ML16286A081

From kanterella
Revision as of 02:43, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning
ML16286A081
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/12/2016
From: Lyon F
Plant Licensing Branch IV
To: Matzke E
Omaha Public Power District
References
MF8437
Download: ML16286A081 (2)


Text

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Wednesday, October 12, 2016 9:01 AM To: MATZKE, ERICK P

Subject:

Acceptance Review (CAC No. MF8437)

By letter dated September 28, 2016, OPPD submitted a license amendment request for FCS. The proposed amendment would modify the TSs to make administrative changes to align staffing requirements to those required for decommissioning FCS. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours4.167 days <br />0.595 weeks <br />0.137 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is September 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

1

Hearing Identifier: NRR_PMDA Email Number: 3094 Mail Envelope Properties (Fred.Lyon@nrc.gov20161012090100)

Subject:

Acceptance Review (CAC No. MF8437)

Sent Date: 10/12/2016 9:01:13 AM Received Date: 10/12/2016 9:01:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"MATZKE, ERICK P" <ematzke@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3145 10/12/2016 9:01:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: