MONTHYEARML24289A1442024-10-15015 October 2024 NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML24031A2772023-11-27027 November 2023 (05000458/2024040) IP 95001 Regarding EA-23-071 Initial Request for Information ML24102A2442023-09-22022 September 2023 NRR E-mail Capture - Audit Question TSTF-505 and 50.69 ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23103A4662023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23103A4672023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23089A0702023-03-29029 March 2023 TSTF-505 Email Providing Reference for 0.3g HCLPF Value ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML21356A5882021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: River Bend Station 1 - IST Program Relief Request for PIV Testing Frequency ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21218A0412021-07-19019 July 2021 NRR E-mail Capture - River Bend Unit 1 - Acceptance of License Amendment Request to Add License Condition Concerning Receipt, Possession ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20337A1382020-11-23023 November 2020 Acceptance of License Amendment Request to Adopt GL 86-10 Standard License Condition for Fire Protection ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20317A2922020-10-15015 October 2020 Entergy Operations, Inc. (River Bend Station, Unit 1) - Acceptance Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20169A3782020-06-16016 June 2020 Email-20-0196-NRC Riv Response V. Dricks to Tom Gurdziel Inquiry: Extent of Condition Flex Equipment ML20169A6752020-05-20020 May 2020 Email-20-0196, Tom Gurdziel Inquiry to NRC Chairman Resource, Extent of Condition FLEX Equipment, 05/20/2020 ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20086J6572020-03-26026 March 2020 NRR E-mail Capture - River Bend Station, Unit 1 -Acceptance Review of the LAR Associated with Extending the Implementation Date from 5/13/2020 to 9/30/2020 for Emergency Action Level Scheme ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19008A3592019-01-0808 January 2019 NRR E-mail Capture - Acceptance Review: RR Volumetric Exams (L-2018-LLR-0388) ML18365A1422018-12-28028 December 2018 NRR E-mail Capture - Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489) 2024-05-16
[Table view] |
Text
NRR-DMPSPEm Resource From: Regner, Lisa Sent: Friday, December 28, 2018 4:11 PM To: Schenk, Timothy A; bjohns (bjohns@entergy.com)
Cc: Regner, Lisa
Subject:
Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489)
By letter dated November 29, 2018, Entergy submitted a license amendment for River Bend Station. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request to remove the Technical Specification (TS) Table of Contents from the authority file and allow the licensees to control this administrative portion of the TSs. The acceptance review was performed to determine if there is sufficient information in scope and depth to allow the NRC staff to complete its detailed review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide information in sufficient detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 50 hours2.083 days <br />0.298 weeks <br />0.0685 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months. If there are emergent issues in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any question, please contact me, Lisa Regner, at Lisa.Regner@nrc.gov or 301-415-1906.
Lisa Regner Sr. Project Manager NRR/DORL/LPL4 301-415-1906 O9D14 1
Hearing Identifier: NRR_DMPS Email Number: 726 Mail Envelope Properties (BN6PR09MB1491B3334CE6D1DD2A145B06E5B70)
Subject:
Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489)
Sent Date: 12/28/2018 4:11:00 PM Received Date: 12/28/2018 4:11:00 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "Schenk, Timothy A" <TSCHENK@entergy.com>
Tracking Status: None "bjohns (bjohns@entergy.com)" <bjohns@entergy.com>
Tracking Status: None Post Office: BN6PR09MB1491.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2701 12/28/2018 4:11:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: