MONTHYEARML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review 2023-05-25
[Table view] |
Text
James Noggle - FW: H-3 sources iPECRL Comments 1.xls _Page1JJ From: "Croulet, Donald" <dcroule@entergy.com>
To: "'James Noggle"' <JDN~nrc.gov>
Date: 12/20/05 3:30PM
Subject:
FW: H-3 sources IPEC_RL_Comments_1.xls Jim, At todays Spent Fuel Pool status meeting I inquired about our plans to verify that the Unit 1 south curtain drain was unblocked and functioning and also the Unit 2 containment footer drain system and segregation of its outfall for sampling at manhole 5. I was told that a feasibility study is in progress to determine robotics entry points.
From: Croulet, Donald Sent: Tuesday, December 20, 2005 9:46 AM To: 'James Noggle'
Subject:
FW: H-3 sources IPECRLComments_1.xls Jim, This is the last list I have. I will confirm with Bill Axelson. We will send you an updated version as changes occur to this list.
From: Lavera, Ron Sent: Tl ursday, December 08, 2005 5:47 PM To: Solanto, Robert; Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Flon Lavera; Ronald Sachatello; T. R. Jones
Subject:
H-3 sources IPEC_RLComments_1.xIs To all This is the known past leakage list that Dennis Quinn and I have compiled, so far. Please let me know about any addtions/deletions/changes.
Thanks Ron
<<H-3 sources IPEC RL-Comments-1.xls>>
Js Nogge - FW: H-3 sourcesIPEC RL Comments 1.xls Pag1 From: "Croulet, Donald" <dcroule©entergy.com>
To: "'James Noggle"' <JDN~nrc.gov>
Date: 12/20/05 9:46AM
Subject:
FW: H-3 sources IPECRLComments_1.xls Jim, This is the last list I have. I will confirm with Bill Axelson. We will send you an updated version as changes occur to this list.
From: Lavera, Ron Sent: Thursday, December 08, 2005 5:47 PM To: Solanto, Robert; Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMulli,; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones
Subject:
H-3 sources IPEC_RLComments_1 .xls To all This is tne known past leakage list that Dennis Quinn and I have compiled, so far. Please let me knovi about any addtions/deletions/changes.
Thanks Ron
<<H-3 sources IPEC_RL_Comments_1.xls>>
Potential Volume H-3 H-3 total for.
U2 FSP 3.OOE+05 2.80E-02 3.18E+01 high 1990-1992, 2005 2000 leak from wall from skimmer U3 FSP 3.OOE+05 3.40E-02 3.86E+01 High pump leak onto concrete Noticed in 1990-1994 time frame. Initial leakage not contained/collected. On going leakage. Containment process U1 West Pool 1.OOE+05 4.OOE-04 1.51 E-01 High implemented.
leakage not contained/collected. On U1 Other Pools 0.00E+00 High going leakage. Containment process Anecdotal information that it over flowed to the ground on several U2 RWST 3.50E+05 1.68E-01 2.23E+02 occasions in the past No known significant leakage to the U3 RWST 3.50E+05 4.64E-02 6.15E+01 ground.
Anecdotal information that the area was U2 CVCS Tanks 0.OOE+00 flooded in the past Anecdotal information that the area was U2 Waste Tanks 0.00E+00 flooded in the past Anecdotal information that the area was flooded by Waste Collection Tank U2 MOB 0.OOE+00 Med water, in the past Overflows of 31 Waste Tank into tank A pit
. containing 31 WHUT, and 31-33
.Ve- -. m T-nnL -LC pitccotIng IMe d 31r- WHUT+
III IL4LHTS I-n', andl l 70' UL4c1a31,-3 y V's
. I.
._ 31 WHUT tank area flooded. 32 & 33 U3 Waste Tanks _.O0E+00 Tank areas never flooded.
Potential for Tritium contamination of U2 SFP 1990 - 1992 Leak [a] 1.83E+04 2.OOE-02 1.39E+0O High soil.
U2 RWST Overflow (year?) 0.OOE+00 _ (
U2 PAB Sump = 1.OOE-01 0.OOE+00 Med Sump is not lined with stainless steel.
Floor was flooded to significant depth in U2 15 Ft. PAB 0.OOE+00 Med late 1970's early 1980's U3 PAB Sump = = 0.OOE+00 U3 to U2 underground waste line - Leaked in 1980s; it was abandoned in abandoned 0.OOE+00 place Known Contamination near the GT U3 to U2 Blowdown Transfer Line High between units.
U2 Resin Spill in alleyway next to Resin spill with relative small volume of FSB 0.OOE+00 low water.
%J.J- I IJWJI I WV ILI I LIAVI I IAUJ PD;7u-trench from PAB spilling into area Known leakage in the 1977-1985 time below cable tunnel 0.OOE+00 High frame.
Known leakage in the 1977-1985 time U3- area between VC, FSB, PAB, frame. Extends to building curtain aka Pigeon Pit, unknown leakage _ 0.OOE+00 drains and storm sewer system.
a- assume 25 gallons/day x 2 years
= 18,300 gallons _0.E+00L
south of U3 Command Post, had Cs 137, Co-60, others. Removed in -
1980 and stored on hill past met 1
tower O.OOE+Oo High U2 Blowdown (Past) atmospheric Known operation for years, with primary release O.OOE+O0 to secondary leaks.
U2 Blowdown (current) atmospheric Known operation for years, with primary release 5.OOE-07 O.OOE+00 to secondary leaks.
Contamination of secondary plant -
U2 SG Tube Leak Feb 2000 O.OOE+00 drains U3 SG Tube Leak Oct 1989 =.OOE+00 Contamination of secondary plant U3 Operation of Main Steam supply Auxilary steam system drains go to to Auxilary Steam system. 5.OOE-07 O.OOE+Oo High plant drains and storm drain system.
Anecdotal information that the area U2 PAB 15' Overflow/Pump to flooded or was pumpted into the transformer yard 1.OOE-01 O.OOE+Oo High transformer yard, in the past On going - Also during years operating IP-2 Transformer Yard - Turbine hall with known primary to secondary condensate drainage High leakage.
U3 RWST base of Hill contaminated Water stream High Source may have been IP-1 leakage IP-3 41' PAB Auxilary Condensate sump pump discharge was aligned to lP-3 41' PAB Sump Pump storm drain system in late 1970's to Dishcharge to storm drain Low early 1980's. Since locked closed.
9 9 9 9
.1 L £ I
. ,
1 7- I -IT-- - I-I II.
I .. I
_________ I I
__
I 1i
__
i
__
i i
__
i
_________
4 .9 I I 4 8 A .1. A
Unit- Site 2
3 tI 1
1 I-r 2
3 2
2 2
1 1
r 2
2 2
2 3 .1 3 - i 3 . 4.i 2
3 3
3 2
2 2
3 3
3 2
3 3.
I I