MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20199J4391998-01-29029 January 1998 Proposed Tech Specs Re Radiological Doses for Locked Rotor Accident ML20198D4081997-12-19019 December 1997 Proposed Tech Specs,Modifying Neutron Flux Requirements to Allow Use of Alternate Detectors ML20198P6571997-11-0404 November 1997 Proposed Tech Specs Table 3.3-4 Re Emergency Bus Undervoltage Trip Setpoint,Allowable Valve & Time Delay for DG Start ML20212C8881997-10-22022 October 1997 Proposed Tech Specs 3.4.8,reducing RCS Specific Activity Limits Per GL 95-05 ML20217A9801997-09-11011 September 1997 Proposed Tech Specs Implementing line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS ML20210L4381997-08-13013 August 1997 Proposed Tech Specs Revised Typed Pages for TS Change Requests 213 & 80,requiring Addl Revs from Pages Submitted in ML20141K5371997-05-23023 May 1997 Proposed Tech Specs Re Typed Paged for Change Request 213 & 80 ML20137C9111997-03-14014 March 1997 Proposed Tech Specs Re Administrative Controls Related to QA ML20147E6511997-03-10010 March 1997 Proposed Tech Specs Modifying Specification 3.4.5 to Allow SG Tube Sleeving Using Framatome Process ML20136G2091997-03-10010 March 1997 Proposed Tech Specs,Modifying Spec 3.4.5 to Allow SG Tube Sleeving Using CE Process ML20147E6301997-03-10010 March 1997 Proposed Tech Specs Modifying Unit 1 Design Feature Section 5.2.1 to Add ZIRLO as Fuel Assembly Matls & Adds Ref to NRC Approved WCAP-12610 to Administrative Control 6.9.1.12 for Both Units 1999-09-22
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements 1999-09-22
[Table view] |
Text
.. ..
l lEACTlVITY CONTROL SYSTEMS s
3/4.1.3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT _
LIMITING CONDITION FOR OPERATION 3.1. 3.1 All full length (shutdown and control) rods which are inserted in the core shall be OPERABLE and positioned within i 16 steps (deter:nined in accordance with Specification 3.1.3.2 of their group step counter demand position.
APPLICABILITY: MODES 1* and 2*
ACTION: ,
- a. With one or more full length rods inoperable due to being imavable as a result of excessive friction or mechanical
~
interference or known to be untrippa61e, detemine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is e satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in H0T STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. With more than one full length rod 150PERABLE or indicated to be misaligned from any other rod in its group by more than
+ 16 steps (detemined in accordance with Specification 3.1.3.2),
IIe in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. With one full length rod inoperable or indicated to be misaligned from its group step counter demand height by more than i16 steps l (determined in ac'cordance with Specification 3.1.3.2), POWER .
OPERATION may continue provided 'that within one hour either:
- 1. The rod is restored to OPERABLE status within the above alignment requirements, or
- 2. The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that:
a) An analysis of the potential ejected red worth ,
is performed within 3 days and the rod worth is detemined to be < 0.95% Ak at zero power and
< 0.20% Ak at RATED THERMAL POWER for the Femainder of the fuel cycle, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and
- See Special Test Exceptions 3.10.2 and 3.10.4 o , .
BEAVER VALLEY - UNIT 1 3/4 1-18 .
4' PROPOSED WORDING 8103170 5S k ,
REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) c) The THERMAL POWER level is reduced to < 75% of RATED THERMAL POWER within one hour and within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the high neutron flux trip setpoint is reduced to < 85% of RATED THERMAL POWER, or d) The remainder of the rods in the group with the inoperable rod are aligned to within + 16 steps of
' the inoperable rod within one hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.5 during subsequent operation.
SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The position of each full length rod shall be determined to be within the group. demand lin,'.t by verifying the individual rod positi s at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the Rod Position Deviation Monitor is inoperable, then verify the group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4.1.3.1.2 Each full length rod not fully inserted shall be determined to be OPERABLE by movement of at least 10 steps in any one direction at least once per 31 days. ,
o O
e O
BEAVER: VALLEY.- UNIT 1 3/4 1-19 PROPOSED WORDING
REACTIVITY CONTROL SYSTEMS POSITION INDICATOR CHANNELS LIMITING CONDITION FOR OPERATION I
3.1.3.2 For Cycle 2 operation, all shutdown and control rod position indicator channels and the demand position indication system shall be OPERABLE and capable of detemining the control rod positions within
+ 16 steps by direct analog indication or as a backup by measurement j of channel detector primary voltages. If a rod position indicator analog channel indicates 16 steps or more deviation from tne group demand l indicator, rod positions for the affected rods shall be detemined by measuring detector primary voltages, as follows:
- a. f rimediately, if associated rods move greater than 8 steps (greater than 16 l b.
steps if all rods in the group have been detemined to be within 8 steps of the group demand indicator by primary voltage measure- I ments within the previous 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />),
- c. at 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, intervals if the affected rod (s) .are not fully inserted
, or fully withdrawn,
- d. at 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> intervals if the affected rod (s) are fully inserted or fully withdrawn.
When the rod position indicator channel is INOPERABLE, the position of not more than three control rods per bank which are not fully inserted or fully withdrawn may be detemined by use of the detector primary voltage measurements.*
< APPLICABILITY: Modes 1 and 2*
ACTION:
- a. If greater than 3 rod position indicators per bank, for banks not fully withdrawn or fully inserted, are INOPERABLE, then '
' declare the rod position indicator system to be INOPERABLE and be in HOT STANDSY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the allowed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> stabilization period and in COLD SHUTDOWN in the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Submit a Special Report to the NRC by telephone and in r
writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or by the close of the next business day, l whichever is later. Restore all affected Rod Position Indicators -
r to OPERABLE status prior to entry to Mode 2.
- b. If the position of a maximum of one rod cannot be determined j by either the direct' reading of the rod position indicators or
' by reading primary detector voltage measurements, either:
- 1. Detemine the position of the non-indicating rod indir'ectly l
by the movable incore detectors immediately and at least c
' once per 8 . hours and ir. mediately after any motion of the non-indicating rod which exceeds 32 steps in one direction l since the last determination of the rod's position, or
- 2. Reduce THERMAL POWER TO < 50% cf RATED THERMAL POWER Ea within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
BEAVER VALLEY - UNIT 1 3/4 1-20 .
PROPOSED WORDING
REACTIVITY CONTROL SYSTEMS ACTION: (Continued)
- c. With a maximum of one demand position indicator per bank inoperable, either:
- 1. . Verify that all rod position indicators for the affected bank are OPERABLE and that the most withdrawn rod and the least withdrawn rod of the bank are within a maximum of 16 steps of each other imediately after rod motion greater than 8 steps (greater than 16 steps if all rods in the group have been determined to be within 8 steps of the group demand indicator by voltage measurements within the previous 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or 2.. Reduce THERMAL POWER TO < 50% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
- d. If the position of more than one rod cannot be detennined by either the direct reading of the rop position indicators or by reading primary detector voltage measurements, then Specification 3.0.3 is applicable.
SURVEILLANCE REQUIREMENTS 4.1. 3. 2 Each-rod position indicator channel shall be determined to be
. OPERABLE by verifying the demand position indication system and the rod position indicator channels agree within 16 steps at least once per 12 l hours (except during time intervals when the Rod Position Deviation Monitor is INCPERABLE or is in a continuous state of alarm), then compare the demand position indication system and the rod position indicator channels at approximately 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> intervals, as follows:
- a. If an individual rod position indicator analog channel does not settle to within + 16 steps within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, then declare that l channel INOPERABLE. ,
- b. For any INOPERABLE channel, no repairs or adjustments shall .
be permitted.without being followed immediately by a full range calibration.
l
- For Core PHYSICS TESTING in Mode 2, primary detector voltage' measurements may be used to detennine the-position of rods in shutdown banks A and B and control banks A and B for the purpose of satisfying Specification 3.1.3.2. During Mode 2 operations, _ rod position indicators for shutdcwn banks A and B and control banks A and B may deviate from the group demand indicators by greater than + 16 steps during reactor startup 'l and shutdown operations, while rods are being withdrawn or inserted.
If the rod position indicators for shutdown ~ banks A and B and control banks A and B deviate by greater than + 16 steps from the group demand l P. ~
indicator, rod withdrawal or insertion may continue until the desired group height is achieved.
BEAVER VALLEY - UNIT 1 3/4 1-20A PROPOSED WORDING Lu g