ML062430457

From kanterella
Revision as of 14:32, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection/Activity Plan for 09/01/2006 - 03/31/2008
ML062430457
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/31/2006
From: Casto C
Division Reactor Projects II
To: Scarola J
Carolina Power & Light Co
Shared Package
ML062430446 List:
References
Download: ML062430457 (2)


Text

Page 1 of 2 Brunswick 08/30/2006 16:18:03 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues PSB1-RP - RP PUBLIC BASELINE INSPECTION 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 11/06/2006 11/10/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/06/2006 11/10/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/06/2006 11/10/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/13/2006 11/17/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 12/04/2006 12/08/2006 Baseline Inspections PI&R - PROBLEM IDENTIFICATION & RESOLUTION - BI 4 1, 2 IP 71152B Identification and Resolution of Problems 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/19/2007 02/23/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/07/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP- WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/12/2007 03/16/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/12/2007 03/16/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/12/2007 03/16/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/12/2007 03/16/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/19/2007 03/23/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL OCCUPATIONAL INSP- WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/26/2007 03/30/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/26/2007 03/30/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/26/2007 03/30/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/26/2007 03/30/2007 Baseline Inspections EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 06/24/2007 06/28/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Brunswick 08/30/2006 16:18:03 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 06/25/2007 06/29/2007 Not Applicable OL EXAM - INITIAL EXAM 4 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 07/16/2007 07/27/2007 Not Applicable EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1, 2 IP 7111121 Component Design Bases Inspection 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 12/10/2007 12/14/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 12/03/2007 12/07/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 12/03/2007 12/07/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/03/2007 12/07/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 12/03/2007 12/07/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/14/2008 01/16/2008 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 01/28/2008 02/01/2008 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/11/2008 02/15/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/11/2008 02/15/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/11/2008 02/15/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 02/11/2008 02/15/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/11/2008 02/15/2008 Baseline Inspections EB3-ISI - UNIT 1 - ISI 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.