ML19297G64624 October 2019LLC Submittal of Changes to Final Safety Analysis Report, Tier 1, Chapter 5.0, Site Parameters, Tier 2, Section 1.8, Interfaces with Certified Design, Table 1.9-3, Conformance with NUREG-0800, Standard Review Plan (SRP) and Design..Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Earthquake
ML19290F36317 October 2019LLC - Submittal of Changes to Final Safety Analysis Report, Section 3.9.1, Special Topics for Mechanical Components
ML19172A17421 June 2019LLC - Submittal of Changes to Final Safety Analysis Report, Section 2.5.4, Stability of Subsurface Materials and FoundationsSafe Shutdown Earthquake
Tornado Generated Missile
Earthquake
ML19158A4567 June 2019LLC Submittal of Changes to Final Safety Analysis Report, Chapter 20, Mitigation of Beyond Design Basis Events.Safe Shutdown
High winds
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
ML19151A79331 May 2019LLC - Submittal of Changes to Final Safety Analysis Report Section 3.2, Classification of Structures, Systems, and Components, Section 3.9, Mechanical Systems and Components, and Section 17.4, Reliability Assurance Program, RelatedSafe Shutdown
Ultimate heat sink
Power change
ML19151A83431 May 2019LLC - Submittal of Turbine Missile Barrier Design Closure Plan Actions (Final Safety Analysis Report, Tier 2, Section 3.5.1.3)Finite Element Analysis
Turbine Missile
ML19142A39722 May 2019LLC Submittal of Changes to Final Safety Analysis Report, Section 19.2, Severe Accident Evaluation
ML19114A55224 April 2019LLC Submittal of Changes to Final Safety Analysis Report, Section 14.3, Certified Design Material and Inspections, Test, Analyses, and Acceptance Criteria.
ML19112A22019 April 2019Submittal of Changes to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Chapter 3, Design of Structures, Systems, Components and Equipment, Chapter 12, Radiation Protection, & Chapter 15, ...Safe Shutdown
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Deep Dose Equivalent
Fuel cladding
ML19105B29215 April 2019LLC - Submittal of Changes to Final Safety Analysis Report Related to the Decay Heat Removal System and Emergency Core Cooling System Actuation LogicSafe Shutdown
Ultimate heat sink
Mission time
Anticipated operational occurrence
Safe Shutdown Earthquake
Surveillance Frequency Control Program
Earthquake
Power change
ML19094B5874 April 2019LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1 Section 2.1 NuScale Power Module, Tier 1 Section 3.6 Ultimate Heat Sink, & Tier 2 Section 14.3 Certified Design Material & Inspections, Tests, Analyses, and Accept.Ultimate heat sink
ML19092A4482 April 2019LLC - Submittal of Changes to Final Safety Analysis Report, Section 6.4 Control Room Habitability and Section 14.2 Initial Plant Test Program.Loop seal
Ultimate heat sink
Grab sample
Pressure Boundary Leakage
ML19088A33129 March 2019LLC - Submittal of Response to NRC Information Requests Changes to Final Safety Analysis Report, Section 3.7.2, Seismic Design and Appendix 3B, Design Report and Critical Section Details.
ML19073A33114 March 2019LLC Submittal of Changes to Part 2, NuScale Final Safety Analysis Report, Part 4, Technical Specifications and Part 7, ExemptionsSafe Shutdown
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Surveillance Frequency Control Program
Exemption Request
Earthquake
Fire Protection Program
ML18257A31014 September 2018LLC Submittal of NRC Request to Provide Information on the Final Safety Analysis Report Section 14.2, Initial Plant Test ProgramHealth Physics Network
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Squib
Emergency Lighting
Coast down
ML18247A1864 September 2018LLC Submittal of Changes to Final Safety Analysis Report, Section 7.0, Instrumentation and Controls - Introduction and Overview, and Section 7.1, Fundamental Design PrinciplesAnticipated operational occurrence
ML18235A68822 August 2018E-mail from Carrie Fosaaen to Omid Tabatabai Regarding Clarification Call - FSAR, Tier 2, Section 10.4.11
ML18194A64813 July 2018LLC - Submittal of Changes to Final Safety Analysis Report Section 7.2, System Features, Technical Specifications Section 1.1, Definitions, and the Bases of Technical Specifications Section 3.3, InstrumentationSurveillance Frequency Control Program
ML18191B26210 July 2018LLC - Submittal of Changes to Final Safety Analysis Report, Section 10.4.7, Condensate and Feedwater System
ML18149A40425 May 2018LLC Submittal of Changes to Tier 1 and Tier 2 of the NuScale Final Safety Analysis ReportBoric Acid
Anticipated operational occurrence
Tornado Missile
Severe Accident Management Guideline
Earthquake
ML18044B07713 February 2018LLC Submittal of Changes to Final Safety Analysis Report, Section 1. Interfaces with Certified Design and Section 7.0, Instrumentation and Controls - Introduction and Overview.Power change
ML17342B3438 December 2017LLC - Submittal of Changes to Part 2 Tier 2 Final Safety Analysis Report, Chapters 1, 4 and 15 and Part 4, Technical SpecificationsShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Internal Flooding
Nondestructive Examination
Fuel cladding
ML17321B09017 November 2017LLC Submittal of Changes to Final Safety Analysis Report, Section 8.4Emergency Lighting
ML17215B0363 August 2017LLC Submittal of Changes to Final Safety Analysis Report, Section 19.1.5.1, Seismic Risk Evaluation.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake