Letter Sequence Draft RAI |
---|
TAC:MF5364, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Open) |
|
MONTHYEARML15022A4732015-01-22022 January 2015 TAC No. MF5364 - Acceptance of Requested Licensing Action License Amendment Request- Adoption of TSTF-425, Rev 3 Project stage: Acceptance Review ML15168A0022015-06-16016 June 2015 NRR E-mail Capture - Draft Request for Additional Information Regarding TSTF-425, rev3 Project stage: Draft RAI 2015-01-22
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24312A1662024-11-0707 November 2024 Request for Additional Information (11/7/2024 E-mail) - LAR to Revise TSs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3 ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24240A1902024-08-12012 August 2024 E-mail (8/12/2024) from R. Reynolds (CEG) to R. Guzman (NRC) - Corrected TS Pages for LAR TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24213A2202024-07-31031 July 2024 Updated Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24197A0092024-07-15015 July 2024 Acceptance Review Determination for LAR to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Mozafari, Brenda Sent: Tuesday, June 16, 2015 3:11 PM To: Ronnie.Reynolds@exeloncorp.com; Villar, Enrique:(GenCo-Nuc)
(Enrique.Villar@exeloncorp.com)
Cc: David.Gudger@exeloncorp.com
Subject:
Draft Request for additional information regarding TSTF-425, rev3 On November 19, 2014, Nine Mile point The proposed amendment would modify the Nine Mile Point (NMP)
Nuclear Station, Unit 2 Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program with the adoption of Technical Specification Task Force (TSTF) -425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b." The licensees application dated November 19, 2014, Attachment 1, Section 2.2, has identified some variations or deviations from the TSTF-425.
Based on our review of the request, we have identified areas where additional information is needed to complete our review. The Draft request for additional information (RAI) is provided in this email, would add a new program, the Surveillance Frequency Control Program, to TS Section 5, Administrative Controls.
REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT REVIEW OF NINE MILE POINT NUCLEAR STATION UNIT 2 ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE-425 RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM (TAC NOS. MF5364)
PRA RAI 1. In Attachment 2, Section 2.5 References, of the License Amendment Request (LAR), the licensee provides references that suggest the July 2009 peer review was performed using ASME RA-Sc-2007, Addenda to ASME RA-S-2002 Standard for Probabilistic Risk Assessment [PRA] for Nuclear Power Plant Applications. The staff would like to clarify that Regulatory Guide 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities (ML090410014), provides clarification to ASME/ANS RA-Sa-2009 on providing a technically adequate PRA.
Furthermore, consistent with the information provided in Regulatory Issue Summary (RIS) 2007-06 (ADAMS Accession No. ML070650428), Regulatory Guide 1.200 Implementation, the NRC staff will use Revision 2 of RG 1.200 (ADAMS Accession No. ML090410014) to assess technical adequacy of the PRA used to support risk-informed applications received after March 2010. If the licensee did not use ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, then they would need to perform a gap analysis for the differences in revisions and provide the applicable Facts and Observations (F&Os) of that gap analysis.
- a. Explain whether the peer review was performed to ASME/ANS RA-Sa-2009 as clarified by RG 1.200 Revision 2.
PRA RAI 2. The licensee stated that its PRA model update to meet Regulatory Guide (RG) 1.200 was completed and peer reviewed in July 2009. The licensee further stated that the peer review resulted in 18 findings which did not meeting Capability Category (CC) II and 34 suggestions that met CCII. The licensee also provided Table 2-1 which lists six open findings that have yet to be resolved per the licensees update process. As discussed in RG 1.200, Revision 2, Regulatory Position 4.2, the licensee should provide discussion regarding the resolution of the peer review findings and observations that are applicable to the parts of the PRA required for the application.
1
- a. If the July 2009 peer review was performed using ASME/ANS RA-Sa-2009, then provide all the applicable findings and suggestions resulting from the 2009 peer review, their disposition, and the potential impact on the Risk-Informed Surveillance Test Interval (RI STI) application. If the peer review was not performed using ASME/ANS RA-Sa-2009, then provide the applicable findings and suggestions resulting from the gap analysis as mentioned in PRA RAI 1, their disposition, and the potential impact on the RI STI application.
2
PRA RAI 3. The LAR does not provide a discussion or description of any low-power or shutdown events. A qualitative analysis of shutdown events is acceptable, as presented in the NRC-endorsed document NEI 04-10, Revision 1. Step 10 of Section 4.0 of NEI 04-10, Revision 1, provides guidance on the initial assessment of Internal Events, External Events, and Shutdown Events.
Describe how shutdown events will be assessed as part of the Nine Mile Point, Unit 2, Surveillance Frequency Control Program.
Once you have had time to review the question let me know if further clarification is need and I can arrange a clarification call. The expected response is 30 days from the date of this email. The response should repeat the questions for completeness.
Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission Nine Mile Point and Ginna Power Plants 301-415-2020 email: brenda.mozafari@nrc.gov 3
Hearing Identifier: NRR_PMDA Email Number: 2152 Mail Envelope Properties (Brenda.Mozafari@nrc.gov20150616151000)
Subject:
Draft Request for additional information regarding TSTF-425, rev3 Sent Date: 6/16/2015 3:10:47 PM Received Date: 6/16/2015 3:10:00 PM From: Mozafari, Brenda Created By: Brenda.Mozafari@nrc.gov Recipients:
"David.Gudger@exeloncorp.com" <David.Gudger@exeloncorp.com>
Tracking Status: None "Ronnie.Reynolds@exeloncorp.com" <Ronnie.Reynolds@exeloncorp.com>
Tracking Status: None "Villar, Enrique:(GenCo-Nuc) (Enrique.Villar@exeloncorp.com)" <Enrique.Villar@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4966 6/16/2015 3:10:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: