Petition of American Municipal Power-OH Inc to Intervene
ML19319C412
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/04/1973
From: Ardery P
AMP, INC., BROWN, ARDERY, TODD & DUDLEY
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C410 List:
References
NUDOCS 8002140793
Download: ML19319C412 (5)


Text

_ _ . _ _

b

.

-

.

-

O UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION IN THE MATTER OF ~

TOLEDO EDISON COMPANY AND CLEVELAND )

ELECTRIC ILLUMINATING COMPANY - ) DOCKi::T No. 50-456- A DAVIS-BESSE NUCLEAR POWER STATION )

PETITION OF AMERICAN MUNICIPAL POWER-OHIO, INC TO INTERVENE.

.

The Petitioner, American Municipal Power-Ohio, Inc. (AMP-0),

pursuant to Section 189 of the Atomic Energy Act and Section 2.714 of the Commission Rules of Practice, hereby petitions to intervene in the above-captioned matter and states as follows:

1. Correspondence, notices, orders and other pcpers herein are to be directed to Philip P. Ardery Brown, Todd & Heyburn 1600 Citizens Plaza Louisville, Kentucky 40202 John C. Engle, President AMP-0, Inc.

Municipal Building, 20 High Street Hamilton, Ohio 45012 George B. Crosby Director of Utilities Piqua, Ohio 45350

.

8 0 02140 h3

_ ,__ . _ _ . _ -

- . _ . _ , . _ _ _ _ . _ _ _ _ _ _~.

- - _ _ . _ _

-s

.

William M. Lewis, Jr.

W. M. Lewis & Associates P. O. Box 1383 Portsmouth, Ohio 45662

2. The purpose of AMP-0 is'to plan and provide future bulk power supply to its members who are forty two municipali-ties in the state of Ohio having municipal electric systems.
3. The .. ember systems of AKP-0 have 616 mw of generating

.

capacity. They have a non-coincident peak load of approximately 750 mvs. They have no transmission ties between them.

1

4. AMP-0 is desirous of obtaining a participating interest in the Davis-Besse Nuclear Power Station, or in the alternative, purchasing a block of power from said station by making a pre-payment on power. The present power requirement of AMP-0 has not yet been exactly determined since its marketi.?g study is not yet complete. Preliminary indications are that AMP-0 would need 50 to 100 megawatts from the Davis-Besse Station.
5. NTP-0 is the power supply representative of its members and has authority to negotiate on their behalf. It seeks in addi-tion to the capacity from the Davis-Besse Station access to the transmission systems of the applicants herein, as well as other transmission systems of investor owned utilities in Ohio for the transmission of said power.

.

_ __ __ _ .- .

.-

_

_

l

!

6. This petition to intervene is being submitted prior to completion of an engineering study of the combined requirements of all AHP-0 member systems which study will be complete not later than July 1, 1973.
7. AMP-0, in order to provide for future power needs of its I

members, to obtain a greater measure of control over the buik power supply of its members, to secure greater systems reliability, to 4

deal with environmental problems and obtain the benefits of scale in electric bulk power supply, needs to obtain the power from the Davis-Besse Station as aforesaid.

For this purpose it petitions intervention and requests permission to present the feasibility of its proposal to be con-sidered by the Commission as a condition to granting the request of the applicants herein.

! WHEREFORE, AMP-0 prays:

(1) That intervention herein be granted.

,

(2) That the applicants herein mak' available such information as is necessary for AMP-O to make its proposal in greater detail, and (3) That the Commission order hearing on the anti-trust

_ -- - . - - ._. , -

_. _ _- . ._.

-- - . _ - . _ - - - . - _ _ _ _ -

_

~

i .

-

j

.

A aspects of the application herein.

i BR0" , TODD & HEYBURN By I 4h n C.tA Philip P. Ardery \

1600 Citizens Plaza Louisville, Kentucky 40202 for American Municipal Power-Ohio, Inc.

i

)1 April 4, 1973 f

i 4

.*

i ,

,

4 i

!

I

,

!

!

, . - . . . . . . . . . _ , . , . _ , _ . . . . - - - . , . - . _ _ -. _ _ _ . . - - . _ _ - .

.

.

-

o VERIFICATION Philip P. Ardery, being. duly sworn and pursuant to

<

Section 2.714 of the Commission Rules of Practice, states that he is duly authorized as special counsel for American Municipal Power-Ohio, Inc. to file this Petition for Intervention, that

.

he has read the foregoing and the statements of fact contained therein are true as he verily believes. He further states that this Petition to Intervene is r fi ed for dilatory purposes.

\

YO . $ CLN Philit P. A'rdery \

\

)

COMMONWEALTH OF KENTUCKY )

) Sct.

COUNTY OF JEFFERSON )

]

Subscribed and sworn to before me by Philip P. Ardery i

this 4th day of April, 1973.

6kv $(dfdW v ptaryPublic

'

My commission expires: /8- I/ O b

!

!

ll l

I

( l -

__ _ __