MONTHYEARB17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With B17748, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With B17693, Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With B17694, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With B17701, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With B17627, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With B17617, Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with B17461, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With B17460, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With B17576, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With B17579, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With ML20195E1871998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 2 B17545, Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With ML20195F9821998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Millstone,Unit 3 B17497, Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With ML20195F9871998-09-30030 September 1998 Corrected Page to MOR for Sept 1998 for Millstone,Unit 3 B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With B17437, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 21998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 2 ML20195E2061998-08-31031 August 1998 Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2 B17441, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With B17450, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With B17410, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 31998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 3 B17406, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 1 B17404, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 2 B17365, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 2 B17366, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 3 B17369, Monthly Operating Rept for June 1998 for Mnps,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Mnps,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
~
r .
r 1
.j UES General Offices
1 .ma minenicae cw= P.O. BOX 270 ,
.a er .rea miatod "
HARTFORD. CONNECTICUT 061410270 k L -J [7,[*[ , CC',"", (203) 665-5000 l
i s December 12, 1989 MP-13853 l Re: 10CFR50.71(a) -
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Facility Operating License No. NPF-49 ]
Docket No. 50-423 4
Dear' Sir:
In-accordance with reporting requirements of technical specifica-
-tions Section-6.9.1.5, the Millstone Nuclear Power Station - Unit l 3 Monthly Operating Report 89-12 covering operation for the month of November is hereby forwarded.
e very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY' a
8 (f5&
Stephe,h l
n E. Scace l Station Superintendent
! Millstone Nuclear Power Station i V 1 l-l I l
h . .
Attachment l
l cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 &3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 8912200194 891130 PDR FJ.iOCK0500g3 g / j.
R f h
~
g/e -
8 om .
f,f ;, s ' "
[-J Yllll% ',
~
8Itit8i NRC DPERA!!N6 STATUS REPORT COMPLETED Bt REACTOR ENGINEERIN6 IIIIIii h,
W ".
"16 C0CKET.... 50-423~ OPERATINGSTATUS:
~
e2.= REPORilN6 PERIOD...NDVEMBER 1989' DUTABE + DNLINE HOURS.. 59.0 : + 66't.0 = 720.0 k- ? 3.LUTILITY C0NTACf.'...........'.....A. 1 ELMS ?03 444 5388 tiI8Itit8IIi1 -
h - 4. LICENSED THERM AL P0WER; . i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3411 - 8 MILLSTONE I M - r '-' 5. NAMEPLATE RAllN6_(6ROSS MWE)................................... 1,253 MW. . I UNii 3 E , t .
- 6. DESIBN ELECTRICAL RATIN6 (NET MWE).............................. 1,153.6 tIIIIII8IIi88 '
y ?7.? MAf! MUM' DEPENDABLE CAPACITV (6ROSS MWE)........................ 1,104.2 G -
-8.l-MAXIMUM DEPENDABLE CAPACliY (NET MWE)..............-'............ 1,137.0 f' ; 9 71F CHANGES DCCUR AB0VE SINCE LAST REPORT, REASONS ARE.......... 4 (x ' N/A :
DM t10.=POWERLEVELTONHICHRESTRICTED,IF.ANY.-(NETMWE)...............N/A
% .'114. REASON FOR RESTRICil0N,-!F ANY....N/A MONTH. YEAR 10 DATE' CUMULATIVE-10DATEL
- 33333 333333333238 ' 'B23*Itttas353338SB.
t hy, 12.HOURSINREPORilN6 PERIOD 720.0 0,016.0- 31,632.0-
- 13. NUMBER OF HOURS THE REACTOR WAS CRiflCAL 668.8 6,121.4 : '25,081.2-
- s ,
- 14. REACTOR RESERVE SHUIDOWN HOURS 0.0: :29.0 '723.9 ww h
~ ~
I!5.' HOURS 6ENERATOR ONLINE. 661.0; 6,036.7 - 24,583.3~
e
, '16.UNITRESERVESHUIDOWNHOURS-0.0 ' 0. 0 - 0.0-O _
'17.GROSSTHERMALENER6Y6ENERATED(MWH) 2,147,662.0 19,799,214.0T 81,347,355.4l
<18,6ROSSELECTRICALENER6YBENERATED(MWH)- -736,309.5 6,756,096.0- 28,0!$,489.5 4
19.NETELECTRICALENER6YGENERATED(MWH) 703,717.0- 6,441,698.9~ 26,719,960.8
~
i i 20.nUNIT SERVICE FACTOR '91.0 75.3 77.7
=21.' UNIT AVAILABILl1Y FACTOR 91.8 75.3 77.7 m , . . .
l
~
22.UN!iCAPAClfYFACTOR(USINGMDCNET). 86.0 70.7' 74.0 23.UNiiCAPACITY. FACTOR (USINGDERNET) 84,7 69.7 .73.2
. . . h 24.' UNIT FORCED OUTAGE RATE 8.2 8.0 9.1
- 25. UNIT _ FORCED 00TABE HOURS 59.0 527.2 2,475.2 SHUTDOWNS SCHEDULED DVER NEXT SIX MONTHS (TYPE, DATE, AND DURAi!0N OF EACH).............. !
N/A
~{
l IF CURRENTLY. SHUTDOWN, ESilMATED STARTUP DATE......Decester 6 1989 l
.. i m..
nn r ,
r t'
AVERAGE DAILY UNIT KMER LEVEL DCCKET NO, 50-423_ ,
UNIT Milletone Unit 3 DATE 12-Q4-1&&8 !
~ COMPLETED BY A. L. ELMS 203-4H-5388 MONTH' [1QYEMBEB DAY AVERAGE DAILY KMER LEVEL DAY AVERAGE DAILY PCMER LEVEL (MWE-NET) (INE-NET) 1
.1 - 1.128 16 944 4 l
- .{
2 1.115 17 943 j 3 1.128 18 1.133 4 1_.123 19 1.131 1
5 1.128 20 1.129 6 ,, 1.125 21 1.d13
, 7- 1.128' 22 L 158 ;
i 8 1.130 23 1.132 .i k
9 1.129 24 1.134 -l 10 1.034 25 1.135
- 11 _ 211 26 1.134 12 722 27 1.138 j 13 1.013 _. 28 783 14 1.129 29 0 l
1 15 1. ~134 30 0 l 1
I 4
a q
. I-DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME -MILIsIONE 3 NOVEMBER 1989 DATE .. 7. 59 COMPLETED BY h Elms.
TELEPHONE (201 ) 444-5388 No. Date e Dura- Reason Method of Licensee System Component Cause and Corrective
( tion (2) Shut down Event Code Code Action to Prevent Hours Reactor (3) Rept No. Prevent Recurrence The turbine electric 89-10 11/11/89 F 6.7 A N/A N/A TG PSV solenoid valve, failed meet its surv9111gnce to acceptance criteria. The cause of th9 failure had been determined to be pqrticulate contamina -
tion. As corrective ac-tion both the 91ectrical
, trip,and solenoid valves i were replaced.
Shutdown reactor due to 89-11 11/28/89 F 52.3 A 1 89-031-00 AB RV C pressurizer safety valve declared inoper-3 able. Investigation as to cause and corrective ac-tion ongoing. Refer to LER for more information.
l 1: F: Forced 2: Reasons: 3: Method 4: Exhibit G - Instructions l S: Schedules A-Equipment FailureB-Maintenance or Test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram EntW Sneets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61)
E-Operator Training & License Exam 5 previous month F-Administrative Power Reduction 5: Exhibit 1 - Same Source l G-Operational Error (Explain)
H-Other 9-Other(Duration =0 (Explain))
m
- c ,
REFUELING INFORMATION REQUEST NOVEMBER 1989 i
1
- 1. Name of facility: Millstone 3.
- 2. Scheduled date for next refueling shutdown: ,
November 17, 1990.
- 3. Scheduled date for restart following refueling:
January 15, 1991
- 4. Will refueling of resumption of operation thereafter require a technical specification change or other license amendments? +
Hl.A
- 5. Scheduled date for submitting licensing action and supporting information.
N/A.
- 6. Important licensing considerations associated with refueling, e.g., new of different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
HZA
- 7. The- number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a): 12). (b): if_q
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present size - 756 t No increase recuested.
1
- 9. The projected date of the last refueling that can be dis-l charged to the spent. fuel pool assuming the present licensed l capacity:
End of cycle S.
1
__. _ _ _ - _ . _ . - . _ _ . _ _ _ _ _ _ - _ - - - _ _ _ _ - - _