MONTHYEARPMNS20240554, Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 22024-04-16016 April 2024 Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 2 PMNS20240189, Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 22024-03-0606 March 2024 Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 2 PMNS20230826, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 22023-07-11011 July 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 2 ML22229A4872022-08-17017 August 2022 Presubmittal Teleconference with STP Nuclear Operating Company Regarding Proposed License Amendment Request to Revise the Dose Consequence Analysis for MSLB and LRA Events for South Texas Project, Units 1 and 2 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220262, Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation2022-03-21021 March 2022 Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation (Isf PMNS20220173, Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements2022-02-25025 February 2022 Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements ML21196A4132021-07-15015 July 2021 Teleconference and Webinar with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16113A1992016-04-22022 April 2016 Public Meeting - Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML15271A3042015-09-28028 September 2015 Public Phone Call Meeting Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 ML14008A2252014-01-0808 January 2014 Notice of Category I Public Meeting Concurrence by NRO, to Discuss Resolution of Open Items and Outstanding Requests for Additional Information (RAI) Responses to Support the Safety Review of the South Texas Project (STP) Units 3... ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 ML13119A0802013-04-30030 April 2013 Notice Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13101A3142013-04-12012 April 2013 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13046A0652013-02-22022 February 2013 3/5/13 Notice of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12243A4042012-09-25025 September 2012 Notice of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni ML12226A4552012-08-15015 August 2012 Forthcoming Meeting with STP Nuclear Operating Company Regarding License Renewal for the South Texas Project, Units 1 and 2 ML12195A3632012-07-13013 July 2012 08/1/2012 Notice of Open House Meeting with the Public to Discuss Results of South Texas Project License Renewal Inspection ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML1132104112011-11-0101 November 2011 Revised Notice of by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1127900992011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 an ML1127901512011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & ML1125101482011-09-15015 September 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1121301822011-08-0202 August 2011 Meeting Notice with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC ME5358-ME5359 ML1118615292011-07-12012 July 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1116402112011-06-24024 June 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1114706522011-05-16016 May 2011 Correction 06/02/2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 ML1113302442011-05-16016 May 2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1111804402011-04-27027 April 2011 Notice of Public Meeting with South Texas Project Nuclear Operating Company Present and Discuss Performance Results for the Period of January 1 Through December 31, 2010 ML1104105052011-02-10010 February 2011 2/22/11 Notice of Forthcoming Public Meeting with STP Nuclear Operating Co., Units 1 & 2, to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Option Approach ML1035106972011-01-25025 January 2011 3/02/11 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for South Texas Project, Units 1 and 2 License Renewal Application Review ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 ML1008101622010-03-22022 March 2010 Design Acceptance Criteria (DAC) Working Group Category 2 Public Meeting ML0925703902009-09-17017 September 2009 Notice of Meeting with STP Nuclear Operating Company to Discuss Experience with Implementation of Risk Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0913801712009-05-18018 May 2009 Notice of Annual Assessment Meeting with South Texas Project Nuclear Operating Co. to Discuss Performance Results ML0811900722008-04-28028 April 2008 Notice of Meeting with South Texas Project Regarding End of Cycle Assessment ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co 2024-04-16
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 May 18, 2009
SUBJECT:
ANNUAL ASSESSMENT MEETING WITH SOUTH TEXAS PROJECT NUCLEAR OPERATING COMPANY FACILITY: South Texas Project DOCKET: 50-498; 50-499 DATE AND TIME: June 3, 2009 6:30 p.m.
LOCATION: Bay City Civic Center 201 Seventh St.
Bay City, TX 77414 PURPOSE: This is the end-of-cycle public meeting between the NRC and South Texas Project Nuclear Operating Company to present and discuss performance results of the South Texas Project Electric Generating Station for the period of January 1 through December 31, 2008.
CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
The Nuclear Regulatory Commission provides reasonable accommodations to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: NRC W. Walker, Chief, Project Branch A J. Dixon, Senior Resident Inspector B. Tharakan, Resident Inspector
STP Nuclear Operating Company PARTICIPANTS: (Continued)
UTILITY J. Sheppard, President & Chief Executive Officer E. Halpin, Executive Vice President and Chief Nuclear Officer D. Rencurrel, Senior Vice President Units 1 & 2 MEETING CONTACT: Wayne C. Walker, NRC, RIV (817) 860-8148 Wayne.Walker@nrc.gov
STP Nuclear Operating Company DISTRIBUTION: J. J. Nesrsta/R. K. Temple/
Mr. Edward D. Halpin, Executive Ed Alercon/Kevin Pollo Vice President, Chief Nuclear Officer City Public Service STP Nuclear Operating Company P.O. Box 1771 South Texas Project San Antonio, TX 78296 P.O. Box 289 Wadsworth, TX 77483 Jon C. Wood Cox, Smith, & Matthews D. W. Rencurrel, Senior Vice President 112 East Pecan, Suite 1800 STP Nuclear Operating Company San Antonio, TX 78205 South Texas Project P.O. Box 289 A. H. Gutterman, Esq.
Wadsworth, TX 77483 Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Louis Peter, Plant General Manager Washington, DC 20004 STP Nuclear Operating Company South Texas Project Richard A. Ratliff P.O. Box 289 Texas Department of State Health Services Wadsworth, TX 77483 P.O. Box 149347 Austin, TX 78714-9347 Tim Powell, Vice President, Engineering STP Nuclear Operating Company Brian Almon South Texas Project Public Utility Commission of Texas P.O. Box 289 P.O. Box 13326 Wadsworth, TX 77483 Austin, TX 78711-3326 A. W. Harrison, Manager, Licensing Environmental and Natural Resources STP Nuclear Operating Company Policy Director, Office of the Governor South Texas Project P.O. Box 12428 P.O. Box 289 Austin, TX 78711-3189 Wadsworth, TX 77483 Nate McDonald Charles T. Bowman, General Manager, County Judge for Matagorda County Oversight 1700 Seventh Street, Room 301 STP Nuclear Operating Company Bay City, TX 77414 South Texas Project P.O. Box 289 Anthony P. Jones, Chief Boiler Inspector Wadsworth, TX 77483 Texas Department of Licensing and Regulation, Boiler Division Marilyn Kistler E.O. Thompson State Office Building Senior Staff Specialist, Licensing P.O. Box 12157 STP Nuclear Operating Company Austin, TX 78711 South Texas Project P.O. Box 289 Susan M. Jablonski Wadsworth, TX 77483 Office of Permitting, Remediation and Registration Cheryl Mele Texas Commission on Environmental Quality City of Austin MC-122 Electric Utility Department P.O. Box 13087 721 Barton Springs Road Austin, TX 78711-3087 Austin, TX 78704
STP Nuclear Operating Company Ted Enos The Honorable Joe Morton 4200 South Hulen, Suite 422 Mayor, City of Palacios Fort Worth, TX 76109 P.O. Box 845 Palacios City Hall Kevin Howell/Catherine Callaway/Jim von Palacios, TX 77465 Suskil NRG Energy, Inc. Jack Colley, Chief 1301 McKinney, Suite 2300 Governors Division of Emergency Houston, TX 77010 Management P.O. Box 4087 Institute of Nuclear Power Operations (INPO) Austin, TX 78773-0220 Records Center 700 Galleria Parkway SE, Suite 100 Julie Parsley, Commissioner Atlanta, GA 30339 Public Utility Commission William B. Travis Bldg.
The Honorable Richard Knapik P.O. Box 13326 Mayor, City of Bay City Austin, TX 78711-3326 City Hall 1901 Fifth Street Chief, Technological Hazards Bay City, TX 77414 Branch FEMA Region VI Gary Mathis, Sheriff 800 North Loop 288 Matagorda County Federal Regional Center 2323 Avenue E Denton, TX 76209 Bay City, TX 77414 William Dub Taylor State Energy Conservation Office P.O. Box 13528 Austin, TX 78711-3528
STP Nuclear Operating Company Electronic Distribution:
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Bernard Stapleton, C:DRS/OB Sue Bogle (OEWEB Resource)
John Adams, OEDO RIV Coordinator OEMAIL, D/OE Amy Powell, OCA Kevin Williams, NSIR/DPR/EP Robert Kahler, NSIR/DPR/EP mortensengk@INPO.org Mohan Thadani, Project Manager, NRR Wayne Walker, Branch Chief, PB/A Clyde Osterholtz, Senior Project Engineer, PB/A John Dixon, Senior Resident Inspector Binesh Tharakan, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Dana Lackey, Region IV DRP Secretary Lynn Wright, Site Secretary Kimberly Brewton, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Deborah Harrison, Region IV DRS Secretary Earnestine Clay, DRMA, TL Denise Freeman, Region IV DNMS Secretary Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\STP EOC MN 06-03-09.doc ADAMS ML091380171 SUNSI Rev Compl. 7Yes No ADAMS 7Yes No Reviewer Initials CCO Publicly Avail 7Yes No Sensitive Yes 7No Sens. Type Initials CCO RIV/SPE:DRP/A PAO RSLO C:DRP/A CCOsterholtz VLDricks WAMaier WCWalker
/RA/ /RA/ /RA/ /RA/
05/13/2009 05/13/2009 05/13/2009 05/18/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax