ML14350A155

From kanterella
Revision as of 16:02, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Exam 2014-301 Draft Administrative JPMs
ML14350A155
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/16/2014
From:
NRC/RGN-II
To:
Progress Energy Carolinas
Shared Package
ML14350A180 List:
References
50-324/14-301, 50-325/14-301 50-324/OL-14, 50-325/OL-14
Download: ML14350A155 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Brunswick Date of Examination: October 2014 Examination Level: ROB SRO B Operating Test Number: FINAL Administrative Topic Type Describe activity to be performed (see Note) Code*

Conduct of Operations Calculate GAFS and T.S. Assessment R, M (COO01) 2.1.23 Ability to perform specific system and integrated (RO, then SRO) plant procedures during all modes of operation.

Conduct of Operations Verifying SLC Operating Parameters R M (COO-02) 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument (RO) interpretation.

Conduct of Operations Evaluate Plant Chemistry Limits During Condenser R D Tube Leak (COO-03) 2.1 .34 Knowledge of primary and secondary plant SRO chemistry limits.

Equipment Control Evaluate a CRD Clearance R, D (RO and SRO) 2.2.13 Knowledge of tagging and clearance procedures.

Radiation Control Determine Total Dose for ALARA R D (RO and SRO) 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions Emergency Procedures/Plan Classify an Emergency per PEP-2.1 R, N (SRO Only) 2.4.29 Knowledge of the emergency plan.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Conduct of Operations (COO-O1) (RO, then SRO)

Calculate GAFs and Tech Spec Assessment R, M K/A 2.1.23 Ability to perform specific system and integrated plant procedures during all modes of operation.

This is a modified JPM that requires the Exam inee to calculate Gain Adjustment Factors (GAF5) per OPT-Ol .8C, and then the SRO determines the Tech Spec implications based on the calculations. Numbers were modified to provide different values for calculated GAFs and different GAFs that were out of spec.

Conduct of Operations (COO-02) (RO)

Verifying SLC Operating Parameters K/A 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

This is a modified JPM that requires the RO to verifying SLC Tank operating parameters. This is part of the RO DSR. Parameters were changed to provide satisfactory results.

Conduct of Operations (COO-03) (SRO)

Evaluate Plant Chemistry Limits during Condenser Tube Leak R, M 2.1.34 Knowledge of primary and secondary plant chemistry limits.

This is a bank JPM that was used on the 2008 NRC Exam. It requires the Examinee to evaluate plant chemistry limit lAW OAOP-26.0, High Reactor Coolant Or Condensate Conductivity and then determine the determine applicable actions required by OAI-81, Water Chemistry Guidelines, related to plant operations.

Equipment Control (RO and SRO)

Evaluate a Clearance Boundary 2A CRD Pump R, D K/A 2.2.13 Knowledge of tagging and clearance procedures.

This is a bank JPM that was used on the 2008 NRC exam. Given a boundary request form and a written clearance, the Examinee must evaluate the clearance for safety and accuracy.

Radiation Control (RO and SRO)

Determine Total Dose for ALARA R, M K/A 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions.

The is a bank JPM that was used on the previous NRC Exam (2012). It required the Examinee to determine the travel path which gives the lowest dose, ALARA.

Emergency ProcedureslPlan (SRO only)

Classify and Emergency lAW OPEP-2.1 R, N K/A 2.4.40 Knowledge of SRO responsibilities in Emergency Plan implementation.

This is a new JPM that requires the SRO Examinee to classify and emergency.

Although classification JPMs have been use in previous exams, the classification requirements for this JPM are new.