Letter Sequence Meeting |
---|
|
|
MONTHYEARML13214A3532013-08-0606 August 2013 Notice of Forthcoming Pre-Application Meeting with Constellation Energy Nuclear Group, LLC (MF2516 and MF2517) Project stage: Meeting ML13234A3852013-08-19019 August 2013 NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff Project stage: Meeting ML13310A8442013-11-14014 November 2013 Summary of Meeting with Constellation Energy Nuclear Group, LLC, on the Pre-Application of the National Fire Protection Association Standard 805 Project stage: Meeting 2013-08-19
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18190A3922018-06-14014 June 2018 Licensee Presentation Material for June 14, 2018 Public Meeting ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18096A0222018-04-0404 April 2018 Annual Assessment Meeting 04/04/2018 Handouts ML18096A9902018-03-12012 March 2018 NRC Pre-Submittal Call Briefing Notes, Calvert Cliffs Emergency Planning Future Licensing Actions ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17143A1612017-05-23023 May 2017 Annual Assessment Meeting Handout and Sign in Sheet ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9102014-08-18018 August 2014 Enclosure - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-01-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9102014-08-18018 August 2014 Enclosure - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9092014-08-18018 August 2014 Enclosure - Generic Concrete AMP CC ISFSI - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9082014-08-18018 August 2014 Enclosure - Elements of an AMP CC ISFSI - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-01-30
[Table view] |
Text
CENG~
a joint venture of------__.
Constellation ..* ~ eDF Energy' ~,.
Calvert Cliffs Nuclear Power Plant
~
- ~.,....~- NFPA80S
~:~
-C-'.II, _~
'7
"'-:'-~-
~- " ---..>
_ ............... License Amendment Request
~<).~
Pre-Application Meeting with NRC Staff August 19, 2013
Introd uctions
- Elliott Flick Gen'l Manager, Fleet Engineering
- Dave Dellario Manager, Engineering Services
- Jim McQuighan Project Manager, NFPA 805
- Paul Darby Principal Engineer, NFPA 805
- Pat Furio Principal Engineer, Licensing
- Jeff Stone Supervisor, PRA
- Jim Landale Principal Engineer, PRA
- Bret Colby Supervisor, Engineering
- Ch ris Dobry Principal Engineer, Engineering
- Mark Crompton EPM, NFPA 805 Project Manager
~ --
-~ f~~"':: -
CENG..
a )CIn1-nure 01._ _ _ _ __ ~-:-l-
~- -c-: --- - ~
=.wE "'"
I)~: ~::. - -- ':.*~ eDF 2
Agenda Overview of CCN PP
- Current Fire Protection Licensing Basis
- Implementation Overview Summary
/;...;7-
<~-
CENG.. I a joont ventum o f - -_ _ _,
~-"- k
~;J ~~ -~ --:~~~- - .r
- "!-'eor:
01' 3
Overview of CCNPP
- Two PWRs, each rated @ 2737 MWth
- Combustion Engineering NSSS Commercial operations began in 1975/1977
- Renewed Operating License issued - expires in 2034/2036
-'7-
- --~--
...:>-~
CENG.
8)oint VEWTlure 011- _ _ _ __
I
...... -:*t
<'"" .- . . .."-~-
J~.- " -.,.
~f " eOF 4
Current Fire Protection Licensing Basis
- Branch Technical Position APCSB 9.5-1, Appendix A
.. ~7~ CENG.. I
- --~- ..:..---'*k Iii ~~- - -.' ----
'. ,,)001II8I'I1U19 "'- - - - - - ,
~
~ ..f"' eDf
~ -" 5
NFPA 805 Transition Project Overview
- License Amendment Request (LAR) committed submittal date - September 30, 2013
- Using the Nuclear Energy Institute (NEI) LAR template
- Web portal will be established to support NRC review
--~~-
~~7--- CENG_
a joini venliml 01_ _ __ _ -,
I
~~ - k
'\:.:" ~: --""- ,,~
~-
.;.' - ' ~. - -
&.w ..*..eDF
~~
6
NFPA 805 Transi,t ion Project Overview
- License Condition being revised
- Technical Specifications being revised
- Reviewed existing exemptions
- Three exemptions will be credited post-NFPA 805 transition
~.
_ 19".:-"
,~-
,~~-..
s-:
._.~!z,;;.
CENG_
B lOinI\llllltura af- ~
- ".~eDf
~'"
I
.'. 7
Compliance with NFPA 80S NFPA 805 Chapter 3 Compliance
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 Review documented in B-1 Table (Attachment A of LAR)
Results of review
- 3 Code compliance modifications
- 7 sections are addressed via Attachment L of LAR.
- 96 Sections/sub-sections comply
- 43 Comply with clarifications/EEEEs/required actions
- 16 Comply by previous NRC approval
. ~-,- - CENG.. I ".
,-::.-'~---
" -c""': -.~--~-.
a joInI venture 01'_ _ _ _--, ~~-k 1 ~'- ~ . ~ <1-.
- J - .,y ..*.. eDf 8
Compliance with NFPA 805
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040
- Fire modeling not used to eliminate or reduce pinch points
- Recovery actions are not credited
- Results of review
- All success paths identified
- Component list associated with maintaining Key Safety Functions
- Recommendations to manage Fire Risk ci:~'
CENGw I
"';.'~-
~. -
~ - -.~ - -.;,.. ajant ventuteo! _ ~ '~-'
- ~- . - ..' ....eDf
.-~
9
Compliance with NFPA 805
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056
- Plant evaluated on a room by room basis
- Credit engineering controls and CENG offsite dose calculation for gaseous and liquid effluents
- Reviewed Pre-Fire Plan and training materials to clarify monitoring and control requirements
- Minor Pre-Fire Plan/procedure changes and training program revisions in progress.
4#9:"'::'
-~.,- CENG. ..; . ~-wI
j~.-'
- -c:- * -., -~~
~ - -
a joint venture of _ ~
-EI-wY ~eDF
-- 4' 10
Compliance with NFPA-80S
- Nuclear Safety Capability Assessment Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054
- Safe and Stable defined as Hot Standby
- Common Enclosure review (Protection)
- Common Power Supply review (Coordination)
Fire Area review
- Multiple Spurious Operations review
- Effects of suppression activities review Results of review
- 21 Fire Areas to be transitioned deterministically
- 46 Fire Areas to be transitioned using Fire Risk Evaluations
..,~~
CENG.. I '*
~~-
~ --~-
a joht _01,- -___ ~~ - -.t
('-., *Cn
Compliance with NFPA 805 Recovery Actions Feasibility Assessment
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030
- Primary Control Station (Other than main Control Room)
- Alternate Shutdown Panels 1(2)C43
- Recovery actions listed in LAR Attachment G
- There was over 85% reduction in operator recovery actions
- J#Z7-
-~-,~-
~:
1-~- -__
~
CENG.
a pot venture 011- _ _ _---,
~
~
-'~
~~
eDF
~-" , .
12
Compliance with NFPA 805
- Following FAQ 10-0059, Revision 5 guidance NSCA and Fire PRA components
- If any new functions, will be added to Maintenance Rule Program Non-Power Operation components, radioactive release systems, Fire Protection program components
- To be included in normal system and program health monitoring Fire Protection systems and features
- Low Safety Significant - normal system/program health monitoring
- High Safety Significant - NFPA 805 specific monitoring program that uses the Maintenance Rule program software CENG* ~-~- f
,,~7 __
--~- a janl..,lUf1l at_ _ _ _ ~
<. ~ - --~ - .:~-
5 ~:- - ~ -- .r. ....':.-. eoF 13
PRA Development/Results
- Fire PRA built on a quality Internal Events model
- Full Internal Events peer review to RG 1.200, Revision 2 in 2010
- Fire PRA followed guidance in NUREG/CR 6850 as supplemented by FAQs.
- Full peer review to RG 1.200, Revision 2 in January 2012
- Total of 41 Facts & Observations (F&Os)
- All F&Os subsequently dispositioned
- No un-reviewed methods used
- - - -~..:-
'- .::~ ~~. ---'- >.
CENG~
8~1~~ofl __________,
,..,. -"'-.t J~---::'" -
~ ...*4eDF
-...- J' 14
PRA Development/Results
- Overall Plant Risk Post-NFPA 805 Transition
- Sufficient margin to account for non-quantified hazards Unit 1 .JL Unit 2 Comments CoF LERF CoF LERF Fire PRA quantification with NFPA 3.2E-OS 3.0E-06 3.6E-OS 4.2E-06 80S modifications credited.
Internal Events PRA quantification 1.3E-OS 1.3E-06 1.0E-OS 1.3E~06 with NFPA 80S modifications credited.
IPEEE for COF. Estimate for LERF 1.7E-06 1.SE-OS 2.0E-06 based on 13% of CoF.
Tornad oes/H igh IPEEE for CoF. Estimate for LERF 4.4E-06 S.7E-07 4.4E-06 S.7E-07 Winds based on 13% of CoF.
Plant-Level Total 6.2E-OS 6.6E-06 6.SE-OS 8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.
CENG.. 1
_.... ~;.I*7~~
~- 1I)oont wrdUre 01'- - - - - ,
~ wr't _.
.~" .:?~. -- -"'~
"i ~ - - -- - -
"*~eOF
'" 15
PRA Development/Results
- Risk improvement from NFPA 805 modifications Total delta risk for B.65E-6/ryr 6.39E-7/ryr B.B7E-6/ryr 9.0BE-7/ryr plant fire scenarios Internal Events risk 1.74E-6/ryr 2.10E-B/ryr 2.26E-6/ryr 4.60E-B/ryr improvement from modifications Plant delta risk with 6.91E-6/ryr 6.1BE-7/ryr 6.61E-6/ryr B.62E-7/ryr plant modifications
- Total risk increases <lE-S for CDF and <lE-6 for LERF
- Delta risk meets criteria for RG 1.174 and NFPA 805 application
~
~~
- - ~"""-----
,~"..~~.~ -.-.-~;. ..
1"-'+*-" ':"-'
CENG.
a IC*l1 ..",ture
--..r 01- - - - -,
..* ... eOF
~ ...
I 16
Implementation Overview
- 15 Fire PRA related modifications
- 3 NFPA Code compliance modifications
- Process/Procedure Changes
- Fire Brigade response
- Design change process
- Training
- Operations alarm procedures, Fire Fighting Strategy Manual, hot work, lower mode (refueling outage),
AOPs/recovery actions, etc.
,::- - ~
1
_r~'
-~- -
-c;- - - -~'
CENG..
I
-" " 17
Modifications
- RCP Loss of Seal Cooling alarm and local 13 kV trip of RCPs Electrical modifications: (hot short, grounds, etc)
- Reactor vessel head and Pressurizer vents
- Main Steam Isolation Valve control
- Steam Generator blowdown control valves
- Normal sump motor operated valves
- Hydrogen purge valves
- Component cooling water heat exchanger flow control valve
- Pressurizer Power Operated Relief Valves Auxiliary Feedwater steam admission valves
- Reactor Coolant Pump breaker control 4kV breaker control
- Cable Spreading Room dampers
- Cable replacement and lighting transformer protection
- .-~..:- CENG. ..,. WI'"'
I
_.eo L
~";'~ ..:.- ~; ------~
j~.' ' 18
Summary
- Complete LAR to be submitted on or before September 30, 2013
- No un-reviewed methods or deviations from approved Fire PRA methods
- Modifications will be required and are being planned
- Assumes 2 year NRC review
- Consistent with other submittals
- Implement procedure/process changes 6 months after SER
- Completion of modifications for both units following SER approval- April 2018
.;,1;
-z~
--\.~- ~
CENG. . -,
~-"- .
-' .¢;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,
'i~:--- ' -- -
- . . .- ...*:-eoF
.6.
19