MONTHYEARB17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With B17748, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With B17693, Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With B17694, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With B17701, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With B17627, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With B17617, Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with B17461, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With B17460, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With B17576, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With B17579, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With ML20195E1871998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 2 B17545, Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With ML20195F9821998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Millstone,Unit 3 B17497, Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With ML20195F9871998-09-30030 September 1998 Corrected Page to MOR for Sept 1998 for Millstone,Unit 3 B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With B17437, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 21998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 2 ML20195E2061998-08-31031 August 1998 Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2 B17441, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With B17450, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With B17410, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 31998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 3 B17406, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 1 B17404, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 2 B17365, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 2 B17366, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 3 B17369, Monthly Operating Rept for June 1998 for Mnps,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Mnps,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
\
?
2 t -
h OPER.ulNG DATA RLl' ORT
'DOCKETNO. 50-336 DAfE 247/8.1 l CO31Pl.ETED liY S.!I. lloIIIett til l TEI Ell 10NE .(203)_4M1791 X,1 l
I OPrRAIING s r.u US
- 1. Unit Nune:
Millstone 2 Notes
- Items 21 & 22 Cumu-lative are computed by using I 2T Reporting Pesiod. Januaryl981 a weighted average.
- 3. Licenwd Tia nna! Pouir (StW:). 2700 -
4
- 4. Nam (plate Ratin;(Giow StWe): ._109 __.
- 5. Design EleciricalItating(Net 31We).870 895
- 6. .*Inimum Dependable C.,pwity (Gron .\1We): --864 3 .
- 7. Mnimum Dependahfe Cap: city (Net 31We):
' S. If Changes Occur in Capuity Ratin;s (Items Number 3 Throu;h 7) Since Last Report.Gise Reasons:
j None
- s 1
- 9. Power Lesel To Which Restricted.lf Any (Net 31We): None N/A
- 10. Reasons For Restrictions. If Any:
.}
t This Stonth Yr. to Date Cumu!.itise l
744 744 44,736 i~ 11. I!ours In Reporting Period 324.5 324.5 31,573_.8 i 12. Number Of trours Reactor Was Critical 0 0 2,076.9
- 13. Reactor Resene Shutdown Hours f
303.9 303.9 30,0TE7
- 14. !!aurs Generatur On Line 0 0 468.2 i 15. Unit Resene Shutdow n !!oun
- 16. Gross Thermal Energy Generated (31Wil) .782.184 782.184 74.017.101_. -
]1 17. Gross Electrical Energy Generated (31WII) 954;600. ... _259.600 _23 :932,517___ _
246,563 246,563 _ 22,908_,609 -
IS. Net Eicctrical Energy Generated (MWH) 1 40.8 40.8 67.2
- 19. Unit Senice Factor
- 40.8 40.8 68.3
- 20. Unit Assi13bilis'v Factor 21.' Unit Capacity l actor (U ing MDC Net) 38.4 38.4
!) 22. Unit Capacity Factor (U>ing DER Net) 38.1 .
38.1
- 60.8 Il 23. Unit Forced Outage Rate 59.2 '59.2 23.4
- 24. Shutdowns Sched iled Oser Next 6 Months (Type. Date.and Duration of Eacht:
j None -
ll I 25. If Shut Down At End Of Report Period. Estimated Date of Startup: M
- 26. Units in Test Status (Prior io Commercial Oper.ition): Forecast Achiesed N/A N/A I- INITi tL CRITICA LITY INITI A L ELECT RICITY _N/A __ N/A l~
COM\1ERCI AL OPFR ATION N/A N/A NOTE: Item 16, Gross Thermal Energy (MWH), reflects correction made due to error in December 1980, Operating Data Report.
2 mm m . , ts / 71
__ __ ____ _ . -__ _l[iflfiY:1n m _
w ,
.' AVER ACE D uty UNil l o,,ER LEVEL - - . -
DOCKET NO. 50 336 _.-
. UNir Millstone 2 ,
DA TE 2lll0I CO'.1PLETED 11Y G.H. Howlett III TEl.EPilONE (203)447-1791 X364 MONTH _ January 1981 .
DAY DAY AVERAGE DAILY POWER LEVEL AVER AGE D Al 'IlOhER LEVEL (MWe Net) 848 ,7 0 (-6) 2 27 gg 0 (-14) 3 0 (-6) 3, 0 (-25) 4 0 (-6) 7, 298 0 (-12) 705 3 ,,
0 (-6) ,,
766 6
7 0 (-13) 23 866 0 (-8) 867 s y, 9 0 (-6) 25 867 .,
0 (-5) y, 865 i 10, 11 .
'O (-5) 27 865 .
0 (-5) ,8 864 12 13 0 (-5] 29 865 0 (-5) 864 34 3, 0 (-5) 853 is 3, l . 16 0 (-5) -
l INSTRUCTIONS l
l On this formn.iist the asera;e daily unit power leselin MWe Net for cath dayin the reportin; m.mth. Compute to -
l the r.estest whole metawatt.
l
{ () Indicates Station Service MWe (9071 l
DOCKETNO. 50-336 UNITS!!UTDOWNS AND POWER REDUCTIONS ?
UNIT N A3tE F i l l Wa
? or73 2///si"+*'a-' ..
W- 7iI COAfPLETED BY G
- REPORT MONT11 January 1981 TELEPl!ONE (203) 447-1791 1364
- e. .-
e.
Eg
-, .! ? }g ) .Y Licenrec o Action to No. Date g E Ej .3 s 5 Event gi mO g3O Prevent Recurrence H
fE $ 3g: :
a 1 Report #
u o
6 -
1 810102 F 440.1 G 3 LER 81-6 '.B VALVEX Unit forced outage due to operator error and required maintenance.
. (Reference Document Immediate Action t Letter,81-01 Docket #50-336) ,
T g .
O
O '
Ei'PS?) .
e e)
D .
h .
SUMMARY
- The Unit operated at 'or neir .100% cf. rated thermal power throughout ,thh' month except for the forced - -
outage commencing on the 2nd. l -
s- . . .
i . . .
A _ ^^~ -
Docket No. 50-336 Date 2/10/97 Page 1 of 1 Unit Name _ Millstann ?
Completed 3y G.H Hawlett III Telephone (203)447 1791 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month December 1980 COMP 0NENT MAINTENANCE ACTION
,DATE SYSTEM 11/10/80 Reactor Protection- R.P.S. Channel 'D' Reactor Coolant Replaced bistable.
Coolant Pump speed sensing bistable, DTU-2.
Containment Post Hydrogen Analyzer AE-8154 Alarm Replaced alarm assembly.
11/10/80 Incident Hydrogen assembly.
Control 11/21/80 Reactor Protection R.P.S. Channel ' A' Comparator Replaced H2 , 3 Module CPC-2 Chemical & Volume Charging' Pump P-18C Repacked pump.
12/16/80 Control 12/17/80 Reactor Building Spent Fuel Pool heat exchanger Rebuilt valve. .
Closed Cooling outlet isolation valve 2-RB-8A 12/29/80 Service Water 120 Diesel Generator Service Replaced faulty limit switch Water temp control valve 2-SW-89A .
l P
e 1
0 "
i . . . . . . . . . _ . . . . , , , , . . . , - . . . . . , , ,
Docket tio. 50-336 l'
. Date: 2/12781_ ___
Completed By: G.H. Hovilete 111~
Telephone: '203/447 i~9/1 X36'4 i
i . ;
c
. REFUELIfiG Ifif0RMATI0il REQUEST l
\
l
- 1. Name of facility: Millstone 2 !
- 2. Scheduled date for next refueling shutdown: l Commenced refuel outage flovember 28, 1981.
! 3. Schedule date for restart following refueling: January 16, 1982
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other ifcense amendment?
It is not anticipated that Cycle 5 operations will require I l Technical Specification changes or othar License amendments. ;
Scheduled date(s) for submitting licensing action and 5.
supporting information:
Licensing documentation will be provided a minimum of 90 days l prior to start-up of Cycle 5 or as documented in the R. A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 ;
- operation. ;
i
- 6. Important licensing considerations associated with refueling, e.g., new or j different fuel design or supplier,'unreviewed design or performance analysis :
methods, significant changes in fuel design, new operating procedures: 4 f
l N/A ;
4 j i
The number of fuel assemblies (a) in the core and (b) in the spent fuel
! 7. ,
storage poci: l (a) In Core: 21 7 (b) 216 i
- 8. The present licensed spent fuel pool storage capacity and the size of any I increase in licensed storage capacity that has been requested or is planned, i l in number of fuel assemblies: l l
l 667 -
l
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core-Full, Spent Fuel Pool contains 648 bundles.