|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
H.IC) R.IMY PACCELERATED RIDS PROCESSING) 1 Fe
~
i ra REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR:9407190298 DOC.DATE: 94/07/12 NOTARIZED: NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System P RECIP.NAME RECXPXENT AFFILIATION Document Control Branch (Document Control Desk) R Application for amend to license NPf-21,requesting amend to 'U TS,relocation of TS table for instrument response time limits.
DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution
( ENCL J SIZE: 0, R
NOTES:
RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PDIV-3 LA 1 1 PDIV-3 PD 1 1 CLIFFORD,J 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB 1 r 1 NRR/DORS/ONDD 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/S PLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 0 OGC/HDS3 1 0 EG~FlTi 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC D
u N
NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20
rl
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 993S2-0968 ~ (S09) 372-5000 July 12, 1994 G02-94-160 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENTTO THE TECHNICALSPECIFICATIONS, RELOCATION OF TECHNICAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS
Reference:
Generic Letter, 93-08 dated December 29, 1993, NRC to All Holders of Operating Licenses for Nuclear Power Reactors, "Relocation of Technical Specification Tables of Instrument Response Time Limits" In accordance with the Code of Federal Regulations, Title 10 Parts 50.90 and 2.101, the Supply System hereby requests an amendment to the WNP-2 Technical Specifications. This submittal requests that instrument response time limit tables for the Reactor Protection System (RPS),
Isolation Actuation and Emergency Core Cooling System (ECCS) be relocated to the WNP-2 Final Safety Analysis Report (FSAR) [see Attachment 3]. This request is made in accordance with the guidance in the referenced Generic Letter.
Generic Letter 93-08 states that relocating instrument response time limittables to the FSAR will not alter the surveillance requirements of the Technical Specifications. The Supply System concurs with this statement. WNP-2 Plant surveillance procedures specify acceptance criteria that implement the response time limits proposed for relocation. The relocated time limits will be controlled as part of the FSAR. Changes to the FSAR and plant procedures are evaluated and controlled in accordance with 10 CFR 50.59.
9407190298 9407i2 oo(
PDR ADOCK 05000397 P PDR
I f
J ~
0
Page Two REQUEST FOR AMENDMENT, RELOCATION OF TECHNICAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS The 10 CFR 50.59 process requires any change that results in a plant response more severe than, or different from, the current accident analysis to be submitted to the NRC for review and approval prior to implementation. Those changes to the FSAR that do not adversely impact the accident analysis are implemented and submitted as an update to the FSAR as required by 10 CFR 50.71(e). For these reasons the relocated instrument response time limit tables will continue to be appropriately controlled. Changes to the limits will not be made without adequate review and approval. Therefore, relocating the tables does not alter compliance to the WNP-2 Technical Specifications. provides discussion of and justification for the change. Attachment 2 is a No Significant Hazards evaluation of the change, and Attachment 3 is the affected pages of the WNP-2 Technical Specifications and Bases reflecting the change. It should be noted that the footnotes at the bottom of pages 3/4 3-11 and 3/4 3-25 can be deleted as they are no longer effective. Also, Technical Specification page 3/4 3-21 has another pending change that could affect it. However, as indicated in Attachment 3 the proposed change, submitted in October 1993 will also be removed from the Technical Specifications with approval of this amendment request.
As discussed in Attachment 2, the Supply System has concluded that this change does not involve a significant hazards consideration, nor is there a potential for a significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does the change involve a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and therefore, in accordance with 10 CFR 51.22(b),
an environmental assessment of the change is not required.
This Technical Specification change request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.
In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
J r(
Page Three REQUEST FOR AMENDMENT, RELOCATION OF TECHNICAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS It is requested that the change be made effective thirty days following approval of this submittal.
Should you have any questions or desire additional information regarding this matter, please call me or P. R. Bemis, Manager, Regulatory Programs at (509) 377-4027.
Sincerely
. V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations Attachments CC: LJ Callan - NRC RIV NRC Sr. Resident - 927N NS Reynolds - Winston & Strawn KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office DL Williams - BPA/399 FS Adair - EFSEC JW Clifford - NRC
STATE OF WASHINGTON )
Subject:
Request for Amend to TS, Relocation of
) T T I f r Res on Time Limi COUNTY OF BENTON )
I. J. V. PARRISH, being duly sworn, subscribe to and say that I am the Assistant Managing Director, Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.
DATE , 1994
. Parrish, Assistant Managing Director perations On this date personally appeared before me J. V. PARRISH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~day of 1994.
Notary Pubhc in and for the STATE OF WASHINGTON J
r"
/
r ~
I Residing a My Commission Expires
0 llll' P
. ~
V~
vg v
REQUEST FOR AMENDMENT, RELOCATION OF TECHNICAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS Attachment 1 Page 1 of 2 DISCUSSION AND JUSTIFICATION OF CHANGE The RPS, Isolation Actuation and ECCS Instruments provide signals to the actuation logic for safety equipment that is needed to mitigate accidents and transients. The relocation of the response time tables from the Technical Specifications to the FSAR will not affect this safety function. Relocation does not change the operability or surveillance requirements for these instruments from the existing Technical Specification requirements.
Nor will relocation allow changes to be made in the response time limits without adequate review and approval. When relocated, proposed changes to the FSAR list of response time limits willbe processed under the administrative controls of 10 CFR 50.59. The 10 CFR 50.59 process will require any change to the instrument response times that results in a plant response more severe than, or different from, the current accident analysis to be submitted to the NRC for review and approval as an unreviewed safety question prior to implementation, Changes to the FSAR evaluated and determined not to be an unreviewed safety question would be implemented and submitted as an update to the FSAR as required by 10 CFR 50.71(e).
Plant Procedure PPM 1.1.5, "Plant Operations Committee" (POC) requires POC to review:
"all safety related procedures and programs covering activities referenced in Section 6.8 of the Technical Specifications and changes thereto, and any other procedures, programs or changes thereto as determined by the Plant Manager to affect nuclear safety."
Section 6.8.1 of the Technical Specifications presently requires that:
"written procedures shall be established, implemented, and maintained covering,"
(6.8.1.d), "surveillance and test activities of safety related equipment."
The administrative controls of 10 CFR 50.59 and the POC responsibilities will ensure that the relocated instrument response time limit tables willcontinue to be controlled and changes to the limits will only be allowed after adequate review and approval. Hence, relocation will neither affect the safety function of the instruments nor allow the safety function to be impacted by a change that has not had an adequate review and approval, As stated in the referenced generic letter, each licensee who wishes to implement this improvement to their Technical Specifications should confirm that the plant procedures which govern or control response time testing include acceptance criteria that implement the limits which will be relocated to the FSAR. The Supply System hereby confirms that the WNP-2 procedures include acceptance criteria that implement the response time limits which will be relocated to the FSAR. It should be noted that the Supply System recently completed a Technical Specification Surveillance Improvement Project (TSSIP). TSSIP reviewed the
REQUEST FOR AME NT, RELOCATION OF TEC CAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS Attachment 1 Page 2 of 2 DISCUSSION AND JUSTIFICATION OF CHANGE (continued) adequacy of the plant surveillance procedures, Some surveillance procedures, to be performed during the 1995 refueling outage, require modification to address discrepancies identified by TSSIP. The TSSIP program, findings, and corrective actions are described in WNP-2 Licensing Event Report No. 93-10 and supplementary reports there to.
The Generic Letter also requires that a commitment be made to include the relocated response time limits in the next update of the FSAR. Accordingly, the Supply System will include the relocated instrument response time limits in the next FSAR update after approval of this amendment request in accordance with the schedule requirements of 10 CFR 50.71.
REQUEST FOR AME NT, RELOCATION OF TEC CAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS Attachment 2 Page 1 of 2 NO SIGNIFICANT HAZARDS EVALUATION In accordance with 10 CFR 50.92, the Supply System has evaluated relocating the response time limit tables from the Technical Specifications to the FSAR and determined that the change does not represent a significant hazards consideration. The following is provided in support of this conclusion.
- 1) Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?
The RPS, Isolation Actuation and ECCS Instruments provide signals to the actuation logic for safety equipment needed to mitigate accidents and transients. The proposed change relocates the instrument response times from the Technical Specifications to the FSAR but will not affect the operability or surveillance requirements of the affected instruments. The instruments will continue to be proven operable on the schedule provided in the Technical Specifications. The FSAR change process and Plant Operations Committee review responsibilities ensure that changes to the response time limits cannot be made without adequate review and approval. Since operability confirmation as required by the Technical Specifications (surveillance testing require-ments) will not be affected by the change and the limits themselves cannot be altered without adequate review and approval, there is no possibility of a significant increase in the probability of an accident previously approved as a result of this change.
The instruments provide signals to the actuation logic of equipment used to mitigate the consequences of an accident. However, since no changes are being made in the methods or frequencies of proving operability the systems will not be degraded or be made susceptible to degradation that could go unidentified. As discussed above, changes to the limits will not be made without adequate review and approval. Hence, this change will not affect the capability of the plant to mitigate a previously evaluated accident. Because the mitigative capability is not affected there is no significant increase in the conse-quences of a previously evaluated accident as a result of this change.
For the above reasons, the change does not represent a significant increase in the probability or consequences of an accident previously evaluated.
- 2) Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed change relocates only the tables containing the instrument response times for the RPS, Isolation Actuation and ECCS response time limits from the Technical Specifications to the FSAR. The change does not affect how these instruments will function, Relocation of this information does not represent a change in the configuration or operation of the plant. No new hardware is being added to the plant as part of the proposed change. Plant procedures are not affected by the change. The Technical
0 0
~%up a
/
REQUEST FOR AME NT, RELOCATION OF TEC CAL SPECIFICATION TABLES FOR INSTRUMENT RESPONSE TIME LIMITS Attachment 2 Page 2 of 2 NO SIGNIFICANT HAZARDS EVALUATION(continued)
Specification sections for the surveillance testing of these instruments will not be, affected. Therefore, the Technical Specifications will continue to require that the same operability and surveillance requirements be met for the affected instruments.
Consequently, the possibility of a new or different kind of accident from any accident previously analyzed is not introduced as a result of this change.
- 3) Does the change involve a significant reduction in a margin of safety?
The margin of safety established by the response time limits is in ensuring that the RPS, Isolation Actuation and ECCS systems will respond in time to support the assumptions of the accident analysis. Relocating the response time limits to the FSAR does not alter the operability or the surveillance requirements applicable to the affected instruments.
These instruments will continue to be tested for operability and therefore remain capable of responding to accident events within the time limits required by the accident analysis.
The administrative change control provisions for the FSAR, the plant procedures implementing the requirements of 10 CFR 50.59 and the administrative sections of the Technical Specifications are adequate to control changes to the response time limits such that they cannot be altered in a manner that would adversely affect plant safety.
Therefore, for these reasons, the change does not involve a significant reduction in a margin of safety.