Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] |
Text
consumers Power KurtM. Haas Plant Safety and Licensing Director POWERIN&
MICHl&AN"S PIUl&llESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 February 13, 1995 Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT CHANGES TO THE EMERGENCY RESPONSE DATA SYSTEM The Palisades Nuclear Plant will replace the Critical Functions Monitoring
~ystem (CFMS) in 1995. This system provides. the Safety Parameter Display System (SPDS) functionality and is linked to the Emergency Response Datalink System (EROS). Replacement of the CFMS computer will result in the SPDS and EROS being out of service for a period of time. We will notify the NRC
- approximately one week prior to the replacement of the CFMS computer, which is currently scheduled for March or April of this year. We estimate that the SPDS will be out of service for no longer than one week and the EROS out of service for no longer than three weeks ..
10 CFR 50 Appendix E, Section VI, describes the EROS requirements. One of the requirements is to notify the NRC as soon as practicable, but at least thirty days prior to hardware or software modifications that could affect the transmission format and computer communication protocol to the EROS. The new CFMS computer system uses a different type of computer and operating system but, as demonstrated during factory acceptance testing, the new system is able to link to the NRC's EROS system with no changes to the EROS attributes or EROS communications protocol.
Appendix E to 10 CFR 50, paragraph Vl.2.b requires that the EROS system be capable of transmitting all available EROS parameters at time intervals of not less than 15 seconds or more than 60 seconds. The new computing system will transmit data every 15 seconds. In our June 27, 1989 EROS survey response, we noted an exception to the NRC's request to provide a system capable of transmitting all available .EROS parameters at a fifteen~second rate. In the survey response, we indicated that we were not sure that a 15-second rate 9502210171 950213 PDR ADOCK 05000255 F PDR Ac.MS ENERGY COMPANY
2
~.-*--.
could be maintained during a plant transient without affecting performance of the CFMS tasks. At that time, we stated that we would use 60 seconds as a transmission rate.* Both our current and proposed systems data transfer rates meet the data transfer requirements.
In our June 27, 1989 letter we responded to the NRC EROS survey from NUREG 1394 which was designed to provide the NRC with the hardware, communications, data point and administrative information necessary for the NRC to design the EROS interface *and data base for Palisade~. Because the information on the data transfer rates mentioned above was contained in that survey, and because we have made some other minor changes to information provided by the survey, We have revised the survey information and it is provided in Attachment 1.
. Note that the attachment is provided in the format of the survey found in Revision. 1 to NUREG 1394 ..
If you have any questions on these design changes do not hesitate to call the plant specialist for the EROS system, Andrew Zillins at (616) 764-8913 extension 0377.
SUMMARY
OF COMMITMENTS This letter contains one new commitment, as follows:
We will notify the NRC approximately one week prior to the change-out of the CFMS computer.
I Kurt M Haas Plant Safety and Licensing Director CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment
e.
- ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255
.e APPENDIX B ERDS COMMUNICATIONS DESCRIPTION AND SURVEY QUESTIONNAIRE
APPENDIX B ERDS COMMUNICATIONS DESCRIPTION AND SURVEY QUESTIONNAIRE The following is a questionnaire pertaining to the Nuclear Regulatory Commission's (NRC)
Emergency Response Data System (ERDS). It consists of a series of questions concerning plant 110 points. software protocols, data formats, transmission frequencies. and other plant com-puter specific information to be used in the ERDS computer database files. Also. included here are descriptions and examples of data streams that the NRC is expecting to see transmitted over the communication line.
- The purpose of collecting the data is to develop a plant-specific database that will be retrieved
- into the EROS once the system is activated by a utility. It will also be used to design and imple-ment EROS software that can receive the utility's data transmission. In essence. this informa-tion will provide the basis for building a profile of the plant in the EROS database.
In some cases, the 1/0 point data may be distributed over several computers. The ERDS consid-ers this situation a multi-feeder site and Section IV must be filled out for each feeder.
For plants that utilize the PC based interface described in Appendix J, item 15,Section IV must be filled out for the EROS interface PC as well as each computer which feeds data to the inter-face PC.
This request Is covered by Office of Management and Budget Clearance Number 3150-0150
- which expires March 31, 1992. The estimated average burden hours is 32 person hours per licen-see response, including staff and management review and preparation of the requested re-sponse. These estimated average burden hours pertain only to those identified response-related matters and do not include the time for any follow on implementation. Send comments regard-ing this burden estim*ate or any other aspect of this collection of information, including sugges-tions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of. Information Resources Management. U.S. Nuclear Regulatory Commission, Washington, DC 20555; and to the Paperwork Reduction Project (3150-0150). Office of Management and Budget, Washington, DC 20503.
Note: Consw;iers Power Company originally responded to the NRC's April 5, 1989 request to respond to the survey.
Attached is Revision 1 to the survey.
B-1 NUREG-1394. Rev. I
I. Contacts Note: Please provide name. title. mailing address. and phone number.
A. Survey Coordinator (i.e .. contact for later clarification of questionnaire answers):
Andrew Zillins Consumers Power Company 27780 Blue Star Hwy Covert, MI 49043 (616) 764-8913 B. Computer Hardware Specialist(s):
Andrew Zillins C. Systems Software Specialist(s):
Andrew Zillins D.
- Application-level Software Specialist(s):
- Andrew Zillins E. T de phone Systems Specialist(s):
. Sandy Wymer, Emergency Planning, or Butch Geisler, Facilities Consumers Power Company 27780 Blue Star Hwy Covert, MI 49043 (616) 764-8913 .
NURCG-1394. Rev. 1 B-2
II. EROS Communications Description A. Hardware The following hardware will be supplied:
for a single-feeder site:
Codex 2235 modem or equivalent - V.22 2400 bps. asynchronous. auto~dialing. auto-*
answer. error-correcting. using the AT command set for a multiple-feeder site:
Codex 6015 multiplexer, Codex 2264 modem or equivalent - V.32 9600 bps. asynchronous. auto-dialing. auto-answer. error-correcting, using the AT command set (for an alternate approach see Appendix A. Item 7)
The modems are intended to be operated in the auto-reliable link mode (referred to as MNP in.
the modem manuals). There are several modem parameters that affect MNP operation. These are discussed in the sections of the modem manuals pertaining to MNP. The single feeder mo-dems at the NRC Operations Center are configured for auto-reliable link mode. local terminal tlow control. and default break handling. '
B. Software
- 1. Data Transmission All transmissions. from both the site and the EROS, will be terminated with a carriage return
(<CR>).
- a. Site will initiate a link request in ASCII using:
the three-character site designator.
the word LINK, local site time and date in the format MM/DD/YY/HH:MM:SS. and a <CR>.
If the site does not receive a response from the ERDS within one minute. it should send another link request message and continue sending them at one-minute intervals. If more than five minutes elapses without a response, site personnel should notify the NRC before disconnecting the line. -
- b. ERDS will respond in .ASCII with:
the-three-character site designator, the word ACCEPTED or DENIED. and a <CR>.
If the ERDS responds with the denied message, the site should wait one minute and then send a link request message and continue sending them at one-minute intervals. If B-3 NUREG-1394. Rev. 1
. more than five minutes elapses without a response. site personnel should notify the NRC before disconnecting the line. *
- c. When the EROS is ready to receive data, it will send an initiate message in ASCII using:
- the three-character site designator, the word INITIATE. and a <CR>.
If the ERDS does not send an initiate message within one minute of the accept mes-sage. the site should send the link reconnect message (described in Section II.B.1.f.).
- d. Upon receipt of the initiate message,. the plant begins transmission of data at a 15-second rate. The data string consists of:
- a header containing the three-character site designator and date and time in the format MM/DO/YY /HH:MM:SS, the data packet sequenced with point identifier, value, a.nd quality tag, a trailer containing the checksum value of the data packet, and a <CR> .
- e. When the site or ERDS wishes to terminate the connection, an ASCII message will be
. sent containing:
the three-character site designator, the word TERMINATE, and a <CR>.
- f. If a site is inadvertently terminated (due to loss of communications or receipt of termi-nate message) and the incident is still underway, the site should reconnect with the EROS by redialing and using the link reconnect message. The link reconnect message should be used any time .the phone line is lost after the receipt of an Accept Message (described in Section II.B.1.b). This message is in ASCII and will contain:
the three-character site designator, the word RECONNECT, .
local site time and date in the format MM/OD/YY/HH:MM:SS. and a <CR>.
- Upon receipt of this message. the ERDS will respond with the accept and initiate mes-sages as described in Sections II.B.l.b and II.B.1.c. If the EROS responds with a link deny message (described in Section II.B.1.b), the site should stop trying to reconnect and send a link request message (described in Section II.B.1.a). If the EROS does not respond to the site's reconnect request within one minute, the site should send another reconnect request and* continue sending reconnect requests once a minute. If more than five minutes elapses without a response, site personnel should notify the NRC before disconnecting the line. It is the responsibility of the site to monitor the outgoing line for loss of communications.
Once a physical connection has been established with the NRC. the site should not disconnect the phone line until a TERMINATE message (described in section NUREG-l394. Rev. 1 B-4
l ,_
II.B. Le) has been transmitted. If problems are encountered in the link request se-
- quence. -do not hang up the line but proceed with the stei:>s outlined above.
- g. If the site will transmit in EBCDIC rather than ASCII, the following applies:
( 1) The link request message (defined in II.B.1.a) and the reconnect message (defined in II.B.1.f) must be in ASCII.
(2) All replies sent by the ERDS to the site will be in ASCII.
(3) The terminate message sent by the site may be in EBCDIC or ASCII.
(4) All update sets sent by the site must be in EBCDIC.
- 2. Data Format The following three delimiters have been identified:
(1) field delimiter(*),
(2) data set delimiter(\), 'and (3) carriage return ( <CR> ).
Note: The length of the messages sent by the ERDS (e.g., ACCEPTED, DENIED.
INITIATE, TERMINATE) are variable and it is recommended that the site soft-ware use the data set delimiter as the message delimiter for messages received from the ERDS.
- a. Link requests will be in ASCII as described in II.B.1.a. with each field separated by a field delimiter and the request terminated with a data set delimiter. For example, PAl *LINK*Ol/12/89/11:48:50\ <CR>.
_b. The ERDS response will be in ASCII as described in II.B.1.b. with each field sepa..:
rated by a freld delimiter and the response terminated with a data set delimiter. For
example, PAl*ACCEPTED\<CR>. . -
- c. When the ERDS is ready to receive data it will respond in ASCII as described in II.B.1.c with each field separated by a field delimiter and the response terminated with a data set delimiter. For example, PAI *INITIATE\< CR>.
- d. Data streams will be in ASCII and will consist of three parts (header. data, and trailer) as described in II.B.1.d. with each field separated by a field delimiter and each of the three parts separated by a data set delimiter. For example, Header: PA POl/12189/l Li0:30\
Data: B21CP004*-0.1234E+003* ..... (for each parameter)\
Trailer:.. 0000056000\ <CR> - ----- -
- e. The point identifier may be up to 12 characters in length.
- f. The value may be up to 20 characters in length.
B-5 NUREG-1394, Rev. 1
- g. the following quality tags will be accepted by the EROS:
Good =O Value is within range tolerance for discreet points or in-put points are within tolerance for composed points.
Off-scan =1 Point is currently out-of-service.
Suspect =2 Value is not bad yet should not be considered good. This quality will occur primarily on composed values when
- enough good inputs are present to allow the calculation to be made yet a bad quality on other inputs may make the result questionable.
Bad =3 Value is not within tolerance for discreet points or calcu-latiQn of a composed point may not be made due to the qualities of its inputs.
Unknown. =4 No quality indicator available.
Operator Entered =5 Value has been manually entered, overriding the dis-creet or composed value. *
- High Alarm .= 6 Value is in high alarm .
Low Alarm = 7 Value is in low alarm.
- h. The checksum which accompanies each update set will be an integer value calculated by summing each of the bytes of the transmission, up to and including the dataset de-limiter following the body of the update set (the body of the update set being the por- .
tion containing the parameter, value, and quality indications). This integer checksum value will then be encoded into the update set as a 10-digit value, left-padded with zeros as required to fill the 10-digit field. The checksum is the sum of th!! transmitted bytes.
- 1. The reconnect link request message will be in ASCII as described in Sect\on II.B. l.f with each field separated by a field delimiter and the request terminated with a data set delimiter. For example, PAl *RECONNECT*Ol/12/89/11:48:50\ <CR>.
- 3. Protocol
- a. ERDS will use XON/XOFF to stop. resume, or suspend data transmission for the site.
- b. Communication parameters:
eight data bits -- . ---*--
1 stop bit parity = none
- 4. Exceptions Please note any exceptions which must be taken to Section II and explain why.
NUREG-L394, Rev. l B-<l
III. Selection Of Data Feeders A. How many data feeders are there (six maximum)?
One data feeder.
B. Identify the selected data feeders and provide the following for each:
(1) a short description of the categories of data points it will provide (e.g:, met. rad. or plant data points, by unit) and * *
(2) the rationale for selecting it if another system can also provide its categorie*s of data points.
Palisades.Plant Computer (PPG)
( 1) All data points requested are availa.ble o~ the PPC and*
(2) is only system containing all categories of data points.
C. Which data feeder is the site time determining feeder? This should be the feeder which is providing the majority of the data points.
- Palisades Plant Computer (PPG)
B-7 NUREG-1394. Rev. l
i IV. Data Feeder Information Note: A new Section IV must be filled out for each feeder system selected.
General Questions
- 1. Identification of Data Feeder
- a. What is the name in local parlance given to this data feeder (e.g., Emergency Response Information System)? Please give both the acronym and the words forming it.
Palisades Plant Computer (PPC)
- b. Is this the site time determining feeder?
Yes
- c. How often will this feeder transmit an update set to the ERDS (in seconds)?
Every 15 seconds.
- 2. Hardware/Software Environment
- a. Identify the manufacturer and model number of the data feeder hardware.*
Digital Equipment Company (DEC), Hodel 4705A
- b. Identify the operating system.
VMS
- c. What method of timekeeping is implem~nted on this feeder system (Daylight Savings.
Standard. Greenwich)?
Daylight Savings
- d. In what time zone .is this feeder located?
Eastern NUREG-1394. Rev. 1 B-8
- 3. Data Communication Details
- a. Can this data feeder provide asynchronous serial data communication (RS-i32-C) with full-modem control?
Yes.
- b. Will this feeder transmit in ASCII or EBCDIC?
ASCII
- c. Can this feeder transmit at a serial baud rate of 2400 bps? If not, at what baud. rate can it transmit? .
Yes, i t .can transmit at 2400 bps.
- d. Does the operating system support XON/XOFF flow control?
Yes.
- 1. Are any problems foreseen with the NRC using XON/XOFF to control the trans-
. mission of data?
No.
- e. If it is not feasible to reconfigure a serial port for the ERDS linkup (i.e .. change the baud rate. parity, etc.), please explain why.
- f. Do any ports currently exist for the ERDS linkup?
Yes.
- 1. If not, is it possible to add additional ports?
B-9 NUREG-1394, Rev. 1
- 2. If yes. will the port be used solely by the EROS or shared with other no~
emergency-time users? Give details.
Yes, used for ERDS only.
- 4. Data Feeder Physical Environment and Management
- a. Where is the data feeder located in terms of the TSC. EOF, and control room?
In a trailer on turbine deck within 100 feet of Control Room/TSC.
- b. Is the data feeder protected from loss of supply of electricity?
UPS will supply PPC for greater than two hours following a loss of offsite power. The PPC is capable of automatic restart after return of power.
- c. Is there a human opexator for this data feeder?
No.
- 1. If so. how many hours a: day is the feeder attended?
NUREG-1394. Rev. l B-10