ENS 54467
ENS Event | |
---|---|
05:00 Jan 8, 2020 | |
Title | Part 21 - Inadequate Selenium Surge Suppressor Thread Modification |
Event Description | The following is a summary of information that was received via facsimile:
On November 14, 2019, Engine Systems, Inc. obtained information of a defect or failure to comply associated with selenium surge suppressors. Three batches of suppressors supplied by Engine Services, Inc. between 2011 and 2013 utilize a thread modification that is inadequate for the application. The design specifies the use of a single 1/4-20 x 2-3/4" long bolt to compress the stack of selenium cells as well as mount the suppressor. Contrary to this requirement, the manufacturer used a #8-32 screw through the body of the stack and added a modified bolt to obtain the required 1/4-20 mounting threads. The modified bolt consisted of a 1/4-20 x 5/8" long bolt that was drilled and tapped in the head to accept #8-32 threads. An attempt to install the selenium surge suppressor by tightening the corresponding mounting nut may result in failure of the modified bolt threads. Use of this thread modifier significantly reduces the strength of the mounting threads. Failure of the mounting threads creates the possibility of the suppressor dislodging with the potential to electrically short between the positive and negative plates of the rectifier assembly. An electrical short would affect output of the voltage regulator system, which may prevent the emergency diesel generator set from performing its safety-related function. This issue is therefore considered to be a reportable defect as defined by 10 CFR Part 21. The affected part number is 8403049. A list of affected customers include: Point Beach Nuclear Plant and Surry Power Station. |
Where | |
---|---|
Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+11.73 h0.489 days <br />0.0698 weeks <br />0.0161 months <br />) | |
Opened: | Dan Roberts 16:44 Jan 8, 2020 |
NRC Officer: | Brian Lin |
Last Updated: | Jan 8, 2020 |
54467 - NRC Website | |
Engine Systems, Inc with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 565382023-03-28T04:00:00028 March 2023 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Emergency Diesel Generator Governor ENS 556052021-11-09T17:00:0009 November 2021 17:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Hinge Pin Retainer Plug Defective on Diesel Check Valve ENS 555312021-08-20T16:00:00020 August 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Pressure Regulator Valve Failure ENS 553472021-05-11T16:00:00011 May 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified Loose Zinc Anodes Installed in Heat Exchangers for Diesel Generators ENS 544672020-01-08T05:00:0008 January 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Inadequate Selenium Surge Suppressor Thread Modification ENS 543502019-09-06T04:00:0006 September 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emd Fuel Injectors Seized Plunger and Bushing ENS 542362019-08-22T04:00:00022 August 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Cracked Spray Tip on Emd Fuel Injector ENS 537632018-11-30T05:00:00030 November 2018 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect En Revision Imported Date 12/24/2018 ENS 536002018-07-19T04:00:00019 July 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Motor Operated Potentiometer Defect ENS 533022018-02-01T04:00:0001 February 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Refurbished Pressure Regulator May Result in Emergency Diesel Generator Failure to Start ENS 527982017-06-08T04:00:0008 June 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Defective Motor Operated Potentiometer ENS 524662016-12-21T05:00:00021 December 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Issues Identified with the Enterprise Diesel Engine Subcover ENS 524772016-11-12T05:00:00012 November 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Seizure of Fuel Injector on Emergency Diesel Generator ENS 511292015-06-05T22:12:0005 June 2015 22:12:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ENS 489602013-04-19T04:00:00019 April 2013 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Esi Refurbished Emergency Diesel Generator Cylinder Heads May Have Valve Keeper Seals Missing ENS 485642012-12-06T05:00:0006 December 2012 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Esi Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port 2023-03-28T04:00:00 | |