February 13, 2007
Mr. Paul A. HardenSite Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANT NRC COMPONENT DESIGN BASESINSPECTION (CDBI) REPORT 05000255/2006009(DRS)
Dear Mr. Harden:
On December 15, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed aninspection at your Palisades Nuclear Plant. The enclosed report documents the inspection findings which were discussed on December 15, 2006 and January 29, 2007, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to safety, and tocompliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected calculations, design bases documents, procedures,and records; observed activities; and interviewed personnel. Specifically, this inspection focused on the design of components that are risk significant and have low design margin.Based on the results of this inspection, 11 NRC-identified findings of very low safetysignificance were identified, ten of which involved violations of NRC requirements. However, because these violations were of very low safety significance and because they were entered into your corrective action program, the NRC is treating the issues as Non-Cited Violations (NCV) in accordance with Section VI.A.1 of the NRC's Enforcement Policy.If you contest the subject or severity of a NCV, you should provide a response with a basis foryour denial, within 30 days of the date of this inspection report, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 WarrenvilleRoad, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Palisades facility.
P. Harden-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/Ann Marie Stone, ChiefEngineering Branch 2 Division of Reactor SafetyDocket No. 50-255License No. DPR-20
Enclosure:
Inspection Report 05000255/2006009
w/Attachment:
Supplemental Informationcc w/encl:J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor State Liaison Office, State of Michigan L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division
SUMMARY OF FINDINGS
......................................................7
REPORT DETAILS
............................................................6
===.1
Introduction.
...........................................................6.2Inspection Sample Selection Process........................................6===
.3 Component Design......................................................71.Startup Transformer not Evaluated for Past Operability and Reportability......112.Reduction in Fast Bus Transfer Capability..............................133.Non-Conservative Voltage Drop Calculations for Motor Control Center ControlCircuits.........................................................164.Effect of Accident Temperatures on Cable Resistance Not Evaluated.........185.Molded-Case Circuit Breaker Testing Program Deficiencies................196.Battery Terminals Not Coated with Anti-Corrosion Material.................21
7.Diesel Generator Frequency Variation not Considered in Loading Calculations..23 8.Emergency Diesel Generator Automatic Fuel Transfer Equipment not Rated forExpected Maximum Temperature....................................259.High Pressure Safety Injection Pump Vortex Limit Calculation Inaccuracies....27 10.Potential for Safety Injection Refueling Water Tank Level Switch Setpoints to beOutside Technical Specification Limit..................................2811.Failure to Correctly Apply Pressure Locking Thrust in Motor Operated ValvePerformance Test Procedures.......................................3012.Potential Common Mode Failure Mechanism Due to Out of Phase Transfer....3113.Incorrect Auxiliary Feedwater Vortex Limit Calculation.....................3314.Addition of Manual Operator Action Not Evaluated in Accordance with 10 CFR 50.59...................................................34.4Operating Experience...................................................36
.5 Modifications..........................................................37
.6 Risk Significant Operator Actions..........................................38OTHER ACTIVITIES (OA).....................................................38
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- G. Baustian, Training Manager
- B. Berles, System Engineering Manager
- T. Blake, Nuclear Safety Assurance Manager
- A. Blind*, Design Engineering Manager
- B. Brogan*, Design Engineering, Technical Lead
- J. Broschak, Engineering Director
- D. Cooper, Chief Nuclear Officer
- B. Dotson, Regulatory Compliance
- J. Erickson, Design Engineering
- T. Fouty*, Programs and Analysis Programs Supervisor
- P. Harden, Site Vice President
- G. Hettel, Plant Manager
- D. Kennedy*, Design Engineering
- L. Lahti, Licensing Manager
- D. Malone, Regulatory compliance supervisor
- M. Nordin*, Configuration Management Supervisor
- P. Russell, Engineering Programs Manager
- W. Scott*, Electrical and Instrumentation and Controls Supervisor
- G. Sleeper*, Senior Reactor Operator
- J. Smith*, Design Engineering
- K. Smith, Nuclear Oversight Manager
- D. Strebeck*, Design Engineering
- M. Wadley, NMC/Vice President Operations Support
- K. Yeager, Assistant Operations ManagerConsumers Energy
- S. Wawro, Asset Manager
Nuclear Regulatory Commission
- C. Pederson, Director, Division of Reactor Safety (DRS)
- C. Lipa, Chief, Branch 4, Division of Reactor Projects
- A.M. Stone, Chief, Engineering Branch 2, DRS
- J. Ellegood, Senior Resident Inspector
- J. Giessner, Resident Inspector* Inspection team contacts
2
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened0500255/2006009-01NCVStartup Transformer not Evaluated for Past Operability andReportability0500255/2006009-02NCVReduction in Fast Bus Transfer Capability
0500255/2006009-03NCVNon-Conservative Voltage Drop Calculations for MotorControl Center Control Circuits0500255/2006009-04NCVEffect of Accident Temperatures on Cable Resistance NotEvaluated0500255/2006009-05NCVMolded-Case Circuit Breaker Testing Program Deficiencies
0500255/2006009-06NCVBattery Terminals Not Coated with Anti-Corrosion Material
0500255/2006009-07NCVDiesel Generator Frequency Variation not Considered inLoading Calculations0500255/2006009-08NCVEmergency Diesel Generator Automatic Fuel TransferEquipment not Rated for Expected Maximum Temperature0500255/2006009-09NCVHigh Pressure Safety Injection Pump Vortex Limit CalculationInaccuracies0500255/2006009-10NCVPotential for Safety Injection and Refueling Water Tank LevelSwitch Setpoints to be Outside Technical Specification Limit0500255/2006009-11FINFailure to Correctly Apply Pressure Locking Thrust in MotorOperated Valve Performance Test Procedures 0500255/2006009-12URIPotential Common Mode Failure Mechanism Due to Out ofPhase Transfer0500255/2006009-13URIIncorrect Auxiliary Feedwater Vortex Limit Calculation
0500255/2006009-14URIAddition of Manual Operator Action Not Evaluated inAccordance with 10 CFR 50.59Closed0500255/2006009-01NCVStartup Transformer not Evaluated for Past Operability andReportability0500255/2006009-02NCVReduction in Fast Bus Transfer Capability
0500255/2006009-03NCVNon-Conservative Voltage Drop Calculations for MotorControl Center Control Circuits0500255/2006009-04NCVEffect of Accident Temperatures on Cable Resistance NotEvaluated0500255/2006009-05NCVMolded-Case Circuit Breaker Testing Program Deficiencies
0500255/2006009-06NCVBattery Terminals Not Coated with Anti-Corrosion Material
0500255/2006009-07NCVDiesel Generator Frequency Variation not Considered inLoading Calculations
Attachment30500255/2006009-08NCVEmergency Diesel Generator Automatic Fuel TransferEquipment not Rated for Expected Maximum Temperature0500255/2006009-09NCVHigh Pressure Safety Injection Pump Vortex Limit CalculationInaccuracies0500255/2006009-10NCVPotential for Safety Injection and Refueling Water Tank LevelSwitch Setpoints to be Outside Technical Specification Limit0500255/2006009-11FINFailure to Correctly Apply Pressure Locking Thrust in MotorOperated Valve Performance Test Procedures
Attachment4
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.Action Requests Reviewed During the InspectionD-PAL-93-016; Loss of 1-1 Safeguards Transformer and "F" Bus During Performance ofQO-1; January 28, 1993
- D-PAL-93-226; Inadequate Safeguards Bus Transfer Scheme; October 5, 1993
- C-PAL-94-1072; Loss of Switchyard "F" Bus; November 23, 1994
- CAP021914; 2400V Bus Fast Transfer/Faulted Cable; January 16, 1996
- CAP030519; Lack of Automatic Fast Transfer from Station Power Transformer 1-2 to Start-Up Transformer 1-2 on Safeguards Bus Differential Relay Operation;
- April 26, 2002
- CAP034500; Loss of Offsite Power that Results in a Loss of Shutdown Cooling;
- March 26, 2003
- CAP040196; Calculated Short Circuit Currents Greater Than 480V AC Breaker Interrupt Rating; February 25, 2004
- CAP046059; Incorrect Closure Times for Breakers 252-302 and 252-402;
- January 11, 2005
- CAP047963; Evaluate Impact of Installed Dilution Water Pump Motors on 2400V Fast Transfer; May 19, 2003
- 216513; Received Alarm
- EK-0518, 2400V Bus Ground 1C, 1D or 1E Ground;
- February 16, 2000
- 218414; Component Cooling Water P-52C Tripped on Time Overcurrent;
- January 2, 2000
- 257227; Received Alarm
- EK-0518, 2400V Bus Ground 1C, 1D, and/or 1E Ground Unexpectedly; July 11, 2002
- 257994; Breaker 72-132 Trip; June 10, 2002
- 269523; Unexpected Alarms due to Bus 1E Ground; September 19, 2002
- 00418814; Station Battery Charger #1 Output Breaker 72-15 Trip; March 17, 2003
- 00463992; Breaker 72-234 Was Found Out of Tolerance During Testing; July 24, 2003
- 00463997; Breaker 72-228 Was Found Out of Tolerance During Testing; July 24, 2003
- 00463999; Breaker 72-219 Was Found Out of Tolerance During Testing; July 24, 2003
- 00464001; Breaker 72-231 Was Found Out of Tolerance During Testing; July 24, 2003
- 00758546; DC Breaker 72-119 Failure; September 29, 2004
- 00776683; Breaker 72-123 Fails As-Found Setting Test; November 16, 2004
- 00776691; Breaker 72-130 Fails As-Found Setting Test; November 16, 2004
- 00832070; Control Room Heating, Ventilation and Air Conditioning Went to Emergency Mode When Deenergizing Control Power with Breaker 72-408; April 12, 2005
- 00858068; Re-evaluate Conservatism in
- EA-CA-025644-01; June 16, 2005
- 00870121; Inadequate Guidance for Operations when Outside Air Temperature Exceeds 95F; July 26, 200501002363; Declining Service Water P-7B Performance; October 31, 2005
- Attachment501004981; Turbo Charger Mounting Bolt Broken on K-6B, 1-2 Emergency DieselGenerator; November 22, 2005
- November 23, 2005
- 01012578; Emergency DG Performance Indicates an Adverse Trend ; January 30, 2006
- 01013397; Concern on Auxiliary Feedwater Suction Pressure Trip; February 3, 2006
- 01014535; Design Basis Potentially Not Fully Met for Condensate Storage Tank T2 and Auxiliary Feedwater Pumps; February 13, 2006
- 01016573; Replacement of Relays 383-11 and 383-12 Removed from EC157 Scope;
- April 24, 2006
- 01021713; Battery Test Software Locked Up During
- RE-83A; April 2, 2006
- 01024313; 72-211; DC Breaker Will Not Reset; April 16, 2006
- 01024377; Report Could Not Be Generated for
- RE-83B; April 17, 2006
- 01024455; DC Breaker 72-208 As-Found Reading Out of Tolerance; April 17, 2006
- 01024462; DC Breaker 72-216 As-Found Readings Out of Tolerance; April 17, 2006
- 01027656; 151X Lockout Protective Relay Very Slow to Operate; June 4, 2006
- 01031654; Stuck Load Tap Changer; May 22, 2006
- 01036648; 1-2 Diesel Generator Started Outside Acceptance Criteria; June 22, 2006
- 01045526; 1-2 EDG Slow to Start; August 21, 2006
- September 17, 2006
- 01051796; Received Alarm
- EK-0333 and
- EK-0518 Unexpectedly; September 23, 2006
- 01054496; Revise Procedure
- SPS-E-8; October 9, 2006
- 01056230; Corrosion Observed Twice on
- ED-02 Cell 25; October 17, 2006
- 01056723; Work Order on Hold due to Improperly Issued Engineering Change Request;
- October 19, 2006
- 01057946; Error in Load Calculation for
- EC-9049 Assumption; October 24, 2006
- 01058843; Motor Operated Valves in Chemical and Volume Control System Removed from MOV Program; October 31, 2006
- 01059476; High Pressure Safety Injection Pump Alignment Key Configuration Incorrect;
- November 2, 2006
- 01060868; Air Operated Valve Capability Calculations Not Updated with Field Test Data;
- November 9, 2006
- 01061082; Auxiliary Feedwater Pump P-8A Leakage out of Overflow Pipe;
- November 10, 2006
- 01061084; Auxiliary Feedwater Pump P-8B Taper Pin Configuration;
- November 10, 2006
- 01061104; Alignment Blocks on Auxiliary Feedwater Pump P-8A Missing Taper Pins;
- November 10, 2006
- 01061110; Two Nuts on Valve
- MO-2169 Not Fully Engaged; November 10, 2006
- 01061383; Setpoint Calculation for 127-1 and 127-2 Does Not Exist;
- November 13, 2006Action Requests Generated As a Result of the Inspection01059464; Loose Nut on Nitrogen Station 1 Bottle Clamp; November 2, 200601060387; Superceded Calculations Identified as Active; November 8, 2006
- Attachment601061576; Incorrect Information Given to NRC Team During Design Inspection;November 14, 2006
- 01061586; Emergency Operating Procedure Basis Not Updated for Diesel Generator
- 1-3; November 14, 2006
- 01061641; Revise Procedure
- SPS-E-8 to Show Correct Breaker Number;
- November 14, 2006
- 01061758; Errors in Flow Acceptance Criteria Service Water Test RO-216;
- November 15, 2006
- 01061838; Revise Procedure
- RI-14 and Associated Basis Document to Correctly Account for Instrument Accuracy; November 15, 2006
- 01061904; Seismic Qualification Utility Group Analysis of Condensate Storage Tank Not Microfilmed; November 15, 2006
- 01061932; Evaluate Use of Station Power Transformer 1-2 to Feed 2400V Buses in Modes 1-4; November 15, 2006
- 01061939; Discussion of Second Steam Line to Turbine Driven Auxiliary Feedwater Pump K-8 Turbine Still in Design Basis Document; November 15, 2006
- 01061965; Safety Injection Refueling Water Tank Level Switch
- LS-0329 Set Above Upper Limit; November 15, 2006
- 01061968; Hasp Missing from Coupling Guard on K-8A Auxiliary Feedwater Pump;
- November 16, 2006
- 01062183; Operating Experience Received on Cable Ties; November 16, 2006
- 01062256; Supplemental Diesel Generator Cold Weather Check List Verification;
- November 16, 2006
- 01062278; Non-Bounding Air Entrainment Value Supporting the Low End of the Recirculation Actuation System Setpoint Band; November 16, 2006
- 01062304; All Emergency Diesel Generator Room Cooling Room Intake Louver Screens are Dirty; November 16, 2006
- 01062307; Emergency Diesel Generators K-6A and K-6B Exhaust Tailpipe Corrosion;
- November 16, 2006
- 01062314; Debris Noted in Emergency Diesel Generator 1-1 Air Intake/Exhaust Cubicle Roof Drain; November 16, 2006
- 01062531; Discrepancy in Calculation
- EA-RTD-91-01; November 17, 2006
- 01062628; Errors in Service Water Pump Curve Used for T-216 Acceptance Criteria;
- November 18, 2006
- 01062644; Error in Air Entrainment Calculation for Auxiliary Feedwater Trip Setpoint;
- November 18, 2006
- 01063336; Impact of Elevated Temperatures on Cable Resistance; November 22, 2006
- 01064038; Evaluate Differences in Calculation Project Documentation;
- November 28, 2006
- 01064043; Supplemental Diesel Generator Temperature Limits; November 28, 2006
- 01064671; Circuit Breaker Test Procedure Not Up to Industry Standards;
- November 30, 2006
- 01064772; Incorrect Statement in Final Safety Analysis Report Section 7.4.3.1.2;
- November 30, 2006
- 01064804; Failure to Perform Technical Specification Surveillance Requirement;
- November 30, 2006
- 01064944; Inadequate Trending of Molded Case Circuit Breaker Operational and Test Failures; December 1, 2006
- Attachment701065328; Possible Enhancements to
- SOP-30, Station Power; December 4, 200601065608; Breaker Testing Failure Not Captured in Corrective Action Program;
- December 5, 2006
- 01065641; Misapplication of Uncertainty Method when Calculating Instrument Uncertainties; December 5, 2006
- 01066193; Incorrect Calculation Revision Referenced for Component Design Basis Inspection Request for Information 69; December 7, 2006
- 01066264; Replaced Molded Case Circuit Breaker Deficiencies Trending;
- December 7, 2006
- 01066273; Excluded Required Equipment in Operability Recommendation 108 for Greater than 95F Ambient Air; December 7, 200601066349; Minor Uncertainty Value Error for
- VHX-1 in
- RO-216 Basis Document;
- December 8, 2006
- 01066422; Station Battery
- ED-02 Possible Corrosion; December 8, 2006
- 01066444; Minor Administrative Error in
- EA-C-PAL-99-1209B-01, Revision 1;
- December 8, 2006
- 01066618; Corrosion Found on
- ED-01 and
- ED-02 Main Station Batteries;
- December 9, 2006
- 01066913; Diesel Generator Cooling Fan V-24 Discrepancies; December 11, 2006
- 01067047; MOV Procedures Inadequately Apply Pressure Locking Loads;
- December 12, 2006
- 01067063; Fast Transfer From Safeguard Transformer 1-1 to Startup Transformer 1-2
- May Result in a Loss of Offsite Power; December 14, 2006
- 01067467; Past Operability not Requested or Performed for AR 01031654;
- December 12, 2006
- 01067491; Calculation Does not Consider Frequency Variation in Calculating Loading;
- December 13, 2006
- 01067508; Create Engineering Analysis of Auxiliary Feedwater Room Heat up Considering P8B Steam Trap Leak; December 13, 2006
- 01067550; Specification Change 96-012 Should Have Had 50.59 Evaluation;
- December 13, 2006
- 01067585; Incorrect Conclusion Statement in
- EA-DTE-797-01; December 13, 2006
- 01067728; Component Design Basis Inspection Issues Aggregate Review;
- December 14, 2006
- 01067779; Lack of Lockout Relays for Bus 1C and 1D Breakers; December 14, 2006
- 01067792; Potential Need to Reperform Calculation on 2400V Bus Transfer;
- December 14, 2006
- 01067802; Overestimate of Design Margin in OPR of AR 01063336;
- December 14, 2006
- 01067804; Overestimate of Design Margin in Operability Recommendation for
- 01062531; December 14, 2006
- 01067805; Non-Conservative Electrical Loads Used in System Load Flow Analysis;
- December 14, 2006
- 01067886; Potential Motor Shaft Damage During 2400 V AC Fast Transfer;
- December 15, 2006
- 01068503; Operability Recommendation Conclusion is Incorrect; December 15, 2006
- 01073680; Operability Recommendation Inappropriately Refers to a Non-Implemented Calculation; January 24, 2007
- 01074263; Prior NRC Approval Required for Manual Action; January 26, 2007
- Attachment8Calculations1C/108-J9400/127-7; Bus 1C Second Level Undervoltage Relays; Revision 31D/203-J9401/127-8; Bus 1D Second Level Undervoltage Relays; Revision 3
- DCP-090188-1; Range of Station Power Voltages; Revision 0
- DCP-122887-1; Optimize Emergency Diesel Generator Sequencer Times; Revision 0
- EA-A-PAL-90-129; Analysis of 2400 Volt System Bus Transfer; Revision 0
- EA-A-PAL-94-279-004; Seismic Analysis Rreport for 4" ANSI Class 150 Forged Stainless Steel Bolted Bonnet Motor Operated Gate Valve; Revision 0
- EA-AOVCAP-ESS-02; Actuator Capability Review for Air Operated Valves with Air Cylinder - Spring Return Fail Close Actuators in the Engineered Safeguards System;
- Revision 0
- EA-AOVCAP-ESS-03; Actuator Capability Review for Fail Open Air Operated Valves with Direct Acting Diaphragm Actuators in the Engineered Safeguards System;
- Revision 0
- EA-AOVCAP-GATE-ESS-01; Actuator Capability Review for Air Operated Gate Valves in the Engineered Safeguards System; Revision 1
- EA-AOVCAP-MSS-02; Actuator Capability Review for Air Operated Valves with Double Acting Air Cylinder - Spring Return Fail Close Actuators in the Main Steam System;
- Revision 1
- EA-AOVT/T-UNBALANCED-01; Thrust Requirements for Palisades Unbalanced Disk Air Operated Globe Valves with Compressible Flow; Revision 2
- EA-AOV-WKLINK-02; Weak Link Calculation for Air Operated Valves
- CV-3027 and
- CV-3056 from Crane Valve; Revision 0
- EA-APR-95-004; 10 CFR Part 50 Appendix R Safe Shutdown Associated Circuits Analysis for Common Power Supply and Common Enclosure; Revision 4
- EA-APR-95-005; 10 CFR Part 50 Appendix R High Impedance Fault Analysis;
- Revision 2
- EA-C-PAL-95-0053B-01; Incorporation of a Higher Auxiliary Feedwater Pump Suction Pressure Trip Setpoint into the T-2/T-81 Inventory Calculations Using the RETRAN
- Program; July 19, 1995
- EA-C-PAL-95-0877D; Evaluation of the Potential for Excessive Air Entrainment Caused by Vortexing in the Safety Injection Refueling Water Tank During a Loss of Coolant Accident; Revision 0
- EA-C-PAL-96-0329-01; Investigation of Circuit Breaker and Fuse Coordination for Safety Related 125V DC Distribution Panels; Revision 2; April 15, 2004
- EA-C-PAL-99-1209B-01; Generation of Flow Rate Acceptance Criteria for Technical Specification Surveillance Test
- RO-216; Revision 1
- EA-C-PAL-01-03563-01; Engineered Safeguards System Recirculation Mode Net Positive Suction Head and Flow Rates with Modified Containment Sump Check Valves Using Pipe-Flo; Revision 2
- EA-CA023959-01; Acceptance of Gothic Room Heat-Up Analysis; Revision 0
- EA-CA025644-01; Evaluation of the Impact of 110% Emergency Diesel Generator Overload Operating Condition on Ambient Temperature; Revision 0
- EA-DBD-1.04-002; Electrical and Mechanical Failure Analysis for the Chemical and Volume Control System; Revision 0
- EA-DTE-797-01; Degradation of Mobil
- DTE-797 Lubricant as Related to the Loss of Ventilation in Auxiliary Feedwater Pump Room; May 15, 1987
- EA-E-ELEC-VOLT-06; Determine the Terminal Voltage at the 46 Safety Related Motor Operated Valves; Revision 1
- Attachment9EA-EAR-2000-0302-01; Installation of Permissives and Interlocks on Emergency CoreCooling System (ECCS) Valves
- CV-3001,
- CV-3002,
- CV-3070 and
- CV-3071; Revision 1
- EA-EAR-2001-0333-01; Generation of Engineered Safeguards System Pump Performance Curves for Use with the Pipe-Flo Engineering Safeguards System Hydraulic Model; Revision 2
- EA-EC9600-01; Functionality of Equipment in Emergency Diesel Room at Elevated Temperature of 121F; November 30, 2006EA-EC-8083-01; Evaluation of Condensate Storage Tank for Tornado Wind and Depressurization Loads; Revision 0
- EA-ELEC-08-03; Instrument Uncertainty Calculation for Service water System Installed Process Flow Instrumentation Channels; Revision 0
- EA-ELEC-FLT-005; Short Circuit for the Palisades Class 1E Station Batteries D01 and
- D02; Revision 1; December 22, 1999
- EA-ELEC-LDTAB-005; Emergency Diesel Generator 1-1 and 1-2 Steady State Loading;
- Revision 7, Addendum EAR2003-0270
- EA-ELEC-LDTAB-009; Battery Sizing for the Palisades Class 1E Station Batteries 001
and 002; December 29, 1999, and January 20, 2000
- EA-ELEC-VOLT-013; Palisades Loss of Cooling Accident With Offsite Power Available;
- Revision 1; Minor Revision 000A
- EA-ELEC-VOLT-017; Second Level Undervoltage Relay Setting to Adequately Protect
- 2400 and 480V Class 1E Equipment from Degraded Voltage; Revision 0
- EA-ELEC-VOLT-026; Voltage Drop Model for the Palisades Class 1E Station Batteries
- 001 and 002; Revision 1; January 17, 2000
- EA-ELEC-VOLT-033; Second Level Undervoltage Relay Setpoint; Revision 0
- EA-ELEC-VOLT-037; Palisades Degraded Voltage Calculation for the Safety-Related Motor Operated Valves; Revision 3
- EA-FC-866-1; Turbine Driven Auxiliary Feedwater Pump K-8 Steam Trap Design;
- Revision 0
- EA-FC-954-02; Low Pressure Suction Trip on Auxiliary Feedwater Pump Setpoint Change; Revision 3
- EA-FC-954-03; Auxiliary Feedwater Pump Minimum Intake Submergence Requirements and Suction Line Hydraulic Losses Using PipeFlo; Revision 0
- EA-GL-8910-01; Generic Letter 89-10 Motor Operated Valve Thrust Window Calculations; Revision 10
- EA-GL-8910-10; Periodic Verification of Generic Letter 89-10 Motor Operated Valve Operating Margins Using Static Diagnostic Test Results; Revision 3
- EA-MOD-2005-004-03; Engineering Safeguards System Flow Rates and Pump Net Positive Suction Head During Recirculation Mode with Containment Spray System Throttling; Revision 1
- EA-PAL-90-129; Analysis of 2400 Volt System Bus Transfer; Revision 0
- EA-PLTB-00; Pressure Locking and Thermal Binding for Power Operated Gate Valves in Response to Generic Letter; Revision 4
- EA-SC-96-012-01; Revise Auxiliary Feedwater Pump Inventory Level and High Temperature Alarm Setpoints; August 1, 1997
- EA-SDW-95-001; Generation of Minimum and Maximum High/ Low Pressure Safety Injection Systems Performance Curves Using Pipe-Flo; Revision 2
- EA-SP-20033-15; Generic Seismic Technical Evaluation of Replacement Molded Case Circuit Breakers; Revision 0; November 4, 1996
- SUT1-2/SUT1-2/ALTC; Startup Transformer 1-2 Load Tap Changer Automatic Controls;
- Revision 0
- Attachment10CorrespondenceConsumers Power Company to Nuclear Regulatory Commission; Submittal ofSwitchgear Room, Cable Spreading Room and Auxiliary Feedwater Pump Room Test Results; November 8, 1982
- Consumers Power Company to Nuclear Regulatory Commission; Ventilation Systems;
- April 4, 1986
- Consumers Power Company to Nuclear Regulatory Commission; 0C0788-0058-NL04:
- Response to NRC Bulletin 88-04 - Potential for Safety Related Pump Loss; July 7, 1988
- Consumers Power Company to Nuclear Regulatory Commission; Update to Electrical Distribution System Functional Inspection Fast Bus Transfer Schemes - NRC Concern
- 8; January 7, 1994
- Consumers Power Company to Nuclear Regulatory Commission; Withdrawal of Commitment for Reducing the Dead Bus Transfer Time During a Fast Transfer;
- February 28, 1996
- C&D Technologies to Nuclear Management Company; No-Oxide Grease Application to Terminal Plate Assemblies; December 4, 2006
- Consumers Power Company Internal Correspondence; Offsite Power Arrangement -
- Compliance with Licensing Basis; November 10, 1993Design Basis Documents2.02; Design Basis Document High Pressure Safety Injection System; Revision 83.05; 480V AC System; Revision 5
- 4.01; Station Batteries; Revision 6
- 4.02; 125V DC System (Safety-Related); Revision 8
- 4.03; Preferred AC System; Revision 5
- 4.04; Uninterruptible Power Supply; Revision 5
- 5.02; Emergency Generator and Generator Protective System; Revision 5
- 5.03; Emergency Diesel Generator Performance Criteria; Revision 6
- 5.04; Load Shedding Circuits; Revision 5
- 5.05; Design Basis Accident and Normal Shutdown Sequencer; Revision 6
- 5.06; Control and Monitoring Systems for Emergency Generator and Auxiliaries;
- Revision 4DrawingsARP-7; Auxiliary Systems Scheme
- EK-11 (C-13); June 30, 2006C-009; Condensate Storage Tank Equipment T-2; Revision 1
- C-18, Sheet 41; Condensate Storage Tank T-2 Erection Diagram; Revision 6
- E-1, Sheet 1; Single Line Meter and Relay Diagram 480 Volt Motor Control Center Warehouse; Revision 76
- E-1, Sheet 3; Plant Single Line Diagram; Revision 4
- E-1, Sheet A; Single Line Meter and Relay Diagram; Revision 6
- E-3, Sheet 1; Single Line Meter and Relay Diagram 2400 Volt System; Revision 50
- E-4, Sheet 1; Single Line Meter and Relay Diagram 480 Volt Load Centers; Revision 39
- E-4, Sheet 2; Single Line Meter and Relay Diagram 480 Volt Load Center; Revision 34
- E-5, Sheet 1; Single Line Meter and Relay Diagram 480 Volt Load Centers; Revision 54
- E-5, Sheet 5B; Single Line Meter and Relay Diagram 480 Volt Load Centers;
- Revision 12
- Attachment11E-5, Sheet 5C; Single Line Meter and Relay Diagram 480 Volt Load Centers;Revision 11
- E-12, Sheet 2; Schematic Meter and Relay Diagram 2.4 kV and 480V Systems;
- Revision 7
- E-17, Sheet 3; Logic Diagram Safety Injection Initiation; Revision 18
- E-17, Sheet 4; Logic Diagram Safety Injection Initiation; Revision 16
- E-17, Sheet 9; Logic Diagram Turbine Generator Trips and Fast Transfer; Revision 18
- E-17, Sheet 10; Logic Diagram 2400 Volt Load Shed; Revision 8
- E-17, Sheet 13; Logic Diagram Diesel Generator Breakers; Revision 8
- E-17, Sheet 15; Logic Diagram Bus 1E, 1F and 1G Incoming Breakers; Revision 3
- E-17, Sheet 17; Logic Diagram Diesel Start (CPCO); Revision 2
- E-17, Sheet 18; Logic Diagram Start-Up Xfmr. Protection; Revision 2
- E-17, Sheet 18A; Logic Diagram Safeguards Transformer 1-1; Revision 2
- E-17, Sheet 19; Logic Diagram Circuit Breaker Operation; Revision 1
- E-17, Sheet 21; Logic Diagram Auxiliary Feedwater Pump P8A and P8C Motor Control;
- Revision 6
- E-17, Sheet 21A; Logic Diagram Auxiliary Feedwater Pump P8B Control; Revision 11
- E-17, Sheet 22; Logic Diagram AFW Flow Control and Pump Trips; Revision 9
- E-17, Sheet 14; Logic Diagram Bus 1C and 1D Incoming Breakers; Revision 6
- E-44, Sheet 195; Lighting Panel Schedule L-9014; Revision 6
- E-129, Sheet 1; Schematic Diagram Stored Energy Circuit Breaker 2400V and 4160V;
- Revision 12
- E-129, Sheet 1A; Schematic Diagram Stored Energy Circuit Breaker 2400V and 4160V;
- Revision 7
- E-129, Sheet 1B; Schematic Diagram Stored Energy Circuit Breaker 2400V and 4160V;
- Revision 4
- E-129, Sheet 2; Schematic Diagram Stored Energy Operated Circuit Breaker 152-310;
- Revision 6
- E-129, Sheet 4; Schematic Diagram Stored Energy Operated Circuit Breaker 152-311;
- Revision 6
- E-129, Sheet 6B; Schematic Diagram Stored Energy Operated Circuit Breaker 152-213;
- Revision 4
- E-129, Sheet 6C; Schematic Diagram Stored Energy Operated Circuit Breaker 152-213;
- Revision 0
- E-129, Sheet 7; Schematic Diagram Stored Energy Operated Circuit Breaker 152-110;
- Revision 1
- E-129, Sheet 7A; Schematic Diagram Stored Energy Operated Circuit Breaker Overcurrent Relays (Breaker 152-110); Revision 0
- E-129, Sheet 12; Schematic Diagram Stored Energy Circuit Breaker 152-104;
- Revision 0
- E-129, Sheet 14; Schematic Diagram Stored Energy Operated Circuit Breaker 152-108;
- Revision 0
- E-129, Sheet 15; Schematic Diagram Stored Energy Operated Circuit Breaker Overcurrent Relays (Breaker 152-108); Revision 0
- E-129, Sheet 31; Schematic Diagram Stored Energy Operated Circuit Breaker 152-201;
- Revision 0
- E-129, Sheet 32; Schematic Diagram Stored Energy Operated Circuit Breaker 152-204;
- Revision 1
- 2E-129, Sheet 38; Schematic Diagram Stored Energy Operated Circuit Breaker 152-207;Revision 0
- E-129, Sheet 39; Schematic Diagram Stored Energy Operated Circuit Breaker 152-207;
- Revision 0
- E-129, Sheet 42; Schematic Diagram Stored Energy Circuit Breaker 152-209;
- Revision 0
- E-129, Sheet 43; Schematic Diagram Stored Energy Circuit Breaker 152-209;
- Revision 0
- E-130, Sheet 1A; Schematic Diagram Solenoid Operated Circuit Breakers; Revision 2
- E-131, Sheet 1; Schematic Diagram Station Power Transformer 1-1 and 1-2 Incoming Breakers; Revision 23
- E-131, Sheet 1A; Schematic Diagram Station Power Transformer 1-1 and 1-2 Incoming Breakers; Revision 5
- E-132, Sheet 1; Schematic Diagram Start-Up Transformer 1-1 and 1-2 Incoming Breakers; Revision 25
- E-132, Sheet 1A; Schematic Diagram Start-Up Transformer 1-1 and 1-2 Incoming Breakers; Revision 6
- E-136, Sheet 1; Schematic Diagram 2400V and 4160V Bus Transfer; Revision 29
- E-136, Sheet 2; Schematic Diagram 2400V and 4160V Bus Transfer; Revision 29
- E-154, Sheet1; Schematic Diagram Service Water Pump; Revision 22
- E-154, Sheet1A; Schematic Diagram Service Water Pump; Revision 1
- E-196, Sheet 1; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 14
- E-196, Sheet 2; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 4
- E-196, Sheet 3; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 4
- E-196, Sheet 4; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 5
- E-196, Sheet 5; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 6
- E-196, Sheet 6; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 4
- E-196, Sheet 7; Schematic Diagram Motor Driven Auxiliary Feedwater Pump; Revision 5
- E-196, Sheet 8; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 10
- E-196, Sheet 9; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 10
- E-196, Sheet 10; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 2
- E-196, Sheet 11; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 3
- E-196, Sheet 12; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 2
- E-196, Sheet 13; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 14
- E-196, Sheet 14; Schematic Diagram Motor Driven Auxiliary Feedwater Pump;
- Revision 1
- E-209, Sheet 4; Schematic Diagram Safety Injection and Sequence Loading Circuits;
- Revision 30
- E-238, Sheet 4; Schematic Diagram Auxiliary Feedwater System; Revision 28
- E-238, Sheet 4A; Schematic Diagram Auxiliary Feedwater System; Revision 4
- E-238, Sheet 5; Schematic Diagram Auxiliary Feedwater Pump Turbine Steam Valves;
- Revision 28
- Attachment13E-238, Sheet 6; Schematic Diagram Auxiliary Feedwater Pump Turbine Steam Valves;Revision 11
- E-238, Sheet 7; Schematic Diagram Auxiliary Feedwater Pump Turbine Steam Valves;
- Revision 6
- E-238, Sheet 9; Schematic Diagram Auxiliary Feedwater Pump Turbine Steam Valves;
- Revision 6
- E-238, Sheet 13; Schematic Diagram Auxiliary Feedwater Pump Turbine Steam Valves;
- Revision 4
- E-249, Sheet 1; Schematic Diagram High Pressure Safety Injection Pumps P-66A;
- Revision 16
- E-249, Sheet 2; Schematic Diagram High Pressure Safety Injection Pumps P-66B;
- Revision 1
- E-1172, Sheet 1; Lighting and Communications in Technical Support Center;
- Revision 15
- GEH-1768 Figure 2; Time-Voltage Curves for Type IAV54E and IAV55C Relays;
- Revision 0
- JLG-144, Sheet 1; Logic Diagram Turbine Driven Auxiliary Feedwater Pump P-8B;
- Revision 8
- JLG-144, Sheet 2; Logic Diagram Turbine Driven Auxiliary Feedwater Pump P-8B;
- Revision 16
- M-202, Sheet 1; Process and Instrumentation Diagram (P&ID) Chemical and Volume Control System; Revision 71
- M-202, Sheet 1A; P&ID Chemical and Volume Control System; Revision 56
- M-202, Sheet 1B; P&ID Chemical and Volume Control System; Revision 54
- M-202, Sheet A; System Diagram Chemical and Volume Control System; Revision 11
- M-204, Sheet 1; P&ID Safety Injection, Containment Spray, and Shutdown Cooling System; Revision 78
- M-204, Sheet A; System Diagram Safety Injection, Containment Spray, and Shutdown Cooling System; Revision 7
- M-205, Sheet 2; P&ID Main Steam and Auxiliary Turbine Systems; Revision 64
- M-207, Sheet 2; P&ID Auxiliary Feedwater System; Revision 36
- M-209, Sheet 1; P&ID Component Cooling System; Revision 63
- M-213; P&ID Service Water, Screen Structure and Chlorinator; Revision 86
- M-220, Sheet 1; P&ID Make-Up Domestic Water and Chemical Injection Systems;
- Revision 86
- WD 1421, Sheet 1; Palisades Substation; Revision BO
- WD 1421, Sheet 1A; Palisades Substation; Revision K
- WD 1421, Sheet 2; Palisades Substation; Revision AG
- WD 1421, Sheet 11; Palisades Substation; Revision X
- WD 1421, Sheet 31; Palisades Substation; Revision M
- 5935-M-398; Condensate Storage Tank T-2; Revision 9
- 950X30, Sheet 28; Type S Adjustax Vaneaxial Fan Arrangement Number 4;
- May 23, 1969Job Performance Measures and Lesson PlansPL-OPS-EOP-12J; Manual Alignment of Fire Water to Auxiliary Feedwater Pumps P-8Aand P-8B; January 13, 2006
- Attachment14PL-OPS-EOP-29J; Manual Closure of Atmospheric Dump Valves; November 27, 2006PL-OPS-EOP-30J; Manual Alignment of Supplemental Diesel; November 27, 2006
- PL-OPS-EOP-31J; Provide Manual Makeup to Condensate Storage Tank;
- November 27, 2006
- PL-OPS-06C-001L; Auxiliary Operator News; July 19, 2006
- PL-NLO-JIT-001L; Overview of Diesel Generator 1-3; October 16, 2006MiscellaneousLA-2021; Instrument Calibration Sheet for Condensate Storage Tank T-2 Level;Revision 0
- 2400VAC System Ground Alarms Post 1996 Bus 1D Cable Failure; undated Voltage and Specific Gravity Curves for each cell in
- ED-01 and ED-02
- NMC-1; Quality Assurance Topical Report; Revision 2
- Palisades Interface Supplement to the Generator Interconnection Agreement;
- April 1, 2001ModificationsEAR 96-0700; Replace DC Breakers in Panels
- ED-11-1,
- ED-11-2,
- ED-21-1, andED-21-2; November 17, 1996
- EAR-98-0423; Service Water Pump 1B Rebuild; Revision 0
- EAR-99-0081; Chemical and Volume Control System Declassification; Revision 0;
- December 16, 2003
- EAR-2000-0064; Capping Steam Supply Line to Auxiliary Feedwater Turbine from Steam Generator B; Revision 0
- EC-157; Replace Start-Up Transformer 1-2; November 2, 2006
- EC-8757; Condensate Storage Tank Water Loss During Postulated Tornado Event;
- Revision 0
- EC-8866; Temporary Modification to T-2 Condensate Storage Tank Lid; Revision 0
- FES-95-206-ED01;
- ED-01 Station Battery Replacement; Revision 4; July 21, 1995
- FES-95-206-ED02;
- ED-02 Station Battery Replacement; Revisions 1 & 2; July 25, 1995
and July 31, 1995
- FES-96-139; Replace Overcurrent Relay on High Pressure Safety Injection Pump Breaker (canceled); Revision 0
- FES-96-227; Replacement of 125V DC Westinghouse Circuit Breakers with Different Style Numbers; November 27, 1996
- SC-94-102; Set Transformer Taps to 2340/480V AC Setting; Revision 0Operability Recommendations Reviewed During the Inspection024557; Resolve Operability Condition of Motor Control Center Short Circuit CurrentsGreater Than 480V AC Breaker Interrupt Rating; July 2, 2004
- 000051; Calculated Short Circuit Currents Greater Than 480V AC Breaker Interrupt Rating; February 25, 2004
- 00870121-01; Operability Recommendation for Outside Air Temperature in Excess of
- 95F; August 11, 200501002363-01; Operability of Service Water Pump P-7B; Revision 1
- 01015197-01; Operability of Auxiliary Feedwater Pumps P-8A and P-8B with Stuck Open Steam Traps; February 20, 2006
- Attachment1501014535-01; Operability of Auxiliary Feedwater Pumps P-8A, P-8B and P-8C;Revision 1Operability Recommendations Generated as a Result of the Inspection01062278-01; Operability Recommendation for Engineered Safeguards System Pumps;Revision 0
- 01062531-01; Operability of Motor Control Centers Due to Discrepancies in Calculation
- EA-RTD-91-01; Revision 0
- 01062644-03; Operability of Auxiliary Feedwater Pumps at the Low-Low Condensate Storage Tank Level; Revisions 0, 1 and 2
- 01063336-01; Impact of Elevated Temperatures on Cable Resistance; Revision 0
- 01066913; Operability of Diesel Generator Ventilation Fan V-24C; Revisions 0 and 1
- 01067802; Reevaluate Operability Recommendation
- 01063336 to Address Deficiencies;
- Revision 0
- 01067804; Reevaluate Errors in Operability Recommendation
- 01062531; Revision 0ProceduresAP-5.00; Maintenance Organization, Responsibilities, and Conduct of Maintenance;Revision 17
- AP-9.20; Technical Specification Surveillance and Special Test Program; Revision 22
- ARP-7; Auxiliary Systems Scheme
- EK-11 (C-13), Windows 8 and 15; Revision 69
- EM-09-02; Inservice Testing of Plant Valves; Revision 26
- EM-28-01; Motor Operated Valve Program; Revision 9
- EM-28-02; Check Valve Program; Revision 5
- EM-28-03; Air and Solenoid Operated Valve Program; Revision 7
- EM-28-04; Motor Operated Valve (MOV) Periodic Verification and Trending Program;
- Revision 4
- EM-28-07; MOV Diagnostic Test Engineering Acceptance; Revision 0
- EOP 3.0; Station Blackout Recovery; Revision 14
- EOP 4.0; Loss of Coolant Accident Recovery; Revision 17
- EOP 5.0; Steam Generator Tube Rupture Recovery; Revision 14
- EOP 9.0,
- HR-2; Functional Recovery, Primary Coolant System and Core Heat Removal;
- Revision 19
- EOP 9.0,
- RC-2; Functional Recovery, Boration Using Chemical Volume and Control System; Revision 19
- EOP Supplement 12; "A" Steam Generator Tube Rupture Isolation Checklist; Revision 7
- EOP Supplement 19; Alternate Auxiliary Feedwater Methods; Revision 17
- EOP Supplement 28; Supplementary Actions for Loss of Power; Revision 6
- EOP Supplement 42; Pre and Post Recirculation Actuation System Actions; Revision 5
- FPE-E-MOD-04; Design Inputs; Revision 3
- FPE-E-MOD-07; Design Verification and Technical Review; Revision 1
- FP-OP-CTC-01; Control of Time Critical Operator Actions; Revision 0
- FP-PA-OE-01; Operating Experience Program; Revision 5
- MO-7A-1; Emergency Diesel Generator 1-1; Revision 65
- MO-7A-2; Emergency Diesel Generator 1-2; Revision 61
- MSE-E-21; VOTES Diagnostic System Operating Procedure; Revision 21
- Attachment16MSE-E-45; Single Cell Charging for Station Batteries
- ED-01 and
- ONP-12; Acts of Nature; Revision 23
- OWA 06-02; Operator Work Around, Identification and Disposition; February 21, 2006
- PD-11; Test Procedure for AC and DC Molded Case Circuit Breakers Without Static Trip Devices; Revision 17
- QO-2; Technical Specification Surveillance Procedure Recirculation Actuation System;
- Revision 17
- RE-137; Calibration of Bus 1C Undervoltage and Time Delay Relays; Revision 2
- RE-138; Calibration of Bus 1D Undervoltage and Time Delay Relays; Revision 2
- RE-83A; Service Test - Battery
- ED-01; Revision 12
- RE-83B; Service Test - Battery
- ED-01; Revision 12
- RI-14; Safety Injection Refueling Water Tank Level Switch Interlocks Test; Revision 10
- RO-147; Comprehensive Pump Test Procedure - High Pressure Safety Injection Pumps
- P-66A and P-66B and Engineered Safeguards System Check Valve Operability Test;
- Revision 0
- RO-216; Service Water Flow Verification; Revision 6
- SOP-12; Feedwater System; Revision 47
- SOP-24; Ventilation and Air Conditioning; Revision 47
- SOP-30; Station Power; Revision 47
- SPS-E-8; 2400 Volt Safeguard Switchgear Breaker Maintenance; Revision 6;
- July 29, 2006
- SPS-E-11; 480 V AC Breaker Inspection and Repair; Revisions 7 and 8
- T-276; Switchgear Bus 1D Fast Transfer Test; Revision 3
- T-277; Switchgear Bus 1C Fast Transfer Test; Revision 2ReportsEM-28-04-7; Motor Operated Valve Trend Summary Reports for Time Period between07/2001 and 11/2006; February 12, 2004, February 21, 2005, and December 11, 2006
- Task
- 601655; Check Valve Maintenance Program, Phase I Activities; August 1987
- Task
- 601655; Check Valve Preventative Maintenance/ Surveillance Plan, Phase II
- Activities; June 12, 1905Simulator ScenariosPL-OPS-SPE-DB1E; Steam Generator Tube Rupture / Excessive Steam DemandEvent; November 22, 2006
- PL-OPS-SPE; Large Break Loss of Coolant Accident; November 22, 2006
- Validation Scenario 7; Loss of Offsite Power (Time validated); October 16, 2006Specifications5935-E-7; 480V Motor Control Centers; Revision 15935-M-51; Heating Ventilating and Air Conditioning; March 29, 1968
- 5935-M-195(Q); Technical Requirements for Design and Analysis of Safety Related Piping and Instrument Tubing; Revision 6
- Attachment17Surveillance (Date Shown is Date Completed)N/A;
- CV-0522B: Performance Test; October 11, 2004N/A;
- CV-3006: Performance Test; November 13, 2004
- N/A;
- CV-3056: Performance test; April 21, 2006
- N/A;
- CV-3027: Performance Test; May 20, 2006
- FE-5A; Modified Performance Test - Battery
- ED-01; Revision10; April 26, 2006
- FE-5B; Modified Performance Test - Battery
- ED-02; Revision 9; April 1, 2003
- ME-12;
- ED-01 and
- ED-02 Battery Checks - Monthly; Revision 34; May 30, 2006, August 28, 2006, and September 25, 2006
- QE-35;
- ED-01 and
- ED-02 Battery Checks - Quarterly; Revision 5; May 13, 2006, July 25, 2006, and October 24, 2006
- RE-83A; Service Test - Battery No
- ED-01; Revision 12; October 1, 2004
- RE-137; Emergency Diesel Generator 1-1 Undervoltage Start Channel Calibration;
- May 28, 2006 and November 1, 2006
- RE-138; Emergency Diesel Generator 1-2 Undervoltage Start Channel Calibration;
- October 15, 2001
- RI-125; Condensate Storage Tank Level Instrument Calibration; Revision 5;
- January 11, 2006
- RO-32-44;
- EM-09-10: Local Leak Rate Test Component Performance Evaluation,
- CV-2083; April 26, 2006
- RO-128-1; Emergency Diesel Generator 1-1 24 Hour Load Run; March 9, 2003 and October 5, 2006
- RO-128-2; Emergency Diesel Generator 1-2 24 Hour Load Run; April 12, 2005 and November 21, 2005System and Program Health ReportsSystem Health and Status Report for 125V Vital DC Power; November 16, 2006System Health and Status Report for 480V AC Power; November 16, 2006
- System Health and Status Report for 2400V AC Power; November 30, 2006
- Program Health Status for Air Operated Valves; November 6, 2006
- Program Health Status for Check Valves; 5/25/05 and 9/29/06
- Program Health Status for Motor Operated Valves; November 1, 2006System Protection Setting SheetsBus 1C Undervoltage Relay 1C/108/127-1; Revision 0Bus 1D Undervoltage Relay 1D/203/127-1; Revision 0;Evaluations and Screenings Under 10
- CFR 50.5996-0474 (Screening); Auxiliary Feedwater Pump Inventory Level and TemperatureAlarm Modification; Revision 0
- 06-0158 (Screening);
- EA-EC-8083-01, Evaluation of Condensate Storage Tank for Tornado Loads; Revision 0
- 06-0202 (Evaluation); Auxiliary Feedwater Pump Inventory Level and Temperature Alarm Modification; Revisions 0 and 1
- Attachment18Vendor Manuals12-800; C&D Technologies Standby Battery Flooded Cell Installation and OperatingInstructions ; Revision 0
- CE10684; Westinghouse Technical Bulletin 04-13; August 5, 2004
- M17-13; Elliott Technical Manual for Dyrt Turbine; September 14, 1989
- NP-7410; Molded Case Circuit Breaker Application and Maintenance Guide; Revision 2
- TB-04-13; Replacement Solutions for Obsolete Classic Molded Case Circuit Breakers,
- UL Testing Issues, Breaker Design Life, and Trip Band Adjustment; June 28, 2004
- TR-100248; Stationary Battery Guide: Design, Application, and Maintenance; Revision 2Work Orders00000958 ;
- ED-21-1 Breaker Testing for
- ED-02; November 7, 200600000959;
- ED-21-2 Breaker Testing for
- ED-02; November 7, 2006
- 00002227; Manual Stroking of Fire Protection System and Service Water System Manual Valves to Auxiliary Feedwater; February 10, 2004, and October 3, 2005
- 00003296; Shutdown Cooling Valve
- MO-3015 Break; November 7, 2006
- 00003297; Shutdown Cooling Valve
- MO-3016 Break; November 7, 2006
- 00003302; Verify Control Room Alarm Window K07-24; November 7, 2006
- 00003422; 480V Breaker Starter 52-271; November 7, 2006
- 00020457;
- CV-3070 Static Test; April 30, 2006
- 00026590;
- MO-2169 Static Test; February 6, 2006
- 00027941;
- CK-SW402: Non-Intrusive Check Valve Test; October 16, 2005
- 00030733;
- CK-SW402: Non-Intrusive Check Valve Test; January 23, 2006
- 00031357 01;
- RE-83A -Service Battery
- ED-01; March 30, 2006
- 00031602 01;
- RE-83B -Service Battery
- ED-02; April 14, 2006
- 265262;
- CK-SW402: Non-Intrusive Check Valve Test; October 12, 2006
- 268578 01 ;
- ED-01 &
- ED-02 Battery Checks-Quarter; May 13, 2006
- 280451 01;
- FE-5A Performance Test - Battery
- ED-01; April 26, 2006
- 282254; 151X-302 Operated Too Slowly, Inspect, Lube, and Clean; May 4, 2006
- 293158; 151X, Preventive Maintenance on Lockout Relay; July 19, 2006
- 294182; Supplemental Diesel Generator 1-3, No-load Test Run; November 10, 2006
- 297152 01; Supplemental Diesel Generator 1-3 Incoming Breaker; November 7, 2006
- 297230;
- CV-3070: Performance Test; October 11, 2006
- 00300907; M-1005; Supplemental Diesel Generator 1-3 Reactive Load Test Run;
- November 10, 2006
- 00301397 01; Supplemental Diesel Generator 1-3 Incoming Breaker; November 7, 2006
- 00302137 01; M-1005; Supplemental Diesel Generator 1-3 Quarterly PM;
- November 7, 2006
- 00303031 01; M-1005; Supplemental Diesel Generator 1-3 Quarterly Preventive Maintenance; November 7, 2006
- 00303731 01; M-1005; Supplemental Diesel Generator 1-3 Monthly Preventive Maintenance; November 7, 2006
- 00307059 01;
- ED-01 and
- ED-02 Cable Terminations Need to be Greased;
- December 1, 2006
- 24011303;
- CV-3027: Performance Test; April 23, 2001
- 24011850;
- CV-3056: Performance Test; April 23, 2001
- 24101787; T-2, Recoat Interior During 92 Refueling Outage; March 4, 1992
- 24113222;
- MO-2170 Static Test; March 24, 2003
- Attachment1924113822;
- CV-2083: Performance Test; November 19, 200124320445;
- CK-FW726: Non-Intrusive Check Valve Test; July 14, 2003
- 24322553;
- CK-SW402: Non-Intrusive Check Valve Test; December 9, 2003
- 24323475; CV0522B Static Test; October 27, 2004
- 24414239; Main Station Battery Left Channel; July 19, 1995
- 24414240; Main Station Battery Right Channel; July 25, 1995
- 24420943;
- CK-SW402: Non-Intrusive Check Valve Test; June 22, 2004
- 24520573;
- CK-FW726: Non-Intrusive Check Valve Test; June 10, 2005
- 24612555;
- CK-FW741: Non-Intrusive Check Valve Test; September 9, 1996
- 24612662; High Pressure Safety Injection Pump P-66A Breaker; July 18, 1996
- 24714776;
- CV-3071 Static Test; September 24, 1998
- 24801903;
- CK-SW402: Disassembly and Inspection; September 14, 1988
- 24901947;
- CK-FW743: Disassembly and Inspection, SOER 86-03; October 12, 1989
- 24902600;
- CK-FW726: Disassembly and Inspection, SOER 86-03; October 24, 1989
- 24902652;
- CK-FW741: Disassembly and Inspection, SOER 86-03; October 12, 1989
- 24913804;
- CK-FW743: Body to Bonnet Leak; July 25, 2000
- 20
LIST OF ACRONYMS
- AF [[]]
WAuxiliary Feedwater Pump
- AR [[]]
- CDB [[]]
- CF [[]]
- CS [[]]
TCondensate Storage Tank
- DR [[]]
- ED [[]]
- FI [[]]
- FSA [[]]
- IM [[]]
CInspection Manual Chapter
- LE [[]]
- MC [[]]
- MCC [[]]
- MO [[]]
VMotor Operated Valve
- NE [[]]
- NEM [[]]
- NR [[]]
- OP [[]]
- PR [[]]
- SD [[]]
- SIR [[]]
WSafety Injection Refueling Water
- UR [[]]
IUnresolved Item
VVolts
V/HZVoltage/Hertz