ML13252A171

From kanterella
Revision as of 01:52, 6 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse)
ML13252A171
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 09/09/2013
From: Hunegs G
NRC/RGN-I/DRP/PB6
To:
Hunegs G
References
MN 13-022
Download: ML13252A171 (4)


Text

MN No.13-022 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING September 9, 2013 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Name of Facilities: Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations Docket Nos: 50-334, 50-412, 50-440, and 50-346 Date/Time: September 24, 2013 8:30 a.m. - 11:30 a.m., EDT Location: Embassy Suites - Pittsburgh Airport 550 Cherrington Parkway Coraopolis, PA 15108

Purpose:

To discuss FENOC fleet-wide performance with FENOC management.

Public Participation: This is a Category 1 Meeting. The public is invited to observe the meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Following the business portion of the meeting, members of the public will have an opportunity to discuss FENOCs performance and the role of the NRC in ensuring safe operation of the plants. The agenda is enclosed.

Attendees:

NRC: Eric J. Leeds, Director, Office of Nuclear Reactor Regulation (NRR)

William M. Dean, Regional Administrator, Region I Cynthia D. Pederson, Regional Administrator, Region III Kenneth G. OBrien, Director, Division of Reactor Projects (DRP)(Acting),

Region III Michael L. Scott, Deputy Director, DRP, Region I Gordon K. Hunegs, Chief, Projects Branch 6, DRP, Region I Peter J. Bamford, Project Manager, NRR Mark J. Marshfield, Senior Resident Inspector, Perry Dave I. Spindler, Senior Resident Inspector, Beaver Valley Erin Carfang, Resident Inspector, Beaver Valley FENOC: Peter Sena, President and Chief Nuclear Officer Sam Belcher, Senior Vice President, Operations, and Chief Operating Officer Paul Harden, Senior Vice President, Fleet Engineering Ken Sturtecky, Executive Director, Fleet Outages Kevin Ostrowski, Vice President, Nuclear Oversight Eric Larson, Site Vice President, Beaver Valley Raymond Lieb, Site Vice President, Davis-Besse Ernest Harkness, Site Vice President, Perry

2 Meeting

Contact:

Gordon K. Hunegs, Chief, Projects Branch 6, DRP, Region I 610-337-5046 Email: Gordon.Hunegs@nrc.gov The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by September 17, 2013, to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under Public Meetings.

Approved by: ______/RA/______________

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

Agenda cc w/encl: Distribution via ListServ

ML13252A171 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP NAME BBickett/GKH for DSpindler/GKH for GHunegs/GKH DATE 09/09/13 09/09/13 09/09/13 2013 FENOC Fleet Public Meeting Tuesday, September 24, 2013 EMBASSY SUITES PITTSBURGH AIRPORT 550 Cherrington Parkway, Coraopolis, PA 15108 0830-1100 EDT Joint FENOC/NRC Public Meeting MEETING AGENDA Opening Remarks Pete Sena - President FENOC and Chief Nuclear Officer FENOC Overview Sam Belcher - Senior Vice President FENOC and Chief Operating Officer Fleet Perspective Ken Sturtecky - Executive Director, Fleet Outages Fleet Engineering and Projects Paul Harden - Senior Vice President, Fleet Engineering Site Performance Review Beaver Valley: Eric Larson - Vice President Davis-Besse: Ray Lieb - Vice President Perry: Ernest Harkness - Vice President Fleet Oversight and Assessment Kevin Ostrowski - Vice President, Oversight Closing Remarks Pete Sena 1100-1130 Opportunity for Public to Ask Questions of NRC 1130 End of Meeting Enclosure