Arkansas Nuclear One, Denial of Non-Cited Violation, IR 05000313/2015002 and 05000368/2015002
ML15282A338
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/09/2015
From: Gepford H J
NRC/RGN-IV/DRS/PSB-2
To: Jeremy G. Browning
Entergy Operations
H. Gepford
References
EA-15-194, IR 2015002
Download: ML15282A338 (3)


See also: IR 05000313/2015002

Text

October 9, 2015

EA-15-194 Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT: DENIAL OF NON-CITED VIOLATION, NRC REPORT 05000313/2015002 AND 05000368/2015002

Dear Mr. Browning:

This letter acknowledges your September 3, 2015, correspondence in response to our letter, dated August 5, 2015. On August 5, 2015, the U.S. Nuclear Regulatory Commission (NRC) documented Arkansas Nuclear One's failure to establish and maintain an adequate testing program for the fuel oil transfer piping for Units 1 and 2. This violation was documented as Non-cited Violation (NCV)05000313/2015002-04; 05000368/2015002-04, "Failure to Perform Testing of Diesel Fuel Oil Transfer Piping." The non-cited violation enclosed in NRC Inspection Report 05000313/2015002 and 05000368/2015002 (ML15218A371) required you to respond in writing within 30 days. On September 3, 2015, the NRC received a letter from you contesting this violation. The NRC is currently reviewing your basis for contesting the violation in accordance with Part I, Chapter 2, Section 2.2.8, of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written response within 90 days of the receipt of your letter. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS) ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html the Public Electronic Reading Room).

Sincerely,/RA/

Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-313, 50-368 License: DPR-51, NPF-6 October 9, 2015 EA-15-194 Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT: DENIAL OF NON-CITED VIOLATION, NRC REPORT 05000313/2015002 AND 05000368/2015002

Dear Mr. Browning:

This letter acknowledges your September 3, 2015, correspondence in response to our letter, dated August 5, 2015. On August 5, 2015, the U.S. Nuclear Regulatory Commission (NRC) documented Arkansas Nuclear One's failure to establish and maintain an adequate testing program for the fuel oil transfer piping for Units 1 and 2. This violation was documented as Non-cited Violation (NCV)05000313/2015002-04; 05000368/2015002-04, "Failure to Perform Testing of Diesel Fuel Oil Transfer Piping." The non-cited violation enclosed in NRC Inspection Report 05000313/2015002 and 05000368/2015002 (ML15218A371) required you to respond in writing within 30 days.

On September 3, 2015, the NRC received a letter from you contesting this violation. The NRC is currently reviewing your basis for contesting the violation in accordance with Part I, Chapter 2, Section 2.2.8, of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written response within 90 days of the receipt of your letter. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS) ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html the Public Electronic Reading Room).

Sincerely,/RA/

Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-313, 50-368 License: DPR-51, NPF-6 Distribution next page ADAMS ACCESSION NUMBER: SUNSI Review By: HJG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE DRS/PSB2 BC:DRP:E ACES:TL DRS/PSB2 NAME HJGepford NOKeefe MCHay HJGepford SIGNATURE /RA/ /RA//RA//RA/ DATE 10/9/15 10/9/15 10/9/15 10/9/15 OFFICIAL RECORD COPY Letter to Jeremy Browning from Heather Gepford, dated October 9, 2015

SUBJECT: DENIAL OF NON-CITED VIOLATION, NRC REPORT 05000313/2015002 AND 05000368/2015002

DISTRIBUTION Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov) Resident Inspector (Andy .Barrett@nrc.gov) Resident Inspector (Margaret.Tobin@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/E (John.Dixon@nrc.gov)

Project Engineer, DRP/E (Brian.Correll@nrc.gov) Project Engineer, DRP/E (Jackson.Choate@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROPreports