ML19094B587
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML19094B587 | |
Person / Time | |
---|---|
Site: | NuScale |
Issue date: | 04/04/2019 |
From: | Rad Z NuScale |
To: | Document Control Desk, Office of New Reactors |
References | |
LO-0419-65031 | |
Download: ML19094B587 (11) | |
Similar Documents at NuScale | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML19297G6462019-10-24024 October 2019
[Table view]LLC Submittal of Changes to Final Safety Analysis Report, Tier 1, Chapter 5.0, Site Parameters, Tier 2, Section 1.8, Interfaces with Certified Design, Table 1.9-3, Conformance with NUREG-0800, Standard Review Plan (SRP) and Design.. ML19290F3632019-10-17017 October 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 3.9.1, Special Topics for Mechanical Components ML19172A1742019-06-21021 June 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 2.5.4, Stability of Subsurface Materials and Foundations ML19158A4562019-06-0707 June 2019 LLC Submittal of Changes to Final Safety Analysis Report, Chapter 20, Mitigation of Beyond Design Basis Events. ML19151A7932019-05-31031 May 2019 LLC - Submittal of Changes to Final Safety Analysis Report Section 3.2, Classification of Structures, Systems, and Components, Section 3.9, Mechanical Systems and Components, and Section 17.4, Reliability Assurance Program, Related ML19151A8342019-05-31031 May 2019 LLC - Submittal of Turbine Missile Barrier Design Closure Plan Actions (Final Safety Analysis Report, Tier 2, Section 3.5.1.3) ML19142A3972019-05-22022 May 2019 LLC Submittal of Changes to Final Safety Analysis Report, Section 19.2, Severe Accident Evaluation ML19114A5522019-04-24024 April 2019 LLC Submittal of Changes to Final Safety Analysis Report, Section 14.3, Certified Design Material and Inspections, Test, Analyses, and Acceptance Criteria. ML19112A2202019-04-19019 April 2019 Submittal of Changes to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Chapter 3, Design of Structures, Systems, Components and Equipment, Chapter 12, Radiation Protection, & Chapter 15, ... ML19105B2922019-04-15015 April 2019 LLC - Submittal of Changes to Final Safety Analysis Report Related to the Decay Heat Removal System and Emergency Core Cooling System Actuation Logic ML19094B5872019-04-0404 April 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1 Section 2.1 NuScale Power Module, Tier 1 Section 3.6 Ultimate Heat Sink, & Tier 2 Section 14.3 Certified Design Material & Inspections, Tests, Analyses, and Accept. ML19092A4482019-04-0202 April 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 6.4 Control Room Habitability and Section 14.2 Initial Plant Test Program. ML19088A3312019-03-29029 March 2019 LLC - Submittal of Response to NRC Information Requests Changes to Final Safety Analysis Report, Section 3.7.2, Seismic Design and Appendix 3B, Design Report and Critical Section Details. ML19073A3312019-03-14014 March 2019 LLC Submittal of Changes to Part 2, NuScale Final Safety Analysis Report, Part 4, Technical Specifications and Part 7, Exemptions ML18257A3102018-09-14014 September 2018 LLC Submittal of NRC Request to Provide Information on the Final Safety Analysis Report Section 14.2, Initial Plant Test Program ML18247A1862018-09-0404 September 2018 LLC Submittal of Changes to Final Safety Analysis Report, Section 7.0, Instrumentation and Controls - Introduction and Overview, and Section 7.1, Fundamental Design Principles ML18235A6882018-08-22022 August 2018 E-mail from Carrie Fosaaen to Omid Tabatabai Regarding Clarification Call - FSAR, Tier 2, Section 10.4.11 ML18194A6482018-07-13013 July 2018 LLC - Submittal of Changes to Final Safety Analysis Report Section 7.2, System Features, Technical Specifications Section 1.1, Definitions, and the Bases of Technical Specifications Section 3.3, Instrumentation ML18191B2622018-07-10010 July 2018 LLC - Submittal of Changes to Final Safety Analysis Report, Section 10.4.7, Condensate and Feedwater System ML18149A4042018-05-25025 May 2018 LLC Submittal of Changes to Tier 1 and Tier 2 of the NuScale Final Safety Analysis Report ML18044B0772018-02-13013 February 2018 LLC Submittal of Changes to Final Safety Analysis Report, Section 1. Interfaces with Certified Design and Section 7.0, Instrumentation and Controls - Introduction and Overview. ML17342B3432017-12-0808 December 2017 LLC - Submittal of Changes to Part 2 Tier 2 Final Safety Analysis Report, Chapters 1, 4 and 15 and Part 4, Technical Specifications ML17321B0902017-11-17017 November 2017 LLC Submittal of Changes to Final Safety Analysis Report, Section 8.4 ML17215B0362017-08-0303 August 2017 LLC Submittal of Changes to Final Safety Analysis Report, Section 19.1.5.1, Seismic Risk Evaluation. 2019-06-07 Category:Letter MONTHYEARML23234A1232024-03-28028 March 2024
[Table view]US600 DC and SDA 50.46 Exemption - Letter ML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 2024-03-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19094B587&oldid=2523917"