Letter Sequence Other |
---|
|
Results
Other: ML13317A969, ML15141A468, ML15272A398, W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), W3F1-2012-0093, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049), W3F1-2013-0006, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-051, W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3, W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2014-0050, Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Un, W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2015-0004, Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation
|
MONTHYEARW3F1-2012-0042, Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments2012-06-0707 June 2012 Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments Project stage: Request W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2012-10-26026 October 2012 Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other W3F1-2012-0093, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2012-10-26026 October 2012 Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) Project stage: Other W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32013-02-21021 February 2013 (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other W3F1-2013-0006, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-0512013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-051 Project stage: Other W3F1-2013-0017, (Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 (Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML13246A3182013-08-28028 August 2013 Request for Additional Information E-mail, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2013-0055, Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation2013-09-26026 September 2013 Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation Project stage: Response to RAI ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 Project stage: Other ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Acceptance Review ML13312A7872013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2014-0050, Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Un2014-08-28028 August 2014 Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Unit 3 Project stage: Other W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-08-28028 August 2014 Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-26026 February 2015 Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2015-0004, Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2015-02-26026 February 2015 Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15141A4682015-05-27027 May 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2015-08-27027 August 2015 Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2015-0073, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2015-08-31031 August 2015 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Request ML15245A3442015-10-0404 October 2015 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Approval ML15272A3982015-10-0606 October 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other 2013-09-26
[Table View] |
|
---|
Category:Letter type:W
MONTHYEARW3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 W3F1-2022-0028, Annual Radiological Environmental Operating Report - 20212022-04-26026 April 2022 Annual Radiological Environmental Operating Report - 2021 W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.22062022-04-26026 April 2022 Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report2022-04-11011 April 2022 Review of Preliminary Accident Sequence Precursor Report W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20212022-04-0707 April 2022 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 2024-07-22
[Table view] Category:Status Report
MONTHYEARML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML21084A8092021-03-25025 March 2021 Entergy Operations, Inc - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) IR 05000382/20200062021-03-0303 March 2021 Annual Assessment Letter for Waterford, Unit 3 (Report 05000382/2020006) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report ML17275A6792017-10-0202 October 2017 Third and Final Six Month Status Notification in Response to Confirmatory Order EA-15-100 W3F1-2017-0031, Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-15-1002017-04-0606 April 2017 Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-15-100 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report W3F1-2016-0062, Waterlord, Unit 3, First Six Month Status Notification in Response to Confirmatory Order EA-15-1002016-10-0606 October 2016 Waterlord, Unit 3, First Six Month Status Notification in Response to Confirmatory Order EA-15-100 W3F1-2016-0021, Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-25025 February 2016 Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2016-0009, Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-24024 February 2016 Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2015-08-27027 August 2015 Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation W3F1-2015-0067, Fifth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-27027 August 2015 Fifth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-26026 February 2015 Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-08-28028 August 2014 Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2012-10-26026 October 2012 Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)2007-03-29029 March 2007 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1) W3F1-2005-0051, Status of the Real Time Contingency Monitoring Program2005-09-28028 September 2005 Status of the Real Time Contingency Monitoring Program CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling2005-05-0505 May 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report2005-03-31031 March 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2023-03-21
[Table view] |
Text
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3 W3F1-2013-0050 August 28, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License With Regard To Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
References:
- 1. NRC Order Number EA-12-049, Order to Modify Licenses With Regard To Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012 (ADAMS Accession No. ML12054A736)
- 2. Waterford Steam Electric Station, Unit 3 letter to NRC, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated February 28, 2013 (ADAMS Accession No. ML13063A266)
Dear Sir or Madam:
On March 12, 2012, the NRC issued an order (Reference 1) to Entergy Operations, Inc.
(Entergy). Reference 1 was immediately effective and required Waterford Steam Electric Station, Unit 3 (Waterford 3), to develop mitigating strategy provisions for beyond-design-basis external events. In response, Waterford 3 developed and submitted an Overall Integrated Plan (Reference 2) which specified periodic updates during the implementation of the plan.
The purpose of this letter is to provide, as an attachment, the first six month status report for the implementation of Order EA-12-049 with regard to the requirements for mitigation strategies for beyond-design-basis external events for Waterford 3.
W3F1-2013-0050 Page 2 of 2 There are no new commitments identified in this submittal. Should you have any questions concerning the content of this letter, please contact Bryan Pellegrin, Licensing Manager (acting), at (504) 739-6203.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 28, 2013.
Sincerely, DJ/WH
Attachment:
Waterford Steam Electric Station, Unit 3, First Six Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to the Requirements for Mitigation Strategies for Beyond-Design-Basis External Events cc: Attn: Director, Office of Nuclear Reactor Regulation U. S. NRC RidsNrrMailCenter@nrc.gov Mr. Steven Reynolds, Regional Administrator (acting)
U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Project Manager for Waterford 3 Kaly.Kalyanam@nrc.gov NRC Senior Resident Inspector for Waterford 3 Marlone.Davis@nrc.gov
Attachment W3F1-2013-0050 Waterford Steam Electric Station, Unit 3, First Six Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to the Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
Attachment to W3F1-2013-0050 Page 1 of 4 Waterford Steam Electric Station, Unit 3, First Six Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to the Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 1 Introduction Waterford Steam Electric Station, Unit 3 (Waterford 3), developed an Overall Integrated Plan (Reference 1 in Section 8) documenting the diverse and flexible strategies (FLEX) in response to Reference 2. This attachment provides a planned update of milestone accomplishments since submittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
2 Milestone Accomplishments The following milestone(s) have been completed since the development of the Overall Integrated Plan (Reference 1), and are current as of July 30, 2013.
None.
3 Milestone Schedule Status The following provides an update to the milestone schedule to support the Overall Integrated Plan (Reference 1). This section provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed.
Revised Target Activity Target Milestone Completion Status Completion Date Date Submit Overall Integrated Plan Feb 2013 Complete N/A Submit 6 Month Updates:
Update 1 Aug 2013 Complete N/A Update 2 Feb 2014 Not Started No Change Update 3 Aug 2014 Not Started No Change Update 4 Feb 2015 Not Started No Change Update 5 Aug 2015 Not Started No Change Perform Staffing Analysis Nov 2015 Not Started No Change
Attachment to W3F1-2013-0050 Page 2 of 4 Revised Target Activity Target Milestone Completion Status Completion Date Date Modifications:
Engineering and Implementation N-1 Walkdowns May 2014 Not Started No Change Design Engineering Oct 2014 Not Started No Change Implementation Outage Nov 2015 Not Started No Change On-site FLEX Equipment Purchase Dec 2014 Not Started No Change Procure Sept 2015 Not Started No Change Off-site FLEX Equipment Develop Strategies with RRC Dec 2013 Not Started No Change Install Off-Site Delivery Station (if Nov 2015 Not Started No Change Necessary)
Procedures Create Waterford FSGs Nov 2015 Not Started No Change Create Maintenance Procedures Nov 2015 Not Started No Change Training Develop Training Plan May 2015 Not Started No Change Implement Training Nov 2015 Not Started No Change Submit Completion Report Nov 2015 Not Started Feb 2016*
- This date corresponds to the last 6 month update and provides time to compile the report following the completion of the Fall 2015 Implementation Outage.
4 Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference 1).
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Waterford 3 expects to comply with the order implementation date and no relief/relaxation is required at this time.
Attachment to W3F1-2013-0050 Page 3 of 4 6 Open Items from Overall Integrated Plan and Draft Safety Evaluation Overall Integrated Plan Open Item Status OI1. The suction path from the TDEFWP to the WCTs would be Not Started through a non-running ACCWS pump post-ELAP. It is expected that both the TDEFWP and the currently sized EFW FLEX pump (primary strategy) will have sufficient capability and/or NPSH to do so. However, this will need to be confirmed more fully as the detailed design of the primary strategy for maintaining core cooling and heat removal evolves (with SGs available).
OI2. An analysis will be needed to demonstrate that containment Not Started pressure and temperature will stay at acceptable levels throughout the ELAP event and that no containment spray system will be required as part of FLEX.
OI3. At this stage of the conceptual design, the chemistry effects of Not Started alternate cooling source (ACS) use on secondary wetted components are unknown.
OI4. It is currently unclear if and how long gravity feed from the Not Started RWSP can be maintained during Modes 5 and 6 in Phase 1. If this time is sufficiently short, Waterford 3 may choose to pre-stage requisite FLEX equipment in Modes 5 and 6.
OI5. It is expected that only the component cooling water system and Not Started dry cooling towers will need to be made operational to reject the heat load generated post-ELAP in Phase 3. However, this must be investigated more fully to confirm such. Notably, only 60% of the dry cooling tower fan motors are currently missile protected and none of the wet cooling tower (WCT) fan motors are missile protected. If more than 60% of dry cooling tower (DCT) capacity is needed to support Phase 3, DCT and/or WCT fan motors may need to be missile protected. Currently available information follows:
The DCT one train heat removal in an accident would be 113.38 Mbtu/hr (Reference 50, Pg 18). Given that 60% of the DCT is missile protected, its assumed that that 40% of the heat removal capability is lost. 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> after shutdown, decay heat is less than 68 Mbtu/hr (ANS 79 decay heat curve) and less than the heat removal capacity of the DCTs. As the event proceeds, the required heat removal will decrease. Until this point in the event, Phase 1 and 2 FLEX strategies will be capable of removing decay heat. Final system operating details for the CCW and DCT (i.e., number of pumps and fans to operate) still need to be determined.
Attachment to W3F1-2013-0050 Page 4 of 4 7 Potential Draft Safety Evaluation Impacts The NRC has not yet issued draft safety evaluations for Waterford 3; therefore, there are no potential impacts to the Draft Safety Evaluation identified at this time.
8 References The following references support the updates to the Overall Integrated Plan described in this Attachment.
- 1. Waterford Steam Electric Station, Unit 3 letter to NRC, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated February 28, 2013 (ADAMS Accession No. ML13063A266)
- 2. NRC Order Number EA-12-049, Order to Modify Licenses With Regard To Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012 (ADAMS Accession No. ML12054A736).