Restressifu NCR's _

SHOP END FlELD END TOTAL Rlonlation (1500 psi to 80R ult.)-Pred./Ac. . . _._ _ I_ Lif t-Of f -eesre L0(.I..Pf FWI ft&J Predicted /Actual (nftP) 13~ Ica., f3%.,/47:S, N/A Shin Thickness/802 Ultimate Pressure 1 N/A Unseared/Broken Wires 0 Total effective wires after stressing /63

6. Date Bulk-filled Bulk-.illing NCR*'_

Time since Installation ..... Inlet Pressure Ou tlet Tamip. ... Date end caps refilled: Shop Field 7"

7. Data compiled by _ __ _ _ _ Orgauization ______ ___ __

Date I 7 76 00~ --- :Pj--/*-M -.Q" 12y=

8. Additional Commentes -1~p! S Eor _FT2SI SLLIVMLtU.CE -- 9 2)Loc - o r- _,oclE? _(SAIP-SAMEA L4 W--I&5V L
   ,  _) 'JO          "gACleW4                     Ar -            C       *LC **t

';i nAq .me

   ~-.-
   .. d.                                                                                             S,                                                                             S.

cIrAl. UV1I UUIT go* 3 cm MU lOINftn U l-fITfd MtSU11M

                                                                            -s UVOCIDl InUUYW1tUAKl      U*~:Oe3        .                                     ,,nWeo Vao. ns_ *
                                                .mmr        ClOMO          .110                                                                 h70ator alds.

A Ialk lool- eg

                                            &-50        whim     slow                                                                 Iffaetie low      eature Olf t gI. iv v el*4                Pt.       ltom elaba      atlea foargo  Vo.     !lg*enas.o    ao                                                                            _          8l, 4..         Coug 1 eiod   "A                                                                       (iHa.     (tlC   )       (li)s     (10) _   Vto.

IIf) (hIp. (in) vimne _..__m- (kie)

                                                                         -                      VIA-                  WA        VIA Or"Is.al    -    A           3 m

S jIIIIt*~ ~ 165 UItAI L IIIZ&.L. 1670 1667 6 SAN VA112

                                                                    &3                           6~a7                   r      VIA 4 2140    VIA         163      92      46 6 3140     VIA             113          164      13623
  • 1616 2644 VIA 1. Ltfc-off oall VIA 7w 7d VIA
          -      .         A-..

2 VI WI 362~ VIA. 113

                                    .Ih)
                                 .10.2221   ..~14 L..    '4~..2LJII.                16
                                                                                                                                                                       .32. Oo~toti' me QCaws If J                                     2j.!     NIA                          ellA                      03J4     ad                                     4DDItv awa £Cvofwb
                                $L~         4E/#                                                                                                 4123.      72
                                                                                              -                       a       -
                           --                           a       -

fit .1 Si

  • 1-

Florida Power CRYSTAL RIVER UNir NO. 3* REACrOR BUILDINlC ,,EsI.ssIN SYST PaA us comoa.,g@. TENIDON4 HISTORY rENDON IDENTrIFICATION~ NUMBER ) icu'r LENG~TH /5 - 6

HOP WASHER, I D
C /c L CR /2. FIELD WASHER ID: PC/ C /Z3' _
1. GAI/QA vendor inspection cover letter number-FPC I /]OZ.VS DATE 9',/7V
2. Date tendon received on-site ._!/-_- ___ N,!.,umber 3
3. Date installed In conduit ._-/0-94 Insta5atioNCI's R Wires removed 0 , Wires replaced 0 Total Ineffective wiires 0

(.. Date buttonheaded /0 94 Buttonheading NICR's Bad wires 0 Accept. Reheads 0 Total Ineffective wires 0

5. Date stressed I4 91 Stressing, NCR'"

Date restressed ,_, Restresnsin NCR's SHOP END FIELD END TOTAL K} tongation (1500 poi to 80% ult.)-Pred./'Act. 40 Lift-off Pressure - Predicted/Actual 7 14r 4/1 (v 7iomr _N/AA Shim Thickness/80% Ultimate Pressure 1 V,2/77a (2~ 1 710 N/I& Unseated/Broken Uires 00 Total effective wires after stressing /6.3

6. Date Bulk-filled 2A-?S B-1ulk-Filling NC'.__s
      'ZIme since installation                      Inlet Pressure5         4    j    - Outlet Temp.

Date end caps refilled: Shop . Field

7. Data comupiled by 2?4 - Organization_______________

Date / /7

8. Additional Coments_

1"4 .4

"'.* '-*.) CRYSTAL RIVER U!6IT NO. 3 ckm
          *        .              I xA aO . CUIL D. ::G Prr .* .. s s I ., SYS T D I                                   A£e i u MIOIDENrIFzCxrxo:: :IER                                   3                        T LENGTH CU3                               4F Y3 o* IAS)TER to: Pc-         JAI.o:CR .           ....       FIELD WASHER ID: PC'                                      C" CAI/QA vendor inspection cover letter n=bar-FPC                       5         /03 57                          DATE. YI3        7_?17-*l Date tendon rice.ved 0--ste                 L-t-"*                      1'R Number         _"I                          _       _,

Date In::a!1ed !-. Ccnduit pp.1 Installation NCICLS ___________

 .ires re-oved             0    .       Ures replaced                            Total Ineffective vires                            C>

Date buttc..n.eaded - lutton*dei~inZ rCR's Bad w'ires " j Accept. Veheads 0 Total Ineffective vi;:s / Date stressed_ 1 1-t4-t:-14 StressinS NCR's _ lt"1I DaCe rest.__ssd_......... Restressing NCR's ..... SHOP rFD FIELD Ee*D TOTAL vSnsin(1500 Psi to 60% ult.)-Pzed./Act. 3I'1'" 3W,3 ( ..2.L.i.... I-Ift O~f Pressure - PrediLcted/Actual 4O~1~b -4F ~~~ Shim Thickness/SO% Ulti-ace Zressure I N/A Unseated/Bro'ken W'ires L.... Total effective vires after stressing .L. - " Date Bulk-Mled B,-,l-7S' B.ik-ril.ing '

cs /9/80 Time since installation q~.. fiA Inlet P Temp.

Date end caps refilleds Shop _ Field __ Data cocpiled by .?Organiza tion _____________ Date 1,7__ __. Additional Co-ents: ___"_ _ A . .. t m mil

Florida CRYSTAL RIVER UNIT NO. 3 At*Wu4Ms4 Awmb~m..

  • Pnswor W?" .F*
                ~

(F

  • o oN*,l. v.*njNaNu, u*h.LWJ. HISTORY TENDON r1VL,.i .&O*L¶Ijd *j8rui f T~* D~rrCAZO 9*030,8 w.onz~r~ n_______

TENDON IDENTIFICATION( mW)4ER_____________ __g2!_70_CUT______ SHOP WAS*iER ID: PC CR _ FIELD WASHER ID: PC _ CR __

1. CAI/QA vendor inspection cover letter nusber-FPC I DAT_
2. Date tendon received on-site _MR _ Nmber Nu__
3. Date Installed in conduit Installation lICIVs Wires removed Wires replaced Total Ineffective wires
4. Date buttonheaded _ ____._Buttonheadin$ NCR's Bad wires __Accept. Reheads _Total Ineffective vife$
5. Date stressed ____ Stressing MC'SO _a__

Date restressed __ __ _ _estressing NCRs._ SHOP END FIELD END TOTAL V.NL Elongation (1500 psi to 80% ult.)-Pred.Act. _ I

 )     Lift-Off Pressure - Predicted/Actual                                                I                          j                         IA Shia Thickness/=0O        Ultimate Pressure                                         /           ..                                     _    /A .

Unseated/Broken Wires _ Total effective wires after stressing

6. Date Bulk-filled 'Bauk-Filling NCR's Time since Installation Inlet Pressure . ... Outlet Temp. _ _.,

Date end caps refilled: Shop Feld

7. Data compiled by Organization Date /77
8. Additional Comments: A..e . .--

4r-- 200rje i 4 .Z /,Po "Nez"Zsg/

                                                            - ~..~     T    .                                   -                           Qf7   716

Florda CRYSTAL RIVER UNIT -NO. 3 Aftaek.mi Power REACrOR BUILDI,,C PiPZS'tSSIH. SYSTME 83, co,,.om,,o.o,, _ TENDON IHISTO.RY

  • NDON IDENTIFICATIOH NUMBER C LENGTH1 HOP WASHER ID: PC.JL CR . FI FELD 'WASHERID,: PC L1 c 9&,
 . CAI/QA vendor inspection cover letter number-FPC I                                /03."7                          DAT         .. ,,/36/17Y
 . Date tendon received on-site                      VMR                               Number     __         ___..                               ..
1. Date Installed in conduit __________Installation NCR's___________

Wires removed 0 Wires replaced 0 Total Ineffective wires 0 Date buttonheaded /041-i74L Buttonheadink NCR's _____________ bad wires 0 Accept. Reheads 0 Total Ineffective wiries ._____

  • Date stressed __.._-_74t_. stressing mcR'.' 1 6__4_ _.'_.

Date restressed ... . RestressIng NCR's SHOP END FIELD END TOTAL P.longation (1500 psi to 801 ult.)-Pred.IAct. ________ 4____3AE_

    )Lift*Of f Pressure -Predicted /Actual,4                                        j  ~       s        f~~~~ts                              NIA Shia 'Thickness/801Ultimate Pressure                                   4~~V                   .L L Z~N/A Unseated/iroken Wires                    0                   Total effective wires after stressing                                            _

SDate bulk-filled " 21 Sulk-Fillins NCR's Time since Installation

  • i Inlet Pressure 3 Outlet Temp.

Date end caps refilled: Shop __ Field

 '. Data   compiled by                                                       Organization Date   __     _   __      _    __     _    _    __       _   __   _    _

I. Additional Counents:

4s Florida Power

               *.SP@      PAS
  • CRYSAL RIVER U11IT N4.3 RuAcoOR 1uuma rEithsrissuc SYSTEM TENDON HISTORY ACbehm. S4 Page,.3 TENDON IDENTIFICATION N _ . 3ER CUT LENGTH SHOP VASUER ID: PC____ CR *_ YIELD WASHER ID: PC ____ CR _

I. GAI/QA vendor Inspection cover letter number-FPC I __DATE_ pAT"._ -

2. Date tendon received on-site _ _ _R Number .
3. Date installed in conduit Installation 14CR's _

Vires removed W._ires replaced Total Ineffective wires

4. Date buttotnheaded ButtonheadLnS NCR's Bad wires Accept. Reheada _ Total Iaeffective wires
5. Date stressed ____ __Strepsing NC ___

Date restressed lestresslog tCK's SHOP END FIELD END TOTAL Elongation (1500 psi to.80Z ult.)-Fred./Act. _ _ ..........L. . Lift-Off Pressure - ?redicted/Actual I . IA Shim Thickness/802 Ultimate Pressure MIA. , Unseated/Broken Wires Total effective vires after stressing __""

6. Date Bulk-filled Sulk-Filling NCR's Time since installation Znlet Pressure .... __ Outlet Temp. ,_..... __

Data end caps refilled: Shop _Fiel_ ed ,__ _

7. Data compiled by,..5 Organization _ _ _... . ..
                                                                                      .tteAdt-..C,,t/,,.._              .
8. Aditinal ommnts:je~eef V
                                                  -.-----              -r-.     -.                                -
  • 0,.-, '- ,.o da CRYSTAL RIVER uNIT 0. 3 "*WR ',-,-,

RrAC1OR CUILDIN: P E SYSTEM ADI*Iow 5

       ,      c* ,,                                   TEI:MO0   11iSTOIY IDEN'T      ZoFICAT.Z MI','X:.ME.R               7) 3oS"05                               LL-4GXU        /CUT     PYI IP WASHER       ID:.I'C       /O           CR                   Y~

IELD WASHIER ID: PC _1 CR CAI/Q,%vend.r inspection cover letter r.-'ber-FPC I /03," . DATE.__,' _____,_ Date tenden received on-site I.tR Number i-*7,. Date ltrstalled + ccnduit __ 67_4_ - 74- " installation m CRs / _ . Wires reeoved lres relaced Wi/ 0 Total Ineffective vires / Date buct._hteded /0 -!/--4j _ uttonheadinZ NCR*& Bad vires _ Accept. Reheads / Total Ineffective wires 7-Date stressed* _ / , . Td.- tressing NCR's., Date restressed . _ Restressing NCR's-

  • SHOP ED FIELD E[;D TOTAL 01 4_Ol, ti,, (1500 psi to 60% ult.)-Pred.lAct. '/r JL*.. . I
  'L6ft-Off Pressure - Predicted/ActualIIA Shi Thickness/8OX Ultimate Pressure                                    -6/2                                2~                         NIA
 *Unseated/Broken Wires                          0            Total effective wires after stressing                           /60 Date                        -ulk-filed                                       NCRs__                          _         nulk-Fillin Time since Installation               &/         ^4        Inlet  Pressure        JM          S       Outlet Tem~p.

Date end caps refilled: Shop Yield Data compiled by, e._;27'ý4 Organization ______________ Date __ __ _ __ __ _ __ __ _ __ __ _ Additional C-e.ents: *"

Florida CRYSTAL RIVER UNIiT NO. 3 CPkwapse S45O0m hreS34 Power C94008A4 so. REACTOR BUILDINGC PRE3iRESSING SYSTEM TENDON HISTORY TENDON IDENTIFICATION IINMER .2 3ro" anI LENGTHI_________ SHO W4ASHIER ID: PC CR . FIELD ASr1ER ID: PC___ _ CR.

1. GAI/QA vendor inspection cover letter number-FPC I .... ___TE:_,_,_,_.
2. Date tendon received on-site __R Number _
3. Date installed in conduit Installation NCR's Wires removed Wires replaced __ Total Ineffective vires
4. Date buttonheaded *Buttonheadlng NCR's Bad wires Accept. Reheads Total Ineffective wires S. Date stressed .__,_ _ . Scressins NCR's __

Date restressed Restressing KCR's . SHOP END FIELD END TOTAL Elongation (1500 psi' to 802 ult.)-Pred.IAct. -- j Lift-Off Pressure - Predicted/Actual [ , N/A Shim ThicknessllOZ Ultimate Pressure HIA Unseated/Broken Wires Toial effective wires after stressing

6. Date Bulk-fAled Bulk-Filling NCR's Time since installation .... Inlet Pressure , Outlet Temp.

Date end caps refilled: Shop Field

7. Data compiled by , Organization _

Date 9AA_

8. Addtional Counents: _9d'*i__.t'o,...
                  *     -      -0        /            o                          4e
                            -                M           2fr'-
                              ~~~~~~j                  n                   L.          ,,                  Of    .      .

5

                    *al         _    u*                    -      -
  • ss nu,, n1

Florida.... Power REACOR BULDING CRYSTAL cPsR'E.STESIc RIVER UNIT NO. 3 SYST.E --3-- C~kvb~md S.9S4M tgosm worT..EtDO T HISTORY

                              %L*
      -ol  IDENTIFICATION     NUMBER__________                                       aLIT LEN=1           *'
    'HPWSER ID:          C          D       CI                       FIELD WASHER I.D: PG           (*

.. GAI/QA veidor Inspection cover letter number-FPC 1 /403 SP DATE- 4V/e7,

. Date tendon'received on-site ___________ M Nkumber X 2762 I. Date Installed in conduit g -7& Installation NCR's Wires removed
       '                      0              Wires replaced                 0        Total Ineffective wires                (
o. Date buttonheaded _16- 9-74 Buttonheading NCR's Bad wires
  • Accept. )Reheads 0 Total Ineffective wires /
 ;a    Date   stressed               /1-.7-94                           Stressing NCR's     .....

Date restressed _Restressins NCR's SHOP END FIELD END TOTAL e oneation (1500 psi to 60% ult.)-Pred./AOt. p.

          ).f  ffPressure       -   Predicted/Actual                         6_______                                       NIA Shim Thicknessl8O% Ultimate Pressure                                                                27               N/A_______

Unseated/Broken Wires ,... Total ef fectivi wires af ter stressing.

     *.Date Bulk-filled            ~      '11            .          Bulk-Filling NCRes______________

Time since Intlain/ Inlet Pressure ~t ~ Outlet Temp. Date end caps refilled: Shop __ , _ Field

1. Data compiled by 2 g ý Organization _______-___

Date e ______

3. Additional Comnents: 4 .&

4V /

Floddc CRYSTAL RIVER UNIT NO. 3 Afte,,.I Power REACrOR BUILDINC PRLSTRESSINC SYSTEi TENDON IUSTORY TENDON IDENTIFICATION NUMBER

  • CU/0LENGTH ct SHOP WASHER ID: PC ____ _.
                                 .. CR.                            . FIELD WASHER ID: PC.                           CR_      _

I. CAI/QA vendor inspection cover letter number-FPC I DAiZ 2o Date tendon received on-site 1__R Number "

3. Date installed in conduit Installation NCL's Wires removed Wires replaced Total Ineffective vires .......
4. Date buttoaheaded _ _Buttonheadlng NCR.'s Bad vires Accept. Reheads Total Ineffective vires
5. Date stressed ..... Stressing NCR, __a Date restressed _Restressing NCRts _

SHOP END FIELD END TOTAL rN Elongation (1500 psi to 802 ult.)-Pred,/Act. I I

 )      Lift-Off Pressure - Predicted/Actual                                       f .                        !                N/A Shia Thickness/80     Ultimate Pressure                                                                                N I/A Unseated/Broken Wires                                      Total effective vires after stressing
6. Date Bulk-filled bulk-Filling NCR's Time since Installation Inlet Pressure ,, Outlet 7emp.

Date end caps refilled: Shop __ Field,

7. Data compiled by _Organization _ _ _ _ _

Date #//77

8. Additional Comments:-

0 5-I

CRYSTAL RIVER UNIT NO. 3 Aft*&-w 9o Power REACTOR BUILDING ILSTItESSING SYSTEM top w,

              .P     *~C6POA?@STENDON 11ISlORY r    IDENTIFICATION NUMER                           3 /                      CUT LENGTH          /43J t.5
ao~ WASHE RiD
Pc__C. ~J._e1Qf FIELD WASHER ID: PC ,j

.. CAI/QA vehdor inspection cover letter number-FPC I /0357 DAT E. _,_____,_,

1. Date tendon received on-site _ -0 1-_2 aR Number 3R7O
3. Date Installed In conduit - Installation NCR's .

Wires removed 0 Wires replaced 0 Total Ineffective wires 0

1. Date buttonheaded _O.--')' . Buttonheading NCR's Bad wires 0 Accep*o. Reheads 0 Total Ineffective wires
;. Date stressed                 11-11-7IL                   Stressing NCR'sI Date restressed                                           Restressing        NCR's SHOP END             FIELD END                     TOTAL "R~longation (1500 psi to 802 ult.)-Pred. /Act. Lj V{14/LNfi.                        !i7q      13                   cj;*      1 ~',
      .Aft-Off  Pressure        - Predicted/Actual                 (4201"OJ.O           C140.:2                              N/A Shim Thickness/80Z Ultimate Pressure                           Ifts 17770                       -7290                   N/A Unseated/Broken Wires                <3              Total effective wires after stressing                           16:3 Date Bulk-filled                           ___       Bulk-Filling B_,,_._7-          NCR's Time since .installation, /OAr-&X;Zt                 Inlet PresisureM             P=      Outlet Temp.

Date end caps refilled: Shop ,-Field I. Data compiled by 2 .2 Organization"_ _'_.... Date I.Additional Coments: nnn i inmlm- . w. -

  • u _i _ _ _-

Florida CRYSTAL RIVER OUT N40. 3 t aPm Power ~~Ca..ba REAcroR BUnLDiNc ras ,gf~ol SYSTEH vev e. TENDON I1STORY TENDON IDENTIFICATION NUMBER .U 3//

  • N GT SHOP WASHER iD: PC_ CR . FIELD F_ WASHER ID* PCC _CI
1. CAIIQA vendor inspection cover letter n~uber-F.C I .D. ,ATE ___ ___
2. Date tendon received on-site _._ PMR HNuber
3. Date installed in con'duit Installation NCR!9s ____ __

Wires removed 'Wires replaced Total lneffective wires _ A. Date buttonheaded ......... buttoahe adlg NCRss Bad wires _ Accept. Reheads Total Ineffective wires S. Date stressed .. _ _ S___ tressing NCR' . Date restressed _Iestressing NC'. __ SHOP END FIELD END 7OTAL Elongation (1500 psi to 802 ult.)-Pred./Act. , *. . . /

   )     Lift-Off Pressure - Predicted/Actual                                                           .                        ,                   .. N,,   /IA Shim Thickness/SOX Ultimate Pressure                                                  I            .L                       .                  "/A Unseated/Broken Wires                       .....            __   Totsl effective             wires after stressing                                        "_
6. Date Sulk-filled __lk-Filliog NCRK's ,,

Time since installation _ Inlet Pressure . . _.. Outlet Temp. Date end caps refilleds Shop Field .. __ .. ___ ___ .

7. Data compiled by ___ _ _ _Organization
8. Additional Commentsz: .'e.~e~~d I-, i~ J~ Z..OF
           -,       -                                       S.-                            -

K2.

  )
                           -                     vV   gv                       --        =,,
                                                                                         .   .   . ,       -_-I.-                  -   .

Florida CRYSTAL RIVER UNmir NO. 3 Cd, B5S-O Power 49OV611414011 f,14o..,,o. REAcot BUILDINGC 1Fo.s.-ssINC SYSTE-TENDON )JISTORY pa M rj MIDENTIFICATION UMBER :7D3 ap CU LENGTH vs -

0H? WASHER IZ
PC... J. o, CR Q FIELD WAS*ER ID: PC. Ci _ 55
t. GAI/qh vendor inspection cover letter number-FPC I /03S7 DATF. _______

Z. Date tendon received on-ste / -I/;.21 MR N m7brbe ,3N

3. Date installed In conduit , Installation NCR!'s Wires removed 0 Wires replaced 0 Total Ineffective wires 0
4. Date buttonheaded _ _ - _-_ Buttonheading NCR's Bad wires ( Accept. Reheads 0 Total Ineffective wires <

Date stressed Stressing NCR's Date restressed Restressing NCR's SHOP END FIELD END TOTAL OZlongation (1500 psi to 80Z ult'.)-Pred./Att. /I*7 ,a cJ Ift-Of f Pressure - Predicted Ac tual N/A Shim Thickness/80Z Ultimate Pressure 62 1"7 770 NIA, Unaeated/Broken Wires C) Total effective vires after stressing J _ "

  • Date Bulk-filled 3.3-21-75" Bulk-Filling NCR's Time since Installation J0tAw4MtJo -Inlet Pressure ~ ~~ Outlet Temp. Azh :6~

Date end caps refilled: Shop __Field _ _ _.. ...

    '    Data compiled by       Z   .      __...                            Organization       ___

Date "//_7_ _

    . Additional Comments:

K-7 i - - - -' N-. -. -flaw

Florida CRYSTAL RIVER UNIT NO. 3 Mb,,.3 Power REMO BUILDING PRESTRESSING SYSTYXtos TENDON IIISTORY jZp0 DI rcEoTIFrC1CA 0i YHUBEkR

                                   .              4,,'2    'f 7                On uiic'*ENH                    .

SHOP W*S*ER ID: C /Z/ / cR 4 74I' tIELD WASHER ID': PC-/ . . cp /*27.

1. CAI*QA vendor inspection cover letter number-FPC 916/ DAZ D _ t ILA7Y
2. Date tendon received on-site /2 -2,P. 73 MR KHuber #?"I
3. Date Installed in conduit /-_27- ?V, - Installation iNc*R's _

Vimes removed 0 Vires replaced 0 Total Ineffective.vires 0

4. Date buttonheaded *-/7- buttonheading HCRs Bad wires 0 Accept. Reheads _ Total Ineffective wires 0
5. Date stressed o,- - 7r Stressing NCR'S Date restressed Restressing MICR's S10? END TIELD END MOTAL
~'!P%   Elongation (1500 psi to 80Z ult.)-Pra~d./Act.                  s/~' IS-Fr          71r ,4V                   /

X4 beý/

                                                                                                                          /0 Lif t-Of f Pressure - Predict ed/Actual                      6P70 17066          7/        4
                                                                                                 ,iPoo                 N/A Shim Thickness/80% Ultimate Pressure                            7   /?P/0        G,     /7780                 H/A Unseated/Broken Wires                 0           Total effective wires after stressing                   /63
6. bate Bulk-filled _7-2 G-7* -_ Bulk-Filling . -CRO_

Time since Installation inlet Pressure 7 Outlet Temp.o/ Date end caps refilled: Shop Field _

7. Data compiled b CZ Organization Date 7
8. Additional Coments:_

907 716

ig.re 11 Florkia CRYSTAL RIVER UIlT NO. 3 IN4 Power oo,,.TENIDON IIcOR sUILDItII rim"LSSu SYSTK 11W 541 IISTORY-IDENTlFCATI*N OMER 4,' _*T1 CUT L*/ - V 4,e SHOP WASHER ID: PC 2/ CR 6 - FIELD WASIIER 1D: PC /212-1 CR 9

1. CAI/QA vendor Inspection cover letter number-FPC I ____DATE 2/'
2. Date tendon received on-site /2-20" 73 MiRNumber Z
3. Date Installed in conduit /-,2Z-0/ installation NCRIO Wires removed to Wires replaced _ Total Ineffective wires
4. Date buttonheaded Buttonheadlft l*/I'71 NCR's .... _ _.

Bad wires 0 Accept. Rebeads - Total Ineffective wires 0

5. Date stressed 1 4" 7_r Stressing OCR's .

Date restressed ____Restressing NCR's SHOP END FIELD END TOTAL I" Eloangtion, (1300 psi to 8102 ult.)-Prcd./Act. s-SJr, - Lift-Off Pressure - PredictedlActual IWO/'0 1777 __ N/A7S'0 _A Shim Thlicknessu/0Z Ultimate Pressure 4 I 7MOP L/s;- HIA UnseatedlBroken Wires " Total effective wires after stressing /63

6. Dote bulk-f illed - 7 26 "74X Bulk-Filling NCR'. _ _......___

Time since Installation .4& ,2!4 . Inlet Pressure 47 Outlet Temp. /' Date eod caps refilled: Shop Field

7. Data compiled by - Organization .__.___-

Date __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ S. Additional Coments: 907 716

Florida CRYSTAL RIVER UNIT NO. 3 Auhm.u3 INN Power eesa..o..,o REACTOR BUILDING PP,'.TRESSM Tr~_ND04 11srTOY. SYSTE-I' TINDON IDENTIFICATION NUMKBER CUT LENGT 1$'- 7t'l_________ SHOP WASHER ID: PC /Z . CR 5.6T FIELD WASHER IDI Pc /. / CK /V/

1. CAI/QA vendor inspection cover letter number-FPC . 9?2/ DAiTF. 212
2. Date tendon received on-site 2 P- 7. MlR Number 3Y r
3. Date installed In condutt /- 22. - . Installation NCR'S Wires removed 0 Wires replaced 4= Total Ineffective vires
4. Date buttonheaded £-/I--7.y buttonheadIng NCR's Bad wires " Accept. Reheads 0 Total Ineffective wires 0
5. Date stressed -*-75. Stressing NC_1_a Date restressed _ _._ ., Restressing NCR's_

SilOP END FIELD END TOTAL f"'ElouGation (1500 psi to 80% ult.)-Pred. /Act. Jr*,i fr ' /~4//~4 ) Lift-Off Pressure - Predicted/Actual 6 14/ Np/.OADO Shim Thickness/80Z Ultimate Pressure , 17T10 6_ _ ro N/A Unseated/Broken Wires 0 Total effective vir*s after stressing /le-3

6. Date Bulk-filled 2- 4 -7 , Bulk-Filling NCRs Time since Installation g **-*# *. Inlet Pressure _ - -Outlet Temp. -

Date end c8ap refilled: Shop __ Field

7. Data compiled W-4?4 e_ Organization _____________

Date I"_/_ _ _ _

8. Additional Comments:

W.n7 716

Florida CRYSTAL RIVER UN1T NO. 3 A*. Mw), Power o*.o-.,,eo U^E OR SUILDWCX TENDON ?RES-ruSSIoc H!ISTORY SysXV - .. WPON IDENTIFICATION VUHSER VZ 1131 W? wncm CS 7 Ay SHOP WASIHER ID: PC fl.I CR 3T FIELD W1ASKER ID: PC /-Z. C, _IZZ 3 I. GAI/QA vendor inspection cover letter nunber-FPC I , ??A8< MTE a/ fr/1;.3

2. Date tendon received on-site /P -Y - 7 3 W1K Nbe 3.3 6
3. Date Instafled in conduit f/ Z *- '7v InstallatIon NCR_'s Wires removed W0ires replaced P Toital Ineffective wires 0
4. Date buttonheeded G -2.-7,1/. . Buttonheeding NCR's __, _ .

Bad uires 0 Accept. Reheads 0 Total Ineffective vtres

5. Date stressed 2- ./ - 7J' Stressing NCR's Date restressed __ _ ,___ Restressing MCR's SKOP END FIELD END TOTAL Elonsation (1500 psi to 80% ult.)!-Prtd./Act. t4' -4' -,

_V,r; i'iI~re ; i)tt-Off Pressure - Pzedicted/Actuaal U70 P70000 cP/o ,6*O ,I,4A Shia Ihicknesslfi0l Ultimate Pressure e/.,V jIC. J~ 7 75P4A Unseated/lroken Wires 0 'Total effective wires after stressing /63

6. Date Bulk-filled 7--l-.-74 Bulk-Filling NC'__

Time since installation 6 r4wiA Inlet Pressure 2% Outlet Temp. /780 Date end caps refilled: Shop Field

7. Data compiled by Organization _,__ _,

Date e-/ 77 ..

8. Additional Coments:.
 )

907 716

Florda CRYSTAL RIVER UN7 NO. 3 Power EAMoR BUILOMIG ?PSTRESSING SYSTEM

                 '   o                               TEDOWI HISTORY

.. Z..TM IDE'rNTIFICATION 14UM)4ER 112 HW- 1 Z' LENTH /"' SHOP WASHER ID: PC /-/ CR 5'/ FIELD WASHER IDS PCm c Z CA /Z3

1. CA11QA vendor Inspection cover letter nber-FPC 1 _Z?20 DAT.*-/2 0/74
2. Date tendon received on-site /7 -Y Wilt umber 3 ' v r rf
3. Date Installed in conduit /-/-7-7'_* lnstallation NCI's ___..___ _

Wires removed 0 W*res replaced 0 Total Ineffective wires 4D A. Date buttonheaded , 74' buttonheadtnt HCR's _ Bad wires , Accept. Rebeads _ Total Ineffective wires .

5. Date stressed 2- -7 . Stressing ICR's __

Date restressed _Restresslag NCR __ SkOP END FIELD END TOTAL Elongation (1500 psi to 80Z ult.)-Pred./Act. dL*L / !: ~ ,4-/e' Lift-Off Pressure - Predicted/Actual 6PIt7 / 67ro -7 ?Og41.O NIA Shim Thicknessl8O% Ultimate Pressure 6?*7'/o 4'$,77r* N/A UnseatedlBroken Wires 0 Total effective wires after stressing /6

6. Date Bulk-filled , 7 ,.Y Bulk-Filling, NCR'e Time since installation 27 .w-/4A" Inlet Pressure /5' d Outlet Temp. 1657 Date end caps Tefilledi Shop ,.,_ Field ___
7. Data compiled by Z. Organization __-_

Date___________ _

8. Additional Comments:
      )'      --               ..                                                           - . . _..

907 716

00 . Florida Power CRYSTAL RIVER UNIT NO.3 REACTOR BUILDIN PPY*STRESSl, *SYSE K-s) TENDON 1hISTORY 4FJDON IDENTIFICATION NIIHBER 'J/2H-3 3 anwCU Lon T 'sýs f SHOP VASHIER ID: PC /Z- CR 5'.Y& FIELD WASHER ID: PC /-Z/ ciR 9f74'

1. CAI/QA vendor Inspection cover letter nuaber-FPCI 0 .,ATF D T2 7_
2. Date tendon received on-site /- 7-/ IMt Number _ 3!r

___ r

3. Date Installed in conduit -- 71 Installation NCR_'s Wires removed 0 Wires replaced 0 Total Ineffective vires _
4. Date buttonheaded 6-Z7 -79/ Buttonheading NiCR's Bad wires _ Accept. Reheads 0 Total Ineffective %fires 0
5. Date stressed 7.-/ .7r Stressting Nes .NC.....

Date restressed Restressing NCR's SHOP END FIELD E11D TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. M i O

      ) 1,4(t-Off Pressure  -  Predicted/Actu~al                              1,870    /70,0       010       14..                   1N/A Shim Thickness/80Z Ultimate Pressure                                    7 Ys/70/0                     7780                  N/A Unseated/Broken Wires     ___      _Total                         effective vires after stressing                       /S3
6. Date Sulk-filled - -k Bulk-Filling N4CR's _

Time since Installation 7 &Y-ojov/ Inlet Pressurek/._ Outlet Temp. /60d' Date end caps refilled: Shop Field

7. Data compiled by _ Organization Date
8. Additional Coments:

Aeddmdme 89" Florda CRYSTAL RIVER UNIT NO. 3 ceku/m I95.og Power

            . emet,o REACrOR BUILDING ?ESTFESSfING
                                     ....                 TENDON 1I1STORY SHOP UASHER ID:       PC /ZA             CR    .LV                 nIED WUASHER ID: PC /2/                   C    7 7r
1. CAI/QA vendor inspection cover letter number-FC I -?go DATE 2/2o/7Y
2. Date tendon received on-site /-/A 7' R Number ., 03/
3. Date installed in conduit /-2/1-71 Installation N4CRlas Wires removed 0 Wires replaced t0 Total Ineffective Wires 0
4. Date buttonheaded 7-,P 70/, Buttonheading NCR's Bad wires 0 Accept. Reheads 0 Total ineffective vires C
5. Date stressed ...... _t-7_ _Z-_..... Stressing NCR's Date restressed _Restressing NCR'es SHOP END FIELD END TOTAL Elongation (1500 pot to 802 ult.)-1'red.IAct. r'Yi% f,. z j r 1~ .r4/%

Li Ct-Off Pressure - ?redictedlActual

  • 7 ° 1/ 70/0 N/A Shim ThicknessIaoz Ultimate Pressure 7/ / ?7"I' HIA UnseatedlBroken Wires 0 Total effective wires after stressin$ / 3 *
6. Date Bulk-filled 7_.71 lulk-FIlling NCRP's ..

Time since installation o5ý o'i,.S4 Inlet Pressure /P " . Outlet Temp. /.. Date end caps refilled: Shop __ _ _ eld

7. Data compiled by .? ** - -. Organization Date_______________
8. Additional Coumments:

907 716

Florida CRYSTAL RIVER UNIT N1). 3 Par an Power REAcroR. UILDIZIG PRSTP.ESSNC SYSTEM

     ,   ./    ~o"'"m                            TENDON HISTORY
  • TERON IDENTIFICATION NUM __ER4 2 H _ E.

wcu /L$ , SHOP VASUER ID: PC /ZZ CR /230 FIELDuASHER ID: PC /Z7- CR

1. GAI/QA vendor Inspection cover letter number-FPC I . . 0 ___ b9dt2 _o_
2. Date tendon received on-site /',/ - 7&/. INRK *uber. 63
3. Date Installed In conduit 1/- - 74' Installation NCR'a Vires removed 0 Wires replaced _ Total Ineffective wires 0 A. Date buttonheaded 74 ' ButtonheadLng NCRes Bad wires 0 Accept. Reheads 0 Total Ineffective wires .
5. Date stressed Z &-_

_ - 7.1 __ _ Stressing NCR's Date restressed Restressing NCR's_ SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. c/ri o~r, Jrxr I ____

-      Lift-Off Pressure - Predictedl/ctual                       (4701               L94"     67S.0                N/A Shim Thickness/80Z Ultimte Pressure                         4                     7                          N/A Unseated/Broken Wires          0                 Total effective wires after stressing                   /     _

7-J/- 7Y Bulk-Filling NCR's , It

6. Date Bulk-filled Time since installation 6 -vrw*,^4r Inlet Pressure ,______ Outlet Temp. /o Date end caps refilled: Shop __ _ _ Field -
7. Data compiled by . ~ A t Organization Date_____________
8. Additional Coments:_

on? 71m

Foriida CRYSTAL RIVER UNIT NO. 3 est 3 090104NA119TENt)ON le - o ,o HISTORY ..TENDON IDENTIFICATION NUMBER ' A . CUT LEN4GTH /$( SHOP WASHER ID: PC -/Zo / CR 5-. -FIELD WASHER ID: PC / ,." _c. ,._ _

1. CAI/QA vendor inspection cover letter nunber-FPC I _g._*/II... / V
2. Date tendon received on-site /1/4 - 7y 3PR Number J 0 3$-1 3, Date Installed In conduit /2.I. 74V Installation OCR's ......

Vires removed 0 Wires replaced 0 Total Ineffective vWies ,

4. Date but tonheaded 7-/4 - 7%/ Buttonheading NCR's Bad Wires 0 Accept. Reheads 0 Total Ineffective Wires 0 S. Date stressed Z. .' 7 Stressing NCR's_

Date restressed Restreusing NCR's SHOP END FIELD END TOTAL

      '7'Elongation (1500 pat to 80% ult.)-Pred.IAct.                      Jj                     fen__S__/0,s&

LIlft-Off Pressure - Predleted/Actual '7T /71000 49-1. 1A6t NIA Shim Thickness/802 Ultimate Pressure 7i/ i 7k/0 6 Yr, 77*? N/A Unseated/Broken Wires 0 Total effective Wires after stressing ._ ___

6. bate Bulk-filled - . ... 7A ./ bulk-Filling NCR's .... ...

Time since installation £ .4v&=6A . Inlet Pressure /2 Outlet Temp. /o 0 Date end caps refilled: Shop .... _...... Field

7. Data compiled by _______________Organization ________________

Date _5A01y,

8. AddItional Comments:

907 716

i*iL . Florida Power CRYSTAL RIVER UNIT NO. 3 REACrOR BUtLDIIC PIaESTRESSINC SYSTEM E~k Ae.,g

                                                                                                                             -s~m u TENDON IHISTORY                                                   1pl4 IDNIDENTIMlATlO4 N4UMBER                                                 J LEN=T1 CUTI~f)                 /rS               /

SHOP WASHER ID: PC /20 CR 7Y FIELD WASHER ID: PC, /ZC . R 113 V__

1. CAI/QA vendor inspection cover letter number-FEPCI 20 f ... DT ,/3/a.73
2. Date tendon received on-site .. ?/-_'7 .. W..3Number 3 RR ,2 '1"%
3. Date install8 d In conduit "5'-

I-is " I. Installation NCIL'u Wiree'removed

  • Wires replaced _ Total Ineffective wires 0
4. Date buttonheaded IC-
                                  /c-       "7          luttonheading NCR's B                                                   _

Bad wires /3 Accept. Reheads /2_- Total In effective wires /

5. Date'stressed '7) -7j Stresssing NCR'ss, Date restressed ___ Restressina NCR's SHOP LID FIELD END TOTAL fElongation (1500 psi to 802 ult.)-Pte:3./Act. . '  %. /" ,O '/,D40 '

Litft-Otf Pressure - Predicted/Actual

  • Cf)O 4*/9 00 1 .... _/__a_
     .shim Thickness/80% Ultimate Pressure                        7/     ,7700      e. f 7r-,/                                   N/A UinseatedlBroken Wires         Z.-               Total effective wires after stressing                                 let
6. Date Bulk-filled If - 4 711. Bulk-Filling NCR's Time since Installation p 3cik Ine ressure Outlet remp.

Date end caps refilled:' Shop "-I- "71'45 Field if /'J-1"

7. Data compiled by Z? ,"'*-. ... Organization __ _ _.--

Date F________77_______

8. Additional Comments:
                                                                                                                            -q7          "71 -

Florida CRYSTAL RIVER UNIT NO* 3 ,Q Power REACTOR BUILDIti PPI:STRESSINC SYSTEM holwe Co*-q " TENDON 110STOPY D4~ON IDENTIFICATION N4UMBER '169121 CUT LECTiH _ V__ __ _ _ SHOP WASHER ID: PC /20 CR 14 Z FIELD WASHER ID: PC /22. CR

1. CAI/QA vendor inspection cover letter number-FPC I _________DAT_
2. Date tendon received on-site I "-I'S - -37 MR Number 3 3 1I .
3. Date Insta1l1d In conduit - " '- Installation NCR's I4 Wires removed 0 Wires replaced 0 Total Ineffective wires 0,
4. Date buttonheaded - If " " . SuttonheadipS B NCR's bad wires Accept. Iteheads 0 Total Ineffective wutes /
5. Date stressed Q) 7 7.5 Stressing NCR's _

Date restressed Restressing NCR's _ SHOP END FIELD END TOTAL Elongation (1500 psi to 802 ult.)-Pred./Act. -e/r/pr/r J-.- Lift-Off Pressure - Predicted/Actual _7 70O 6730 r&0 UIA N6?$0 Shim Ihickness/8Ol Ultimate Pressure /r/7700 S'/& I7d NIA Unseated/Broken Wires C7 Total effective vires after stressing /42-

6. Date Bulk-f 111.4 _j I - y- - -7)p Bulk-Filling NCR' _________________

Time since Installation. k ný_ 1-,. Inlet Pressure .QO..4 ._ outlet Temp. ° Date and caps refeilled: Shop &/4--i79 Field .- _- 14--75

7. Data compiled by Organization ______________

Date -A

8. Additional Comments:

) nn7 71i

_ ) Florda Power S CRYSTAL RIVER UNIT RD.3 ELCOR BUILDINO PRESTRESSING SYSTEM CA.II £,o 2.,51 0t TENION HISTORY TENDON IDEnTIFICATION EH 2( . arr CT LENGTH SHOP 'WASHER -ID: PC C& YIELD WASHER ID: 70C_" CR

1. CAI/QA vendor Inspection cover letter uumber-.PC I DATE "
2. Date tendon received ou-site *_

_ Number

3. Date Installed In conlduLt _nstallation NC_*_a
       ,ires removed    ,,"                Vires replaced                               Total lueffeii.ve irrer..
'4. Date buttonheaded                                        ._      uttonheading NCs.

Bad vires Accept. Rheadsd Total ZlUeffective vwies _

5. Date stressed ,. Stressing NCR'sa Date restressed Rsstresstns NCR's SHOP ED FIELD END 7OTAL K. 0loutation (1500 psi to 80o ult.)-?red.Ikc:. L....
  • _ e ' .*

L11ft-Off Prsi -?redicted/Actual(anV) I'1fZS Hs7.5# 1ZCIP ( f L .CV-oKf- F---- Shia Thickness/80 Ultimate Pressure "W , , A t- 640 POO. Upseated/Broken Wires )- I $"". F Total' effective wires after utressLuul

6. Date bulk-filled _ulk-FMIin 1CR'._s Tine since installation l*.et Pressute Outlet Temp.

Data end caps refilled: Shop yield __.....

7. Data compiled by OrganizatIon _

IV Date __ _ _._ _". S. Additional Comments:

                    /rI~!5ŽrC~roAJgAF                              T4ý-         Ce~t
      Ži)           -adc-FP -- oC                         (Ste-        sA-ý Al                                         /SW-O 1      r-6to0) 2121~ Il&LbAo SWL&)0~"                                    On         '--AMlALt,                  ('

907 716

C CMT.AL Xrga ,MT W. 3

                                                               -"L                 .*hLSIG 1U113M8NG             Mg
                                                              -     IN KMrnW-                it-Co                                               Tan   o. 4G21
                                      -tin a"f MMITION                                           STMUW leaptIle                          Ag.        Ibis    111"t-   Total                    AV$*. 4       IE      Sitan-   Teotl    lneits l1ids.

fruied oao fore fares 7bliehie &ties ltileI ems Pee te Thiaehaee l itlee ir feotiv lTosperecuw of Oviglkal 9-6 1624 551/ h* N4 ILL

  • Itrekialg fr 421653 3j63/41* J /&AlL NL A NI& A&A lot 9-6 1458 3 /4 Xu/A 14*3 S 314 V/A 1-10-78 7- i 1546 1502 3 9/16 VIA 163 1514 1536 5 9/16 VIA ) 106 41
   -                    J I-   -7W               !-   AA                    Al                     .1_1              AIA     .-..                                 &..
         -                 uz         -                -                                  l Je-vow a.
-            -          -                    --                          a                           -            -

w - - - - - - -- --- -- S I!b' 311

0 ATTACHMENT I Sheet I of I QA or Vital Records Change Form FORM RDC-NGGC-0001-1-15 Original Document Number/Description: _.ot O -Zc. Ao. (o J 0 Li3 -01 Original Record Number (RMS (Record Nbr), STAIRS (Din Nbr), SEEK (RAN Nbr): Original Document Date: 12. 7 '7 Reason For Correction p

      . _, _ . _G-  ,.
                        #U,                 -,    ..       .. Vgaj..*.. CI'&,-      ,,,,.,,

S:T. AO/3~ddAI - RAJdII tZA..f~ ~ ~L ~ Iv.i4.,. ,~yjij~jf* *O S. 1 (Z AC6 OF-I F" r CIO -SVI C Approved By: Signature OriginatingOrganization Date NOTE: When transmitting the Correction or Supplement add "Supplement" to the document title field. QA RECORD IRDC-NGGC-0001 Rev. 17 1 Page 35 of 66 1

Evaluation and Acceptance of PSC Tendon Surveillance Results (3 0 th Year) The surveillance was conducted by Precision Surveillance Corporation (PSC) between October and November 2007 with CR-3 site overview utilizing SP-182 as the controlling site procedure. The actual procedures used for testing activities were contained in the PSC In-Service Inspection Manual for Progress Energy Crystal River Unit 3 (N1002) Revision 0. This 30V year surveillance met all the requirements of ASME Section XI, subsection IWL as modified by 10CFR50.55(a). The results of this surveillance have shown that the CR-3 containment structure has not experienced abnormal degradation and is projected to meet its minimum design criteria until the end of its current forty-year life. Code Compliance. IWL-2400: Schedule CR-3 performed the Structural Integrity Test in November of 1976. The code required the 30"' year surveillance is to be performed in November of 2006 +1-1 year. Since the 30" surveillance was performed between October and November 2007 this requirement was met. IWL-2510: Examination of Concrete The concrete was visually examined (VT-3) during the 30'h surveillance period. For areas that required further evaluation, a detailed visual exam (VT-1) was performed. The data was reviewed by the Responsible Professional Engineer (RPE) and found to

  • be acceptable.

IWL-2520: Examination of Unbonded Post-Tensioning Systems The random selection for CR-3 resulted in three Dome, three Vertical and, 5 Horizontal tendons being selected. These tendons were D129, D212, D238, 12V01, 45V20, 61V17, 46H21, 42H46, 51H34, 62H30 and 13H36. Itwas later determined that 12V01 (identified as a control tendon) was retensioned during the prior surveillance. Per IWL-2521 (b), 61V08 was selected as a substitute control tendon. Although not identified as an exempted tendon the IWL-2524 and IWL-2525 examinations were performed on the original selected tendon (12V01). IWL-2522: Tendon Force Measurements Tendon force measurements were performed on the selected sample and adjacent tendons as required. All vertical and dome tendons tested this inspection period were found to have forces greater than 95% of the corresponding predicted force. Of the hoop tendons, 42H46 and 51H34 were observed with forces above 95% of their predicted force. Tendons 62H30, 46H21 and 13H36 were found to have forces below 95% but above 90% of their corresponding predicted forces. While monitoring the forces of tendons adjacent to the respective surveillance tendons, PSC NCR's FN1002-001, 002, 003, 006, 007, 008, 009, 011 and 012 were generated to document the conditions and were dispositioned by CR03ENG in AR's 251318 and 252558. After the completion of testing the adjacent tendons, all tendons with an as-found force below 95% were restored to an as-left force --0%, +6% of their corresponding predicted force in accordance with PSC Procedure SQ9.0. The acceptance criteria of IWL-3221.1 were met for all the tendons with the exception of tendon 62H30, 13H36. and 46H21. The analysis of the as-found lift-off forces contained in the PSC final report, demonstrates that the as-found condition is acceptable for these tendons. Part of the analysis is a

discussion on the calculation of the predicted base value for each tendon. Historically CR-3 has found numerous tendons below the 95% of predicted base value, but demonstrated the acceptability of the containment with the as-found condition. IWL-2523: Tendon Wire and Strand Sample Examination and Testing Tendons D238. 61V17 and 51H34 were detensioned and a wire removed for testing. The acceptance criteria of IWI-3221.2 were met for all wire samples. IWL-2524: Examination of Tendon Anchorage Areas A VT-I visual examination was performed for all tendons when the end cap was removed. The detailed inspections did not reveal any cracks in the concrete adjacent to the bearing plates nor in any of the anchorage components. There were several instances of missing or broken wires observed. These instances were compared against the acceptance criteria contained in IWL-3321.3 and SP-182 and found to be acceptable. Therefore no further analysis was required for these conditions. IWL-2525: Examination of Corrosion Protection Medium and Free Water There were no instances of free water in the corrosion protection medium. The acceptance criteria of IWL-3221.4 were met for all samples taken. IWL-2526: Removal and Replacement of Corrosion Protection Medium The amount of grease removed and replaced was recorded for each tendon. 10CFR50.55(a)(b)(viii) Examination of Concrete Containments (a) During the visual exam, all grease caps were examined for leakage and deformation. No grease leakage or deformation was observed. Minor weepage continues to be observed on the intermediate building buttresses. See (d) (3) below for further discussion. (b) The evaluation of the trend data does not indicate an adverse trend. (c) The elongation of any tendon during restressing did not vary from previously recorded results by more than 10% and therefore was acceptable. (d) The following items shall be included in the RFO 15 NIS-1 report: (1) The presence of water in the grease sample. There was no water recorded for this surveillance. (2) The absolute difference between the amount of grease removed and the amount replaced did not exceed 10% of the net duct volume in any of the tendons. (3) Detection of grease leakage (if found). During the tendon accessibility walkdown PSC noted that small grease/oil leaks were occurring on multiple tendon caps, which were located inside existing structures that adjoin the containment building (adjacent to main steam and feedwater penetrations). The substance displacing from the tendon cap is actually the oil portion from the original P2 grease that has separated. This is a common occurrence that we has been noted throughout many plants which perform tendon surveillances. This condition does not correspond to the system's degradation. A small amount of oil can cause a large aesthetically unpleasing condition. On buttresses without any coating, the oil is absorbed into the concrete, leaving very little signs of leakage. However, in the existing condition, the coated surface does not allow for the absorption to occur.

Therefore, the oil continues to displace down the buttress face. PSC 0 recommends this condition be monitored and cleaned on a periodic. Gasket replacement can be performed on the tendon cap, however the oil will continue to leak from the cap based on PSC's experience. The labor and material required for the gasket replacement is not cost effective and PSC does not recommend performing such task. Based on the evaluation of the In-Service Inspection results of the 3 01h Year Containment IWL Tendon Surveillance performed at CR-3 have been determined to meet the code requirements and that the containment structure has experience no abnormal degradation of the post-tensioning system. The containment post-tensioning system is performing in accordance with the design requirements and is expected to continue to do so for the remaining life of the unit. Prepared By: Rick Portmann (IWE/IWL P ogra Owner) Reviewed By: Joe Lese signated CR3 IWE/IWL RPE) Reviewed By: Loyd Larramore (ANII) 0

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: i I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 3OW"YEAR CONTAINMENT IW!. INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I DOCUMENT COVER SHEET I Document No: CR-1002-504 I

Title:

FINAL REPORT FOR THE 30TH YEAR CONTAINMENT IWL INSPECTION I I I I I I I I I I I 0 Submittal Issue C.E. COX 01/24/08 j--__________ P.C. SMITH 01/24/08 Prepared By Date Reviewed By Date I No. Description PSC SIGN OFF I REVISIONS RETAINED INHARD COPY 2E(--& S3/0(02$ I

I DOCUMENT NUMBER: CR-NIO02-504 REVISION: 0 PAGE: ti I DOCUMENT TITLE PROJECT TITLE: FINAL REPORT FOR THE 30TM YEAR CONTAINMENT M&. INSPECTION 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24108 I ABSTRACT The purpose of this report is to present the results of the 2007 3 0 " Year Containment IWL Inspection of the Progress I Energy Florida Crystal River Unit 3 Containment Structure post tensioning system. The results of this investigation are discussed in detail in the body of this report and are summarized as follows:

1. The sheathing filler (grease) samples were tested and found to have acceptable levels of water-soluble ions, I (Chlorides, Nitrates, and Sulfides). All tendon ends had a moisture content within acceptable limits. All neutralization numbers were above the IWL requirement of 0.0 mg KOHIg value and acceptable. No visible breakdown of the grease was noted either by color or consistency for all grease samples tested.

I 2. No tendon end exhibited water during removal of the grease cap, detensioning or around the tendon anchorage.

3. Acceptable corrosion levels were found on all tendon ends and no cracks were found on any anchorage I components. Cracks in the concrete surrounding the bearing plates were all within allowable tolerance of
          < 0.010"
4. Additional missing or protruding buttonheads were found on two of the inspected surveillance tendons. The I conditions have been reported via NCR's FN1002-004 & FN1002-010 (12V01) and FN1002-005 (61V17) to CR03ENG for disposition.
5. The IWL baseline concrete examination for Unit 3 was required to be completed by September 10. 2001.

The subsequent required examination of the containment concrete was performed during this 30e Year I period. However, all of the examinations associated with this IWVrequirement have been performed by the Utility and the results are reviewed and reported by CR03ENG.

6. The hydraulic jacks used for liftoffs, detensioning and retensioning tendons were calibrated and found to be I within an acceptable variation of +/- 1.5%.
7. All surveillance tendons monitored for forces this inspection period were found to have forces greater than 95% of the corresponding predicted force OR. iffound below 95%, had their adjacent tendons inspected U until one tendon, on both sides of the original scope tendon, met the lift-off force criteria. All tendons, both original and adjacent found below 95% were restored to an As left force of -0%, .6% above predicted force.
8. The detensioned tendons were retensioned with acceptable elongations and acceptable force levels. All I test wires removed from detensioned tendons were found to have acceptable corrosion levels and acceptable yield and tensile tests.
9. All tendons were resealed and regreased to acceptable levels in accordance with S012.1 of the PSC I Surveillance Procedure, which is included in Appendix F.
10. A comparison of "As-found" force levels to the original force levels was made in an effort to detect any evidence of system degradation. The amount of force loss since the original installation is comparable to the losses of other plants of this age and does not show any evidence of system degradation.

I Based on the data gathered during the 2007 300 Year Containment IWL Inspection and reported herein, the conclusion is reached that no abnormal degradation of the Post Tensioning System has occurred at the Progress Energy Florida Crystal River Unit 3 Containment Structure. I I I I I

I I DOCUMENT NUMBER: CR-NlO02-504 DOCUMENT TITLE: REVISION: 0 FINAL REPORT FOR THE 30'," YEAR CONTAINMENT IMA.INSPECTION PAGE: it PROJECT TITLE: 30'M YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I fl6-ULFMET COVFR SHEET I I ARqTRAlrT

1.0 INTRODUCTION

li I I TABLE 1:30. YEAR SURVEILLANCE SCOPE OF WORK TABLE 2: 30Tm YEAR ADDITIONAL SCOPE OF WORK: ADJACENT TENDONS 2 3

   *in amDyriI I Amirp DoflI'IIID                                                                    A I

dlk*V 3.0 SHEATHING.FILLER ANALYSIS a

                                                                                                     '.5 TABLE 3: VERTICALS-LABORATORY ANALYSIS OF SHEATHING FILLER                                           5 I TABLE 4: HOOPS-LABORATORY ANALYSIS OF SHEATHING FILLER TABLE 5: DOMES-LABORATORY ANALYSIS OF SHEATHING FILLER 6

6 7 4.0 ANC HORAGE COMPONENTS I TABLE 6: VERTICALS - S06.0 - GREASE CAP REMOVAL TABLE 7: HOOPS - SQ6.0 - GREASE CAP REMOVAL 7 7 8 TABLE 8: DOMES - S06.0 - GREASE CAP REMOVAL 8 I TABLE 9: 13H36 ADJACENT HOOPS - S06.0 - GREASE CAP REMOVAL TABLE 10: 46H21 ADJACENT HOOPS - S06.0 - GREASE CAP REMOVAL 9 9 TABLE 11: 62H30 ADJACENT HOOPS - SQ6.0 - GREASE CAP REMOVAL 10 I TABLE 12: ORIGINAL SCOPE - SQ6.1 - INSPECT FOR WATER TABLE 13: ADDITIONAL SCOPE - S06.1 - INSPECT FOR WATER 10 11 TABLE 14: VERTICALS - S08.0 - ANCHORAGE CORROSION CONDITION 12 I TABLE 15: HOOPS - S08.0 - ANCHORAGE CORROSION CONDITION TABLE 16: DOMES - S08.0 - ANCHORAGE CORROSION CONDITION TABLE 17: 13H36 ADJACENT HOOPS - S08.0 - ANCHORAGE CORROSION CONDITION 13 13 14 I TABLE 18: 46H21 ADJACENT HOOPS - S08.0 - ANCHORAGE CORROSION CONDITION TABLE 19: 62H30 ADJACENT HOOPS - S08.0 - ANCHORAGE CORROSION CONDITION TABLE 20: VERTICALS - S08.0 - BUTTONHEAD COUNT 15 16 17 TABLE 21: HOOPS - SQ8.0 - BUTTONHEAD COUNT 18 I TABLE 22: DOMES - S08.0 - BUTTONHEAD COUNT TABLE 23: 13H36 ADJACENTS - S08.0 - BUTTONHEAD COUNT 18 19 TABLE 24: 46H21 ADJACENTS - SQ8.0 - BUTTONHEAD COUNT 20 I TABLE 25: 62H30 ADJACENTS - S08.0 - BUTTONHEAD COUNT 5.0 S08.3 - CONCRETE INSPECTION 21 22 I TABLE 26: VERTICALS - SQ8.3 - CONCRETE INSPECTION 6.0 TENDON ACCESSIBILITY 22 21 V TABLE 27: 12V & 23V SERIES - TENDON ACCESSIBILITY MATRIX 23 I TABLE 28: TABLE 29: 34V & 45V SERIES - TENDON ACCESSIBILITY MATRIX 56V & 61V SERIES - TENDON ACCESSIBILITY MATRIX 24 25 TABLE 30: 13H SERIES - TENDON ACCESSIBILITY MATRIX 26 I TABLE 31: TABLE 32: 35H SERIES - TENDON ACCESSIBILITY MATRIX 51H SERIES - TENDON ACCESSIBILITY MATRIX 27 28 TABLE 33: 42H SERIES - TENDON ACCESSIBILITY MATRIX 29 U TABLE 34: TABLE 35: 46H SERIES - TENDON ACCESSIBILITY MATRIX 62H SERIES - TENDON ACCESSIBILITY MATRIX 30 31 TABLE 36: l000 SERIES - TENDON ACCESSIBILITY MATRIX 32 I

I DOCUMENT NUMBER: CR.N1002-504 REVISION: 0 PAGE: iv I DOCUMENT TITLE PROJECT TITLE: FINAL REPORT FOR THE 3 0 '" YEAR CONTAINMENT IWI INSPECTION 30TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 I TABLE 37: D200 SERIES - TENDON ACCESSIBILITY MATRIX 33 I TABLE 38: D300 SERIES - TENDON ACCESSIBILITY MATRIX 7.0 HYDRAU.,LC JACK .CALIBRATIONS 34 35 TABLE 39: HYDRAULIC JACK CALIBRATIONS 35 I 8.0. TENr )ON UFTOFFS TABLE 40: VERTICALS - S09.0 - MONITORING TENDON FORCE 37 I TABLE 41: HOOPS - S09.0 - MONITORING TENDON FORCE TABLE 42: DOMES - S09.0 - MONITORING TENDON FORCE TABLE 43: 13H36 ADJACENTS - S09.0 - MONITORING TENDON FORCE 37 38 38 I TABLE 44: 46H21 ADJACENTS - S09.0 - MONITORING TENDON FORCE TABLE 45: 62H30 ADJACENTS - S09.0 - MONITORING TENDON FORCE TABLE 46: ADJACENTS- TENDON FORCE RESTORATION 39 39 40 TABLE 47: AVERAGE AS-FOUND NORMALIZED TENDON FORCE I 9.0 WIRE INSPECTION AND TESTING 41 42 TABLE 48: S010.2 &S010.3 -VISUAL INSPECTION AND TENSILE TESTING OF WIRE 42 I "V*W TABLE 49: Tuf%1~h ir DEWTb~eifbLlhIf ALMf SQ11.0- TENDON RETENSIONING 0=0@MA"OMV 43 I TABLE 50: TABLE 51: TABLE 52: VERTICALS - S012.0 - GREASE CAP REPLACEMENT DOMES - SQ12.0 - GREASE CAP REPLACEMENT HOOPS - SQ12.0 - GREASE CAP REPLACEMENT 45 45 46 TABLE 53: 13H36 ADJACENTS - SQ12.0 - GREASE CAP REPLACEMENT I TABLE 54: TABLE 55: 46H21 ADJACENTS - SQ12.0 - GREASE CAP REPLACEMENT 62H30 ADJACENTS - S012.0 - GREASE CAP REPLACEMENT 46 47 47 TABLE 56: VERTICALS - S012.1 - GREASE LOSS VS. GREASE REPLACEMENT 48 I TABLE 57: TABLE 58: HOOPS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT DOMES - S012.1 - GREASE LOSS VS. GREASE REPLACEMENT 49 49 TABLE 59: ADJACENTS- S012.1 - GREASE LOSS VS. GREASE REPLACEMENT 50 I TABLE 60: 11.0 ADJACENTS - SQ1 2.1 - GREASE LOSS VS. GREASE REPLACEMENT COMPARISON WiTH ORIGINAL INSTALLATION DATA 51 I TABLE 61: COMPARISON WITH ORIGINAL INSTALLATION DATA 12.0 STFtESSING TREND ANALYSIS 52 53 TABLE 62: VERTICALS - REGRESSION ANALYSIS INPUT DATA 53 I TABLE 63: VERTICALS - REGRESSION ANALYSIS OUTPUT DATA TABLE 64: HOOPS - REGRESSION ANALYSIS INPUT DATA 54 55 TABLE 65: HOOPS - REGRESSION ANALYSIS OUTPUT DATA 56 I TABLE 66: DOMES - REGRESSION ANALYSIS INPUT DATA TABLE 67: DOMES - REGRESSION ANALYSIS OUTPUT DATA 57 58

13.0 CONCLUSION

59 I IIAA II'*FV 00r12Pr frWlflfU~klT~ I -. 04

                                                                                                       ~, I I

I

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: v DOCUMENT TITLE: FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 301N YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 APPENDICES NO. OF PAGES APPENDIX A: SURVEILLANCE DATA SHEETS 393 APPENDIX B: LABORATORY ANALYSIS OF SHEATHING FILLER 12 APPENDIX C: NON-CONFORMANCE REPORTS 14 APPENDIX D: FIELD CHANGE REQUESTS 2 APPENDIX E: JACK CALIBRATIONS 32 APPENDIX F: SURVEILLANCE PROCEDURE 247 I I I I I U I I I I

I DOCUMENT NUMBER: CR-NI002-504 REVISION: 0 , PAGE: I I DOCUMENT TITLE. PROJECT TITLE: FINAL REPORT FOR THE 30'm YEAR CONTAINMENT IWL INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I

1.0 INTRODUCTION

This report details the 30* Year Containment IWL Inspection of the Progress Energy Florida Crystal River Unit 3 U containment structure. The Containment Structure surveillance program is a systematic means of assessing the quality and structural performance of the post tensioning system and exterior concrete surface. The tendon surveillance program consists of a periodic inspection of the condition of a selected group of tendons. I This program provides confidence in the condition and functional capability of the system, and an opportunity for timely corrective measures ifadverse conditions are detected. Physical tendon surveillance consists of sheathing filler inspection and testing, anchorage inspection, force monitoring, inspection and tensile testing of removed wire I samples (for detensioned tendons), retensioning of detensioned tendons and replacement of sheathing filler after completion of all inspections. Crystal River Unit 3 is currently committed to meet the requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section X1, 1992 Edition with 1992 Addenda. Sub-Section IWL I "Requirements for Class CC Concrete Components of Light-Water Cooled Plants". This program is also subject to the limitations and modifications of 10 CFR 50.55a(b)(2), 10 CFR 50.55a(g)(4), and 10 CFR 50.55a(g)(6). The 30m Year tendon surveillance at the Crystal River Unit 3 began on October 8, 2007 and ended on December 6. U 2007. This surveillance period consisted of a Physical Inspection on Unit 3. The Crystal River Reactor Building Structural Integrity Tendon Surveillance Program (SP-182), PSC Surveillance Procedures, the Code of Federal Regulations 10 CFR 50.55a and ASME Secton Xl. Sub-Section IW., define the specific requirements for selection of the inspection tendons as well as specific requirements and acceptance criteria for the performance of the I inspection. A copy of the PSC Surveillance Procedures is included in Appendix F of this Surveillance Report. The tendon selection for the Surveillance is listed in the following Tables 1 and 2. I I I U I I I I I I RETAINED IN HARD COPY

                                            ~~Ec(X                 Z$IOo~

I OOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 2 I DOCUMENT TITLE: PROJECT TITLE. FINAL REPORT FOR THE 30'M YEAR CONTAINMENT IWL.INSPECTION 30"' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01I24/08 II I iý'TA13LE 1: 3 OTM YEAR SURVEILLA'NJC-tiSc'-i:ýýiý6ýIW'dFýKý,r VISUAL VISUAL PHYSICAL PHYSICAL 0 0. n. TENDON a 1* 0 ('I COMMENTS I END 4.w C! NY U) O3 a/ a (I) a to C* CY 0* 12V01 D&G 0 * * *

  • s STEAM ZONE @ DOME I 45V20 61V17 D&G D&G 0

a a a

  • a a a ORIGINAL SCOPE DETENSION 61V08 II 13H36 D& G ST. 1 &3 0

a 0 a a a a a COMMON (REF. FCR-FN1002-O01) 1 42H46 46H21 ST. 284

                              &4 BT. 4 &6
  • 0
                                                       *  *
  • a STEAM ZONE @ BT2 COMMON 51H34 ST. 5 & 1 0 a a a *
  • a a a a DETENSION, STEAM ZONE @BTI I 62H30 46H07 ST. 5 &2 T.4 &6 0 * *
  • STEAM ZONE @ST 2 ALTERNATE I D129 0212 BT. 3 & 5 BT. 1 &3 0

a a a a a STEAMZONE @BT3 COMMON I D238 BT, 4 & 6 BT. I & 5 B337 0 * *

  • 0* * *
  • a DETENSION ALTERNATE SO 6.0 - GREASE CAP REMOVAL SO 90 - MONITOR TENDON FORCE I SO SO SO 6.1 -

7.0 - 8.0 - INSPECTION FOR WATER AQUIRE GREASE SAMPLES ANCHORAGE INSPECTION SO 10.2 - SO 10.3 - SO 11.0 - SQ 12.1 - TENDON WIRE INSPECTION TESTING TENDON WIRES RETENSION TENDONS GREASE REPLACEMENT SQ 8.3 - CONCRETE INSPECTION II I I I I Once Installed on the Containment Dome, the Frames support the work platform and a I hoist for the hydraulic ram. I I U fi 1,9,

            ,,lJI IL#%0~ %.%J~V"
                       , kil 11 1I
                               ,,,-LSt~
                               %J.JIlq V..s I .,  f

I DOCUMENT NUMBER CR-NI002-504 REVISION 0 PAGE: 3 I DOCUMENT TITLE: PROJECT TITLE. FINAL REPORT FOR THE 30T" YEAR CONTAINMENT IWL INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24108 I OALSCOPEHYSIC k'AL I I TENDON ABL 21 END q V VE~ISU COMMENTS I I 4O 0 - a 0Y 0

                                               ,,a 0Y o,,
                                                      ,o C1)              to YC          oo, 13H33           BT. 1 & 3       *
  • 0 0* DUE TO LOW LIFT OFF ON 13H36 U 13H34 13H35 BT.I&3 BT. 1 &3 0
                                    *0 0             0 0

0 0 0 DUE TO LOW LIFT OFF ON 13H36 DUE TO LOWLIFT OFF ON 13H36 I 13H37 13H38 4OH19 BT. 1 &3 BT. 1 &3 BT. 4 &8 0 a 0 0

  • e 0

DUE TO LOW LIFT OFF ON 13H38 DUE TO LOWLIFT OFF ON 13H38 DUE TO LOW LIFT OFF ON 46H21 I 46H20 46H22 BT. 4 &6 BT. 4 &6 0 a 0 DUE TO LOW LIFT OFF ON 46H21 DUE TO LOW LIFT OFF ON 46H21 46H23

  • I BT. 4 &6 0 0 DUE TO LOW LIFTOFF ON 46H21 46H24 BT.4&6
  • 0 0 DUE TO LOW LIFT OFF ON 461-121 62H29 BT. 6 & 2
  • DUE TO LOW LIFT OFF ON 62H3O I 62H31 62H32 BT. 6 & 2 BT.6 & 2 a

DUE TO LOW LIFT OFF ON 62H3O DUE TO LOW LIFT OFF ON 62H30 62H33 BT66 & 2 0 0 0 DUE TO LOW LIFT OFF ON 62H3O I 62H34 ST.6&2 DUE TO LOW LIFT OFF ON 62H30 D I NOTE.. Physical inspection of 62H31 & 62H32 were only performed on the Buttress 2 end. Access restictions limited the Buttress 6 to visual inspecions only SO 6.0 - GREASE CAP REMOVAL SO 9,0 - MONITOR TENDON FORCE I So SO SQ SO 6.1 - 7.0 - 8.0 - 8.3 - INSPECTION FOR WATER AQUIRE GREASE SAMPLES ANCHORAGE INSPECTION CONCRETE INSPECTION SO SO SQ SQ 10.2 - 10.3 - 11.0 - 12.1 - TENDON WIRE INSPECTION TESTING TENDON WIRES RETENSION TENDONS GREASE REPLACEMENT I I I I I RETAINFD IN HARD COPY I b.*-k 30310&,=

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 4 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30"' YEAR CONTAINMENT IWL INSPECTION 30r' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I 2.0 SURVEILLANCE PROCEDURES I Appendix F of this Surveillance Report contains the detailed procedures for conducting the tendon surveillance. The surveillance consists of the following steps: I 2.1 2.2 Visual examination of sheathing filler grease. Analytical testing of sheathing filler grease samples. I 2.3 2.4 Inspection of the anchorage assembly of each of the surveillance tendon ends for deleterious conditions such as corrosion, cracks, broken or missing wires or buttonheads. Inspection of concrete surrounding the bearing plate. I 2.5 2.6 Measurement of the liftoff force for each physical surveillance tendon. Removal of one wire from surveillance tendons, which are detensioned for examination and testing. 2.7 Retensioning of detensioned tendons and measuring the corresponding tendon elongation. I 2.8 Visual inspection for corrosion, pitting, or any significant physical change of the removed wires. 2.9 Testing of wires removed from tendons for yield strength, ultimate strength, and percentage elongation at I 2.10 failure. Resealing tendon caps and replacement of lost sheathing filler into the tendon duct and cap. 2.11 Evaluation of test and inspection results to assess the general condition of the post tensioning system. I I I I I I I I I I RETAINED IN HARD COPY 46 93 1O4va

I DOCUMENT NUMBER: CR-NAL02-504 I REVISRPTF: 0 PAGE: 5 DOCUMENT TITLE: FINAL REPORT FOR THE 301" YEAR CONTAINMENT IW INSPECTION PROJECT TITLE: 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124=0 I I 3.0 SHEATHING FILLER ANALYSIS 3.1 A sample of sheathing filler (grease) was removed from each end of the surveillance tendons. Chemical tests were performed on each sample by Suburban Laboratories, Inc. The results are presented in I Appendix B and are summarized in Tables 3 thru 5. In Tables 3 thru 5, "N/A" indicates that samples were not required for testing. 3.2 The maximum acceptable limits are: 10 percent by weight for water content and 10 parts per million for I 3.3 water-soluble chlorides, nitrates and sulfides. All samples that were tested met the acceptance criteria as stated above. The sample testing report also includes the neutralization number of each grease sample. This test is generally performed by grease manufacturers on new batches of the product and is a method of I determining the overbase additives in the grease. Degradation of the sheathing filler will yield a change in the acidity of the filler material as well as an increase in the ion content. The required neutralization number for the mixture of grease at Crystal River Unit 3 is greater than 0.0 mg KOH/g. This requirement I 3.4 was achieved by all samples tested. No detrimental condition was noted on any grease samples, and no visible breakdown of the grease by either color or consistency was noted on any of the tendons tested. I I TENDON END ION GURN TMUMIO CHLORIDE SULFIDE PPM) NITRATE WVY, I CONTENT (%wt) ilm No. -;,ý_ (mag KOHfg) TOP 40.50 '0.50 '0.50 0.19 71.5 I 12V01 BOT TOP 0.50

                                           '0.50
                                                        <0.50         <0.50
                                                                      '0.50 10.50 0.31 0.19 51.9 72.3 45V20 I                        BOT TOP 0.50 0.50
                                                       '0-50
                                                        <0.50 C0.50
                                                                      '0.50 0.34 0.16 60.2 68.4 61V08 I       61V17 DOT TOP 0.50 0.50
                                                        '0.50
                                                        <0.50
                                                                      <0.50
                                                                      <0.50
                                                                                    <0.10
                                                                                    <0,10 48.0 61.5 BOT                 0.50        <0.50         <0.50         <0.10            43.4 I                                      ITES ACCEPTANCE LIMITS LIMITS WATER SOLUBLE CHLORIDE                   LESS THAN 10.OPPM I                   WATER SOLUBLE NITRATES WATER SOLUBLE SULFIDES WATER CONTENT NEUTRALIZATION NO.

LESS THAN 10-OPPM LESS THAN 10.0PPM LESS THAN 10% DRY WEIGHT GREATER THAN 0.0 mg KOH/ I I After the grease cap is removed, samples of grease are taken for all tendons requiring a I visual or physical inspection, I MOTFAIKS~r g* 3e IKI ILA01fl C'NDIJ I 0v_'3rrr

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 6 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 3 0TH YEAR CONTAINMENT IWL INSPECTION 30'T YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I I -- ION CONCENTRATION (PPM) CHLORIDE SULFIDE MwtO (ma KOHlal BT 1 0.50 C0.50 '0.50 033 454 I 13H36 ST 3 BT 2 1.0 0.50

                                            <0.50
                                            <0.50
                                                         '0.50
                                                         <0.50 0.10
                                                                        <0 10 46,3 40.4 42H"4 I  -46H21 BT 4 ST 4 0.50 0.50
                                            <0.50
                                            <0.50 C0.50
                                                         <0.50
                                                                        <0.10
                                                                        <0.10 43.1 55.7 BT6             0.50       <0.50        <0.50          <0.10          62.4 I   51 H34 BT 1 BT 5
                                <050 0.50
                                            <0.50
                                            <0.50
                                                         <0.50
                                                         '0.50 0.12
                                                                        <0.10 47.7 40.3 I   62H30 BT 2            0.50       <0.50         <0.50         <0.10          34.0 I

BT 6 0.50 <0.50 '0.50 '0.10 48.2 ACCEPTANCE LIMITS

                           .I                                   MITS WATER SOLUBLE CHLORIDE             LESS THAN 10.OPPM WATER SOLUBLE NITRATES             LESS THAN 10.OPPM I             WATER SOLUBLE SULFIDES WATER CONTENT NEUTRALIZATION NO.

LESS THAN 10.OPPM LESS THAN 10% DRY WEIGHT GREATER THAN 0.0 mg KOH/ U 1UtQOaND.lON (PPM) %WATER iiiiiiRjL I - 7ENO~ EN ICoENmT

                   -         CHLORDE ýU4J1O            NITIRATE        t%wt)

No. (mg KoHwo) I D0129 BT 3 BT 5 0.50 0,50

                                            '050
                                            <050
                                                          <050
                                                          '0.50 0.91 048 50.2 42.9 I    D212 BT 1 BT 3 ST 4 0.50 0.50 0.50
                                             <0.50
                                            <0.50
                                             '0.50 0.50
                                                          '0.50
                                                          <0.50 0.17 0.18 0.17 54,3 44.0, 45.2 D238 i                 BT 6            0.50       '0.50 ACCEPTANCE LIMITS
                                                          '0.50          '0.10         43.3 TEST                              LIMITS I             WATER SOLUBLE CHLORIDE WATER SOLUBLE NITRATES WATER SOLUBLE SULFIDES WATER CONTENT LESS THAN 10.OPPM LESS THAN 10-OPPM LESS THAN 10 OPPM LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO.                 GREATER THAN 0.0 mg KOH/

I I

I I DOCUMENT NUMBER: DOCUMENT TITLE. CR-N1002-504 REVISION: FINAL REPORT FOR THE 30" YEAR CONTAINMENT IWL INSPECTION 0 PAGE 7 PROJECT TITLE: 30TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I 4.0 ANCHORAGE COMPONENTS I In the following discussion, all procedures referred to are included in Appendix F of this report and all data sheets are included in Appendix A. 4.1 SQ6.0 - GREASE CAP REMOVAL U 4.1.1 Inspection of the anchorage components began by removing the grease cap (PSC Procedure SQ 6.0). Complete grease coating (100%) was found on all tendon ends inspected. The percentage of grease coverage was recorded on Data Sheet SQ 6.0 with the results tabulated in Tables 6 thru 11. I

                                       +4VRTIAL,          ý-;

WBLE6: I TENDON END GREASE CAP BUTTON HEADS GREASE COATING (%) ANCHOR HEAD SHIMS BEARING PLATE I 12V01 TOP BOT 100 100 100 100 100 100 100 100 100 100 I TOP 100 100 100 100 100 45V20 TOT 100 100 100 100 100 TOP 100 100 1030 100 100 61V08 I BOT TOP 100 100 100 100 100 100 100 100 100 100 61V17 I SOT 100 100 100 100 100 I I I I I Before the Grease Cap is removed, a plastic bag is taped to the concrete in order to catch any grease that I might fall during removal. I Ofto-W-A a& lpr% OIL a a 2 a WW% 10%,O--ýOWLB

 -"-r-   1 A1111`411=10 Ill I 1PkML) 9FZ
  • 5S-5 to &!ý,

I I DOCUMENT NUMBER. CR-Noo02-504 DOCUMENT TITLE: PROJECT TITLE: REVISION FINAL REPORT FOR THE 30"' YEAR CONTAINMENT IWL INSPECTION 30 TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER 0 DATE: PAGE: 8 01124108 Pro I I TENDON END GREASE BUTTON GREASE COATING (%) ANCHOR SHWAS BEARING CAP HEADS HEAD PLATE I 13H36 BT1 BT 3 100 100 100 100 100 100 100 100 100 100 I 42H46 BT 2 BT 4 100 100 100 100 100 100 100 100 100 100 ST4 t00 100 100 100 100 I 46H21 BTS BT1 100 100 100 100 100 100 100 100 100 100 I 51 H34 ST 5 100 100 t00 100 100 BT 2 100 100 100 100 100 62H30 U BT6 100 100 100 100 100 I _________ GREASE COATING (%) _ TENDON END REmse BUTTON ANCHOR SHgM B , .AING I 0129 BT 3 CAP 100 HWADS 100 HEAD 100 100 PLATE 100 I BT S 100 100 100 100 100 aT I 100 100 100 100 100 D212 ST 3 100 100 100 100 100 I 0238 BTA4 BT6 100 100 100 100 100 100 100 100 100 100 I I Grease Cans are removed using an impact wrench. While workers take care to I support the weight of the can filled with grease. I I l*=TAI fI=*lII, LJADrI tEYIDV I ~EC,* ~3dO(o~

I DOCUMENT NUMBER: CR-N1002-504 REVISION. 0 PAGE: 9 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30" YEAR CONTAINMENT IW. INSPECTION 304 YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 pW. I I TENDON END GREASE CAP BUTTON HEADS GREASE COATING ANCHOR HEAD SHIMS BEARING PLATE U 13H33 BT1 BT3 100 100 100 100 100 100 100 100 100 100 I 13H34 STI 8T3 100 100 100 100 100 100 100 100 100 100 BT1 100 100 100 100 100 I 13H35 BT3 BT1 100 100 100 100 100 100 100 100 100 100 13H37 I 13H38 BT3 BTI 100 100 100 100 100 100 100 100 100 100 I BT3 100 100 100 100 100 I GREASE COATING (9/6) I TENDON END GREASE CAP BUTTON HEADS ANCHOR HEAD SHIMS BEARING PLATE BT4 100 100 100 100 100 I 46H1 9 BT6 BT4 100 100 100 100 100 100 100 100 100 100 46120 I 46H22 3TO BT4 100 100 100 100 100 100 100 100 100 100 100 I BT8 100 100 100 100 BT4 100 100 100 100 100 46H23 BT6 100 100 100 100 100 I 46H24 BT4 BT6 100 100 100 100 100 100 100 100 100 100 I 1 I I

I I DOCUMENT NUMBER, CR-N1002-504 DOCUMENT TITLE: REVISION: FINAL REPORT FOR THE 30"h YEAR CONTAINMENT IWL INSPECTION 0 PAGE: 10 PROJECT TITLE: 30T" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24108 I I TABLE ~ ~ *O [HOOP - P.1: *6H0AJCN I0ý.-Gý GREASE COAlING (%) TENDON I END GREASE BUTrON ANCHOR BEARING I 8B2 CAP 100 HEADS 100 HEAD 100 SHIIMS 100 PLATE 100 62H29 I 62H31 BT6 BT2 100 100 100 100 100 100 100 100 100 100 BT6 100 100 100 100 100 I 62H32 6T2 BT6 100 100 100 100 100 100 100 100 100 100 I 62H33 BT2 BT6 100 100 100 100 100 100 100 100 100 100 6T2 100 100 100 100 100 I 620134 8T6 100 100 100 100 100 I 4.2 SQ6.1 - INSPECT FOR WATER 4.2.1 Water Inspections were recorded on Data Sheet SQ 6.1 and are summarized in Tables 12 and 13. No I water was found in any tendon inspected or around the tendon anchorage either during removal of the grease cap or detensioning. I SIURVEILLANCE TENDONS

                                     ~

TABLE ~ ~ Q. 12IRGNLStP NPC b'Ag SURVEILLANCE TENDONS I mlNDON END WATER QUANIMY (OZ.) TENDON END WATER QUANTITY TOP 0 I 12V01 8OT TOP 0 0 461H21 BT 4 BT8 ST 1 0 0 0 45V20 511H34 I BOT TOP 0 0 62H30 BT 5 81 2 BT 6 0 0 BOT 0 .0 I 61V17 TOP BOT 0 0 D129 BT 3 ST 5 0 0 0 I 13H36 BT 3 BT 2 0 0 D212BT BT 3 BT 4 1 0 0 42H46 D238 I

  • BT 4 I

0 I I I BT 6 I 0 I

DOCUMENT NUMBER: CR-NIOO?4504 REVISION: 0 PAGE: 11 I DOCUMENT TITLE. PROJECT TITLE: FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IWL INSPECTION 31T" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08

                                                                                                        ýN Prop I

I ADJACENT TENDONS WATER ADJACENT TENDONS WATER TENDON END QUANTITY TENDON END QUANTITY I 13H33 ST 1 0 46H23 " BT 4 0 BT 3 0 BT6 0 1 13H34 BT 1 BT 3 0 0 46H424 BT 4 BTG 0 a I 13H435 BT 1 BT 3 BT 1 0 0 0 62H29 BT 2 BT6 BT2 0 0 0 13K37 621431 U 13H38 BT3 STI1 0 0 62H32 BT6 BT 2 0 0 BT 3. 0 BT 6 0 I 481H19 BT 4 ST 6 0 0 621433 BT2 BT 6 0 0 I 481H20 BT 4 BT 6 6T 4 0 0 0 621434 BT 2 BT6 0 0 46H22 I BT 0 0 I I I I I I During all phases of the can removal I and inspections, the presence of water is noted and quantified. COPY IN HARD I RETAINED RETAINED IN HARD COPY ac* 3,2,3 1olv-

I DOCUMENT TITLE: FINAL REPORT FOR THE 30'M YEAR CONTAINMENT IW. INSPECTION PROJECT TITLE: 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 P1 gus I 4.3 SQ8.0 - ANCHORAGE CORROSION CONDITON 4.3.1 The anchorage components (anchorhead, buttonheads. shims and bearing plate),were inspected for corrosion level and cracks per PSC Procedure SO 8.0. The results were recorded on Data Sheet SQ 8.0 and are summarized in Tables 14 thru 19. In Tables 14 thru 19, "N/A" indicates the Anchor I.D. was not detected. 4.3.2 The corrosion level for all of the inspected anchorage assemblies and wire was either: I - Bright metal; no visible oxidation. Or2- Metal reddish brown color,no pilling. 4.3.3 No evidence of cracking was observed on any of the anchorage components. I TABLE 14: VERTICAL*S'-:ýtiD6rO'-ýýý!ýtH'OR*6'ttC-ORROSI;ONiCOtiDITION I I HEAD PLATE i 12V01 TOP BOT CR650 N/A 1 1

1. NONE
1. NONE 2, NONE 2. NONE
2. NONE 2. NONE TOP CR650 2 2, NONE 2, NONE 2. NONE 45V20 BOT CR260 1 2. NONE 2. NONE 2. NONE I 61V08 TOP BOT CR933 CR300 1

1

1. NONE
1. NONE 2, NONE
2. NONE
2. NONE
2. NONE I 61V17 TOP BOT CR943 CR256 1

1 1, NONE 2, NONE

2. NONE
2. NONE
2. NONE
2. NONE I INDICATES CORROSION LEVEL INDICATES XOF CRACKS 1 - Bright metal, No visible oxidation.

I 2 - Metal reddish brown color, no pitting. 3 - Metal having patches of red oxide I I I I I

I I DOCUMENT NUMBER: CR-NIO02-UM DOCUMENT TITLE: REVISION: FINAL REPORT FOR THE 30r" YEAR CONTAINMENT IWL INSPECTION 0 PAGE: 13 PROJECT TITLE: 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DA7E: 01124108 I I III 1 ~ I **' ***'*'11 CORROSION LEVEL, CRACKS TENDON I END ANCHOR BUTTON I.D. HEADS ANCHOR BEARING I BT I CR618 1 HEAD

2. NONE SHIMS 2, NONE PLATE
2. NONE 13H36 I 42H46 BT 3 BT 2 CR1167 CR1170 1

1

2. NONE I, NONE
2. NONE
2. NONE 2, NONE
2. NONE BT 4 CR529 1 1. NONE 2. NONE 2. NONE I 46H21 BT 4 BT 6 CR1141 CR167 1

1

1. NONE
1. NONE
2. NONE
2. NONE 2, NONE
2. NONE I 51H34 BT I BT 5 CR459 CR943 1

1

1. NONE
1. NONE
2. NONE
2. NONE
2. NONE 2, NONE BT 2 CR96 1 1. NONE 2. NONE 2. NONE I- 62H30 87 6 CR609 1 1. NONE 2. NONE 2, NONE I INDICATES CORROSION LEVEL " INDICATES # OF CRACKS 1 - Bright metal, No visible oxidation.

I 2 - Metal reddish brown color, no pitting. 3 - Metal having patches of red oxide. I A B6 T 16: DOE. NONE CO R IN ONE ,INO I ANCHOR LID. SUtTON HEADS- ANCHOR HEAD cmuwLV* EARING B~s~ PLATE I D1293 ST 5 CR995 CR886 2 1 NONE

2. NONE 2, NONE
2. NONE
2. NONE 2, NONE BT.1 CR1032 1 2. NONE 2. NONE 2. NONE I 0212 5T 3 CR1214 1 1, NONE 2. NONE 2. NONE BT 4 CR657 1 1. NONE 2. NONE 2. NONE U 0238 FT 6 CR1029 1 1. NONE 2. NONE 2, NONE I INDICATES CORROSION LEVEL INDICATES # OF CRACKS 1 - Bright Metal, No visible oxidation.

2 - Metal reddish brown color, no pitting. I 3 - Metal having patches of red oxide. I

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 14 DOCUMENT TITLE: FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IVYL INSPECTION PROJECT TITLE: 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I I TAL 7:I11i A DAENIPýlt A AN OAE-6R'ý1*0,N6Nb NA ANCHOR BUTTON CORROSION LEVEL, CRACKS TENDON END I.D. HEADS ANCHOR BEARING I BT 1 CR518 1 HEAD

1. NONE SHIMS 2, NONE PLATE 2, NONE 13H33 I 13H34 BT 3 BT 1 CR1200 CR514 I

1

2. NONE
1. NONE
2. NONE
2. NONE 2, NONE
2. NONE ST 3 CR1159 I 1. NONE 2. NONE 2. NONE I 13H35 BT I ST 3 CR510 CR1158 1 1 1. NONE
2. NONE
2. NONE
2. NONE 2, NONE
2. NONE I 13H37 BT I BT 3 CR509 CR1272 1

1

1. NONE
1. NONE
2. NONE
2. NONE
2. NONE
2. NONE BTI CR614 1 1. NONE 2. NONE 2. NONE I 131H38 BT 3 CR710 1 2. NONE 2. NONE 2. NONE I INDICATES CORROSION LEVEL I I NONE r--. . INDICATES # OF CRACKS 1 - Bright Metal, No visible oxidation I 2 - Metal reddish brown color, no pitting.

3 - Metal having patches of red oxide. 8.2 & 8.3 - CORROSION & CRACK INSPECTION I (8.2.1.1) Buttonheads Level: f (8.2.1 & 8.2.2) Cracks (8.2.1 & 8.2.2) Cracks o Yes

                                                                                           - Yes*

blNo 19No 0QN1A [INIA (8.2.2.1) Anchorhead Level:  ! 10 No I (8.2.2.1) Shims (8.2.2.1) Bearing Plate Level: Level: (8.2.1 &8.2.2) Cracks 1A'2I A A-2-21 Cradks Yes* ElYes tffNo [INIA 0QNIA I I I I I forrTendon Inspetion I RETAINED IN HAFD LUUVY k~t ý3eI CX-,C

I DOCUMENTr NUMBER: CR-NIO02-504 REVISION: 0 PAGE: 15 DOCUMENT TITLE: FINAL REPORT FOR THE 30'm YEAR CONTAINMENT IWI. INSPECTION PROJECT TITLE: 30' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 P*pUS I I.- I ANCHOR BUTTON

  • S. S**:"-I CORROSION LEVEL, CRACKS TENDON I END I.D. HEADS ANCHOR BEARING I BT4 CR1218 t HEAD
2. NONE SHIMS
2. NONE PLATE
2. NONE 46H19 I 46H20 BT S BT4 CR380 CR1138 2 1 2. NONE
2. NONE
2. NONE
2. NONE
2. NONE
2. NONE BT 6 CR78 1 1, NONE 2. NONE 2, NONE I 46H22 BT 4 ST 6 CR1140 CR41 1

1

2. NONE
2. NONE
2. NONE
2. NONE
2. NONE
2. NONE I 46H23 BT4 BT 6 CR903 CR40 1

1

2. NONE 2, NONE
2. NONE
2. NONE
2. NONE
2. NONE BT 4 CR1157 1 2. NONE 2. NONE 2. NONE I 46H24 BT 6 CR14 1 2. NONE 2. NONE 2. NONE I INDICATES CORROSION LEVEL INDICATES # OF CRACKS 1 - Bright Metal, No visible oxidation.

I 2 - Metal reddish brown color, no pitting. 3 - Metal having patches of red oxide. I Corrosion Inspection for Tendon D2381BT6 I I I I 8.2 a 8.3 - CORROSION & CRACK INSPECTION I (8.2.1.1) Buttonheads (5-.22.21) Anchorhead Level: Level:- 1 4" I (8.2.1 (8.2.1

                                                                           & 8 2.2) Cracks C] Yes (2)
                                                                           & 8.2.2) Cracks [] Yes (2) fNo
                                                                                                              'S No 0 N/A 0 N/A (8.2.2.1) Shims                    Level:             fit         (8 2.1  & 8.2.2) Cracks . C1 Yes ",        1B No       O NIA I (8.2.2.1) Bearing Plate            Level:       ,     (1          (8.2.1  & 8.2.2) Cracks C1 Yes I"'

(1 - Corrosion Levels of 3. 4. 5 or 6 required an NCR. 1L.No 0 N/A

                               -1_

r..nm,* A kplkM n othn cracks tn Sketch Sheet 8.0 and iniiate an NCR. I Eti:IAINED WN HARD COPY

I I DOCUMENT NUMBER: CR-N1002-504 DOCUMENT TITLE: REVISION: FINAL REPORT FOR THE 30" YEAR CONTAINMENT IW. INSPECTION 0 PAGE: 16 PROJECT TITLE: 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE. 01124108 I J'J4~i A Lý0ýýFý'I-Jk-'--k

                       -.                         6   tý"O.O'N             H **kG     !-R  0Fbs:'7tNtCNE)

I TENDONI END ANCHOR I.D. BUTTON HEADS ANCHOR HEAD CORROSION LEVEL, CRACKS SHIMS BEARING PLATE

                          -iii-         -i I           62H29 BT2 BT 8 CR393 CR1113 1

1

1. NONE
1. NONE
2. NONE
2. NONE
2. NONE
2. NONE BT 2 CR164 1 1. NONE 2, NONE 2. NONE I 62H31 BT 6 BT 2 CR958 CR75 1

1

1. NONE 1, NONE
2. NONE 2, NONE 2, NONE
2. NONE 62H32 I BT 6 BT 2 CR960 CR77 1

1

1. NONE 1, NONE
2. NONE
2. NONE
2. NONE
2. NONE 62H33 I 62H34 BT 6 BT 2 CR538 CR25 1

1 1, NONE

1. NONE
2. NONE
2. NONE
2. NONE 2, NONE BT 6 CR900 1 1. NONE 2. NONE 2, NONE I INDICATES CORROSION LEVEL - . 1. NONE INDICATES # OF CRACKS I 1 - Bright Metal, No visible oxidation.

2 - Metal reddish brown color, no pitting. 3 - Metal having patches of red oxide. I 8.2 & 8.3 - CORROSION & CRACK INSPECTION (8.2.1.1) Buttonheads Level: I I (8.2.1 &8.2.2) Cracks 0 Yes "I No O N/A I (8.2.2.1) Anchorhead (8.2.2.1) Shims Level: Level: j (8.2.1 &8.2,2) Cracks (8.2.1 &8.2.2) Cracks DYes' 2 ' 0 Yes 121 [No C N/A O N/A I (8.2.2.1) Bearing Plate Level: j (8.2.1 &8-2.2) Cracks C Yes rn) No o N/A mor 6 required an NCR. tch Sheet 8.0 and inflte an NCR I I I I Corrosion Inspection for Tendon D212/BT1 I RETAINED IN MAKU COPY R-Ec*- -ýe-15 04

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 17 DOCUMENT TITLE: FINAL REPORT FOR THE 3O*" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 30"' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 4.4 SQ8.0 - BUTTONHEAD COUNT 4.4.1 The inspection for protruding and missing buttonheads was performed and documented per PSC procedure SQ 8.0. The buttonheads were inspected for their physical condition. This inspection is performed to acquire information on the function of the tendon, since the original installation or previous surveillance. A missing and/or protruding buttonhead decreases the amount of effective wires in the tendon. All conditions for buttonheads and wires, whether missing or defective, have been documented. The results of these inspections are recorded on Data Sheet SQ 8.0, and are summarized in Tables 20 thru 25. In Tables 20 thru 25, "N/A" indicates no inspection was performed. 4.4.2 No additional protruding/missing buttonheads were detected on any of the inspected tendon ends except tendons 12V01 both ends and 61V17 shop (top) end. 12V01 shop was found with I wire protruding that was not previously reported, NCR FN1002-010 was written to document this finding. The field end of 12V01 was identified as having 3 missing buttonheads not previously reported and was documented on NCR FN1002-004. 61V17 had one (1) additional missing buttonhead that was recorded on NCR FN1002-005. The stated conditions have been submitted to CR03ENG for disposition. 4.4.3 All of the other tendon ends with missing or protruding wires have been previously documented and accepted, either at original installation or during a previous inspection. 4.4.4 In addition to the nominal 163 stressed wires, the anchorheads have another hole in which a test wire was originally installed on some tendons. The cases in which the surveillance test wire was found to be missing or not installed has been documented for all tendons, however a missing test wire has no bearing on the ability of a tendon to carry force. The documentation of this condition is purely for informational purposes. I 2 E ORIGINAL AS FOUND AS LEF IUNDOW N D1 WZ loEtL 0

                                                                      !AL                               06 rg IL TOP           1       0       2        0       2       0       0        161         181 12V01 BOT           0       2       0        5       0       5       0        158         158 TOP           0       0       0        0       0       0       0        163         163 45V20 SOT           0       0       0        0       0       0       0        163         163 TOP           0       0       0        0       0       0       0        163         163 61V08 SOT           0       0       0        0       0       0       0        163         163 0        2       0       2        1       161          160 61VI?           TOP           0       1 BOT           0       0       0        0       0       0        1       163          162 I

I I I

I DOCUMENT NUMBER: CR.N1002-504 REVISION: 0 PAGE: 18 I ý7_0 DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 301" YEAR CONTAINMENT PA INSPECTION 30m' YEAR TEN DON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 I I '--BE2*1:ICOS ORIGINAL o(S 0!-iUToNH AS FOUND 3 AS LEFT 0OUN' wu 0a, w0 ,W I TENDON END W I-OR L 0 0Z 0go 0 uZO Ow 0 P

                                                                                 &ILCo w (

U.j ix w. I 13H36 BT 1 0 0 0 0 0 0 0 163 163 BT 3 0 0 0 0 0 0 0 163 163 I 42H46 8T 2 BT 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 153 163 163 I 46H21 BT 4 BT 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 183 163 163 BT 1 0 0 0 0 0 0 1 163 162 I 51H34 BT 5 BT 2 0 0 0 0 0 0 0 0 0 0 0 0 1 0 163 163 162 183 62H30 I 5T6 0 0 0 0 0 0 0 163 163 I TAL 22 9SbdIBTOHA .3bMSý,ý ON I I I I I I I I

i I DOCUMENT NUMBER: CR-Nt002-504 DOCUMENT TITLE: REVISION FINAL REPORT FOR THE 30"' YEAR CONTAINMENT IVL INSPECTION 0 PAGE: 19 PROJECT TITLE: 3 0T" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I I TAL 23 133 ASt.tT ORIGINAL

                                               'Q8 ASIFOUND
B TOH AS LEFT AWON 00 0 i TENDON END a rE 0 l1g wswt w w~

i 13H33 BT 1 0 0 0 0 0 0 0 163 163 BT 3 0 0 0 0 0 0 0 163 163 i 13H34 BT 1 ST 3 0 0 0 0 0 0 0

                                                  "0 0

0 0 0 0 0 163 163 163 163 U 13H35 BT 1 BT 3 0 0 0 1 0 0 0 1 0 0 0 1 0 0 163 162 163 162 BT 1 0 0 0 0 0 0 0 163 163 I 13H37 BT 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 163 163 163 BT 1 13H38 I BT 3 0 0 0 0 0 0 0 163 163 I r. I I I 'rOOOOOO000O00 000000000000 0000000000000 I 000000000 0o000000oooooo 000000ooooo I ooY 000000000 ooooo 0 I I I Buttonhead Inspection for Tendon D 129/BT5 I RETAINED IN HAHU UUrT

I I D DOCUMENT NUMBER: CR-N1002-504 DOCUMENT TITLE: PROJECT TITLE: REVISION: 0 FINAL REPORT FOR THE 30'" YEAR CONTAINMENT MA. INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: PAGE: 20 01124/08 I I ORIGINAL I AS FOUND AS LEFT I TENDON END a ii

                                                'U a

ii

                                                                     --ft 50
                                                                                          !20 I              I-0      0(      0ý 1.

WE 0:0 in 2 W 161 U. I 46H19 BT 4 BT 6 A. 0 0 0 0 0. 0 0 0 0 0 0 163 163 0 0 0 0 163 163 I 46H20 BT 4 BT 6 3 0 0 0 3 0 0 0 3 0 0 0 0 0 160 163 160 163 I 46H22 BT 4 T"6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 163 163 163 BT4 0 2 0 2 0 2 0 161 161 I 46H23 ST 6 0 0 0 0 0 0 0 163 163 BT 4 0 0 0 0 0 0 0 163 163 46H24 I BT 6 0 0 0 0 0 0 0 163 163 1 I /\.2, oooooo I not 0 0*o o o I 000000 000000000000 0000000000000000 0o000 I 000000000000 0000000000000 000000 000 00 00000000000 I oo. 010 o00oooooooo 000( I I I I tit fAINED IN HARD~ COPY AEC*z se831oloz

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 21 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30'm YEAR CONTAINMENT IW.L INSPECTION 30W YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 EMU I

  • em *. *aL
                                                                   ~-T-b I

TA L 25 623 A IJ INS-S8! HW ;b, ORMGINAL AS FOUND AS LEFT I C 0I w - 40 TENDON END ZI jO o ~0 4u U 0 E.

                                                                ~

o

                                                                ~-i--

WZ

                                                                          ~

ml www I 62H29 BT 2 BT6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 163 163 163 BT 2 0 0 0 0 0 0 0 163 163 I 62H31 BT 6 BT 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 163 163 163 I 62H32 BT8 ST 2 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 163 163 163 62H33 I 62H34 BT 8 BT 2 1 0 0 0 1 0 0 0 1 0 0 0 0 0 162 163 162 163 BT 6 0 1 0 1 0 1 0 162 162 I I I rasi, I ^Ivr.b 00000000 I 0000000000 00000000000 00000oo0000 I 0000000000000 0000000000000 0000000000000 I \*o0 0000000000000 00000000000 ooo0ooooooo I Inspection

                       ýBurttonhead for Tendon     D1291BT3 I

I RiETAINED lN HARD GCFLY P-E 4t- S 3S/O(O0 --

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 22 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30TMYEAR CONTAINMENT PA. INSPECTION 301T YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 I I 5.0 SQ8.3 - CONCRETE INSPECTION 5.1 A VT-1C Detailed inspection in accordance with PSC Procedure S08.3 was performed on the 24" around the bearing plate. This detailed inspection is performed in order.to detect any cracks in the concrete I 5.2. greater than 0.010" in width. The results were recorded on Data Sheet SQ 8.3 and summarized in Table 26. None of the inspected tendon ends exhibited concrete cracks exceeding 0.010' around any bearing plate inspected. I C T0 0lq I TENDON END ING PLA*TE CRACKS WITH WIDTHS > 0.010" QUANTITY L TMAXIMUM LENGTH IlNi I MAXIMUM A IWIDTNinI I 12V01 TOP NONEFOUND 0 0 0 BOT NONE FOUND 0 0 0 I 45V20 TOP BOT NONE FOUND PC58 0 0 0 0 0 0 I 61V08 TOP BOT NONE FOUND NONE FOUND 0 0 0 0 0 0 TOP NONE FOUND 0 0 0 I 61V17 SOT BT I NONE FOUND NONEFOUND 0 0 0 0' 0 0 13H36 I 421H46 BT3 BT 2 NONEFOUND NONE FOUND 0 0 0 0 0 0 BT4 NONE FOUND 0 0 0 I 46H21 BT4 NONE FOUND 0 0 0 STO NONEFOUND 0 0 0 I 51 H34 STI BT5 NONE FOUND NONEFOUND 0 0 0 0 0 0 I 62H30 BT 2 BT6 NONE FOUND NONEFOUND 0 0 0 0 0 0 BT 3 NONEFOUND 0 0 0 I D129 BT 5 BTI NONEFOUND NONE FOUND 0 0 0 0 0 0 D212 I 0238 BT 3 BT4 NONE FOUND NONE FOUND 0 0 0 0 0 0 BT6 NONE FOUND 0 0 0 I I

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 23 I DOCUMENT TITLE-PROJECT TITLE: FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IWL INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I 6.0 TENDON ACCESSIBILITY 6.1 The PSC field personnel performed a general examination for tendon accessibility during this surveillance I period. This examination was performed in order to assist CR03ENG in the planning of future surveillances. The results are summarized in Tables 27 thru 38. I 6.2 During this examination it was noted that small grease/oil leaks were occurring on multiple tendon caps, which were located inside existing structures that adjoin the containment building. The substance displacing from the tendon cap is actually the oil portion from the original P2 grease that has separated. I This is a common occurrence that has been noted throughout many plants during tendon surveillances. This condition does not correspond to the system's degradation. A small amount of oil can cause a large aesthetically unpleasing condition. On buttresses without any coating, the oil is absorbed into the concrete, leaving very little signs of leakage. However, in the existing condition, the coated surface does I not allow for the absorption to occur. Therefore, the oil continues to displace down the buttress face. PSC recommends this condition be monitored and cleaned on a periodic basis. Gasket replacement can be performed on the tendon cap, however the oil will continue to leak from the cap based on our experience. The labor and material required for the gasket replacement is not cost effective and PSC I does not recommend performing such task. TABLE~~~~~~ 27.2 &2VSSiS-TNO ACE5111. TR I I 0 U) I 12V01 12V02 12V 01 TA BL TB T& 0 23V01 23V02 23V 03 T TAB 12V 04 I 12V 05 12V 04 TAB TAB TAB 23V 04 23V 05 23V 06 TAB TAB TAB 12V 07 TAB 23V 07 TAB I 12V 08 12V 09 TAB TAB 23V 08 23V 09 TAB TAB 12V 10 TAB 23V 10 T AB ,I 12V10 12V 12 12V 11 TAB TAB TAB 23Vll 23V 12 23V 11 TAB TAB TAB 12V 12 12V 13 T&8 TAB 23V 12 13 TAB TAB I 12V 14 12V15 TAB T&B 23V 23V 14 15 TAB TAB 12V 16 TAB 23V 16 TAB I 12V 17 12V18 TAB TAB 23V 23V18 17 23V 19 TAB TAB TAB 12V 19 TAB I 12V 20 12V 211 12V 22 T& TA&B TAB

                                                              !23V 23V 20 21 23V 22 TAB TA&B T&B 23V 23           TAB I  12V 23 12V 24 T = TOP CAN TAB TAB B - BOTTOM END I

23V 24 TAB

  • I I

I DOCUMENT NUMBER: CR-N1002.504 REVISION: 0 PAGE: 24 DOCUMENT TITLE: FINAL REPORT FOR THE 30IM YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 30TMYEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 I I -TB E2- 34m5'ER'S

  • ENO A-ES bLITM TiX I a-tL 00to US to w K U) 16WU.a aac 0 t
                                                                                 . kl I 34V 01 34V 02 T&B TAB 45V 01 45V 02 T AB T&B 34V 03        T&B                                         45V 03         TAB I 34V 04 34V 05 T&B TAB 45V 04 45V 05 T&A TA8 45V 06         TAB I 34V 06 34V 07 34V 08 T&B T&AB TAB 45V 07 45V 08 T AB TAB 45V 09         T&B I 34V 09 34V10 34V11 TAB TAB TAB 45V10 45V11 T&B TAB T&B I 34V12 34V 13 34V 14 T&B TSB TAB 45V12 45V 13 45V 14 T&B T&B I 34V15 34V16 34V 17 TAB T&B T& 1 45V15 45V16 45V 17 TAB T&B TAB 45V I8         T&B I 34V 18 34V 19 34V 20 TAB TAB TAB 45V 19 45V 20 TA B T&B I 34V 21 34V22 34V 23 T&B T&B TAB 45V 21 45V22 45V 23 TAB T&A TAB I 34V 24 T TOP CAN TAB B = BOTTOM END 45V 24         TAB mmý I

I I I I

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 25 U DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 3 0 "' YEAR CONTAINMENT IWL INSPECTION 30TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 U TrBL:2:.5V, 6VSElk TND N'~-CtýS6I!ITYM TRX.- I I j 4II wS2 j - -*o_ U' I I U 40 V5; 4 R!Z 56V 01 61V 01 I TAB TAB 56V 02 TAB 61V 02 TAB 56V 03 TAB 61V 03 TAB 56V 04 61V 04 I TAB TAB 56V 05 TAB 61V05 i TAB 56V 06 TAB 61V 06 TAB 61V07 U 56V07 TAB TAB 56V 08 TAB eiv 08 TAB 56V 09 TAB 61V 09 TAB 56V 10 I 56V 11 56V 12 TAB TAB TAB 61V 10 61V 11 61V 12 TAB TAB TAB I 58V 13 56V14 56V15 TAB TAB TAB 61V 13 61V14 61V15 TAB TAB TAB I Sv is 56V 17 56Vis TAB TAB TAB 61V16 61V 17 61V 18 T&B T &8 TAB I 56V 19 56V20 56V21 TAB TAB TAB 61V 19 61V 20 61V 21 TAB TAB TAB I 56V 22 56V 23 56V 24 TAB TAB TAB 61V 22 61V 23 61V 24 TAB TAB TAB

                          -                              a             I              I                   i I      T " TOP CAN                 B = BOTTOM END I

I I I I

I U W DOCUMENT NUMBER: CR-NIO02-504 DOCUMENT TITLE: PROJECT TITLE: REVISION: 0 FINAL REPORT FOR THE 30"' YEAR CONTAINMENT IWI. INSPECTION 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: PAGE: 26 01/24/08 I -30EIS 13 ENO M TI I Z1- 0 v =. . Z W I (4a4 up W w l U. IIL I 13H 01 13H 02 B3 81 &83 a1 13H 25 13H 26 818B3 81 &83 13H 03 81 &B3 13H 27 B1 & B3 I 13H404 13H 05 B1 A13 81 83 13H 28 13H 29 81 &83 81 & B3 13H 06 81 B3 13H 30 B1 & B3 I 13H 07 13H 08 B1 B3 81883 13H 13H 31 32 81 &B3 B1 & B3 13H 09 B3 B1 13H 33 81 &83 I 13H 10 13H11 B3 83 81 B1 13H 34 13H135 , 81 &83 B1 &83 13H 12 03 B1 13H 36 81 &83 I 13H 13 13H 14 B3 83 e1 Ba 13H 37 13H 38 Bi &B3 B1 &83 13H 15 B3 81 13H 39 B1 &83 I 13H 16 13H 17 83 83 B1 e1 13H 40 13H 41 81 &B3 81 & B3 13H 18 B1 B3 13H 42 81 &83 U 13H 19 13H 20 81 B1 &B3 B3 13H 43 13H44 81 &83 B1 & B3 13H 21 BI&B3 13H145 BI1&83 I 13H122 13H 23 e8&83 81 &83 13H146 13H 47 81&83 B1 & B3 13H 24 B1 &S3 I 81 = BUTTRESS 1 END 83 = BUTTRESS 3 END I I I I I

I DOCUMENT NUMBER: CR-N1002.504 REVISION: 0 PAGE: 27 1 ý7. DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30TMYEAR CONTAINMENT IW. INSPECTION 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I I I I 35H 01 S 83 & 85 S S U 35H 25 S B3 &B5 S S 35H 02 B3 & B5 35H 26 83&B5 I 35H 03 35H 04 B3 & B5 B3 & B5 35H 27 35H 28 B3 &B5 838 85 B3& B5 35H 05 83 & 65 35H 29 83&B5 I 35H 06 35H 07 B3 B5 83 & B5 35H 30 35H 31 B3& 65 83& 85 35H 08 BS B3 35H 32 83 &B5 I 35H 09 35H 10 B3 B5 35H 33 35H 34 83£85 63 & B5 35H 11 35H 35 838& 5 I 35H 12 35H 13 B3 B3 85 B5 35H 36 35H 37 63 & 85 133 85 35H 14 B3 85 35H 38 I 35H 15 35H 16 B3 & B5 B3 &85 35H 39 35H 40 838&85 B3& 83 & B55 B5 35H 17 83 & e5 35H41 83& B5 I 35H 18 35H 19 B3 & B5 B3 85 35H 42 35H 43 83 & B5 8388 5 35H 20 B3 85 35H 44 I 35H 21 35H 22 B3 B3 B5 85 35H 45 35H 46 B3 & B5 838 B3& 815 05 35H 23 83 & B5 35H 47 I 35H 24 I B3 & 85 83 = BUTTRESS 3 END I I 85 = BUTTRESS 5 END I I I I I I I I

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 28 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30r YEAR CONTAINMENT IW. INSPECTION 3OT" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I nABLE 5 II I m m I I I

    .2            "ZnW F:z        L u.a 5r      -    . (.I3            z         -i to            W J              r I                 0) 0I     L)cow#j_

A. Q U)L j )0 (.J I I 51H 01 SIH 02 81 B9 85 B5 51H 25 51H 26

                                                                                    &as 91 a65 511H03             81                                  85       51H 27"        el &85 I 51H 04 51H 05 B1 BI as 85 51H 28 51H 29 91 &85 BI &B5 51H 06             B1                                  85       51H 30         B1&85 I 51H 07 51H 08 91               B5 al 85 51H 31 51H 32 B1 &B5 B1 &Bs 51H 09                                01                        51H 33         91 &85 I 51H 10 51H   11       Bi&B5 al 8                         51H 34 51H 35 B1 &a5 a1 &85 51H   12           91                 as                        51H 36         81885 I 51H 51H 51H 13 14BI 154i5H3 B1                 B5 85 51H 37 51H 38 BI &85 B11&B
                                                                                    &85 51H   15                              81               65       51H139 415           &1 I 51H 18 51H   1        Bi BI 85&B5
                     &                                           511H 41 51H  42        E1a85 81 &B5 51H 18         B1 &65                                           51H 42         B6&85 I 51H 19 51H 20 51H121 9169B5 91                 95 51H 43 51H44 8168B5 B1 &B5 51                 85                        511145         9168S5 I 51H 22 51H 23 al 81 &as as       51H 46 51H 47 B1685 B1 & B5 51H 24          B1 & 85 I            I B1 - BUTTRESS I END I                I B5 = BUTTRESS 5 END I               i I

I I I I

I DOCUMENT NUMBER: CR-NI002-504 REVISION: 0 PAGE: 29 DOCUMENT TITLE: FINAL REPORT FOR THE 30Tm YEAR CONTAINMENT IWL INSPECTION M k n,ý- V',4' PROJECT TITLE: 30'M YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 Pi Emw I B It'-1LE 3:42 SEIJS"- T ENO ACSILTYM RX I z 84 02 268 I 003 I 42H 03 84 82 421"127 825&84 I 42H 04 42H 05 4210 64 82 82 84 B264 42H 28 421129 42Hz30 825&84 825&84 62 &84 I 42H 07 421108 42H09 84 4 82 82 82 84 42H 31 42H 32 42H33 825&84 825&84 82 &84 42H10 84 62 4234' 12.1684 I 42H11 42H12 64

                    &2
                           &      8264                          42H 35 42H 36 82 B2 &84 24 42H 37       82584 I 42H13             84               82 42H14             84               82                          42H 38       B2 A 84 42H 15            84               62                          42H 39       B2 &B4 i                   42H 40       62 &84 I 42H 16            84                                 2 42H17            2 &84                                         42H 41       B2 &84 42H18            24                84                          42H 42       82 &B4 42H 43       82 &B4 I 42H19 42H 20 42H121 B2484 B2584 84 2 &

42H44 42H 45 B2 & 54 82 &84 42H 46 I 42H 22 B284 B2 &84 42H123 B2 4 42H 47 B2 &84 42H124 5 B2 4 3 B2 & B4 I I 82 - BUTTRESS 2 END I I 84 = BUTTRESS 4 END I I i I I I I I

DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 30 DOCUMENT TITLE: FINAL REPORT FOR THE 30 YEAR CONTAINMENT IWL. INSPECTION PROJECT TITLE: 30TH YEAR TENIDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 TABL.34 46H SE(E TEDNkC L-Y~R -*S I z .j~ I (A0 (I) 0 zL l on!U r I w LI 00 (U. 3 4U... I 46H 01 46H 02 I B4 &6 84 86 U 46H 46H 25 26 84886 I I 84 &B8 I 46H 03 46H 04 46H 05 54 &88 84 & B6 46H 46H 46H 27 28 29 549868 B4 & 86 I 46H 06 46H 07 46H 08 84 & B8 06 148 54&868 46H 30 46H 31 46H 32 84&B6 54888B B4 &B8 I 46H 09 46H 10 46H 11 B4 & B8 B4 & 88 46H 33 46H 34 46H 35 54&888 84 & 88 B4 & 85 I 46H 12 46H 13 46H 14 B4 B4&B6 B4 & B8 B8 46H 36 46H 37 B4 &16 84 &86 B4 & 86 46H 38 I 46H 15 46H 16 84 B4 B6 B6 46H 39 46H 40 84& 68 BA&B6 46H 17 B4 86 46H 41 I 46H 18 46H 19 B4 &888 64 &&B 46H 42 46H 43 B4&86 B4 &B6 4e&B6 46H 20 B4 &868 46H 44 B48&B8 I 46H 21 46H 22 848B6 B548B 54&88 46H 45 46H 46 B4& 54888BO 548 B6 46H 23 54&88 46H 47 I 46H 24 84 = BUTTRESS 4 END

  • i B6 = BUTTRESS 6 END a i i I

I I I I

I DOCUMENT NUMBER- CR-NI002-U04 REVISION: 0 PAGE: 31 DOCUMENT TITLE: FINAL REPORT FOR THE 3011 YEAR CONTAINMENT IWL. INSPECTION PROJECT TITLE: 30Tm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I I 0w 3o w u 0B. 82 & (3 01:62S~lg ABLE Vg NbB6 62H 25S *B2 8f,Y B6.. I 2H 066 6 0. I 62H 01 62H 02 8286 82 86 62H 25 62H 26 62H 27 2&86 8286 B2 &86 62H 03 82 86 I 62H 04 62H05 a6 82 6 8 B6 62H28 62H29 82 8& 82886 82 &86 6 62H06 82 8 Be 62H 30 I 62H 07 62H 08 86 86 B2 B2 62H 31 62H 32 82 82 86 B6 62H09 82 B62 62H 33 B2 886 I 62H 10 62H 11 B2 B6 86 82 62H 34 62H 35 B2 8&8S B2 8 B6 62H12 62 9 86 62H36 82 86 U 62H 13 62H14 82 62 B6 B6 62H 37 62H 38 B2 8 B6 B2 &S6 62H B2 61 66 62H439 2 &86 I 62H 16 62H 17 86 86 B2 82 62H 40 62H 41 82 8& B28&86 6 62H18 62 &886 62H 42 628&66 U 62H419 62H 20 B2 62 86 86 62H 43 62H44 828&86 B28&68 62H 21 B28&65 62H 45 828&86 I 62H 22 62H 23 82 &866 82 8 B6 62H 46 62H 47 62886 B2 886 62H 24 82 8& 6 I B2 - BUTTRESS 2 END B5" BUTTRESS 6 END I U I I I

I

            'DOCUMENT NUMBER: CR-N1002-504                                     REVISION.      0     PAGE:     32 DOCUMENT TITLE:    FINAL REPORT FOR THE    30 TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE:      30'" YEAR TEN*IDON SURVEILLANCE AT CRYSTAL RIVER            DATE:     01124108 U

I ku z

                                .j                                                              .~j I

z lIE 0 1§1> 11

                                                  .j                         C,0 9. m oSuJ Q) (A.
                                                                                                                   .j I D 101 I

B2/3 &B556 B213 & B5,'6

                                            -6 0 125        2/38& 85/

4' 4, D 102 o 126 am 2& B/8 B2/3 & B5/ I D 103 O 104 82/3 &8B5 B2/ & B5S D 127 D 128 B2/3 & B5/8 B2/3 & B65 82n & 65/8 D 105 D 129 B213 & B5 I D 106 D 107 B2/3 B5/6 D 130 O 131 82n & 85/6 82/38 85/8 o 108 D 132 B5/8 B2/3 & B56 I D 109 D 110 B2/3 &85/8 D 133 O 134 B2r41 B241 B5/6 85/8 B5/6 Dill B2/3 & B54 D 135 82n3 I D 112 0113 8213 & B541 82/3 &B65 D 136 D 137 am 82/3 B5/8 6516 0114 D 138 65/6 62f3 & 8518 82/3& B5 I D115 D 116 SB213 B2m3 &&B56B B5/8 D 139 o 140 2/36& 5/6 0 117 B2/3 & B5/ 0 141 82/3 & 6515 I D118 D 119 82/3 & B5/6 8 213 & B5AB B213 &85/6 0120 I D121 D122 82/38&85/8 B2/3 & 85/6 D 123 B2/3 & B56 I D 124 i B2m3 & 8516 B213 - BUTTRESS 2-3 END 8516 a BUTTRESS 5-6 END m i I I I I I I I

I DOCUMENT NUMBER: CR-Nt002-504 REVISION: 0 PAGE: 33 DOCUMENT TITLE: FINAL REPORT FOR THE 30T"YEAR CONTAINMENT W&INSPECTION PROJECT TITLE: 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24/08 I I I I I UE17 D`206s iR-i-i I z muj

                              .j0 S      pi I.             I
                                                                          .J     W ro!~

m.L 140 JI~5 jWu JI- o 0 go@i 02 I D 201 _____I _ B115 & B3/4 I__ Il D 225 I _ B1/6 &B3/4 _&_ __ _ I__ _ _ D 202 B1/6 & B314 D 226 81/5 &8314 I D 203 0 204 B1/6 & 1334 B1/6 & B3/4 0227 0 228 816 &B3/4 8116 &83/4 D 205 81/6 & B314 D 229 81168& B314 I D 206 D 207 61168& 314 8116 & B3/4 D 230 O 231 B1/6&B3/4 B116 & B3/4 o 208 8188 & B3/4 0 232 B1/8& 8314 I o 209 D 210 8116 & B3/4 B118 A B314 D 233 D 234 B1/88& 3/4 B1/8& B3/4 D211 B116 & B3/4 D 235 B1/5 & B3/4 I D212 0 213 8116 & B314 B116 & 8314 B1/888 3/4 D 236 D 237

                                                                               &3/4 B1/6 & B3/4 81/6 & B314 B1/e D 214                                                       D 238 911588314 I  0215 D 216 B1/6 & B314 B1/8& B314 B116 & B314 O 239 D 240 BI/6 & B3/4 B1168&83/4 D 217                                                       D 241        B1/6&83/4 I  D 218 D 219 8118 &8314 B1/6 & 8314 118/6 B3/4 D 220              83/4          8116 I  D 221 0222 B1168&83/4 8116 & B3/4 o 223          B1/68& B3/4 I  D 224          5116 & 83/4 8116 = BUTTRESS 1-6 END        8314 = BUTTRESS 3-4 END I

I I I I

I DOCUMENT NUMBER CR-N1002-504 REVISION: 0 PAGE: 34 I DOCUMENT TITLE: PROJECT TITLE FINAL REPORT FOR THE 30Tm YEAR CONTAINMENT IWL INSPECTION 30T' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I j .04AC "ESýrlbiLAITYVýIIIMý

                          *ALJE--,S9zo I65-1661LREI -ýkfit-j                                  1.

I z ,, 4i WZ JZ- JO 0-j u A I - u.Z Q (o U)0 4L ))- >.I I 0 301 B1/2 &68415 D 325 B/2 &B45 I 302 D303 1/2 &6415 B112 &B415 D 326 D 327 81/2 &B4/5 81/2 6A415 D 304 61/2 &64/5 0328 81/2 & 645 I D 305 D 306 B112 &B415 112 &84/5 D 329 0330 81/2 &64/5 B112 & W5 D 307 B1)2 &B415 D 331 BI62 & 64/5 I 0 308 0 309 B112 A 4)5 61/2 &6415 D 332 D 333 B1/22 &B5 B112 B4/5 D 310 11/2&B4/5 0 334 81/2 8415 I D 311 D 312 B1/2 &B415 B112 &B415 D 335 0 336 3112 B112 B4/5 84/5 D 313 D 337 B112 841/ I 611/2 &64/5 D 314 81/2 &64/5 D 338 B112 B4/5 0315 81/2 &B4/5 D 339 612 &B64/5 0316 0340 B112 &B45 I e112 &B415 0317 B12 &86415 D 341 B/2 64/5 0 318 61126&684/5 0319 61/2 &64/5 I D 320 0 321 81/2 & 4/5 B/2 &6415 0 322 B1/2 &B415 I D 323 0324 B1/2 &6485 81/2 68415 I 61/2 BUTTRESS 1-2 END 6415 , BUTTRESS 4-5 END I I I I U

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 35 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IWL INSPECTION 30'M YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I 7.0 HYDRAULIC JACK CALIBRATIONS I 7.1 Precision Surveillance Corporation has developed a program for calibrating hydraulic jacks utilizing regression analysis (PSC Procedure QA 12.8.G-W). This is a process where a straight line is mathematically best fit to a set of data points (in this case, force versus gauge pressure). This results in a U linear equation which relates the ram area (slope) and constant (y-intercept) for each jack calibration, allowing the conversion of pressure to force and vice versa. Completed calibrations for all of the hydraulic jacks used are contained in Appendix G and are summarized in Table 39. 7.2 A before and after comparison of the stressing jacks' ram areas revealed that none of the hydraulic jacks' I calibrations varied by more than 1.46%, indicating that they were in a properly calibrated status. Acceptable variation is 1.5% 7.3 The wire-testing ram, 1.0.#7702. was also found within the acceptable variation. I 7.4 Note that the force exerted by a jack can be calculated as follows: Force = Area x Pressure + Constant I (F) (in2) (KSI) (K) U I -T_______________H_______AULI JAC CAIBAIO* 1flV I BEFORE SURVEILLANCE I AFTER SURVEILLANCE

                            =

I 33

                                                    &C JACK

[a. 0i a 4(

                                                                                                                 'I I      8780      9W24/0?

335.282 r

                                       -5.022 II.

1906.09 12111/07 336,220 8

                                                                                -4344 U.

1912.11 5700 316 I 8784 9/24/07 337.287 -5.060 1917.48 12112/07 335.547 -13.489 1899.13 5700 +0.96 I 9501 9/25/07 372.057 ,3.814 193851 12/13107 366.254 .5.666 1910.19 5200 +1 46 I 7702 05/08/07 1.590 #0.146 13661 11/30/07 1.579 #0-303 13.725 8500 -0.464 U I I U

I DOCUMENT TITLE: FINAL REPORT FOR THE 30' YEAR CONTAINMENT IW. INSPECTION U PROJECT TITLE: 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 8.0 TENDON LIFTOFFS 3 8.1 MONITOR TENDON FORCES 8.1.1 A liftoff is defined as the force required to lift the anchor head off the shim stack and is representative of the force held by that tendon. A liftoff is performed on each physical surveillance tendon to monitor the force exerted by the tendon onto the structure. PSC Procedure SO 9.0 in Appendix F details the steps taken to perform a liftoff. The results were documented on Data Sheet SO 9.0 and are summarized in Tables 40 thru 45. 8.1.1.1 It should be noted that performing a liftoff has only a localized effect on a tendon; therefore, it is acceptable to use the same jack for both ends of a tendon by executing the liftoff on separate occasions. 8.1.2 All of the vertical and dome tendon liftoffs were found to be above the minimum design and above 95% Predicted Force as required by IWL-3221.1. Three of the five horizontal surveillance tendons were found to be below 95% Predicted Force but above 90% Predicted Force. The liftoff requirement stated in IWL is: 3Tendon forces are acceptable if: (a) The average of all measured tendon forces, including those measured in IWL-3221 .1(b)(2), for each type of tendon is equal to or greater than the minimum required prestress specified at the anchorage for that type of tendon; (b) The measured force in each individual tendon is not less than 95% of the predicted force unless the following conditions are satisfied: (1) the measured force in not more than one tendon is between 90% and 95% of the predicted force; (2) The measured forces in two tendons located adjacent to the tendon in IWL-3221.1(b)(1) are not less than 95% of the predicted forces; and (3) The measured forces in all the remaining sample tendons are not less than 95% of the predicted force. 8.1.3 Based upon the unacceptable horizontal tendon liftoffs, adjacent tendons were monitored for force until an acceptable liftoff reading was obtained on both sides of the selected tendon- 13H36 required testing of 5 adjacent tendons, 46H21 and 62H30 also required testing of five adjacent tendons. Of these tendons, six were above 95%, five were between 95% and 90% and four fell just below 90%. All tendons below 95% were restored to Predicted Force - 0%, + 6% and locked off. The restoration of these tendons is summarized in Table 46. 8.1.4 The average of the As-Found normalized liftoff values was above the minimum requirement, despite the low liftoffs, and deemed acceptable per PSC Procedure S09.0 Section 10.4. 8.1.4.1 The average normalized tendon force in Unit 3 for each group and their respective minimum design are: Vertical Tendon: Group Average = 1535.2 Kips Minimum Design = 1149 Kips Hoop Tendon: Group Average = 1347.4 Kips Minimum Design = 1252 Kips Dome Tendon: Group Average = 1367.3 Kips Minimum Design = 1215 Kips 8.1.4.1.1 As depicted above, all group averages are above the required group minimum and are therefore acceptable. The actual values for each tendon and its corresponding group are summarized in Table 47. 8.1.5 Upon completion of the liftoff, a visual verification is performed to identify any changes in the condition of the tendon end. No additional or broken wires were noted during or after liftoffs. I

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 37 DOCUMENT TfTLE: FINAL REPORT FOR THE 30r" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 30'" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 I bbEi(WiWt jRýTtC,4LS.'-'ýýS09.b;-"PAONiT'6'FýIN64E!Sle,6N(FbWý09+ý I z 0 'a. id. j2 o za

                          'U                  ~                                                                0' I   I.-U             2I    IA.

u' 0 4 .j I IL zw 40 I 12V01 TOP BOT 14.75 4.00 161 158 8784 N/A 1559.95 NIA 1559.95 1525 1449 1372 NO 0 YES I 45V20 TOP BOT 12.50 4.00 153 163 8780 N/A 1458.80 N/A 1456.80 1507 1432 1357 NO 0 YES TOP 13.00 163 8784 1505.98 I 61V08 BOT TOP 4.00 12.00 163 161 N/A 8784 NIA 1580,18 150598 1491 1416 1342 NO 0 YES I 61V17 BOT 4.00 163 N/A N/A 1580.18 1498 1423, 1348 NO I 0 YES I I IL ZL itA~ I I I* a Alti I 13H36 BT,1 6.50 163 8784 1344.08 1385.23 1484 1410 1336 YES 4 a NO BT 3 7,25 163 8780 1428.63 I 42H46 BT 2 5.75 163 8784 1546.46 1558.63 1458 1383 1310 NO 0 YES ST 4 6.00 163 8780 1570.80 I 4GH21 BT 4 BT 6 5.75 6.00 163 163 8780 8784 1319.34 1340.71 1330.02 1441 1369 1297 YES 5 NO I 51H34 8T 1 ST 5 8.00 7.00 163 163 8784 8780 1532.96 1396.45 1464.70 1467 1413 1339 NO 0 YES BT 2 6.75 163 8784 1249.64 I 62H30 BT 6 6.75 163 9501 1332.05 1290.84 1413 1342 1272 YES 5 NO I U

DOCUMENT NUMBER: CR-N1002.504 REVISION: 0 PAGE: 38 DOCUMENT TITLE: FINAL REPORT FOR THE 3 0'" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 30'm YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124108 TA* 2 10ME -- 901 6

                                                                            *OIOý]0if                  ON       0(RQ I     z                  X -%                      d          AL             0.

U.. 0.L. 10 z0 IL-"I (J0 40 Z Z

                                                                                                                                                       'u I     w I-.

IL 4 0 a SL

                                                                                                  'AL                      it0                     IL0.1-us I   i "i673 0129       B 3
                     ]625 I162 1         I 8.780 i1289.161 1      1289.64        1287     1223'         1159         NO             0         YES OT 5       6.00        161          8784       1290.12                                                               1 I   D212 6 I1       6.38        162          8784       1259.76 12778.1 I

1305 1240 1175 NO 0 0 YES YES t3 T 6.50 162 8780 1295.87 I 238 BT4 BT6 7.00 6.00 163 163 8780 8784 1527.21 1495.85 1511.53 1348 1281 1213 NO 0 YES I I -3H34 -3H6.61 -MON 147n -ES -O I I I BT 3 6.75 163 163 8784 8780 1310.35 1323.57 ST11 7.00 7.00 163 8784 1350.83 I 13H33 1 3H34 13H37 BT 1 IBT3 67T31 BT 7.00 6.75 6.56 163 163 163 8780 8780 8784 1386.39 1302.057 1249.64 1306-46 1368.61 1309.48 1366 1475 1368 1298 1402 1298 1229 1328 1229 YES YES N YES YES NO N 13H35 1244.25 1373 1304 135 YES No I ST 3 ST71 6.38 6.88 162 163 8780 8784 1238.87 1387.69 11388 1 1299 12311 YES No 13H37 B3 57 16 1 s 11.511289.87 I 13H438 61 1 BT3 6.60 70 163 6 8784 70 1411.54 17.7 1395.05 1444 1372 1300 NO YES I L-- --- - -m - ----- - 6- -1 I I

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 39 I DOCUMENT TITLE: PROJECT TITLE FINAL REPORT FOR THE 30'" YEAR CONTAINMENT IWL INSPECTION 30'M YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01/24108 I 1EE11:ifý minilMNlTt'R1NGk K ~I I wa W6 0) 1-0

                                                                                                                        'u E

CL

                                                                                               >.IL~        z M 2.

l- it II w l-W C9I- dc 412 a N6

                                     '     9  -pi-
                                                 -~                           -       IN     I          '9-I     46H?'19 BT 4 6T 6 BT 4 7.00 7.50 6 75 t163 163 160 1 8780 7

8784 8780 1 1352.87 14. 1364.35 1269.04 1358.61 1 1402 1332 1262 1 NO .YES I 46H20 BT 6 BT 4 T 7-25 5.75 163 163 8784 8780 1327.22 1315.98 1298.13 1467 1394 1321 YES NO 1 46H22 1311.48 1488 1412 1337 I YES NO BT 6 6.38 163 8784 1306.98 II BT 4 6.00 161 8760 1338.10 46H23 1329 97 1425 1354 1283 YES NO I SBT6 5.75 163 8784 1323.85 BT 4 6.75 163 8780 1419.92 46H24 1425.85 1472 1398 1325 NO YES BT 6 7.50 163 8784 1431.78 I I II I 62H23 13.8 BT~~~~~ 2 6,5 290 1-69.3 14-1 1301 1 2-9 NO YE-I BT 6" 6.00 163 N/A NIA I 632H32 ST 2 BT6* 7.00 50 163 163 8780 N/A 1332.7,5 NIA 1332.75 1455 1382 `1310 YES NO BT2 6519 163 8780 1242.22 I 62H33 1313.39 141 1388 1315 YES NO BT 6 6250 162 1784 1384-56 1 BT 2 7.00 163 8780 1393210 62H34 1378.71 1432 1360 1289 NO YES I BT 6 6.75 162

  • TENDON NOT ACCESSABLE AT BUTTRESS 6.

I 8784 136432

                                                            -                  -  I-    -         -            -   I I

I

I I DOCUMENT NUMBER: CR-N1002-504 DOCUMENT TITLE: REVISION: FINAL REPORT FOR THE 30'M YEAR CONTAINMENT IWl INSPECTION 0 PAGE: 40 PROJECT TITLE: 3 0T" YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE; 01/24/08 I

                                                                             "A I                               ýE;46: 4DJACENTS          ME        F q E RESiTiEftTil A AS-FOUND LIFTOFF                  RESTORATION I      2 U'

a z wl 06 U. LL IL

                                                               .j I

BT 1 8784 1350.83 8784 1479.00 I 13H34 BT 3 ST 1 8780, 8784 138839 1249.64 1368.61 8780 8784 1537.27 1411.54 1508.13 1475 +2.2% YES 13H35 1244.25 1417.40 1373 +3.2% YES I 13H36 BT 3 BT 1 8780 8784 1238-87 1344.08 1385.23 8780 8784 1423.27 1546.46 1555.27 1484 .4.8% YES BT 3 8780 1426.63 8780 1564.09 I 13H37 BT 1 8784 1387.69 1289.87 8784 1394.68 1415.68 1368 +3.5% YES ST 3 8780 1212.05 8780 1436.69 ,I 46H20 BT 4 BT 6 8780 8784 1269.04 1327.22 1298.13 8780 8784 1486.98 1502.61 1494.79 1467 *1.9% YES I 46H21 BT 4 BT 6 8780 8784 1319.34 1340.71 1330.02 8780 8784 1503.74 1499.24 1501.49 1441 *4.2% YES BT 4 8780 1315.98 8780 1567.45 I 46H22 BT 6 8784 1306.98 1311.48 8784 150935 1538.40 1486 *3.5% YES BT 4 8780 1338.10 8780 1486.98 I 46H23 BT 6 ST 2 8784 8784 1323.85 1249.54 1329.07 8784 8780 1475.62 1443.39 1481.30 1425 -4.0% YES 62H30 1290.84 1467.71 1413 +3.9% YES 1 62H31 BT 6 BT 2 9501 8780 1332.05 1269.04 1269.04 9501 8780 1492.04 1488.98 1486.98 1475 40.8% YES BT6 NIA NIA NIA NIA I 62H32 BT 2 BT 6" 8780 N/A 1332.75 NA 1332.75 8780 NIA 149704 N/A 1497.04 1455 +2.9% YES I 62H33 BT 2 8780 8784 1242.22 1384.56 1313.39 8780 8784 1488.98 1502.81 1494.79 1461 +2.3% YES I

  • TENDON NOT ACCESSABLE AT BUTTRESS 6 - RESTORATION ONE END ONLY.

-I I

I DOCUMENT NUMBER: CR-N1002-504 REVISION: 0 PAGE: 41 I DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 30'M YEAR CONTAINMENT IW. INSPECTION 30'M YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 01124/08 I AT-iI AN q I TENDON AALV (KIPS) NORMALIZING FACTOR INORMALIZED AALV (KIPS) NORMALIZED GROUP AVE. MIMUM REQUIRED NORMALIZED ACCEPT. FORCE I 12V01 45V20 1559.95 1456.80

                                 -9 7

1550.95 1463.80 1535,23 1149 YES 61V08 1505.98 23 1528.98 I 61V17 131433 1580.18 130646 17 62 1597.18 1388.46 131434 1388.61 -47 1321.61 I 131135 13H36 1244.25 1385.23 58

                               .56 1300,25 1329.23 131437       1289.87          61           1350.87 I  131138 42H46 1395.05 1558.63
                               -17
                                -28 1378.05 1530.63 46H19        1358.61           25          1383.61 I  46H20 46H21 1298.13 133002
                                -39
                               -12 1259.13 1318.02 1347.38            1252.             YES 460122       1311.48          .57          1254.48 I  461123 46H24 1329.97 1425.85 4

44 1333.97 1381.85 51H34 1484.70 -59 140570 I 621129 62H30 1369.63 1290.84 7 14 1376.63 1304.84 62H33 1313.39 -32 1281.39 U 621H34 D129 1378.71 1289.64

                                 -5 34 1373.71 1323.64 D212        1277.81           15           1292.81          136733            1215              YES I   D238         1511.53         -26           1485.53 I

I I I I I}}