Category:CONTRACTED REPORT - RTA
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:QUICK LOOK
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:RESEARCH AND TECHNICAL ASSISTANCE REPORTS
MONTHYEARML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML19294B2591979-10-31031 October 1979 Technical Evaluation Rept of Tech Spec Change for Browns Ferry Unit 3. ML19249D4951979-07-31031 July 1979 Inservice Testing Program:Recommendations to NRC for SER of Plant, Informal Rept ML19261B4061978-08-31031 August 1978 Recommendations to NRC on Browns Ferry Unit 3. Reviews Inservice Testing Program for Pumps & Valves.Includes Specific Evaluations for Ser.Concludes Program,As Modified by Rept,Complies W/Asme 1982-09-30
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML20059A1221990-07-19019 July 1990 Notification of Contract Execution,Mod 20,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20059A1311990-07-19019 July 1990 Mod 20,revising Contract to Purchase Addl Training Aids,To Use to TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20248E2191989-08-16016 August 1989 Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20248E2121989-08-16016 August 1989 Notification of Contract Execution,Mod 16,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20247R3851989-05-16016 May 1989 Notification of Contract Execution,Mod 15,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn,For Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20247R3941989-05-16016 May 1989 Mod 15,extending Period of Performance,Providing Addl Work Re Training for NRC Inspectors & Supervisors,Changing NRC Project Officer & Adding TVA Project Manager & Increasing Contract Ceiling & Funding to Use of TVA Reactor.. ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20214R1481987-05-29029 May 1987 Notification of Contract Execution,Mod 12,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214R1561987-05-29029 May 1987 Mod 12,providing Incremental Funds & Increasing Ceiling,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206G6381987-04-0808 April 1987 Mod 11,recognizing Administrative Changes Due to NRC Reorganization,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206G5861987-04-0808 April 1987 Notification of Contract Execution,Mod 11,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20211E2601987-02-13013 February 1987 Notification of Contract Execution,Mod 10,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20211E2961987-02-13013 February 1987 Mod 10,providing Addl Work Entailing Training for NRC Inspectors & Supervisors,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry, Sequoyah & Bellefonte Simulators ML20210G4871986-09-19019 September 1986 Notification of Contract Execution,Mod 9,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20210G5571986-09-19019 September 1986 Mod 9,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20214T1291986-09-0404 September 1986 Notification of Contract Execution,Mod 6,to Use of TVA Reactor Simulator Facilities of Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214T1531986-09-0404 September 1986 Mod 6,providing for Lease of Yellow Creek Model to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206M1201986-08-15015 August 1986 Notification of Contract Execution,Mod 7,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20206M1321986-08-15015 August 1986 Mod 7,providing Cost Estimate for Leasing of Simulators for Extended Period of Performance,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on the Browns Ferry,Sequoyah & Bellefonte Simulators ML20205D0081986-08-0606 August 1986 Mod 8,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20205C9761986-08-0606 August 1986 Notification of Contract Execution,Mod 8,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML20136H6251985-12-23023 December 1985 Mod 5,extending Period of Performance to 880930 & Providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry, Sequoyah & Bellefonte Simulators ML20136H6031985-12-23023 December 1985 Notification of Contract Execution,Mod 5,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20205C2321985-09-11011 September 1985 Notification of Contract Execution,Mod 4,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown'S Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20205C2451985-09-11011 September 1985 Mod 4,increasing Funding to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown'S Ferry, Sequoyah & Bellefonte Simulators ML20135J0431985-09-0303 September 1985 Notification of Contract Execution,Mod 3,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept 1999-01-31
[Table view] |
Text
{{#Wiki_filter:__ _ _ _ _ _ --
EGG-NTAP-5993 August 1982 k f640kb.adfor fd:knacalksc/ShM6 h p l A RELAPS ANALYSIS OF A BREAK IN THE SCRAM gg DISCHARGE VOLUME AT THE BROWNS FERRY UNIT ONE N r/S l
PLANT @ I J
i
-9 l l W. C. Jouse R. R. Schultz i.
i Idaho National Engineering Laboratory Operated by the U.S. Department of Energy 1
~
/
l '
', i \t .o< s
- _ . a . ,. y3 4 I*h,gy " '
>. N t% mummiszew x,.
s ._
[M.
- 4. . .a "q""5M mumme
~ :~ _-- N f+ .
c= ~ = max '~;; t ;*
' y.,
- TCI-%et . m [,=C'n,, =C Md ~~ ?N sv3'a- 'hTM MM5das?.!:n.w
' samammtW ~~2 A- /jy i '
1 M9'- - -
' '- 7
.w -.- 7-yammas[g a<
\
W-" [ Q _
This is an informal report intenced for use as a preliminary or working document l
Prepared for the
\
U.S.. NUCLEAR REGULATORY COMMISSION Under DOE Contract No. DE-AC07-761001570 FIN No. A6354 8211010560 820831 E 6 E 6 Idaho PDR RES 8211010560 PDR
- - . - . . - . .. . - - . . . - . . - - - _ . - - - _ - . . ~ . - - . . . - - - - . _ - _ _ . .
4 EGzG.. -
FOhM EG&G 396 i
[N (Rev 03 82) INTERIM REPORT Accession No.
Report No. EGG-NTAP-5993 1 Contract Program or Project
Title:
NRC Technical Assistance Program Division Subject of this Document: A RELAPS Analysis of a Break in the Scram Discharge Volume at the Browns Ferry Unit One Plant Type of Document: Technical Report Author (s): W. C. Jouse, R. R. Schultz Date of Document: August 1982 s,
Responsible NRC Individual and NRC Office or Division: R. Curtis, NRC This document was prepared primari!y for preliminary or internal use. it has not received full review and approval. Since there may be substantive changes, this document should not be cor sidered final.
EG&G Idaho, Inc.
Idaho Falls, Idaho 83415 Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C.
Under DOE Contract No. DE-AC07 761D01570 NRC FIN No. A6354 a
INTERIM REPORT
EGG-NTAP-5993 NJ )
- A RELAPS ANALYSIS OF A BREAK IN THE SCRAM DISCHARGE VOLUME AT THE BROWNS FERRY UNIT ONE PLANT W. C. Jouse and R. R. Schultz Published August 1982 O
EG&G Idaho, Inc.
Idaho Falls, Idaho 83415 Prepared for the l
. U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Under DOE Contract No. DE-AC07-761001570 l
l l
O ABSTRACT 4
As part of the Severe Accident Sequence Analysis Program, a RELAPS/ MODI simulation of a scram discharge volume piping break at Unit 1 of the Browns Ferry Nuclear Plant has been performed. The analysis shows eventual core uncovery can occur assuming that the operator takes no action to mitigate the consequences of this small break loss of coolant accident.
Included also is a comparison of results to similar calculations performed at the Oak Ridge National Laboratory.
1 O
b w
ii 1
<~'s
SUMMARY
As part of the Severe Accident Sequence Analysis ($ASA) Program, a scram discharge volume small break loss of coolant accident (SBLOCA) of
. Unit 1 of the Browns Ferry Nuclear Plant is analyzed herein. The objective of this analysis is to determine the mechanism of core uncovery assuming no operator intervention. This Idaho National Engineering Laboratory (INEL) task parallels a similar effort of the Oak Ridge National Laboratory (ORNL).
The scram discharge volume (SDV) is located in the reactor building
- outside of primary containment. A non-isolable SDV break is assumed to occur shortly after a reactor scram. Vessel inventory is maintained by the high pressure coolant injection (HPCI) system. As the fission decay power decreases, the HPCI depressurizes the vessel below the shut-off head of the
}. condensate / condensate Dooster pumps (CBPs). The CBPs flood the vessel and deactivate the HPCI turbine.
Subsequent to vessel flocaing, reactor vessel pressure remains above the shut-off head of the low pressure coolant injection and core spray systems, precluding their operation. Without means of automatic inventory l replenishment, depletion can only result in core uncovery if no operator action occurs. These results agree with the ONRL results.
i e
l' W
I V iii t
i l
4_i_.i_.._ -. , - . __ -m._ , , . _ , . _ . . -,.m.___ _ . . . . - - , . _ - . _ . - _ . _ _ , . , _ , -
1 1
1 CONTENTS O
ABSTRACT .............................................................. ii
SUMMARY
............................................................... iii
- 1. INTRODUCTION ..................................................... 1
- 2. PR OB LE M D ES CR I PT I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <
- 3. MODEL AND CODE ................................................... 4
- 4. RESULTS.......................................................... 9
- 5. COMPARIS0N 0F THE INEL AND ORNL CALCULATIONS . . . . . . . . . . . . . . . . . . . . . 15
- 6. CONCLUSIONS /0BSERVATIONS ......................................... 17
- 7. REFERENCES ....................................................... 18 FIGURES
- 1. Rea ctor b u il ding el eva t i on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 g
- 2. The s implified Browns Ferry "Un it One" RELAPS model . . . . . . . . . . . . . 5
- 3. Near s cram s team and feed fl ows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
- 4. Sh or t te rm s te a m do me pr es s ur e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
- 5. C or e an d by p as s f l ows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
- 6. B r ea k s ea l f l ow an d s i z e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
- 7. System inventory ................................................. 13 l 8. Steam do ne pr ess ure compar i s on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 l
- 9. S eal mass fl ow ra te c omp ar i s on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 1 ~
1 l
TABLES
- 1. Reactor conditions at time of scram .............................. 6
- 2. C hr on ol o gy o f ma jo r ev en ts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 iv
+
A RELAPS ANALYSIS OF A BREAK IN THE SCRAM DISCHARGE VOLUME AT THE q BROWNS' FERRY UNIT ONE PLANT
- 1. INTRODUCTION The basis for the investigation discussed herein is rooted in the I June 13, 1980 Browns Ferry Unit 3 Boiling Water Reactor partial failure to ;
D scram incident. Subsequent studies,1,2 conducted by the Office for [
Analysis and Evaluation of Operational Data (AEOD) of the Nuclear ;
Regulatory Commission (NRC), identified a break in scram discharge volume (SOV) as a potential problem since in some instances the break cannot be t isolated. ;
i Further investigation of the postulated SDV break conducted at the Oak Ridge National Laboratory (ORNL) determined that the worst SDV break t
scenario occurred if it is assumed that the operator did not intervene and the plant protection systems were allowed to trip automatically. f To provide an independent SDV break calculation, the worst case !
sequence was simulated by SASA personnel at the Idaho National Engineering f Laboratory (INEL). The simplified one recirculation loop Browns Ferry :
model developed for the station blackout studies4was used to conduct the f 5 '
RELAP5 SDV break analysis assuming no-operator action.
The report provides a summary discussion of the SDV break in five !
sections which follow. Section 2 describes the problem, Section 3 f discusses the code, the model and the initial boundary conditions. i Section 4 summar.izes the results. A comparison between the INEL/0RNL [
calculations is made in Section 5. Section 6 itemizes the conclusions and
) observations of the SDV breck study. ;
1 t
I
(]7
\
l t
h 1
\
__, . -.-~ ,.. ,_ _.
- - . - - _ -~ , _ _ _ - _ . _ _ __
- 2. PROBLEM DESCRIPTION During a reactor scram the scram discharge volume (SDV) receives effluence from the control rod drives (CRDs). Normally unpressurized, the LDV becomes part of the reactor coolant system pressure boundary upon a l l
scram and until the scram is reset. Any leakage from the SDV or its
associated piping accumulates in the basement of the reactor building. 1 Since the SDV is located outside of primary containment, as shown in d
Figure 1,1 accumulation of effluence in the basement can eventually flood the vessel water inventory equipruent (VWIE) located there, rendering it inoperative. in particular, the high pressure coolant injection (HPCI),
reactor core isolation cooling (RCIC), residual heat removal (RHR), and core spray (CS) system pumps are located in the basement of the reactor building and will fail if flooded.
A key assumption in this accident sequence is that the operator takes no corrective or mitigating action (ORNL has demonstrated that normal operator intervention will make the transient recoverable, see Reference 3). Thus, the scram is not reset, the SDV is not isolated from the reactor, the RCIC is not reset after its injection terminates and the safety relief valves are not manually used by the operator.
Briefly, this accident proceeds as follows: The initiating event is a spurious high main steam line radiation signal which causes the main steam line isolation valves (MSIV) to close and the reactor to scram. Thirty seconds later, the SDV break occurs and effluence begins flowing into the basement. The vessel water inventory is automatically maintained by the HPCI-RCIC systems until the reactor vessel pressure falls below the shut-off heaa of the condensate and condensate booster pumps (CBPs). C8P injection floods the vessel and the HPCI steam turbines, thus leaving the ,
vessel without means of inventory replenishment. The CBPs fail when their source of water i.e., the condensate hotwell is depleted.
O 2
g -
. g s.
-( Q V WMZM' 9 2GAMAWA7111ZZZR&cGizewrAWREZM/M5 y s, O h
,/
Reactor Vessel Drywel1-Torus s .
,p (primary containment)
Reactor Core Jet _
Pumps -u
/
/ \
Reactor building !/ A A A, 6 (secondary ,/ Control -
s
- containment)
'f Rod drive 4 typ of L
4
\
~ -
~'
~
/ #
W /[ 185 SDV Systems vent valves l e. t
/)E e f ;
, .//, .
i '
//// 9l, y' -
cooling teater addition
...'%,~ ,-
t
- - ,,y-I SCRAM instr. Scram discharge
/,p volume , v lume (SDV) header Pipe break
// SCV system drain valve y Q 1 - .-
f, khj:&, f .x -
?/W//55N$5? b8W$/A.s. .WE22.5%. ', ~ 'S ('
l 6 / p CRD Is
\?
f
RilR , ._ CS Rx. b1dg. basenent level ., RHR ,HPCI h
_RCIC & :S /
E .-' m -
w_W- -.<----=~--~,c. ., i h = -C U
k&d87M/ ASH / H IHA Figure 1. Reactor Building Elevation.
. - - , , - - - . - . - - - - - . . . - - . - - - . - - - ~ . . . _ . . - , . . . . . , _ . . . . . . _ , _ , _ , - , _ . . . .
- 3. MODEL AND CODE The overall response of the system depends upon coding, modeling, and application of boundary conditions. RELAP5awas used to perform the 4
transient simulations. The model used in the simulation was developed during the INEL station blackout studies. Figure 2 contains a ncdalization diagram of the Browns Ferry Unit 1 model(Configuration Control No. F00930).
Vessel conditions at time of reactor scram were 100 percent rated power (see Table 1).
Only minor modifications necessary to apply boundary conditions or alleviate computational difficulties were made on the Reference 4 model.
The modifications implemented are listed below:
- 1. The break area (see junction 437 Figure 2) was sized to pass 550 gpm assuming upstream conditions of: 1050 psia, 525 F. The break occurred 30 s after the transient began (see Table 2). The break area was assumed constant for 90 min. Thereaf ter, the area was slowly increased over a 6.5 hr time span until 1800 gpm would leak from the vessel. Such behavior simulates the action of a line break (see Figure 1) with the break flow being limited by the CRD Graphitar seals. The slow increase assumed to begin at 90 min is physically caused by erosion of the seals. The maximum area obtained at 8 hr in the transient represents the complete erosion of the seals.
- 2. The level trip logic was improved from the Reference 4 model.
The HPCI/RCIC systems were modeled to trip on when the downcomer water elevation was 476 in. and off at the 582 in. level.
However, to prevent spurious elevation signals from either ,
tripping the systeus off or on incorrectly, the logic was modified to include a three point moving average computer;
- a. RELAPS MODI Cycle 13, Code Configuration Number F00341 with updates was used (see Reference 5) 4 L
g A
!i ) -
'% ) _
e
, 9 8 .n T 8 gV -
. ig 9 a C
- 4 -
-9
_ e -
8 5 - E g ,g 3 $ E <
. 4 . o J.
3 , a l I ,
v' w
h _% ~
$ ~4, a g 'g 0,r -
m s.
l (A B f j 'N.,
w gp .
g ~ ~
g,
, i -
m 3 s s._
N 3
[<h g he ~
8
e $
e V
C
ss- o 6D
~
^
--+h4 " 'O ,-
& / '
!// // / A!/
! s e-rg.
, - 9 .
- A.a Q',
9 4
\
Q- Q- e- @.2 @Tn @.~h%..g S k* 2d s a a
i
- -m w
e .a> .am. -socg, el e
@ i= -
5 u ,
=,
m g Q' g Q kN*b
.,C RTW Yh*",-@[<
5 2 *: "-
i usj ' ie; O .
7e l
2 # O[
T d a
~
l h E
y 6-j,
.Y h k
$fg ~g e
. +
m
. e s t
, . s i V
I, e
c: t h' (e %
t m x 0
g
(~
ry ? *g
'I w t~a O
! 5 -
O
' ~
TABLE 1. P.EACTOR CONDITIONS ATDIME OF SCRAM o
t Value
- _f Condition Total Reactor Power 3,357.9 MW (t)
Main Steam Flow 13.63 x 106 lbm/hr Feedwater Flow 13.46 x 106 lbm/hr Downcomer Level 544.5 in Steam Dome Pres'sure 1016.1 psia Lower Plenum Pressure 1053.4 psia lower Plenuni Temperdture _ 526.5'F System Totd Inventor 7.295 x 105 lbm Core Mgss Flow Rate 94.3 x 106 lbm/hr
\,-
;x_
5 k
)
[s ,
!N O
6
~
., -~g
- TABLE 2. CHRON0 LOGY OF MAJOR EVENTS i
Time (sec) Event s 0 Reactor trip on high maia steam line radiation.
i 3
Main steam.line isolation valves closed.
30 SDV. piping break initiates.
j - 450 HPCI and RCIC initiate on low vessel water :
;- level. '
i 780 HPCI and RCIC trip off on high level. _The RCIC is not reset.
. 450-12900 Level maintained.between 476 in, and 582 in. by l HPCI system.
12900-18660 CBPs initiate and rapidly fill the vessel,
-(\- flooding the HPCI turbine. Level maintained until CBPs fail on loss of suction.
19300 Reactor vessel pressure begins to increase 1
after reaching a minimum of 316 psia.
19300 + Vessel pressure continues to rise and eventually actuates the safety relief valves.
A boil-off ensues, reducing vessel inventory until the core uncovered.
A .
\s i i
i 7
v-- - ,. Te-- .- ,,e.<- w-m,, w,,,,c.c.g-,.wew----ww *- . weew v - m m , ,--w,=--.re-e,-ee---,w--veme.we.-e.--we,rwes-ww.e,m,w.wre-->-(
1 l
l l
EL = f EL (n - 2) + EL (n - 1) + EL(n) where EL = downcomer water level .
n = current time step with the trip occurring after a 10 s delay (see Reference 4 Appendix B for a description of EL)
- 3. The recirculation pumps were modeled to runback to 20 percent speed upon reactor scram and trip off when the downcomer water level reaches 476 in. (low-low level).
l 4. The total liquid delivered to the reactor building was tracked during the transient. The liquid delivered was calculated as the sum of the break flow and a constant 170 gpm control rod drive cooling flow which bypasses the reactor vessel. The VWIE located in the basement is assumed inoperative when 470548 gal of water have accumulated there.
1 .
O 8
1
- 4. RESULTS ry
) The initiating event of this severe accident sequence is a high main steam line radiation signal, which results in the closure of the main steam
~
line isolation valves (MSIV) and a corresponding reactor scram.
Concurrently, the feedwater pumps begin a rapid run-out as shown in Figure 3, but fail upon loss of steam. The recirculation pumps run back to 20% speed in 50 sec. The motor-driven condensate and CBPs remain operational, but are unable to inject fluid into the vessel because of their relatively low shut-off head (415 psia).
MSIV closure causes the reactor vessel pressure to rise rapidly, and the safety / relief valve (SRV) setpoints are reached in 4 s.a Safety / relief valve cycling initiates and continues while both the net steaming rate (from the core decay heat transfer) and level remain high.
-At 450 sec, the first VWIE (HPCI-RCIC) injection initiates when the vessel level falls to the low-low trip (476 inches above vessel zero). Vessel depressurization follows as shown in Figure 4. Injection terminates at 780 s when the level rises to the high water level (582 inches above vessel v zero) The vessel pressure begins to increase. The RCIC is automatically shut off after the first injection cycle and is not reset.
Shortly after scram, the core and core bypass flows (Volumes 500, 510, and 520) decrease from rated value (see Figure 5). The bypass flow reverses as the liquid in the upper plenum begins to flow downward through the bypass and then into the core inlet piece and upwards through the core. Such a natural recirculation pattern is generated by core decay heat transfer.
.- In the natural recirculation mode of core cooling, core and core bypass flows are driven by a gravity head difference. This head is balanced by frictional losses. Introduction of subcooled emergency core cooling (ECC) injection fluid upsets this balance, and causes the bypass
-/m
- a. The first SRV setpoint is 1120 psia. The remainder are staged upward.
(d
\
)
All reseat 50 psi lower than their opening setpoints.
9
~
l l
SOL 8D o ETEAM DASH = FEED j l
s000 g ; ; ; ; ; j ;
4s00 -
/ '
s 4000 -
f s .
g ._________,
z -
Q 3500 -
\ !
x \
C3 g d
3000 -
\
w i
$ 2500 -
s
,I i
2 %
2 \
- i ts 2000 -
s
$ \
y 1500 -
g 4 \
% \
1000 -
\ __
l
\
\
500 -
g
\
l l l l l 4_ l ! I l 0
-6 -4 -2 0 2 4 S B 10 12 14 16 TIME (SEC)
FIGURE 3; NEAR-SCRAM STEAM AND FEED STEAMCOME PRESSURE 1200 s u u u u jin u un gi.ii'o uluin o u jin u u n gio u u u jiu u u ujiu u u u juiu u u jio u n.6 l 1
A st J l ,
< 1000 -
A Safety relief
[ valve cycling HPCI/RCIC terminate on E
HPCI/RCIC high level -
Pn initiate on '
E Lo-Lo level x
- o. 800 - -
Reactor scram and MSIV closure
_ y -
'""""I"'"I'"""I'""""l"""i'""""I""I'"""l'""""I"""
s00
-100 0 100 200 300 400 500 600 700 800 900 TIME (SEC)
FIGURE 4: SHORT TERM STEAMDOME PRESSURE 10
UPPER TRACE =* SMOOTHED CORE FLOW
. LOWER TRACE = SMOOTHED OYPASS FLOW 6000 i i i i i a j i j i g i ig g g g g g
~
2 U 4000
. e 1 I W 0
=
2000 -
af te% -
l'
) C J-a 1
a f( r , A- PA ^
fv & & W L Core bypass f10W reversed
-2000 O 4000 8000 12000 16000 20000 2000 6000 10000 14000 18000 TIME (SEC)
FIGURE S: CORE AND BYPASS FLOWS 150 i i i g i i i g i g i g i C.04 g g i g g g l w
& W - .-.
100 --
d -
)
w _ F $
2 f y g 3 _
z $
3 % w y ym. i s-
-+ -
v O 0 O.00 0 4000 8000 12000 16000 20000 2000 6000 10000 14000 18000 TIME (SEC)
FIGURE 6; OREAK SEAL FLOW AND SIZE 11 .
flow to briefly revert to its normal direction. The magnitude of the core flow is reduced by the subcooling as the steaming rate falls, but picks up at the termination of an injection cycle.
The vessel pressure, the direction of the bypass flow, the size of the break area ana the static quality of the fluid in the guide tube .
(Volume 180) all influence the break flow. Thus, the break flow (see Figure 6) decrease < as the vessel pressure decreases, and decreases when the bypass flow is reversed since saturated fluid enters the break rather than subcooled fluid. These factors combine to give the break flow behavior shown in Figure 6. An overall increase in flow occurs after 5430 s as the break size increases.
The cycling VWIE systems (see Figure 7) take suction from the atmospheric temperature condensate storage tank. The flow of cool water into the downcomer during injection rapidly condenses steam in the dome and upper downcomer, subcooling and depressurizing the vessel (see Figure 8).
In addition, core steaming is subsequently reduceo and finally stopped as the fluia in the core shroud becomes subcooled. For the most part, vessel thermodynamic conditions correspond closely to saturation. The effect of localized dowrcomer subcooling on vessel pressure is such that core voiding tends to increase during the first few seconds of injection. Vessel pressure and temperature rise rapidly upon the termination of an injection cycle.
In total, the VWlE cycles five times (see Figure 7). The fifth and last HPCI cycle depressurizes the vessel to such an extent that the CBPs begin to flow into the vessel at t = 13000 s. A brief, high-flow period f'ollows in which the vessel is nearly filled, as shown in Figure 7. The HPCI steam turbine is flooded and hence inoperative. The CBPs keep the ,
vessel filled and the vessel pressure at their shut-off head until the condensate hotwell is depleted of liquid at 18570 s. .
O 12
0 X10 ,
' ' l
' i i
.l 4 . i j., j ,
l l
~
i - '
'S _ -
w) _
Vessel nearly ffiled
> N- _
g _ -
l d 1.25 - :
CBP FAILUR
- E _ -
[
3 HPCI cycle _
r 5 1.00 __ -
x ~ 1 CBP flow ~
~ _
?
m m
0.75 - ,
_ i s _ -
l
~
~'
, ! , l , ! , l , l , l , ! , ! , ! ,
g,go ;
O 4000 8000 12000 16000 20000 2000 8000 10000 14000 18000 TIME (SEC)
- FIGURE 7: SYSTEM INVENT 3RY j SOLID = RELAPS DASH = NUREG CR/2872 ,
(FIGURE 3.t) 1500 . g i gigi gil 4 g i ga g4 l 4 g i i . g i j i l l l
~ ~
SRV cycling l i
Wil "--- -
-' t , WI ,] Fifth HPCI I 1000 - ' il Cycle ,' ;
i fII _
$ 1 i
I s l\ t I m , , i si , -
D' i
' g ,' I #n i l a t ; ,g ,
w f 8
,1 i m ~t s I
i J NI , I I i #
~
@ g g /
~
y - N 1
g f ,
I Vessel at CBP ,/ -
E s ,i 1 SHUT 0FF HEAD e saa
\ m ,,
3 i-_____, , . . 2 e / .
i ?
i
- i Pressure reaches !
4 310 PSIA and thet i
! _ begins to rise _ ,
! -t
, l,Iil,lt' l,I , !,!,l,Ii li i , ! , l .
w/ 0 i
1
- 0. 4000 8000 12000 16000 20000 24000 28000 !
i 2000 6000 10000 14000 18000 22000 26000 30000 i
! TIME (SEC) !
FIGURE 8: STEAM D3ME PRESSURE COMPARISON ,
13
._ _ _ _ _ .5
Thus, by 18570 s only the low pressure ECCs remain to provide water to the vessel. Following loss of the condensate / condensate booster pumps, the vessel pressure decreases to 316 psia, but begins to increase as the core decay heat thermally swells the vessel fluid. The low pressure systems are never able to begin injection as the vessel pressure always remains above their shut-off heads. The lack of vessel injection capability will
~
eventually lead to core uncovery due to the continuing break inventory depletion rate. Table 2 contains a concise chronology of these results.
These RELAPS/ MOD 1 results are stored under Configuration Control No. F00944.
O l
l l
l O
14
- 5. COMPARIS0N OF THE INEL AND ORNL CALCULATIONS (mV) The RELAP5 model (INEL) used for the SOV break analysis contains a 3
more detailed nodalization scheme than the BWR-LACP model . Thus the thermo-hydraulic state of each volume (see Figure 2) is rigorously calculated in.the RELAP5 model. Thermodynamic state distributions are i available within a region e.g., volumes 600 through 677 represent the downcomer. As an example, the initial injection of subcooled ECC into the ;
f saturated two phase downcomer rapidly depressurizes the vessel without j directly affecting the core steaming rate. As injection proceeds, core '
boiling is terminated as the core inventory becomes subcooled. However, core boiling begins shortly after ECC injection is terminated. Boiling occurs first at the top of the core and proceeds rapidly downwaro. As a result the vessel repressurizes. The BWR-LACP code treats the vessel regions on an average basis, thus the system response is dynamically slower. Such behavior is apparent if the steam dome pressure calculated by the two codes is compared (see Figure 8). The RELAP5 results show a faster time response in pressure e.g., the RELAP5 analysis predicts a faster repressurization following termination of VWIE injection. The overall Q vessel energy / mass balances agree quite well, however.
Figure 9 shows the seal leakage mass flow rate plotted against both BWR-LACP results and time. Although generally in good agreement, the RELAPS results show a flow degradation due to safety / relief valve cycling induced voiding where the break takes suction, thus reducing the flow rate. :
4 i
r
~
j.
C
+
l 1
15 !
_ _ _ . , _ _ _ _ - _ _ . . , . . ~ _ _-
SOLID = RELAPS DASH = NUREG CR/2672 (FIGURE 3.3) 300 i g i gig ,
g i
g, g i gi , i g i g i g i g i ,
O G '
W a-2 200 -
S
~
l t
U i
% -Typical flow degradtion -
s l
due to SRV cycling , - . ,'
0
l -
100 -
i y
4
, r i \
i e s'
Z ,J\ / % i /
0 O 4000 8000 12000 16000 20000 24000 28000 2000 5000 1C000 14000 18000 22000 26000 30000 TIME (SEC)
FIGURE 9: SEAL MASS FLOW RATE COMPARISON i
I l
t I
?
l l
l 0
! 16 '
l
- l. - - - - - - _ - . - - _ _ _ - _ _ _ _ - _ _ - _ _ _ _ _ _ --_
o.
- 6. ' CONCLUSIONS /0BSERVATIONS
( Several' conclusions and' observations ~ emerged in the SDV calculation '
! conducted using the RELAPS Browns Ferry model:
i:-
l.-
Core uncovery will occur during this transient if the operator f
.does not act.. The automatic systems are not sufficient to I
} . prevent the core from uncovery.
{ -' f !
1 e
2.
~
Once the CBPs have depleted the condensate hotwell, only operator-t-
action reducing the vessel pressure by opening one or more SRVs '
such thatL the low' pressure ECCS .could inject water .into the !
vessel can prevent core uncovery.- !
j i
I
. 3. i s The SDV break flow is influenced directly by the core bypass !
- thermodynamic conditions. !
i !
I
. 4. Generally, RELAP5 and BWR-LACP code calculations show good agreement..
i
-{
1 !
4 j
- - r i
J l
! I
. i l
I 17
.u . .....______.___,___.._,_.,.__.______,.._,._______..__.;
1 l
l
- 7. REFERENCES I
- 1. Safety Concerns Asstclated with Pipe Breaks in the BWR Scram System, NUREG-0785, draft dated March 1981.
- 2. General Safety Evaluation Report Regarding Integrity of BWR Scram System Piping, NUREG-0803, August 1981.
- 3. Condon et al., SBLOCA Outside Containment at Browns's Ferry
- Unit One - Accident 5equence Analysis, NUREG/CR-2672, ORhL/TM-8119/VI, to be published.
- 4. R. R. Schultz and S. R. Wagnor, The Station Blackout Transient at the '
Brown's Ferry Unit One Plant - A Severe Accident Sequence Analysis, to be published.
- 5. Ransom et al., RELAP5/M001 Code Manual, NUREG/CR-1826, November 1980, Vol. 1 and 2.