ML042990558

From kanterella
Revision as of 00:51, 24 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RB-09-2004 - Draft - Outline Comments
ML042990558
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/23/2004
From: Gody A
Operations Branch IV
To: Hinnenkamp P
Entergy Operations
References
50-458/04-301, RB-09-2004 50-458/04-301
Download: ML042990558 (2)


Text

DRAFT OUTLINE COMMENTS Administrative JPMs

  • Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area.

Walk-throughs

  • What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously.
  • Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam.

Scenarios

  • Identify the actual attributes given on ES-301-4
  • Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
  • Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
  • I would like each specific applicant to have their own ES-301-5.

Written

  • Please include the KA description on the reference written exam.
  • For K/As that require the use of procedures, be sure that the question references a procedure.
  • Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed.
  • Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA.

General

  • Would like a separate listing of the PRA and IPE insights (ES 201-2 item 4a).
  • Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No
  • Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2.
  • Is any SROU going to take only the 25 question test? ANS: No