Category:CONTRACTED REPORT - RTA
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:QUICK LOOK
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept ML18094A0781983-08-30030 August 1983 Rev 1 to Technical Evaluation of Integrity of Browns Ferry 1,2 & 3 Reactor Coolant Boundary Piping Sys. ML20072F6591983-06-30030 June 1983 Loss of DHR Sequences at Browns Ferry Unit One - Accident Sequence Analysis ML20080E0211983-05-31031 May 1983 Other Transients Failure Modes & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20024A0041983-04-0505 April 1983 Control of Heavy Loads (C-10),TVA,Browns Ferry Nuclear Power Station,Units 1,2 & 3, Draft Technical Evaluation Rept ML20126F6151983-02-28028 February 1983 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1611982-11-30030 November 1982 SBLOCA Outside Containment at Browns Ferry Unit 1-ACCIDENT Sequence Analysis ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065L9681982-09-30030 September 1982 Station Blackout at Browns Ferry Unit ONE-IODINE and Noble Gas Distribution and Release ML20066B2161982-09-30030 September 1982 Station Blackout Transient at Browns Ferry Unit 1 Plant, Severe Accident Sequence Analysis ML20023A5001982-09-24024 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements, Technical Evaluation Rept.Actual Rept Number TER-C5506-171/172/173 ML18025B8801982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority) ML18025B8771982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority) ML18025B8761982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority) ML20023B0451982-08-31031 August 1982 RELAP5 Analysis of Break in Scram Discharge Vol at Browns Ferry Unit 1 Plant, Interim Rept ML20069D4121982-08-0303 August 1982 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20076B5891982-07-30030 July 1982 Inservice Insp Program, Technical Evaluation Rept ML20062B5281982-07-0707 July 1982 Control of Heavy Loads, Draft Technical Evaluation Rept ML20062H2361982-06-0202 June 1982 RCS Vents, Technical Evaluation Rept ML20041D6471982-02-28028 February 1982 Adequacy of Station Electric Distribution Sys Voltages, Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20041D6451982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Browns Ferry Nuclear Plant,Unit 3, Informal Rept ML20039D7001981-11-30030 November 1981 Station Blackout at Browns Ferry Unit One - Accident Sequence Analysis ML19240B9951981-03-31031 March 1981 Proposed Changes for Main Steam Line Isolation & Suppression Chamber Instrumentation Requirements, Technical Evaluation Rept ML20004D2231981-01-31031 January 1981 Equipment Environ Qualification,Browns Ferry Unit 3, Technical Evaluation Rept 1999-01-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML18039A7871999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 ML20072E0541994-06-30030 June 1994 Plant IPE,Front-End Review ML20072E1221994-03-31031 March 1994 Plant Ipe,Submittal Human Reliability Analysis Final Rept ML20059C2031993-09-30030 September 1993 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Browns Ferry Nuclear Power Station ML18037A4171993-07-31031 July 1993 Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization. ML20058L9641993-07-31031 July 1993 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Browns Ferry Nuclear Plant,Units 1,2 & 3 ML18037A5211993-05-31031 May 1993 Technical Evaluation Rept on Second 10-Yr Interval Insp Program Plan. ML20072E1041993-01-20020 January 1993 Plant IPE,Back-End Submittal ML20082S0101990-08-13013 August 1990 Review of Inservice Testing Program for TVA Nuclear Power Plants ML20059A1221990-07-19019 July 1990 Notification of Contract Execution,Mod 20,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20059A1311990-07-19019 July 1990 Mod 20,revising Contract to Purchase Addl Training Aids,To Use to TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML18033B3951989-12-31031 December 1989 Welding-Related Employee Concerns Evaluations, Technical Rept ML20248E2191989-08-16016 August 1989 Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20248E2121989-08-16016 August 1989 Notification of Contract Execution,Mod 16,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20247R3851989-05-16016 May 1989 Notification of Contract Execution,Mod 15,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn,For Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20247R3941989-05-16016 May 1989 Mod 15,extending Period of Performance,Providing Addl Work Re Training for NRC Inspectors & Supervisors,Changing NRC Project Officer & Adding TVA Project Manager & Increasing Contract Ceiling & Funding to Use of TVA Reactor.. ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20234C1121987-05-31031 May 1987 Severe Accident Sequence Analysis Program - Anticipated Transient Without Scram Simulations for Browns Ferry Nuclear Plant Unit 1 ML20214R1481987-05-29029 May 1987 Notification of Contract Execution,Mod 12,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214R1561987-05-29029 May 1987 Mod 12,providing Incremental Funds & Increasing Ceiling,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206G6381987-04-0808 April 1987 Mod 11,recognizing Administrative Changes Due to NRC Reorganization,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206G5861987-04-0808 April 1987 Notification of Contract Execution,Mod 11,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20213A0341987-03-31031 March 1987 Demonstration Testing of a Surveillance Robot at Browns Ferry Nuclear Plant.Analysis of Costs and Benefits ML20214A7881987-02-28028 February 1987 RAMONA-3B Calculations for Browns Ferry ATWS Study ML20211E2601987-02-13013 February 1987 Notification of Contract Execution,Mod 10,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20211E2961987-02-13013 February 1987 Mod 10,providing Addl Work Entailing Training for NRC Inspectors & Supervisors,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry, Sequoyah & Bellefonte Simulators ML20210G4871986-09-19019 September 1986 Notification of Contract Execution,Mod 9,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20210G5571986-09-19019 September 1986 Mod 9,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20214T1291986-09-0404 September 1986 Notification of Contract Execution,Mod 6,to Use of TVA Reactor Simulator Facilities of Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214T1531986-09-0404 September 1986 Mod 6,providing for Lease of Yellow Creek Model to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206M1201986-08-15015 August 1986 Notification of Contract Execution,Mod 7,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20206M1321986-08-15015 August 1986 Mod 7,providing Cost Estimate for Leasing of Simulators for Extended Period of Performance,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on the Browns Ferry,Sequoyah & Bellefonte Simulators ML20205D0081986-08-0606 August 1986 Mod 8,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20205C9761986-08-0606 August 1986 Notification of Contract Execution,Mod 8,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214H1101986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Browns Ferry Nuclear Plant, Supplementary Technical Evaluation Rept ML20136H6251985-12-23023 December 1985 Mod 5,extending Period of Performance to 880930 & Providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry, Sequoyah & Bellefonte Simulators ML20136H6031985-12-23023 December 1985 Notification of Contract Execution,Mod 5,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20205C2321985-09-11011 September 1985 Notification of Contract Execution,Mod 4,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown'S Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20205C2451985-09-11011 September 1985 Mod 4,increasing Funding to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown'S Ferry, Sequoyah & Bellefonte Simulators ML20135J0431985-09-0303 September 1985 Notification of Contract Execution,Mod 3,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML18029A3541984-12-31031 December 1984 Conformance to Reg Guide 1.97,Browns Ferry Nuclear Plant, Units 1,2 & 3, Interim Rept ML20093E2061984-09-30030 September 1984 Noble Gas,Iodine,And Cesium Transport in a Postulated Loss of Decay Heat Removal Accident at Browns Ferry ML18029A5391984-09-30030 September 1984 Technical Evaluation of Browns Ferry Nuclear Plant, Plant-Unique Analysis Rept. ML20096G6761984-07-31031 July 1984 ATWS at Browns Ferry Unit One - Accident Sequence Analysis ML20090H6281984-03-14014 March 1984 Control of Heavy Loads (C-10),Browns Ferry Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20090H6211984-03-0101 March 1984 Control of Heavy Loads-Phase Ii,Browns Ferry Nuclear Power Station Units 1,2 & 3, Draft Technical Evaluation Rept ML20081J7291983-10-31031 October 1983 the Effect of SMALL-CAPACITY,HIGH-PRESSURE Injection Systems on Tquv Sequences at Browns Ferry Unit One ML20081J7021983-10-31031 October 1983 SBLOCA Outside Containment at Browns Ferry Unit One.Volume 2.Iodine,Cesium,And Noble Gas Distribution and Release ML20080F2981983-10-31031 October 1983 Rept Concerning Effects of Control Sys Failures on Overfill & Overcooling Events at Browns Ferry, Interim Rept ML20085H8081983-09-26026 September 1983 Masonry Wall Design (B-59),TVA Browns Ferry Nuclear Plant, Units 1,2 & 3, Technical Evaluation Rept 1999-01-31
[Table view] |
Text
Technical Evaluation of the Browns Ferry Nuclear Plant Plant Unique Analysis Report Ain A. Sonin John R. Lehner George Bienkowski Constantino Economos Reactor Safety Licensing Assistance Division Department of Nuclear Energy Brookhaven National Laboratory Upton, New York 11973 September 1984 FIN A-3713 BNL-04243 8505i60233 850506 PDR ADOCK 05000259 P PDR
ABSTRACT This Technical Evaluation Report (TER) presents the results of the post-im-plementation audit of the Plant Unique Analysis Report (PUAR) for the Browns Ferry Nuclear Plant (Units 1, 2 and 3). The contents of the PUAR were compared against the hydrodynamic load Acceptance Criteria (AC) contained in NUREG-0661.
The TER summarizes the audit findings (Table 1), and discusses the nature and status of the exceptions to the AC identified during the audit (Table 2).
ACKNSILEDGEMENTS The cognizant NRC Technical Monitor for this program was Dr. Farouk Eltawila of the Containment Systems Branch (DSI) and the NRC Project Manager was Mr. Jack N. Donohew of the Technical Assistance Program Management Group of the Division of Licensing. Mr. Byron Siegel of the Operating Reactors Branch Number 2 (DL) acted as Head Project Manager.
Li st of Acron ms AC Acceptance Criteria (Appendix A of NUREG-0661, Reference 1)
BNL Brookhaven National Laboratory BFN Browns Ferry Nuclear Plant BWR Boiling Water Reactor CO Condensation Oscillation DBA Design Basis Accident DL Division of Licensing DSI Division of Systems Integration FRC :
Franklin Research Center FSTF Full Scale Test Facility LDR Load Definition Report LOCA Loss-of-Coolant Accident LTP Long Term Program NRC Nuclear Regulatory Commission PUAR Plant-Unique Analysis Report RFI Request For Information SMA Structural Mechanics Associates SRSS Square Root Sum of the Squares SRV Safety Relief Valve STP Short Term Program TER Technical Evaluation Report T/Q T-Quencher
C Table of Contents Abstract Acknowledgements List of Acronyms
- 1. Introducti on
- 2. Post-Implementation Audit Summary
\
- 3. Exceptions to Generic Acceptance Criteria
- 4. Conclusions
- 5. References
- l. INTR ODUCTI ON The suppression pool hydrodynamic loads associated with a postulated loss-of-coolant accident (LOCA) were first identified during large-scale testing of an advanced design pressure-suppression containment (Mark III). These addition-al loads, which had not explicitly been included in the original Hark I contain-ment design, result from the dynamic effects of drywell air and steam being rap-idly forced into the suppression pool (torus). Because these hydrodynamic loads had not been considered in the original design of the Mark I containment, a de-tailed reevaluation of the Mark I containment system was required.
A historical development of the bases for the original Hark I design, as well as a summary of the two-part overall program (i .e., Short Term and Long Term Programs) used to resolve these issues can be found in Section 1 of Refer-ence 1. Reference 2 describes the staff's evaluation of the Short Term Program (STP) used to verify that licensed Mark I facilities could continue to operate safely while the Long Term Program (LTP) was being conducted.
The objectives of the LTP were to establish design-basis (conservative) loads that are appropriate for the anticipated life of each Mark I BMR facility (40 years), and to restore the originally intended design-safety margins for each Hark I containment system. The principal thrust of the LTP has been the development of generic methods for the definition of suppression pool hydrody-namic loadings and the associated structural assessment techniques for the Mark I configuration. The generic aspects of the'Mark I Owners Group LTP were com-pleted with the submittal of the "Mark I Containment Program Load Definition Re-port" (Ref. 3) and the "Mark I Containment Program Structural Acceptance Guide" (Ref. 4), as well as supporting reports on the LTP experimental and analytical tasks . The Hark I containment LTP Safety Evaluation Report (NUREG-0661)
j presented the NRC staff's review of the generic suppression pool hydrodynamic .
load definition and struct'ural assessment techniques proposed in the reports cited above. It was concluded that the load definition procedures utilized by the Mark I Owners Group, as modified by NRC requirements, provide conservative estimates of these loading conditions and that the structural acceptance crite-ria are consistent with the requirements of the applicable codes and standards .
The generic analysis techniques are intended to be used to perform a plant-unique analysis (PUA) for each Mark I facility to verify compliance with the acceptance criteria (AC) of Appendix A to NUREG-0661. The objective of this study was to perform a post-implementation audit of the plant-unique analysis for the Browns Ferry Nuclear Plant {Reference 5) against the hydrodynamic load criteria in NUREG-0661.
- 2. POST-IMPLEMENTATION AUDIT
SUMMARY
The purpose of the post-implementation audit was to evaluate the hydrody-namic loading methodologies which were used as the basis for modifying the pres-sure suppression system of the Browns Ferry Nuclear Plant. The Browns Ferry PUAR methodologies (Reference 5) were compared with those of the LDR (Reference
- 3) as approved in the AC of NUREG-0661 (Reference 1). The audit procedure con-sisted of a moderately detailed review of the plant unique analysis report (PUAR) to verify both its completeness and its compliance with the acceptance criteria. A list of requests for further information was submitted (Reference 6), and answers were obtained at a meeting with the licensee (Reference 7).
Table 1 summarizes the audit results . It lists the various load categories specified in the AC, and indicates plant-unique information through the refer-ences, in the right-hand column, to the notes which follow in the text .
CRITERIA hJ
-:~o~
UJ (g 0 K 0 OI- ~o V bl NOT 0 0 00 MET
~m I-g~
bJ MET 0
>OcK Z
CL LOADS CONTAINMENT PRESSURE 6 TEMPERATURE 2.I VENT SYSTEM THRUST LOADS 2.2 POOL SWEI L TORUS NET VERTICAL LOADS 2.3 TORUS SHELL PRESSURE HISTORIES 2.4 VENT SYSTEM IMPACT AND DRAG 2,6 IMPACT AND DRAG ON OTHER STRUCTURES 2.7 FROTH IMPINGEMENT 2.8 POOL FALLBACK 2.9 LOCA JET 2. I4.l LOCA BUBBLE DRAG 2.I4.2 VENT HEADER DEFLECTOR LOADS 2.IO TABLE 1, LOAD CHECKLIST FOR POST-INPLEHENTATION AUDIT
CRITERIA CO
~ UJ u) 9 m 0 I-O ~o NOT O Lsl QJ
~ MET MET ZJ 0
Do Z4 CL LOADS CONDENSAT ION OSCILLATION TORUS SHELL LOADS 2.I I. I-I OADS ON SUBMERGED STRUCTURES 2.I4.5 VENT SYSTEM LOADS 2.I I.5 DOWNCOMER DYNAMIC LOADS 2.I I.2 CHUGGING
.TORUS SHELL LOADS 2.I 2. I LOADS ON SUBMERGED STRUCTURES 2.I4.6 VENT SYSTEM LOADS 2.I 2.3 LATERAL LOADS ON DOWNCOMERS 2.I2.2 TABLE l. (CONTtnuEB)
CRITERIA LJj Lij CD O Z CD 0 I- GO .~O I
O OO 0 0 CD LJJ W
~ MET NOT ZJ w~ 0 MET 0 I 0 DO Z <<K 0.
LOADS T-QUENCHER I OADS DISCHARGE LINE CLEARING 2.I 3.2 TORUS SHELL PRESSURES 2.l 3.3 JET LOADS ON SUBMERGED STRUCTURES 2.I4.3 v AIR BUBBLE DRAG 2.14.4 v THRUST LOADS ON T/0 ARMS 2.I3.5 S/RVDL ENVIRONMENTAL TEMPERATURES 2.13.6 v TABLE 1. (CONTI NUED)
CRITERIA UJ CO CO ~ gO 0+ CQ Q () 0 0 0 I
C9 UJ
~m MET NOT ZQ ~0:
MET Q.
~0CL CL 0 ~
DESCRIPT ION Z cE SUPRESSION POOL TEMPERATURE LIMIT 2.IS.8 SUPRESSION POOL TEMPERATURE MONITORING SYSTEM 2.I5.9 DIFFERENTIAL PRESSURE CONTROL SYSTEM FOR THOSE P LANTS U S ING A DRYWELL-TO" WET WELL PRESSURE 2. I6 DIFFERENCE AS A POOL SWELL MIT IGATOR SRV LOAD ASSESSMENT BY IN-PLANT TEST 2.I 5.9 TABLE 1 (CONTINUED),
Tabl e 1 Notes
- 1. The AC re'quires that a 21.5$ safety margin be applied on the loads defined in the LDR for the torus net vertical upload and the torus shell pressure above the pool. BFN applied a margin of 6.5X. This method was found ac-ceptable. See Section 3.1 for additional details.
- 2. For analyzing structures affected by CO loads, the LDR and NUREG-0661 pre-scribe absolute summation of the CO load harmonics at 1-Hz intervals from 1 to 50 Hz. BFN used an alternate approach where:
(i) forcing frequencies above 31 Hz were neglected, and (ii ) four particular load harmonics (the ones at 4-5, 5-6, 10-11, and 15-16 Hz) were added absolutely and added to the SRSS of the remaining 26.
This method was found acceptable. See Section 3.2 for details.
- 3. While pre-chug loads were analyzed by BFN in accordance with the AC, the post-chug load definition differed from that of the AC. Instead of summing all the steady state responses from each of the prescribed forcing func-tions in the 1 to 50 Hz frequency range as stipulated in the AC, BFN ne-glected the forcing functions for frequencies above 30 Hz. The 30 included for cing functions were, however, summed in compliance with the AC. This method was found acceptable. See Sec. 3.3 for further details.
- 4. For post-chug drag loads on submerged structures, BFN used an approach dif-ferent from the AC. All the prescribed forcing functions from 1-50 Hz were analyzed. However, instead of summing them absolutely, BFN combined the five largest forcing functions by absolute summation and added the SRSS of the rest. This method was found acceptable, as discussed in Sec-tion 3.4 below.
- 5. BFN's multiple SRV load definition is an SRSS combination of the pressures due to the individual SRV's. This deviates from the AC, which prescribes an absolute sumoation. BFN's load methodology was found acceptable. See Section 3.5 for details.
- 6. The local suppression pool temperature limit was defined in the AC as 200F for the generic Mark I T-quencher as described in Appendix A, Section 2.13.8. Subsequently, NUREG-0783 provided procedures whereby the limit could be increased if certain restrictions could be met. Conformance with the above criteria was indicated in the PUAR. However, the applicant uti-lized a local pool temperature model whose overall methodology provides a conservative way of computing pool temperature transients for purposes of demonstrating compliance with the provisions of NUREG-0783.
- 7. As a means to reduce shell pressures related to DBA pool swell, a positive pressure difference is maintained between the BFN drywell, including the vent system, and the torus air space. A nitrogen inerting system is used to pressurize the drywell, while the torus remains at ambient pressure.
According to. technical specifications, the plant is required to come to shutdown if the main ap system fails.
- 3. EXCEPTIONS TO GENERIC ACCEPTANCE CRITERIA The Browns Ferry Nuclear Plant was analyzed by the Tennessee Valley Authority, Division of Engineering Design, Civil Engineering Support Branch (Reference 5). The load application methodology differs from the generic ac-ceptance criteria of NUREG-0661 in five major areas which are listed in Table 2.
In Sections 3.1-3.5, each of these five areas is discussed in detail, and the bases for the resolutions of the differences indicated.
Table 2: Issues Identified During Audit as Exceptions to the Generic Acceptance Criteria Issue No. Descri tion Discussion'tatus Resolved ~0 en Margin applied to pool swell torus uploads Sec. 3.1 2 ~ Method of combining CO load harmonics Sec. 3.2 3~ Neglect of load harmonics above 30 Hz in post-chug torus load definition Sec. 3.3 4~ Method of combining load harmonics associated with post-chug drag loads on submerged structures Sec. 3.4 SRV torus loads Sec. 3.5 3.1 Mar in A lied to Pool Swell Torus U loads The AC stipulates that, in order to bound uncertainties in the empirical data base and its interpretation, the load specified in the LDR for the torus upload and airspace pressure during pool swell be increased by 21.5$ . Part of this margin (6.5$ ) accounts for experimental scatter; and the rest (15$ ) for several uncertainties (see pp. 36-37 of Reference 1), one of which arose from the fact that the generic load definition was derived from tests done on a particular torus geometry.
BFN applied a margin of 6.5$ to the LDR torus uploads. In other words, they imply that the added 15$ margin is unnecessary in their case. There are several reasons for this (see Item 1 of Reference 7), among them the fact that the uncertainty in the generic load definition resulting from the use of a specific torus geometry was minimized because the torus geometry used was that of BFN. BFN also included several conservatisms in their load definition, for example, using absolute summation of the peak strain magnitudes due to the various loads to define a load combination. These reasons, plus the fact that the BFN torus tiedown design is not in any case controlled by a load combination involving pool swell, render the BFN methodology acceptable.
3.2 Method of Combinin CO Load Harmonics The CO torus shell load is an oscillating load caused by periodic pressure oscillations superimposed upon the prevailing local static pressure. The LDR defines the load in terms of harmonics at 1 Hz intervals from 1 to 50 Hz, providing a rigid-wall pressure amplitude for each frequency interval. These load harmonics are to be used in conjunction with a flexible-wall coupled fluid-structure model. In the range from 4 to 16 Hz, three alternative sets of spectral ampl'itudes are provided and the alternative which maximized the response is to be used. The resulting responses from applying the amplitude at each frequency given in the total spectra to be analyzed are to be summed. The above procedure was found acceptable in the AC because the high degree of conservatism associated with the direct summation of the Fourier components of the spectrum was more than sufficient to compensate for any uncertainties associated with the FSTF data from which the load specification was developed.
Direct application of the above methodology to the BFN torus proved to be too conservative and so an alternate approach based in part on a study performed in Reference 8 and subsequent related reports (References 9, 10) was used.
The BFN methodology for CO loads involved (i) neglecting those of the LDR load harmonics having frequencies greater than 30 Hz, and (ii) obtaining a load definition by adding the absolute magnitudes of four specific load harmonics (the ones at 4-5, 5-6, 10-11 and 15-16 Hz) to the SRSS of the remaining ones.
The neglect of the load harmonics with frequencies greater than 30 Hz is based on the structural response of the BFN plant. The responsive structural modes of the torus occur at frequencies below 30 Hz. This is in agreement with the analyses done by most other Mark I plants (see Reference 8). As for the submerged structure drag loads due to CO, these are small compared with the post-chug loads at frequencies over 30 Hz, and the latter were used in the critical load combinations.
The BFN method of combining load harmonics below 31 Hz is similar to one of those suggested in References 8-10, and found marginally acceptable in Reference ll provided stresses are not within a few percent of allowables. The difference is that in Reference 8, the load definition calls for the absolute summation of those four load harmonics Rich produce the maximum structural response, whereas BFN used the four specific load harmonics quoted previously.
The BFN methodology was found acceptable. First, three of the four load harmonics which were absolute summed were in fact the ones producing the highest response in the torus. Secondly, BFN stated in a discussion with FRC on 13 Sep-tember 1984 that the CO shell loads could be increased 2-1/2 times without ex-ceeding allowable stresses for any required load combinations .
3.3 Ne lect of Load Harmonics Above 30 Hz in Post-Chu Torus Load Definition Post-chugging is defined as a spectral load across a wide band of frequen-cies, similar to CO, but lower in amplitude. The AC requires that total re-sponse to post-chug loads is obtained by summing steady state response from each frequency from 1 to 50 Hz.
BFN followed this procedure except that, consistent with the torus response referred to in the previous section, the forcing functions above 30 Hz were neglected. The absolute summation of all 30 remaining forcing functions is significantly more conservative than using the combination of the absolute sum of the four highest of them and the SRSS of the rest, as been found acceptable in Reference 11.
3.4 Combinin of Load Harmonics Associated with Post-Chu Dra Loads on Submer ed Structures For submerged structure drag due to post-chug sources, a phased methodo-logy, using the five maximum harmonic contributors plus the SRSS sum of the remaining 45, has been employed for BFN. Since post-chug loads for submerged structure drag loads can be expected to be even more desychroni zed than for shell loads and since absolute summing of the five maximum harmonics plus SRSS of the rest up to 50 Hz is one of the more conservative phasing approaches used in References 9 to 10, this method has been found acceptable.
3.5 SRV Torus Loads In Section 4 .2.2.1 of the PUAR, the applicant states that the torus shell pressures for multiple valve load cases are obtained by combining pressures from individual valve pressures by a square root of the sum of squares (SRSS) method. This represents an exception to the AC (Section 2.13.2.2) which re-quires linear superposition of the individual pressures. The applicant states this exception can be justified by comparing peak design loads with the measure-ments obtained during in-plant multiple valve tests. We concur with the appli-cant's position based on the following.
The multiple valve tests consisted of four near simultaneous actuations (20 msec. maximum interval) of three adjacent valves. It is our judgement that this represents a reasonable simulation of a "worst case" loading condition. The pressure data which was obtained exhibit very little variability. In particu-lar, the peak overpressures (POP) in the four tests ranged from a low of 10.4 to a high of 12.0 psid with an average of 11.1 psid and a standard deviation of only 6$ . The corresponding 95-95 nonexceedance pressure level, assuming a nor-mal distribution of pressure loads, is 14.5 psid . This compares favorably with the design value of POP employed by the applicant (18.5 psid) since it implies an additional margin of almost 30$ . This margin is sufficient to cover any in-creases needed to extrapolate the measured loads to design and to cover any other uncertainties relative to multiple valve load actuation cases.
T
- 4. CONCLUSIONS A post-implementation pool dynamic load audit of the Br owns Ferry PUAR has been completed to verify compliance with the generic acceptance criteria of NUREG-0661. Five major differences were identified between the PUAR and the ge-neric acceptance criteria. Based on additional information supplied by the ap-plicant, as detailed in the previous section, all of these issues were re-solved. The review of the Browns Ferry PUAR Torus suppression chamber has been completed with no issues or concerns outstanding.
t ~
4 Ct
- 5. REFERENCES References cited in this report are available as follows:
Those items marked with one asterisk (*) are available in the NRC Public Document Room for inspection; they may be copies for a fee.
Material marked with two asterisks (**) is not publicly available because it contains proprietary information; however, a nonproprietary version is available in the NRC Public Document Room for inspection and may be copies for a fee.
Those reference items marked with three asterisks (***) are available for purchase from the NRC/GPO Sales Program, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, and/or the National Technical Information Service, Springfield, Virginia 22161.
All other material referenced is in the open literature and is available thr ough publ i c techni ca 1 libra ri es.
(1) "Safety Evaluation Report, Mark I Long Term Program, Resolution of Generic Technical Activity A-7", NUREG-0661, July 1980.***
(2) "Mark I Containment Short-Term Program Safety Evaluation Report",
NUREG-0408, December 1977.***
(3) General Electric Company, "Hark I Containment Program Load Definition Report", General Electric Topical Report NED0-21888, Revision 2, November 1981.*
(4) Mark I Owners Group, "Hark I Containment Program Structural Acceptance Criteria Plant-Unique Analysis Applications Guide, Task Number 3.1.3",
General Electric Topical Report NED0-24583, Revision 1, July 1979.*
(5) '"Browns Ferry Nuclear Plant, Torus Integrity Long Term Program, Plant Unique Analysis Report", Report No. CEB-83-34, Tennessee Velley Authority, Div. of Engineering Design, Civil Engineering Support Branch, December 21, 1983.*
(6) Letter from J.
Subject:
R. Lehner, BNL, to F. Eltawi la, NRC, dated July Request for Information Regarding Browns Ferry PUAR.*
ll, 1984 .
(7) "BFN PUAR TVA Responses to NRC and Brookhaven National Laboratory guestions", Tennessee Valley Authority, Di v. of Engineering Design, Civil Engineering Support Branch, 5 September 1984.*
(8) "Hark I Containment Program Evaluation of Harmonic Phasing for Mark I Torus Shell Condensation Oscillation Loads", NEDE-24840, prepared by Structural Mechanics Associates for General Electric Company, October 1980.*
(9) Kennedy, R. P., "Response Factors Appropriate for Use with CO Harmonic Response Combination Design Rules", SMA 12101.04-R002D, prepared by Structural Mechanics Associates for General Electric Company, March 1982.*
a (10) Kennedy, R. P., "A Statistical Basis for Load Factors Appropriate for Use with CO Harmonic Response Combination Design Rules", SMA 12101.04-R003D, prepared by Structural Nechanics Associates for General Electric Company, Narch 1982.**
( 11) Bienkowski, G., "Review of the Validity of Random Phasing Rules as Applied to CO Torus Loads", Internal BNL Nemo, August 1983.
ENCLOSURE 2 prepared by the Containment Systems Branch Evaluation DROWNS FERRY Criteria Category Narrative Description
- 1. Hanagement Involvement Management took positive steps to assume timely resolution of the issue.
pproac 0 eso U on of Technical Issues Sound Technical Understanding of the issue. Worked closely with the staff and its consultant toward resolution of the issue.
espons veness Het with the staff and its cons utant shortly after receiving the RAI.
Enforcement H story N/A
- 5. Reporta e Events N/A Staffing rain ng N/A
1'
~
I