ML17053B320

From kanterella
Revision as of 23:59, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - McGuire Nuclear Station, Units. 1 and 2 - Acceptance of Requested Licensing Action Amendment for TSTF-340-A, Rev. 3 - Allow 7 Day Completion Time for a Turbine-Driven AFW Pump Inoperable (CACs MF9117-8)
ML17053B320
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/22/2017
From: Michael Mahoney
Plant Licensing Branch II
To: Vu P
Duke Energy Corp
References
MF9117, MF9118
Download: ML17053B320 (3)


Text

NRR-PMDAPEm Resource From: Mahoney, Michael Sent: Wednesday, February 22, 2017 2:10 PM To: 'PT Vu' Cc: 'Jeff Thomas (Jeff.Thomas@duke-energy.com)'

Subject:

McGuire Nuclear Station, Units. 1 and 2 - Acceptance of Requested Licensing Action Re: Amendment for TSTF-340-A, Rev. 3 - "Allow 7 Day Completion Time for a Turbine-Driven AFW Pump Inoperable" (CACs MF9117-8)

PT, By letter dated January 11, 2017, Duke Energy submitted a license amendment request (LAR) for McGuire Nuclear Station, Units 1 and 2. The LAR adopts TSTF-340-A, Rev. 3 - "Allow 7 Day Completion Time for a Turbine-Driven AFW Pump Inoperable" (CACs MF9117-8).

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is January, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Thanks Mike Michael Mahoney McGuire and Catawba Project Manager, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV 1

2 Hearing Identifier: NRR_PMDA Email Number: 3360 Mail Envelope Properties (55340c9e1e4e4801b675bea508a54e66)

Subject:

McGuire Nuclear Station, Units. 1 and 2 - Acceptance of Requested Licensing Action Re: Amendment for TSTF-340-A, Rev. 3 - "Allow 7 Day Completion Time for a Turbine-Driven AFW Pump Inoperable" (CACs MF9117-8)

Sent Date: 2/22/2017 2:10:05 PM Received Date: 2/22/2017 2:10:07 PM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:

"'Jeff Thomas (Jeff.Thomas@duke-energy.com)'" <Jeff.Thomas@duke-energy.com>

Tracking Status: None

"'PT Vu'" <Phong.Vu@duke-energy.com>

Tracking Status: None Post Office: R4PWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 2751 2/22/2017 2:10:07 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: