ML061100162

From kanterella
Revision as of 20:37, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Corrected Technical Specification Page 3.9-1 Re Refueling Operations
ML061100162
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/18/2006
From:
Plant Licensing Branch III-2
To:
Benney B, NRR/DLPM, 415-3764
Shared Package
ML061100048 List:
References
TAC MC6760
Download: ML061100162 (1)


Text

Refueling Equipment Interlocks 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks LCO 3.9.1 The refueling equipment interlocks associated with the reactor mode switch refuel position shall be OPERABLE.

APPLICABILITY: During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position.

ACTIONS CONDITION REQUIRED ACTION TIME A. One or more required A.1 Suspend in-vessel fuel Immediately refueling equipment movement with equipment interlocks inoperable. associated with the inoperable interlocks(s).

OR A.2.1 Insert a control rod Immediately withdrawal block AND A.2.2 Verify all control rods Immediately are fully inserted Cooper 3.9-1 Amendment No. 218