|
---|
Category:License-Operator
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15220A1382015-06-19019 June 2015 2015-05-POST-EXAM Comments Analysis ML15220A1392015-06-19019 June 2015 June 2015 Initial License Retake Exam, Reactor Operator, with Answer Key ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator 2024-04-02
[Table view] |
Text
DRAFT OUTLINE COMMENTS Administrative JPMs
- Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area.
Walk-throughs
- What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously.
- Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam.
Scenarios
- Identify the actual attributes given on ES-301-4
- Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
- Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
- I would like each specific applicant to have their own ES-301-5.
Written
- Please include the KA description on the reference written exam.
- For K/As that require the use of procedures, be sure that the question references a procedure.
- Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed.
- Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA.
General
- Would like a separate listing of the PRA and IPE insights (ES 201-2 item 4a).
- Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No
- Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2.
- Is any SROU going to take only the 25 question test? ANS: No